Plan Review Details - Permit 16020518
Plan Review Stops For Permit 16020518
Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2016-02-17 Cont ID  
Sent By pleduc Date 2016-02-17 Time   Rev Time 0.00
Received By pleduc Date 2016-02-17 Time 11:28 Sent To M
Notes
2016-02-17 11:37:33THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED
 AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE
 PROVISO COMMENTS WILL RESULT IN A FAILED FIRE
 INSPECTION.
  
  
 24.2 ACCEPTANCE REQUIREMENTS.
  
 24.2.1* HYDROSTATIC TESTS.
  
 24.2.1.1 UNLESS PERMITTED BY 24.2.1.2 THROUGH 24.2.1.8,
 ALL PIPING AND ATTACHED APPURTENANCES SUBJECTED TO
 SYSTEM WORKING PRESSURE SHALL BE HYDROSTATICALLY TESTED
 AT 200 PSI (13.8 BAR) AND SHALL MAINTAIN THAT PRESSURE
 WITHOUT LOSS FOR 2 HOURS.
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-02-24 Cont ID  
Sent By hmoser Date 2016-02-24 Time 13:13 Rev Time 0.00
Received By hmoser Date 2016-02-16 Time 11:03 Sent To  
Notes
2016-02-16 11:03:17ROUTED TO FIRE

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2016-02-24 Cont ID  
Sent By hmoser Date 2016-02-24 Time 13:13 Rev Time 0.00
Received By hmoser Date 2016-02-24 Time 12:58 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved