| Plan Review Stops For Permit 16010522 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
5 |
Status |
P |
Date |
2017-04-06 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-04-06 |
Time |
12:29 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-04-06 |
Time |
12:29 |
Sent To |
|
|
| Notes |
| 2017-04-06 12:30:45 | PROVISO | | | APPLICANT WILL REQUEST TO REVOKE APPLICATION #17030599 | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
F |
Date |
2017-04-03 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-04-03 |
Time |
16:34 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-04-03 |
Time |
16:34 |
Sent To |
|
|
| Notes |
| 2017-04-03 16:41:04 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | FBC = FLORIDA BUILDING CODE, 5TH EDITION (2014) | | | FBC B = FBC BUILDING | | | FBC EB = FBC EXISTING BUILDING | | | FBC A = FBC ACCESSIBILITY | | | FBC EC = FBC ENERGY CONSERVATION | | | | | | 1. A PERMIT APPLICATION WAS SUBMITTED FOR THE EAST | | | FOUNTAIN (17030599). IT APPEARS TO BE THE SAME SCOPE OF | | | WORK AS THE EAST FOUNTAIN IN THIS APPLICATION. THERE | | | SHOULD BE ONE PERMIT FOR THIS WORK, FBC 107. | | | | | | CLARIFY SCOPE. ADDITIONAL ACTION MAY BE REQUIRED. | | | | | | 2. PRIOR TO PERMIT ISSUANCE, PLEASE DISCUSS FEES WITH | | | EITHER STEVE KENNEDY OR ME. | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2017-02-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-02-14 |
Time |
14:30 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-02-14 |
Time |
13:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2016-10-31 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-10-31 |
Time |
08:11 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-10-31 |
Time |
08:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2016-02-02 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-02-02 |
Time |
14:32 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-02-02 |
Time |
14:20 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2017-03-21 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2017-03-21 |
Time |
10:45 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2017-03-21 |
Time |
10:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2016-10-25 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2016-10-25 |
Time |
15:09 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2016-10-25 |
Time |
15:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2016-02-26 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2016-02-26 |
Time |
13:40 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2016-02-26 |
Time |
13:40 |
Sent To |
|
|
| Notes |
| 2016-02-26 13:41:23 | TO CAROLINE FOR COMPLETION |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2016-02-06 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-02-06 |
Time |
06:54 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-02-06 |
Time |
06:54 |
Sent To |
|
|
| Notes |
| 2016-02-06 06:56:15 | THERE IS NO GAS ASSOCIATED WITH THIS PERMIT. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2017-04-03 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-04-03 |
Time |
16:41 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-03-15 |
Time |
14:31 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2017-02-28 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2017-02-28 |
Time |
11:27 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2017-02-08 |
Time |
08:05 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-12-22 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2016-12-22 |
Time |
13:19 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2016-06-21 |
Time |
14:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-02-26 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2016-02-26 |
Time |
13:41 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2016-02-26 |
Time |
13:41 |
Sent To |
|
|
| Notes |
| 2016-02-26 13:41:48 | TO CAROLINE FOR COMPLETION |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
P |
Date |
2017-03-22 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-03-22 |
Time |
07:36 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-03-22 |
Time |
07:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2017-02-10 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2017-02-10 |
Time |
09:10 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2017-02-10 |
Time |
09:10 |
Sent To |
|
|
| Notes |
| 2017-02-10 09:13:41 | 2ND REVIEW FBC-2014 MECHANICAL | | | PERMIT #16010522 | | | 2/10/17 | | | | | | 1) THE MECHANICAL COMMENT FROM THE FIRST REVIEW STILL | | | EXISTS. NO RESPONSE NARRATIVE TO THE COMMENT WAS | | | PROVIDED, AND NONE OF THE REQUESTED INFORMATION ABOUT | | | THE VAULT VENTILATION SYSTEM WAS PROVIDED ON THE | | | RESUBMITTED PLANS. | | | | | | 2) PLEASE PROVIDE A SEQUENCE OF OPERATION FOR THE FAN. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2016-12-22 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2016-12-22 |
Time |
13:12 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2016-12-22 |
Time |
13:12 |
Sent To |
|
|
| Notes |
| 2016-12-22 13:18:23 | 1ST REVIEW FBC-2014 MECHANICAL | | | PERMIT 316010522 | | | 12/22/16 | | | | | | 1) SHEET WF-201; PROVIDE AN EQUIPMENT SCHEDULE FOR THE | | | EXHAUST FAN AND AN EXHAUST VENTILATION CALCULATION. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2017-03-28 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-03-28 |
Time |
12:43 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-03-28 |
Time |
12:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2017-02-22 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2017-02-22 |
Time |
11:02 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2017-02-22 |
Time |
10:48 |
Sent To |
|
|
| Notes |
| 2017-02-22 11:10:53 | 3RD REVIEW | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER LL | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES | | | BUILDING DIVISION | | | 561-805-6711 | | | [email protected] | | | | | | PLUMBING COMMENTS: PREVIOUS COMMENTS HAVE NOT BEEN | | | COMPLIED WITH 3RD REQUEST | | | | | | | | | 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FILTER | | | TANKS, TYPE OF FILTER,FILTRATION RATE, PUMPS,CHLORINE | | | FEEDER, ETC. 2014 AMEND.SEC. 107.2.1. | | | | | | 2ND REQUEST | | | 1. SHT WF 201-300-301-301.1 SHOW 11/2" WATER SUPPLY | | | LINE SHT WF 101-C-500 SHOW A 1" WATER SUPPLY LINE | | | PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1 | | | | | | 2.SHT WF 200-201-201 HAVE OPPOSING DIRECTION ARROWS IT | | | SHOW STWO DIFFERENT ARROWS THE SMALLER HOLLOW ARROWS | | | SEEM TO BE WRONG PLEASE CLARIFY. PER WPB AMEND TO FBC | | | 107.2.1 | | | | | | 3. SHT WF 500 DETAIL 5 SHOWS A 3" TANK DRAIN THAT DOES | | | NOT SHOW UP ON ANY OTHER DRAWINGS PLEASE CLARIFY. PER | | | WPB AMEND TO FBC 107.2.1 | | | | | | NEW COMMENT: | | | | | | 1. SHT. 403 WF 201 THE FOUNTAIN-SHOWN ON THE RIGHT HAS | | | A FITTING LABELED AS #1 SANITARY SEWER THE FOUNTAIN ON | | | THE LEFT HAS THE SAME LABELED AS #4 FILTER RETURN | | | PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1 | | | | | | | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2016-12-20 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2016-12-20 |
Time |
10:33 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2016-12-20 |
Time |
10:33 |
Sent To |
|
|
| Notes |
| 2016-12-20 10:17:37 | 2ND REVIEW | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER LL | | | CITY OF WEST PALM BEACH | | | DEVELOPMENT SERVICES | | | BUILDING DIVISION | | | 561-805-6711 | | | [email protected] | | | | | | PLUMBING COMMENTS: PREVIOUS COMMENTS HAVE NOT BEEN | | | COMPLIED WITH | | | | | | 1) SHT. WF-100 & WF-200 SHOWS THE DISCHARGE FROM THE | | | FOUNTAIN DISCHARGING TO THE SANITARY SEWER SYSTEM. THE | | | DISCHARGE FROM THE FOUNTAINS CANNOT DISCHARGE TO THE | | | SANITARY OR STORM SYSTEM PER CITY OF WPB CODE OF | | | ORDINANCES SEC. 90-126 & 90-203. ALSO REFER TO THE | | | OVERFLOW DRAINS. | | | 2) CLEARLY EXPLAIN THE TYPE OF WASTE THAT WILL BE | | | DISCHARGED INTO THE SANITARY SYSTEM FROM THE VAULT | | | SUMP. WILL THERE BE ANY CHANCES OF CHLORINE BEING | | | DISCHARGED TO THE SANITARY SYSTEM? CLARIFY. | | | 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FILTER | | | TANKS, TYPE OF FILTER,FILTRATION RATE, PUMPS,CHLORINE | | | FEEDER, ETC. 2014 AMEND.SEC. 107.2.1. | | | 4) SHT. WF-201 - EXPLAIN THE SEQUENCE OF OPERATION FOR | | | THE OVERFLOW DRAIN AS SHOWN ON THE SCHEMATIC - I AM | | | CONFUSED BY THE LOCATION OF THE FLOW ARROWS.THE | | | OVERFLOW APPEARS TO DRAIN INTO A 3" LINE THAT HAS A 3" | | | CONNECTION TO THE SANITARY SEWER AND ALSO A 3" DRAIN | | | VALVE, CONTINUING TO THE PROSTRAINER AND PUMP AND BACK | | | TO THE FOUNTAIN. THERE ARE ALSO 2" LINES COMING FROM | | | THE FILTER TANK THAT APPEAR TO CONNECT TO THE 3" | | | OVERFLOW DRAIN, CREATING OPPOSING FLOWS TO THE 3" | | | DRAIN. CLARIFY. | | | 5) SHT. C5.00 - SHOWS A 2 INCH FOUNTAIN VAULT FORCE | | | MAIN. THIS LINE IS NOT SHOWN ON SHT. WF-201. HYDRAULIC | | | SCHEMATIC. CLARIFY. | | | | | | NEW COMMENTS: | | | 1. SHT WF 201-300-301-301.1 SHOW 11/2" WATER SUPPLY | | | LINE SHT WF 101-200-202 SHOW A 1" WATER SUPPLY LINE | | | PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1 | | | | | | 2.SHT WF 200-201-201 HAVE OPPOSING DIRECTION ARROWS IT | | | SHOW STWO DIFFERENT ARROWS THE SMALLER HOLLOW ARROWS | | | SEEM TO BE WRONG PLEASE CLARIFY. PER WPB AMEND TO FBC | | | 107.2.1 | | | | | | 3. SHT WF 500 DETAIL 5 SHOWS A 3" TANK DRAIN THAT DOES | | | NOT SHOW UP ON ANY OTHER DRAWINGS PLEASE CLARIFY. PER | | | WPB AMEND TO FBC 107.2.1 | | | | | | | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2016-02-06 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-02-06 |
Time |
07:47 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-02-06 |
Time |
05:16 |
Sent To |
|
|
| Notes |
| 2016-02-06 07:24:41 | 1) SHT. WF-100 & WF-200 SHOWS THE DISCHARGE FROM THE | | | FOUNTAIN DISCHARGING TO THE SANITARY SEWER SYSTEM. THE | | | DISCHARGE FROM THE FOUNTAINS CANNOT DISCHARGE TO THE | | | SANITARY OR STORM SYSTEM PER CITY OF WPB CODE OF | | | ORDINANCES SEC. 90-126 & 90-203. ALSO REFER TO THE | | | OVERFLOW DRAINS. | | | 2) CLEARLY EXPLAIN THE TYPE OF WASTE THAT WILL BE | | | DISCHARGED INTO THE SANITARY SYSTEM FROM THE VAULT | | | SUMP. WILL THERE BE ANY CHANCES OF CHLORINE BEING | | | DISCHARGED TO THE SANITARY SYSTEM? CLARIFY. | | | 3) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE FILTER | | | TANKS, TYPE OF FILTER,FILTRATION RATE, PUMPS,CHLORINE | | | FEEDER, ETC. 2014 AMEND.SEC. 107.2.1. | | | 4) SHT. WF-201 - EXPLAIN THE SEQUENCE OF OPERATION FOR | | | THE OVERFLOW DRAIN AS SHOWN ON THE SCHMATIC - I AM | | | CONFUSED BY THE LOCATION OF THE FLOW ARROWS.THE | | | OVERFLOW APPEARS TO DRAIN INTO A 3" LINE THAT HAS A 3" | | | CONNECTION TO THE SANITARY SEWER AND ALSO A 3" DRAIN | | | VALVE, CONTINUING TO THE PROSTRAINER AND PUMP AND BACK | | | TO THE FOUNTAIN. THERE ARE ALSO 2" LINES COMING FROM | | | THE FILTER TANK THAT APPEAR TO CONNECT TO THE 3" | | | OVERFLOW DRAIN, CREATING OPPOSING FLOWS TO THE 3" | | | DRAIN. CLARIFY. | | | 5) SHT. C5.00 - SHOWS A 2 INCH FOUNTAIN VAULT FORCE | | | MAIN. THIS LINE IS NOT SHOWN ON SHT. WF-201. HYDRAULIC | | | SCHEMATIC. CLARIFY. | | | | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
3 |
Status |
P |
Date |
2017-04-06 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-04-06 |
Time |
12:31 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-04-06 |
Time |
12:31 |
Sent To |
|
|
| Notes |
| 2017-04-06 12:32:19 | ARCHITECT RESOLVED ERROR | | | FUTURE SUBMITTALS WILL BE DONE IN THE MANNER WHICH DOES | | | NOT CAUSE AN ERROR; APPLICANT IS WORKING WITH BLUEBEAM | | | FOR ADDITIONAL RESOLUTION | | | | | | |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
2 |
Status |
F |
Date |
2017-04-03 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-04-03 |
Time |
16:32 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-04-03 |
Time |
16:32 |
Sent To |
|
|
| Notes |
| 2017-04-03 16:33:57 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | PROVIDE CONTACT INFORMATION FOR DIGITAL SIGNATURE | | | ISSUER; BLUE BAR WHICH SHOULD INDICATE THAT SIGNATURE | | | IS VALID STATES THAT THE CERTIFICATION IS INVALID. | | | | | | AS BOTH ARCHITECT'S OFFICE AND I WERE UNABLE TO RESOLVE | | | THIS ISSUE, PLEASE PROVIDE CONTACT INFORMATION FOR THE | | | ISSUER | | | | | | | | 2017-03-22 07:41:50 | DIG-SIGS CHECKED ON SHEETS 405WF-300 & 412WF-601/ | | | CCOLE/3/22/17 |
|
|
| Review Stop |
SIGNATURE |
ELECTRONIC SIGNATURE SHEET |
| Rev No |
1 |
Status |
P |
Date |
2017-02-14 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2017-02-14 |
Time |
14:37 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2017-02-14 |
Time |
14:36 |
Sent To |
|
|
| Notes |
| 2017-02-14 14:38:12 | ***PROVISO - SIGNATURE REVIEW IS FOR REVIEW CYCLE #3 | | | SUBMITTED 2/8/17. ANOTHER REVIEW CYCLE WILL REQUIRE A | | | NEW SIGNATURE REVIEW*** S.HILL | | | | | 2016-12-22 13:20:21 | SHEET WF-201: DIGITAL SIGNATURE CHECKED AND | | | VERIFIED/CCOLE | | 2016-10-31 08:12:53 | 2/14/17 NEW A SHEETS CHECKED - ERROR MESSAGE | | | (CERTIFICATION BY WILLIAMS HOBBS IS INVALID) BUT | | | SIGNATURE IS VALID, SIGNER IDENTITY IS VALID, AND THE | | | DOCUMENT HAS NOT BEEN MODIFIED SINCE THE SIGNATURE WAS | | | APPLIED. THEREFORE, A SHEETS PASS | | | ALSO VERIFIED WF SHEETS | | | | | | 10/31/16 A SHEETS, DIGITAL SIGNATURE OK (SH) | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
4 |
Status |
P |
Date |
2017-04-03 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2017-04-03 |
Time |
11:57 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2017-04-03 |
Time |
11:14 |
Sent To |
|
|
| Notes |
| 2017-04-03 11:58:11 | THE FOUNTAIN CONFIRGURATION HAS CHANGED FOR THE LATEST | | | SITE PLAN APPROVAL, SO PRIOR TO C.O., THE AS BUILT | | | PLANS MUST BE SUBMITTED TO THE PLANNING DIVISION AS A | | | MINOR PLANNED DEVELOPMENT AMENDMENT. | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
F |
Date |
2017-02-28 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2017-02-28 |
Time |
10:10 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2017-02-27 |
Time |
17:25 |
Sent To |
|
|
| Notes |
| 2017-02-28 11:12:51 | FAILED | | | | | | 1) SHEETS WF-100, FOUNTAINS SITE PLAN, AND A-020, LIFE | | | SAFETY PLANS, DO NOT SHOW THE REVISED FOUNTAIN LAYOUT | | | THAT IS SHOWN ON SHEET A-050, ARCHITECTURAL SITE PLAN. | | | ALL PLANS SHALL SHOW THE SAME CONDITIONS. | | | | | | 2) THE REVISED FOUNTAIN CONFIGURATION REQUIRES THE | | | SUBMITTAL OF AN AS-BUILT MINOR PLANNED DEVELOPMENT | | | AMENDMENT PRIOR TO THE C.O. OF THE RESTORATION HARDWARE | | | BUILDING. | | | | | | 3) PLEASE EXPLAIN WHY THE DECORATIVE STONEWORK HAS BEEN | | | REMOVED FROM THE EAST ELEVATION OF THE WATER WALL | | | (SHEET A-445). THIS IS THE PUBLIC FACADE OF THE | | | BUILDING AND ACCORDING TO THE SITE PLAN INCLUDES UP | | | LIGHTING. IT SEEMS COUNTER INTUITIVE TO UP LIGHT AND | | | HIGHLIGHT A BLANK STUCCO WALL. | | | | | | 4) THE FOUNTAIN CONFIRGURATION HAS CHANGED FOR THE | | | LATEST SITE PLAN APPROVAL, SO PRIOR TO C.O., THE AS | | | BUILT PLANS MUST BE SUBMITTED TO THE PLANNING DIVISION | | | AS A MINOR PLANNED DEVELOPMENT AMENDMENT. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | | [email protected] | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2016-11-28 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2016-11-28 |
Time |
13:47 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2016-11-28 |
Time |
13:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2016-01-26 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2016-01-26 |
Time |
16:24 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2016-01-26 |
Time |
16:24 |
Sent To |
|
|
| Notes |
|
|