Plan Review Details - Permit 15120729
Plan Review Stops For Permit 15120729
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-01-20 Cont ID  
Sent By jgomez Date 2016-01-20 Time 17:40 Rev Time 0.00
Received By jgomez Date 2016-01-20 Time 17:28 Sent To  
Notes
2016-01-20 17:40:51BUILDING REVIEW APPROVED WITH PROVISO DATED 12/15/15:
  
 1- PROVIDE PRODUCT APPROVAL (2 COPIES) FOR:
 A) CUSTOM ENTRY DOOR AS SHOWN ON PLANS. PROVIDE
 COMPLETE ENGINEERING PACKAGE FOR BUILDING OFFICIAL
 APPROVAL. CONTACT BROWN AT [email protected].
 B) STEEL PANEL WALL SYSTEM AS SHOWN ON PLANS.
 C) METAL ROOF AS SHOWN ON PLANS.
 D) MODIFIED ROOFING FOR LOW SLOPE ROOF AS SHOWN ON
 PLANS.
 E) PROVIDE COMPLETE DETAILS, SPECIFICATIONS AND PRODUCT
 APPROVAL FOR THE FINISH COVERING UNDERLAYMENT OF THE
 SECOND FLOOR COVERED TERRACE.
 2- DESIGNER OF RECORD TO APPROVE ABOVE PRODUCT
 APPROVALS.
 3- PRIOR TO FABRICATION AND INSTALLATION PROVIDE
 COMPLETE ENGINEER PACKAGE FOR THE BAR JOIST AND
 CONCRETE DECK SYSTEMS, STAIRWAY , HANDRAILS AND
 GUARDRAILS APPROVED BY THE DESIGNER OF RECORD.
 4- PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR THE
 INSTALLATION OF THE BRICK VENEER SHOWING COMPLIANCE
 WITH SEC. R703.7 (ADDED WITH THIS REVISION).

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2016-01-15 Cont ID  
Sent By jgomez Date 2016-01-14 Time 16:26 Rev Time 0.00
Received By jgomez Date 2016-01-14 Time 16:15 Sent To  
Notes
2016-01-14 16:33:41BUILDING REVIEW APPROVED WITH PROVISO DATED 12/15/15:
  
 1- PROVIDE PRODUCT APPROVAL (2 COPIES) FOR:
 A) CUSTOM ENTRY DOOR AS SHOWN ON PLANS. PROVIDE
 COMPLETE ENGINEERING PACKAGE FOR BUILDING OFFICIAL
 APPROVAL. CONTACT BROWN AT [email protected].
 B) STEEL PANEL WALL SYSTEM AS SHOWN ON PLANS.
 C) METAL ROOF AS SHOWN ON PLANS.
 D) MODIFIED ROOFING FOR LOW SLOPE ROOF AS SHOWN ON
 PLANS.
 E) PROVIDE COMPLETE DETAILS, SPECIFICATIONS AND PRODUCT
 APPROVAL FOR THE FINISH COVERING UNDERLAYMENT OF THE
 SECOND FLOOR COVERED TERRACE.
 2- DESIGNER OF RECORD TO APPROVE ABOVE PRODUCT
 APPROVALS.
 3- PRIOR TO FABRICATION AND INSTALLATION PROVIDE
 COMPLETE ENGINEER PACKAGE FOR THE BAR JOIST AND
 CONCRETE DECK SYSTEMS, STAIRWAY , HANDRAILS AND
 GUARDRAILS APPROVED BY THE DESIGNER OF RECORD.
 4- PROVIDE COMPLETE DETAILS AND SPECIFICATIONS FOR THE
 INSTALLATION OF THE BRICK VENEER SHOWING COMPLIANCE
 WITH SEC. R703.7 (ADDED WITH THIS REVISION).

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2016-01-11 Cont ID  
Sent By mvaldes Date 2016-01-11 Time 15:27 Rev Time 0.00
Received By mvaldes Date 2016-01-11 Time 15:27 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-01-21 Cont ID  
Sent By skennedy Date 2016-01-21 Time 16:11 Rev Time 0.00
Received By skennedy Date 2016-01-20 Time 15:59 Sent To  
Notes
2016-01-20 16:00:09RESUB ROUTED TO TKLARGE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-01-14 Cont ID  
Sent By jgomez Date 2016-01-14 Time 16:25 Rev Time 0.00
Received By jgomez Date 2015-12-23 Time 11:37 Sent To  
Notes
2015-12-23 11:38:05R17

Review Stop P PLUMBING
Rev No 2 Status P Date 2016-01-21 Cont ID  
Sent By tklarge Date 2016-01-21 Time 10:45 Rev Time 0.00
Received By tklarge Date 2016-01-21 Time 10:37 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2016-01-06 Cont ID  
Sent By tklarge Date 2016-01-06 Time 12:21 Rev Time 0.00
Received By tklarge Date 2016-01-06 Time 09:50 Sent To  
Notes
2016-01-06 11:41:081) SUBMIT A NARRATIVE THAT CLEARLY DESRIBES THE CHANGES
 THAT WERE MADE TO THE PLUMBING SYSTEMS. WPB AMEND. TO
 FBC SEC. 107.2.1.
 2) THE PLANS SHOW GAS APPLIANCES. THE GAS SHALL BE
 UNDER A SEPARATE PERMIT. THIS SHALL BE NOTED ON THE
 PLANS.TWO COPIES OF A GAS RISER ALONG WITH TWO COPIES
 OF MANUFACTURER'S SPECIFICATIONS FOR EACH GAS APPLIANCE
 SHALL BE SUBMITTED ALONG WITH A PERMIT APPLICATION WHEN
 SUBMITTING FOR THE GAS PERMIT.
 3) SHT. A1 -SAN. RISER - BATH #4 - A VENT IS REQUIRED
 BETWEEN THE SHOWER AND TUB. 2014 FBCR SEC.P3101.2.
 4) SHT. A1 - SAN. RISER - VIP BATH - A VENT IS REQUIRED
 BETWEEN THE SHOWER AND THE WATER CLOSET. 2014 FBCR
 SEC.P3101.2.
 5) SHT. A1 - SAN.RISER - BATH #3 - A VENT IS REQUIRED
 BETWEEN THE SHOWER AND THE WATER CLOSET. 2014 FBCR
 SEC.P3101.2.
 6) SHT. A1 - SAN. RISER - THERE IS A FLAT, DRY VENT ON
 THE DRAIN AT THE FISH TANK ON THE 2ND FLOOR. THE VENT
 MUST BEE TAKEN OFF ABOVE THE CENTERLINE OF THE DRAIN TO
 WHICH IT CONNECTS. 2014 FBCR SEC. P3104.3.
 7) SHT. A5 SHOWS A POWER WASHER IN A/C STOR AREA #2,
 SHOW THE WATER CONNECTION TO THIS UNIT ON THE WATER
 RISER. IF IT IS SUPPLIED BY A HOSE FROM THE HOSE BIBB
 NOTE THIS ON THE PLAN.
 8) SHT. A6 - THE FLOR PLAN SHOWS A DRYER IN THE SECOND
 FLOOR LAUNDRY BUT NO WASHING MACHINE, BUT THE SANITARY
 AND WATER RISER SHOWS A WASHING MACHINE. CLARIFY.
 9) SHT. A6 - TWO LAVATORIES ARE SHOWN ON THE FLOOR PLAN
 IN THE MASTER BATH BUT ONLY ONE IS SHOWN ON THE
 SANITARY RISER.CLARIFY.
 10) ALL FLOOR DRAINS CONNECTED TO THE SANITARY SYSTEM
 SHALL BE EQUIPPED WITH TRAP PRIMERS. 2014 FBCR
 SEC.P3201.2.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop Z ZONING
Rev No 2 Status P Date 2016-01-21 Cont ID  
Sent By sgraham Date 2016-01-21 Time 15:57 Rev Time 0.00
Received By sgraham Date 2016-01-21 Time 15:57 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2016-01-13 Cont ID  
Sent By sgraham Date 2016-01-13 Time 15:29 Rev Time 0.00
Received By sgraham Date 2016-01-13 Time 15:29 Sent To  
Notes
***NONE***