Plan Review Details - Permit 16030404
Plan Review Stops For Permit 16030404
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-03-23 Cont ID  
Sent By jgomez Date 2016-03-23 Time 16:58 Rev Time 0.00
Received By skennedy Date 2016-03-23 Time 16:58 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2016-03-23 Cont ID  
Sent By skennedy Date 2016-03-23 Time 16:58 Rev Time 0.00
Received By skennedy Date 2016-03-23 Time 16:58 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-03-15 Cont ID  
Sent By mvaldes Date 2016-03-15 Time 07:08 Rev Time 0.00
Received By vperez Date 2016-03-14 Time 14:12 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2016-03-23 Cont ID  
Sent By skennedy Date 2016-03-23 Time 16:50 Rev Time 0.00
Received By skennedy Date 2016-03-23 Time 16:49 Sent To  
Notes
2016-03-23 16:49:51GAS PLAN REVIEW
 A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE
 REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK.
 PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT
 SPECIFICATIONS AND GAS RISER THAT REFLECT THE ENTIRE
 SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC.
 107.2.1.
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-03-29 Cont ID  
Sent By skennedy Date 2016-03-29 Time 08:03 Rev Time 0.00
Received By skennedy Date 2016-03-09 Time 16:42 Sent To  
Notes
2016-03-22 15:59:10REVIEW IS SUSPENDED AT THE REQUESTOF THE APPLICANT,
 VIVIAN, AS AN ALTERNATE DESIGNE WILL BE SUBMITTED.
2016-03-15 07:15:453/15 TO R24
2016-03-09 16:42:28R24

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2016-03-23 Cont ID  
Sent By skennedy Date 2016-03-23 Time 16:50 Rev Time 0.00
Received By skennedy Date 2016-03-23 Time 16:50 Sent To  
Notes
2016-03-23 16:51:13RELOCATING A/C COMPRESSOR.

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status N Date 2016-03-23 Cont ID  
Sent By skennedy Date 2016-03-23 Time 16:43 Rev Time 0.00
Received By skennedy Date 2016-03-23 Time 16:43 Sent To  
Notes
2016-03-23 16:44:18REVISION ADDED VALUE DOES NOT CAUSE THIS TO BE A
 SUBSTANTIAL IMPROVEMENT.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop P PLUMBING
Rev No 1 Status P Date 2016-03-23 Cont ID  
Sent By tklarge Date 2016-03-23 Time 16:50 Rev Time 0.00
Received By skennedy Date 2016-03-23 Time 16:50 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 2 Status P Date 2016-03-28 Cont ID  
Sent By eschneid Date 2016-03-28 Time 19:45 Rev Time 0.50
Received By eschneid Date 2016-03-28 Time 19:45 Sent To PC
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2016-03-18 Cont ID  
Sent By eschneid Date 2016-03-18 Time 17:07 Rev Time 0.25
Received By eschneid Date 2016-03-18 Time 11:32 Sent To  
Notes
2016-03-18 17:07:50FAILED
  
 1) PROVIDE 2 COPIES OF A SURVEY, LESS THAN ONE YEAR
 OLD.
  
 2) PROVIDE A SITE PLAN THAT SHOWS THE SETBACKS FROM THE
 PROPOSED OUTDOOR KITCHEN AND RELOCATED AC TO THE
 PROPERTY LINE.
  
 3) ADDITIONAL COMMENTS MAY BE ISSUED AFTER PROVIDING
 THE SETBACK INFORMATION.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved