| Plan Review Stops For Permit 16020449 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2016-03-10 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2016-03-10 |
Time |
14:17 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2016-03-10 |
Time |
13:47 |
Sent To |
|
|
| Notes |
| 2016-03-09 18:22:42 | 3/9/2016 MECH FAIL - SMALL DENIED C. JV. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2016-03-04 |
|
|
Cont ID |
|
| Sent By |
rlecky |
Date |
2016-03-04 |
Time |
12:47 |
Rev Time |
0.00 |
| Received By |
rlecky |
Date |
2016-03-02 |
Time |
14:50 |
Sent To |
|
|
| Notes |
| 2016-03-04 13:08:38 | 16020449 | | | 7230 WINDING BAY LN. | | | INTERIOR REMODEL | | | | | | | | | PLANS ISSUED WITH THE FOLLOWING PROVISO. | | | | | | REMODELING OF AN EXISTING STRUCTURE IS REQUIRED TO | | | INCLUDE INTERCONNECTED SMOKE ALARMS BOTH WITHIN AND | | | OUTSIDE EACH SLEEPING AREA. IF THE BUILDING HAS GAS | | | APPLIANCES, AN ATTACHED GARAGE OR A FIREPLACE, A CARBON | | | MONOXIDE DETECTOR IS REQUIRED WITHIN TEN FEET OF EACH | | | ROOM USED FOR SLEEPING. 2014 FBC R314, 315 | | | | | | PROVIDE GFCI PROTECTED RECEPTACLES IN REMODELED BATH | | | ROOMS. NEC 210.8; FBC R 3902 | | | | | | VERIFY THE NEW HIGH HAT CEILING LIGHTING FIXTURES THAT | | | ARE IN CONTACT WITH INSULATION ARE IC RATED. NEC | | | 410.116; FBC R 4004 | | | | | | CEILING ELECTRICAL BOXES IF INTENDED FOR SUPPORT OF | | | PADDLE FANS MUST BE LISTED FOR THAT USE. NEC 422.18; | | | FBC R 3905.9 | | | | | | | | | ROBERT LECKY | | | ELECTRICAL PLANS EXAMINER | | | 561-373-3701 | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2016-02-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-02-20 |
Time |
08:58 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-02-20 |
Time |
08:58 |
Sent To |
|
|
| Notes |
| 2016-02-20 08:58:39 | GAS PLAN REVIEW | | | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | | THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE | | | REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK. | | | PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT | | | SPECIFICATIONS AND GAS RISER THAT REFLECT THE ENTIRE | | | SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-03-15 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2016-03-15 |
Time |
17:24 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2016-03-15 |
Time |
13:19 |
Sent To |
|
|
| Notes |
| 2016-03-15 13:19:19 | RESUB ROUTED TO JVALIDO |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-03-10 |
|
|
Cont ID |
|
| Sent By |
jvalido |
Date |
2016-03-10 |
Time |
14:17 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2016-02-12 |
Time |
13:21 |
Sent To |
|
|
| Notes |
| 2016-03-09 19:12:42 | 3/9/2016 MECH FAILED - SMALL DENIED C. JV. | | 2016-02-12 13:21:53 | R01 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
N |
Date |
2016-03-15 |
|
|
Cont ID |
|
| Sent By |
jvalido |
Date |
2016-03-15 |
Time |
15:16 |
Rev Time |
0.00 |
| Received By |
jvalido |
Date |
2016-03-15 |
Time |
15:16 |
Sent To |
|
|
| Notes |
| 2016-03-15 15:16:25 | MECHANICAL CONTRACTOR TO PROVIDE SEPERATE PLANS AND | | | PULL A SEPERATE PERMIT FOR AHU RELOCATION. ALL OTHER | | | HVAC EQUIPMENT TO REMAIN IN EXISTING LOCATIONS. AS PER | | | SUBMITTED PLANS. |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2016-03-09 |
|
|
Cont ID |
|
| Sent By |
jvalido |
Date |
2016-03-09 |
Time |
19:10 |
Rev Time |
0.00 |
| Received By |
jvalido |
Date |
2016-03-09 |
Time |
19:10 |
Sent To |
|
|
| Notes |
| 2016-03-09 18:06:30 | 107.2.1 PROVIDE ON PLANS LOCATION OF MAKE UP AIR FOR | | | NEW GAS BURNING FIREPLACE. CONFIRM IF THERE IS AN | | | EXISTING DUCT. IF IT IS SUFFICIENT FOR NEW GAS BURNING | | | FIRE PLACE. PROVIDE MANUFACTURER SPECIFICATION. |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2016-02-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-02-20 |
Time |
08:57 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-02-20 |
Time |
08:31 |
Sent To |
|
|
| Notes |
| 2016-02-20 08:57:33 | PROVISO | | | SUBMIT SANITARY RISER FOR ALL CHANGES MADE TO THE | | | PLUMBING SYSTEM PRIOR TO THE FIRST PLUMBING | | | INSPECCTION.FBC 107.3.5.3. | | | | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|