| Plan Review Stops For Permit 15120703 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2016-01-07 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2016-01-07 |
Time |
11:17 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2016-01-07 |
Time |
10:36 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2015-12-30 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-12-30 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-12-30 |
Time |
08:37 |
Sent To |
E |
|
| Notes |
| 2015-12-30 08:43:10 | THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC, | | | FIRE MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PLEASE CONSIDER THE FOLLOWING AS PROVISO: | | | | | | THESE PROVISO COMMENTS WILL BE VERIFIED AND CONFIRMED | | | AT THE TIME OF FIRE INSPECTION. FAILURE TO FOLLOW THESE | | | PROVISO COMMENTS WILL RESULT IN A FAILED FIRE | | | INSPECTION. | | | | | | 1. THE INSTALLATION AND TESTING SHALL COMPLY WITH NFPA | | | 101 CHAPTER 7. | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2016-01-07 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2016-01-07 |
Time |
11:37 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-12-21 |
Time |
09:27 |
Sent To |
|
|
| Notes |
| 2016-01-07 11:38:22 | 1/7/16 PASSED ELECTRICAL REVIEW.. CONTRACTOR NOTIFIED | | | VIA EMAIL. SENT TO SMALL READY BIN "A". MA | | 2015-12-28 09:12:32 | TO FIRE | | 2015-12-22 09:27:32 | ELEC <5K |
|
|
|