Plan Review Details - Permit 16020118
Plan Review Stops For Permit 16020118
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-03-03 Cont ID  
Sent By cthroop Date 2016-03-03 Time 13:03 Rev Time 0.00
Received By cthroop Date 2016-03-03 Time 13:03 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-02-25 Cont ID  
Sent By mgonzale Date 2016-02-25 Time   Rev Time 1.00
Received By mgonzale Date 2016-02-25 Time   Sent To B
Notes
2016-02-25 10:36:30CALL 811 BEFORE DIG.
  
 IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF
 WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-03-03 Cont ID  
Sent By cthroop Date 2016-03-03 Time 13:03 Rev Time 0.00
Received By cthroop Date 2016-02-03 Time 10:15 Sent To Z
Notes
2016-02-22 08:56:28TO ENG BOX

Review Stop Z ZONING
Rev No 1 Status P Date 2016-02-22 Cont ID  
Sent By cthroop Date 2016-03-03 Time 13:03 Rev Time 0.00
Received By aaponte Date 2016-02-22 Time 08:56 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved