| Plan Review Stops For Permit 16030071 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2016-03-07 |
|
|
Cont ID |
|
| Sent By |
mvaldes |
Date |
2016-03-07 |
Time |
18:14 |
Rev Time |
0.00 |
| Received By |
mvaldes |
Date |
2016-03-07 |
Time |
18:14 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2016-03-03 |
|
|
Cont ID |
|
| Sent By |
mvaldes |
Date |
2016-03-07 |
Time |
18:14 |
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2016-03-03 |
Time |
16:43 |
Sent To |
E |
|
| Notes |
| 2016-03-03 16:52:25 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | 1. ALL DOOR SYSTEMS SHALL BE VERIFIED AND INSPECTED FOR | | | CODE COMPLIANCE BY A FIRE INSPECTOR ON INSPECTION. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-03-07 |
|
|
Cont ID |
|
| Sent By |
mvaldes |
Date |
2016-03-07 |
Time |
18:14 |
Rev Time |
0.00 |
| Received By |
mvaldes |
Date |
2016-03-02 |
Time |
12:33 |
Sent To |
FIRE |
|
| Notes |
|
|
|