Plan Review Details - Permit 16030080
Plan Review Stops For Permit 16030080
Review Stop G GAS REVIEW
Rev No 3 Status P Date 2016-05-16 Cont ID  
Sent By tklarge Date 2016-05-16 Time 12:44 Rev Time 0.00
Received By tklarge Date 2016-05-16 Time 12:44 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2016-05-09 Cont ID  
Sent By tklarge Date 2016-05-09 Time 12:11 Rev Time 0.00
Received By tklarge Date 2016-05-09 Time 10:30 Sent To  
Notes
2016-05-09 11:07:391) THE SUBMITTED PLANS STILL INCLUDE COPIES OF GAS
 SIZING TABLES FOR SCH. 40 METALLIC PIPE AND ALSO FOR
 CSST. THERE IS NO METALLIC PIPE OR CSST SHOWN ON THE
 PLANS. SUBMIT TWO COPIES OF A COMPLETE GAS LAYOUT
 SHOWING THE TYPES OF PIPE BEING INSTALLED AND WHERE. IF
 THE CSST IS NOT BEING INSTALLED, REMOVE THE SIZING
 TABLE FROM THE PACKAGE. FBC 107.2.1.
 2) THE SUBMITTED PLANS HAVE SIZING TABLES FOR PE PIPE
 AND ALSO FOR PE TUBING. WHICH IS IT? SUBMIT COPIES OF
 THE CORRECT SIZING TABLES FOR THE CORRECT TYPE OF PIPE
 MATERIAL BEING INSTALLED.
 3) FOUR DIFFERENT GAS SIZING TABLES FOR PE PIPE HAVE
 BEEN SUBMITTED FOR REVIEW AND THEY ARE ALL FOR AN INLET
 PRESSURE OF LESS THAN 2 PSI BUT THE PLANS SHOW AN INLET
 PRESSURE OF 2 PSI. CLARIFY.
 4) SHOW THE TOTAL DEVELOPED LENGTH FROM EACH STEP DOWN
 REGULATOR TO THE APPLIANCE SERVED AND SHOW THE TYPE OF
 PIPE ON THE PLANS FROM THE STEP DOWN REGULATOR TO THE
 APPLIANCE. SUBMIT THE CORRECT SIZING TABLE FROM THE
 2014 FUEL GAS CODE. FBC 107.2.1.
 5) SOME OF THE SIZING TABLES SUBMITTED ARE STILL FROM
 AN OUTDATED EDITION OF THE FUEL GAS CODE.THE CODE IN
 EFFECT IS THE 2014 FLORIDA BUILDING CODE, FUEL GAS
 WHICH IS BASED ON THE 2012 ICC CODE, NOT THE
 2009.SUBMIT COPIES OF THE CORRECT SIZING TABLES FROM
 THE CODE THAT IS CURRENTLY IN EFFECT.
 6) REMOVE ALL DOCUMENTS THAT ARE NOT APPLICABLE TO THIS
 INSTALLATION. THIS SUBMITTAL IS TOO CONFUSING TO
 PERFORM A COMPREHENSIVE REVIEW.
 7) THE WORK ORDER/INVOICE SHOWS 63 FEET OF PE PIPE TO
 BE INSTALLED AND ALSO 50 FEET. WHICH IS IT? CLARIFY.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2016-03-23 Cont ID  
Sent By tklarge Date 2016-03-23 Time 03:29 Rev Time 0.00
Received By tklarge Date 2016-03-23 Time 03:03 Sent To  
Notes
2016-03-23 03:29:201) THE SUBMITTED PLANS INCLUDE COPIES OF GAS SIZING
 TABLES FOR SCH. 40 METALLIC PIPE AND ALSO FOR CSST.
 THERE IS NO METALLIC PIPE OR CSST SHOWN ON THE PLANS.
 SUBMIT TWO COPIES OF A COMPLETE GAS LAYOUT SHOWING THE
 TYPES OF PIPE BEING INSTALLED AND WHERE. IF THE CSST IS
 NOT BEING INSTALLED, REMOVE THE SIZING TABLE FROM THE
 PACKAGE. FBC 107.2.1.
 2) SHOW THE LOCATION OF THE STEP DOWN REGULATORS & SHUT
 OFF VALVES ON THE RISER. FBC 107.2.1.
 3) SHOW THE TOTAL DEVELOPED LENGTH FROM THE STEP DOWN
 REGULATORS TO THE APPLIANCE.
 4) THE SIZING TABLES SUBMITTED ARE FROM AN OUTDATED
 EDITION OF THE FUEL GAS CODE.THE CODE IN EFFECT IS THE
 2014 FLORIDA BUILDING CODE, FUEL GAS WHICH IS BASED ON
 THE 2012 ICC CODE, NOT THE 2009.SUBMIT 2 CCOPIES OF THE
 SIZING TABLES FROM THE CODE THAT IS CURRENTLY IN
 EFFECT.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2016-05-16 Cont ID  
Sent By cpuell Date 2016-05-16 Time 15:15 Rev Time 0.00
Received By cpuell Date 2016-05-13 Time 15:29 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-05-09 Cont ID  
Sent By tklarge Date 2016-05-09 Time 13:27 Rev Time 0.00
Received By lmarchan Date 2016-04-06 Time 12:36 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-03-23 Cont ID  
Sent By lmarchan Date 2016-03-23 Time 08:54 Rev Time 0.00
Received By lmarchan Date 2016-03-04 Time 11:05 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved