Plan Review Details - Permit 16020235
Plan Review Stops For Permit 16020235
Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status P Date 2016-05-13 Cont ID  
Sent By skennedy Date 2016-05-13 Time 12:01 Rev Time 0.00
Received By skennedy Date 2016-05-13 Time 12:00 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2016-04-27 Cont ID  
Sent By skennedy Date 2016-04-27 Time 12:03 Rev Time 0.00
Received By skennedy Date 2016-04-27 Time 12:03 Sent To  
Notes
2016-04-27 12:07:042ND REVIEW: FBC 2014 5TH ED. RESIDENTIAL
  
 THE WALL IS DEPICTED AS PROPOSED TO BE PLACED WITHIN A
 5'-0" UTILIY EASEMENT ON THE WEST PROPERTY LINE. EITHER
 PROVIDE EASEMENT RELEASES FOR REVIEW BY ZONING AND
 ENGINEERING, TO ALLOW FOR THIS OR REVISE THE PLAN TO
 SHOW A MINIMUM DISTANCE OF 5'-0" FROM THE WEST PROPERTY
 LINE.
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2016-02-24 Cont ID  
Sent By skennedy Date 2016-02-24 Time 10:50 Rev Time 0.00
Received By skennedy Date 2016-02-24 Time 10:50 Sent To  
Notes
2016-02-24 11:22:51CONTINUED 1ST REVIEW: FBC 2014 5TH ED.
  
 VALUE UPDATED PER MARSHALL & SWIFTS
  
 FBC 109.3 BUILDING PERMIT VALUATION. FOR PERMITTING
 PURPOSES, VALUATION OF BUILDINGS AND SYSTEMS SHALL BE
 TOTAL REPLACEMENT VALUE TO INCLUDE STRUCTURAL, RELATIVE
 SITE WORK, EXCLUDING ONLY LAND VALUE. VALUATION
 REFERENCES MAY INCLUDE THE LATEST PUBLISHED DATA OF
 NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL.
  
 PROVIDE A WIND DESIGN STATEMENT AS TOT THE APPLICABLE
 WIND CRITERIA USED FOR THE DESIGN. FBC 107, MINIMUM
 PLAN REVIEW CRITERIA.
  
 IN THE EVENT THE WALL IS REMOVED FROM THE EASMENT IT IS
 CURRENTLY PROPOSED TO BE PLACED WITHIN, REVISE THE SITE
 PLAN ACCORDINGLY.
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2016-02-24 Cont ID  
Sent By cthroop Date 2016-02-12 Time 10:54 Rev Time 0.00
Received By skennedy Date 2016-02-12 Time 10:54 Sent To ENG
Notes
2016-02-24 11:24:23PLEASE SEE UPDATED COMMENTS BY STEVEN KENNEDY DATED
 2/24/16.
2016-02-12 11:01:22CHRISTOPHER S. THROOP, C.B.O.
 BLDG. PLANS EXAMINER ? PX3169
 (561) 805-6718
 [email protected]
  
 PROPERTY IS LOCATED IN FLOOD ZONE AE
 PIERS AND WALLS TO BE CONSTRUCTED PER FBCR322 - FLOOD
 RESISTANT CONSTRUCTION
 PROVIDE WIND LOAD CALCULATIONS
 PROVIDE FLOOD LOAD CALCULATIONS
 PROVIDE SITE DRAINAGE PLAN
 PROVIDE STRUCTURAL DETAIL FOR PIER CAPS
 PROVIDE DEMENSIONS FOR PIER FOOTINGS
 PROVIDE ELEVATION OF EXISTING GRADE
 DRAWINGS TO BE SIGNED BY PERSON RESPONSIBLE FOR DESIGN
  
 FBC 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS.
 CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN
 UPON SUITABLE MATERIAL. CONSTRUCTION DOCUMENTS SHALL BE
 OF SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE
 AND EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT
 IT WILL CONFORM TO THE PROVISIONS OF THIS CODE AND
 RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS
 DETERMINED BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND
 SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM
 OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS,
 WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE
 TECHNICAL CODES. SUCH INFORMATION SHALL BE SPECIFIC,
 AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE
 OR IN PART, NOR SHALL THE TERM "LEGAL" OR ITS
 EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC
 INFORMATION. ALL INFORMATION, DRAWINGS, SPECIFICATIONS
 AND ACCOMPANYING DATA SHALL BEAR THE NAME AND SIGNATURE
 OF THE PERSON RESPONSIBLE FOR THE DESIGN. (SEE ALSO
 SECTION 107.3.5).
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2016-04-26 Cont ID  
Sent By MGONZALE Date 2016-04-26 Time   Rev Time 0.50
Received By mgonzale Date 2016-04-26 Time   Sent To ENG
Notes
2016-04-26 17:28:31PASSED - PROVISO NO ENCROACHMENTS UNTO CITY
 RIGHT-OF-WAY.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2016-02-20 Cont ID  
Sent By skennedy Date 2016-02-24 Time 11:23 Rev Time 0.00
Received By mgonzale Date 2016-02-20 Time   Sent To B
Notes
2016-02-20 20:32:55#1 STRUCTURES EXTRUDE INTO THE ROW. (NOT ACCEPTABLE)
  
 #2 RELEASES FROM UTILITIES FOR EASEMENT ARE NOT IN
 PACKET.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-04-27 Cont ID  
Sent By skennedy Date 2016-04-27 Time 12:03 Rev Time 0.00
Received By skennedy Date 2016-03-17 Time 13:18 Sent To  
Notes
2016-03-18 13:18:51RESUB ROUTED TO ENGINEERING INBOX

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-02-24 Cont ID  
Sent By skennedy Date 2016-02-24 Time 11:23 Rev Time 0.00
Received By skennedy Date 2016-02-05 Time 09:50 Sent To  
Notes
2016-02-08 09:53:16ROUTED TO ZONING

Review Stop Z ZONING
Rev No 3 Status P Date   Cont ID  
Sent By   Date 2018-08-15 Time   Rev Time 0.00
Received By   Date 2018-08-15 Time   Sent To  
Notes
2018-08-15 16:54:37SEE ATTACHED EMAIL, REGARIND THE VISIBILITY TRIANGLE.

Review Stop Z ZONING
Rev No 2 Status F Date 2018-08-15 Cont ID  
Sent By llouie Date 2018-08-15 Time 09:59 Rev Time 0.00
Received By llouie Date 2018-08-15 Time 09:59 Sent To  
Notes
2018-08-15 10:00:35** FAILED **
  
 1.) PORTION OF THE 4 FT. HIGH WALL IS LOCATED WITHIN
 THE SIGHT VISIBLITY TRIANGLE. [ZLDR S.94-305(E)]

Review Stop Z ZONING
Rev No 1 Status P Date 2016-02-10 Cont ID  
Sent By llouie Date 2016-02-10 Time 09:26 Rev Time 0.00
Received By llouie Date 2016-02-10 Time 09:26 Sent To B
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved