Plan Review Details - Permit 16010522
Plan Review Stops For Permit 16010522
Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2017-04-06 Cont ID  
Sent By shill Date 2017-04-06 Time 12:29 Rev Time 0.00
Received By shill Date 2017-04-06 Time 12:29 Sent To  
Notes
2017-04-06 12:30:45PROVISO
 APPLICANT WILL REQUEST TO REVOKE APPLICATION #17030599
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2017-04-03 Cont ID  
Sent By shill Date 2017-04-03 Time 16:34 Rev Time 0.00
Received By shill Date 2017-04-03 Time 16:34 Sent To  
Notes
2017-04-03 16:41:04****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014)
 FBC B = FBC BUILDING
 FBC EB = FBC EXISTING BUILDING
 FBC A = FBC ACCESSIBILITY
 FBC EC = FBC ENERGY CONSERVATION
  
 1. A PERMIT APPLICATION WAS SUBMITTED FOR THE EAST
 FOUNTAIN (17030599). IT APPEARS TO BE THE SAME SCOPE OF
 WORK AS THE EAST FOUNTAIN IN THIS APPLICATION. THERE
 SHOULD BE ONE PERMIT FOR THIS WORK, FBC 107.
  
 CLARIFY SCOPE. ADDITIONAL ACTION MAY BE REQUIRED.
  
 2. PRIOR TO PERMIT ISSUANCE, PLEASE DISCUSS FEES WITH
 EITHER STEVE KENNEDY OR ME.
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2017-02-14 Cont ID  
Sent By shill Date 2017-02-14 Time 14:30 Rev Time 0.00
Received By shill Date 2017-02-14 Time 13:24 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-10-31 Cont ID  
Sent By shill Date 2016-10-31 Time 08:11 Rev Time 0.00
Received By shill Date 2016-10-31 Time 08:11 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-02-02 Cont ID  
Sent By shill Date 2016-02-02 Time 14:32 Rev Time 0.00
Received By shill Date 2016-02-02 Time 14:20 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2017-03-21 Cont ID  
Sent By vperez Date 2017-03-21 Time 10:45 Rev Time 0.00
Received By vperez Date 2017-03-21 Time 10:45 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2016-10-25 Cont ID  
Sent By vperez Date 2016-10-25 Time 15:09 Rev Time 0.00
Received By vperez Date 2016-10-25 Time 15:09 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-02-26 Cont ID  
Sent By vperez Date 2016-02-26 Time 13:40 Rev Time 0.00
Received By vperez Date 2016-02-26 Time 13:40 Sent To  
Notes
2016-02-26 13:41:23TO CAROLINE FOR COMPLETION

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2016-02-06 Cont ID  
Sent By tklarge Date 2016-02-06 Time 06:54 Rev Time 0.00
Received By tklarge Date 2016-02-06 Time 06:54 Sent To  
Notes
2016-02-06 06:56:15THERE IS NO GAS ASSOCIATED WITH THIS PERMIT.

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2017-04-03 Cont ID  
Sent By shill Date 2017-04-03 Time 16:41 Rev Time 0.00
Received By shill Date 2017-03-15 Time 14:31 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-02-28 Cont ID  
Sent By lmarchan Date 2017-02-28 Time 11:27 Rev Time 0.00
Received By lmarchan Date 2017-02-08 Time 08:05 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-12-22 Cont ID  
Sent By ccole Date 2016-12-22 Time 13:19 Rev Time 0.00
Received By ccole Date 2016-06-21 Time 14:23 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-02-26 Cont ID  
Sent By vperez Date 2016-02-26 Time 13:41 Rev Time 0.00
Received By vperez Date 2016-02-26 Time 13:41 Sent To  
Notes
2016-02-26 13:41:48TO CAROLINE FOR COMPLETION

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2017-03-22 Cont ID  
Sent By ccole Date 2017-03-22 Time 07:36 Rev Time 0.00
Received By ccole Date 2017-03-22 Time 07:36 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2017-02-10 Cont ID  
Sent By ccole Date 2017-02-10 Time 09:10 Rev Time 0.00
Received By ccole Date 2017-02-10 Time 09:10 Sent To  
Notes
2017-02-10 09:13:412ND REVIEW FBC-2014 MECHANICAL
 PERMIT #16010522
 2/10/17
  
 1) THE MECHANICAL COMMENT FROM THE FIRST REVIEW STILL
 EXISTS. NO RESPONSE NARRATIVE TO THE COMMENT WAS
 PROVIDED, AND NONE OF THE REQUESTED INFORMATION ABOUT
 THE VAULT VENTILATION SYSTEM WAS PROVIDED ON THE
 RESUBMITTED PLANS.
  
 2) PLEASE PROVIDE A SEQUENCE OF OPERATION FOR THE FAN.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-12-22 Cont ID  
Sent By ccole Date 2016-12-22 Time 13:12 Rev Time 0.00
Received By ccole Date 2016-12-22 Time 13:12 Sent To  
Notes
2016-12-22 13:18:231ST REVIEW FBC-2014 MECHANICAL
 PERMIT 316010522
 12/22/16
  
 1) SHEET WF-201; PROVIDE AN EQUIPMENT SCHEDULE FOR THE
 EXHAUST FAN AND AN EXHAUST VENTILATION CALCULATION.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop P PLUMBING
Rev No 4 Status P Date 2017-03-28 Cont ID  
Sent By gjohnson Date 2017-03-28 Time 12:43 Rev Time 0.00
Received By gjohnson Date 2017-03-28 Time 12:43 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 3 Status F Date 2017-02-22 Cont ID  
Sent By gjohnson Date 2017-02-22 Time 11:02 Rev Time 0.00
Received By gjohnson Date 2017-02-22 Time 10:48 Sent To  
Notes
2017-02-22 11:10:533RD REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 PLUMBING COMMENTS: PREVIOUS COMMENTS HAVE NOT BEEN
 COMPLIED WITH 3RD REQUEST
  
  
 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FILTER
 TANKS, TYPE OF FILTER,FILTRATION RATE, PUMPS,CHLORINE
 FEEDER, ETC. 2014 AMEND.SEC. 107.2.1.
  
 2ND REQUEST
 1. SHT WF 201-300-301-301.1 SHOW 11/2" WATER SUPPLY
 LINE SHT WF 101-C-500 SHOW A 1" WATER SUPPLY LINE
 PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 2.SHT WF 200-201-201 HAVE OPPOSING DIRECTION ARROWS IT
 SHOW STWO DIFFERENT ARROWS THE SMALLER HOLLOW ARROWS
 SEEM TO BE WRONG PLEASE CLARIFY. PER WPB AMEND TO FBC
 107.2.1
  
 3. SHT WF 500 DETAIL 5 SHOWS A 3" TANK DRAIN THAT DOES
 NOT SHOW UP ON ANY OTHER DRAWINGS PLEASE CLARIFY. PER
 WPB AMEND TO FBC 107.2.1
  
 NEW COMMENT:
  
 1. SHT. 403 WF 201 THE FOUNTAIN-SHOWN ON THE RIGHT HAS
 A FITTING LABELED AS #1 SANITARY SEWER THE FOUNTAIN ON
 THE LEFT HAS THE SAME LABELED AS #4 FILTER RETURN
 PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
  
  
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2016-12-20 Cont ID  
Sent By gjohnson Date 2016-12-20 Time 10:33 Rev Time 0.00
Received By gjohnson Date 2016-12-20 Time 10:33 Sent To  
Notes
2016-12-20 10:17:372ND REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 PLUMBING COMMENTS: PREVIOUS COMMENTS HAVE NOT BEEN
 COMPLIED WITH
  
 1) SHT. WF-100 & WF-200 SHOWS THE DISCHARGE FROM THE
 FOUNTAIN DISCHARGING TO THE SANITARY SEWER SYSTEM. THE
 DISCHARGE FROM THE FOUNTAINS CANNOT DISCHARGE TO THE
 SANITARY OR STORM SYSTEM PER CITY OF WPB CODE OF
 ORDINANCES SEC. 90-126 & 90-203. ALSO REFER TO THE
 OVERFLOW DRAINS.
 2) CLEARLY EXPLAIN THE TYPE OF WASTE THAT WILL BE
 DISCHARGED INTO THE SANITARY SYSTEM FROM THE VAULT
 SUMP. WILL THERE BE ANY CHANCES OF CHLORINE BEING
 DISCHARGED TO THE SANITARY SYSTEM? CLARIFY.
 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FILTER
 TANKS, TYPE OF FILTER,FILTRATION RATE, PUMPS,CHLORINE
 FEEDER, ETC. 2014 AMEND.SEC. 107.2.1.
 4) SHT. WF-201 - EXPLAIN THE SEQUENCE OF OPERATION FOR
 THE OVERFLOW DRAIN AS SHOWN ON THE SCHEMATIC - I AM
 CONFUSED BY THE LOCATION OF THE FLOW ARROWS.THE
 OVERFLOW APPEARS TO DRAIN INTO A 3" LINE THAT HAS A 3"
 CONNECTION TO THE SANITARY SEWER AND ALSO A 3" DRAIN
 VALVE, CONTINUING TO THE PROSTRAINER AND PUMP AND BACK
 TO THE FOUNTAIN. THERE ARE ALSO 2" LINES COMING FROM
 THE FILTER TANK THAT APPEAR TO CONNECT TO THE 3"
 OVERFLOW DRAIN, CREATING OPPOSING FLOWS TO THE 3"
 DRAIN. CLARIFY.
 5) SHT. C5.00 - SHOWS A 2 INCH FOUNTAIN VAULT FORCE
 MAIN. THIS LINE IS NOT SHOWN ON SHT. WF-201. HYDRAULIC
 SCHEMATIC. CLARIFY.
  
 NEW COMMENTS:
 1. SHT WF 201-300-301-301.1 SHOW 11/2" WATER SUPPLY
 LINE SHT WF 101-200-202 SHOW A 1" WATER SUPPLY LINE
 PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 2.SHT WF 200-201-201 HAVE OPPOSING DIRECTION ARROWS IT
 SHOW STWO DIFFERENT ARROWS THE SMALLER HOLLOW ARROWS
 SEEM TO BE WRONG PLEASE CLARIFY. PER WPB AMEND TO FBC
 107.2.1
  
 3. SHT WF 500 DETAIL 5 SHOWS A 3" TANK DRAIN THAT DOES
 NOT SHOW UP ON ANY OTHER DRAWINGS PLEASE CLARIFY. PER
 WPB AMEND TO FBC 107.2.1
  
  
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2016-02-06 Cont ID  
Sent By tklarge Date 2016-02-06 Time 07:47 Rev Time 0.00
Received By tklarge Date 2016-02-06 Time 05:16 Sent To  
Notes
2016-02-06 07:24:411) SHT. WF-100 & WF-200 SHOWS THE DISCHARGE FROM THE
 FOUNTAIN DISCHARGING TO THE SANITARY SEWER SYSTEM. THE
 DISCHARGE FROM THE FOUNTAINS CANNOT DISCHARGE TO THE
 SANITARY OR STORM SYSTEM PER CITY OF WPB CODE OF
 ORDINANCES SEC. 90-126 & 90-203. ALSO REFER TO THE
 OVERFLOW DRAINS.
 2) CLEARLY EXPLAIN THE TYPE OF WASTE THAT WILL BE
 DISCHARGED INTO THE SANITARY SYSTEM FROM THE VAULT
 SUMP. WILL THERE BE ANY CHANCES OF CHLORINE BEING
 DISCHARGED TO THE SANITARY SYSTEM? CLARIFY.
 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FILTER
 TANKS, TYPE OF FILTER,FILTRATION RATE, PUMPS,CHLORINE
 FEEDER, ETC. 2014 AMEND.SEC. 107.2.1.
 4) SHT. WF-201 - EXPLAIN THE SEQUENCE OF OPERATION FOR
 THE OVERFLOW DRAIN AS SHOWN ON THE SCHMATIC - I AM
 CONFUSED BY THE LOCATION OF THE FLOW ARROWS.THE
 OVERFLOW APPEARS TO DRAIN INTO A 3" LINE THAT HAS A 3"
 CONNECTION TO THE SANITARY SEWER AND ALSO A 3" DRAIN
 VALVE, CONTINUING TO THE PROSTRAINER AND PUMP AND BACK
 TO THE FOUNTAIN. THERE ARE ALSO 2" LINES COMING FROM
 THE FILTER TANK THAT APPEAR TO CONNECT TO THE 3"
 OVERFLOW DRAIN, CREATING OPPOSING FLOWS TO THE 3"
 DRAIN. CLARIFY.
 5) SHT. C5.00 - SHOWS A 2 INCH FOUNTAIN VAULT FORCE
 MAIN. THIS LINE IS NOT SHOWN ON SHT. WF-201. HYDRAULIC
 SCHEMATIC. CLARIFY.
  
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status P Date 2017-04-06 Cont ID  
Sent By shill Date 2017-04-06 Time 12:31 Rev Time 0.00
Received By shill Date 2017-04-06 Time 12:31 Sent To  
Notes
2017-04-06 12:32:19ARCHITECT RESOLVED ERROR
 FUTURE SUBMITTALS WILL BE DONE IN THE MANNER WHICH DOES
 NOT CAUSE AN ERROR; APPLICANT IS WORKING WITH BLUEBEAM
 FOR ADDITIONAL RESOLUTION
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2017-04-03 Cont ID  
Sent By shill Date 2017-04-03 Time 16:32 Rev Time 0.00
Received By shill Date 2017-04-03 Time 16:32 Sent To  
Notes
2017-04-03 16:33:57****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 PROVIDE CONTACT INFORMATION FOR DIGITAL SIGNATURE
 ISSUER; BLUE BAR WHICH SHOULD INDICATE THAT SIGNATURE
 IS VALID STATES THAT THE CERTIFICATION IS INVALID.
  
 AS BOTH ARCHITECT'S OFFICE AND I WERE UNABLE TO RESOLVE
 THIS ISSUE, PLEASE PROVIDE CONTACT INFORMATION FOR THE
 ISSUER
  
  
2017-03-22 07:41:50DIG-SIGS CHECKED ON SHEETS 405WF-300 & 412WF-601/
 CCOLE/3/22/17

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2017-02-14 Cont ID  
Sent By shill Date 2017-02-14 Time 14:37 Rev Time 0.00
Received By shill Date 2017-02-14 Time 14:36 Sent To  
Notes
2017-02-14 14:38:12***PROVISO - SIGNATURE REVIEW IS FOR REVIEW CYCLE #3
 SUBMITTED 2/8/17. ANOTHER REVIEW CYCLE WILL REQUIRE A
 NEW SIGNATURE REVIEW*** S.HILL
  
2016-12-22 13:20:21SHEET WF-201: DIGITAL SIGNATURE CHECKED AND
 VERIFIED/CCOLE
2016-10-31 08:12:532/14/17 NEW A SHEETS CHECKED - ERROR MESSAGE
 (CERTIFICATION BY WILLIAMS HOBBS IS INVALID) BUT
 SIGNATURE IS VALID, SIGNER IDENTITY IS VALID, AND THE
 DOCUMENT HAS NOT BEEN MODIFIED SINCE THE SIGNATURE WAS
 APPLIED. THEREFORE, A SHEETS PASS
 ALSO VERIFIED WF SHEETS
  
 10/31/16 A SHEETS, DIGITAL SIGNATURE OK (SH)
  
  
  

Review Stop Z ZONING
Rev No 4 Status P Date 2017-04-03 Cont ID  
Sent By eschneid Date 2017-04-03 Time 11:57 Rev Time 0.50
Received By eschneid Date 2017-04-03 Time 11:14 Sent To  
Notes
2017-04-03 11:58:11THE FOUNTAIN CONFIRGURATION HAS CHANGED FOR THE LATEST
 SITE PLAN APPROVAL, SO PRIOR TO C.O., THE AS BUILT
 PLANS MUST BE SUBMITTED TO THE PLANNING DIVISION AS A
 MINOR PLANNED DEVELOPMENT AMENDMENT.
  
  

Review Stop Z ZONING
Rev No 3 Status F Date 2017-02-28 Cont ID  
Sent By eschneid Date 2017-02-28 Time 10:10 Rev Time 0.50
Received By eschneid Date 2017-02-27 Time 17:25 Sent To  
Notes
2017-02-28 11:12:51FAILED
  
 1) SHEETS WF-100, FOUNTAINS SITE PLAN, AND A-020, LIFE
 SAFETY PLANS, DO NOT SHOW THE REVISED FOUNTAIN LAYOUT
 THAT IS SHOWN ON SHEET A-050, ARCHITECTURAL SITE PLAN.
 ALL PLANS SHALL SHOW THE SAME CONDITIONS.
  
 2) THE REVISED FOUNTAIN CONFIGURATION REQUIRES THE
 SUBMITTAL OF AN AS-BUILT MINOR PLANNED DEVELOPMENT
 AMENDMENT PRIOR TO THE C.O. OF THE RESTORATION HARDWARE
 BUILDING.
  
 3) PLEASE EXPLAIN WHY THE DECORATIVE STONEWORK HAS BEEN
 REMOVED FROM THE EAST ELEVATION OF THE WATER WALL
 (SHEET A-445). THIS IS THE PUBLIC FACADE OF THE
 BUILDING AND ACCORDING TO THE SITE PLAN INCLUDES UP
 LIGHTING. IT SEEMS COUNTER INTUITIVE TO UP LIGHT AND
 HIGHLIGHT A BLANK STUCCO WALL.
  
 4) THE FOUNTAIN CONFIRGURATION HAS CHANGED FOR THE
 LATEST SITE PLAN APPROVAL, SO PRIOR TO C.O., THE AS
 BUILT PLANS MUST BE SUBMITTED TO THE PLANNING DIVISION
 AS A MINOR PLANNED DEVELOPMENT AMENDMENT.
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
 [email protected]
  
  

Review Stop Z ZONING
Rev No 2 Status P Date 2016-11-28 Cont ID  
Sent By eschneid Date 2016-11-28 Time 13:47 Rev Time 0.25
Received By eschneid Date 2016-11-28 Time 13:47 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2016-01-26 Cont ID  
Sent By eschneid Date 2016-01-26 Time 16:24 Rev Time 0.25
Received By eschneid Date 2016-01-26 Time 16:24 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved