|
 |
 |
 |
 |
 |
Plan Review Details - Permit 16010345
| Plan Review Stops For Permit 16010345 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2016-01-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-01-20 |
Time |
13:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-01-20 |
Time |
11:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2016-01-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-01-20 |
Time |
13:28 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-01-20 |
Time |
11:04 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2016-01-16 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-01-16 |
Time |
07:37 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-01-16 |
Time |
07:37 |
Sent To |
|
|
| Notes |
| 2016-01-16 07:37:35 | GAS PLAN REVIEW | | | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | | THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE | | | REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK. | | | PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT | | | SPECIFICATIONS AND GAS RISER THAT REFLECT THE ENTIRE | | | SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-01-24 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-01-24 |
Time |
07:14 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-01-21 |
Time |
09:24 |
Sent To |
|
|
| Notes |
| 2016-01-22 09:24:17 | RESUB ROUTED TO SGRAHAM |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-01-20 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2016-01-20 |
Time |
13:29 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2016-01-13 |
Time |
15:01 |
Sent To |
|
|
| Notes |
| 2016-01-13 15:02:04 | ROUTED TO ZONING |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2016-01-24 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-01-24 |
Time |
07:14 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-01-24 |
Time |
07:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2016-01-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-01-20 |
Time |
05:40 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-01-20 |
Time |
05:28 |
Sent To |
|
|
| Notes |
| 2016-01-20 09:33:51 | 1) SUBMIT A NEW SURVEY THAT SHOWS THE ACTUAL LOCATION | | | OF THE POOL EQUIPMENT. THE POOL PLAN AND THE SURVEY DO | | | NOT MATCH FOR THE LOCATION. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2016-01-16 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-01-16 |
Time |
07:36 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-01-16 |
Time |
07:14 |
Sent To |
|
|
| Notes |
| 2016-01-16 07:26:09 | 1) THE ENGINEERING FOR THE GAS HEATER ANCHORING IS | | | BASED ON THE 2010 FBC. THE CODE IN EFFECT IS THE 2014 | | | FBC. | | | 2) THE ENGINEERING DOCUMENT FOR THE POOL HEATER | | | ANCHORING IS A COPY OF ANORIGINAL SIGNED AND SEALED | | | DOCUMENT. F.A.C. RULE 61G15-23.001 REQUIRES DOCUMENTS | | | PREPARED BY THE DESIGNER TO BEAR THE SEAL AND SIGNATURE | | | OF THE ENGINEER OF RECORD.SUBMIT THE REQUIRED SIGNED | | | AND SEALED DOCUMENT FOR REVIEW. THE ENGINEER FOR THE | | | WIND DESIGN IS DIFFERENT THAN THE ENGINEER FOR THE POOL | | | DESIGN. CLARIFY.ALSO, CHECK THE EXPOSURE. IT IS CALLED | | | OUT AS EXPOSSURE D. | | | 3) THE LOCATION OF THE POOL EQUIPMENT ON THE POOL PLAN | | | DOES NOT CORRELATE WITH THE POOL PLAN. CLARIFY. | | | 4) R403.9.2 TIME SWITCHES. | | | TIME SWITCHES OR OTHER CONTROL METHOD THAT CAN | | | AUTOMATICALLY TURN OFF AND ON HEATERS AND PUMPS | | | ACCORDING TO A PRESET SCHEDULE SHALL BE INSTALLED ON | | | ALL HEATERS AND PUMPS. HEATERS, PUMPS AND MOTORS THAT | | | HAVE BUILT IN TIMERS SHALL BE DEEMED IN COMPLIANCE WITH | | | THIS REQUIREMENT. | | | 5) R403.9.3 COVERS. | | | HEATED SWIMMING POOLS AND INGROUND PERMANENTLY | | | INSTALLED SPAS SHALL BE EQUIPPED WITH A VAPOR-RETARDANT | | | COVER ON OR AT THE WATER SURFACE OR A LIQUID COVER OR | | | OTHER MEANS PROVEN TO REDUCE HEAT LOSS. | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2016-01-22 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2016-01-22 |
Time |
15:22 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
2016-01-22 |
Time |
15:23 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2016-01-14 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2016-01-14 |
Time |
09:04 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
2016-01-14 |
Time |
09:04 |
Sent To |
B |
|
| Notes |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |