Plan Review Details - Permit 16010897
Plan Review Stops For Permit 16010897
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-02-04 Cont ID  
Sent By cthroop Date 2016-02-04 Time 11:13 Rev Time 0.00
Received By cthroop Date 2016-02-04 Time 11:13 Sent To  
Notes
***NONE***

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-02-04 Cont ID  
Sent By Mgonzale Date 2016-02-04 Time   Rev Time 1.00
Received By mgonzale Date 2016-02-04 Time   Sent To ENG
Notes
2016-02-04 10:01:25DEMO MUST ABIDE BY STORMWATER POLLUTION PREVENTION PLAN
 MINIMUM REQUIREMENTS FOR DEMOLITION PROJECTS.
 SEE ATTACHED PROVISOS.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF
 WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
  
  
  
  
  
  
  
  

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2016-02-03 Cont ID  
Sent By cthroop Date 2016-02-04 Time 11:13 Rev Time 0.00
Received By fmittner Date 2016-02-03 Time 09:10 Sent To ENG
Notes
2016-02-03 09:10:52CONFIRMED WITH OWNER, PARTIAL DEMO AS OUTLINED IN COA
 SUBMITTAL/APPROVAL - FMITTNER

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-02-04 Cont ID  
Sent By cthroop Date 2016-02-04 Time 11:13 Rev Time 0.00
Received By cthroop Date 2016-01-27 Time 14:02 Sent To HIST
Notes
***NONE***