Plan Review Details - Permit 15120639
Plan Review Stops For Permit 15120639
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-01-21 Cont ID  
Sent By shill Date 2016-01-21 Time 12:16 Rev Time 0.00
Received By shill Date 2016-01-21 Time 12:16 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-12-22 Cont ID  
Sent By shill Date 2015-12-22 Time 10:40 Rev Time 0.00
Received By shill Date 2015-12-22 Time 10:40 Sent To  
Notes
2015-12-22 10:48:11****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. SCOPE NOT CLEAR. REVISE PLAN TO INCLUDE A
 DESCRIPTION OF THE SHELTER. PLAN INDICATES THAT THIS IS
 A "MODULAR BUILDING PBC." NO UTILITY RELEASES WERE
 PROVIDED.
  
 HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/
 2013/09/DEMOLITION-APPLICATION-PAGE-1.PDF
  
 2. IF APPLICABLE, PROVIDE THE ITEMS ON THE DEMO
 CHECKLIST. IF NOT APPLICABLE, PLAN SHOULD BE REVISED TO
 CLEARLY SHOW WHY THE ITEMS ON THE CHECKLIST ARE NOT
 APPLICABLE.
  
 3. HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/
 33/2013/09/DEMOLITION_DEBRIS_FORM.PDF
  
 4. SCOPE NOT CLEAR. THE APPLICATION IS FOR DEMO OF A
 MODULAR, PLAN SHOWS UNDERGROUND TANK REMOVAL. PLEASE
 CORRELATE AND REVISE APPLICATION AND/OR PLAN
 ACCORDINGLY.
  
 5. SCOPE NOT CLEAR. IS ANOTHER STRUCTURE TO TAKE THE
 PLACE OF THIS STRUCTURE? IF NOT, SEED AND/OR SOD MAY BE
 REQUIRED. REVISE PLAN TO CLARIFY, FBC 107.
  
  
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2016-01-15 Cont ID  
Sent By albarran Date 2016-01-15 Time 13:40 Rev Time 0.00
Received By albarran Date 2016-01-15 Time 13:00 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2016-01-11 Cont ID  
Sent By albarran Date 2016-01-11 Time 15:14 Rev Time 0.00
Received By albarran Date 2016-01-11 Time 15:14 Sent To  
Notes
2016-01-11 15:19:16PLANS AS SUBMITTED ARE EXTREMELY VAGUE. PLEASE DEFINE
 YOUR SCOPE OF WORK AND EXPLAIN THE DISPOSITION OF
 ELECTRICAL SERVICES.

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2016-01-08 Cont ID  
Sent By mgonzale Date 2016-01-08 Time   Rev Time 1.00
Received By mgonzale Date 2016-01-08 Time   Sent To  
Notes
2016-01-08 09:21:11PROVISOS:
  
 #1 SWPP
  
 #2 CALL FOR LOCATES.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF
 WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/WP-CONTENT/UPLOADS/2015/12/CROSS-CONNECT
 ION-MANUAL.PDF
  
  

Review Stop G GAS REVIEW
Rev No 1 Status P Date 2016-01-22 Cont ID  
Sent By tklarge Date 2016-01-22 Time 11:16 Rev Time 0.00
Received By tklarge Date 2016-01-22 Time 11:16 Sent To  
Notes
***NONE***

Review Stop HIST HISTORICAL
Rev No 1 Status P Date 2015-12-28 Cont ID  
Sent By fmittner Date 2015-12-28 Time 14:41 Rev Time 0.00
Received By fmittner Date 2015-12-28 Time 14:41 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-01-22 Cont ID  
Sent By lmarchan Date 2016-01-22 Time 11:39 Rev Time 0.00
Received By lmarchan Date 2016-01-19 Time 08:48 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-01-11 Cont ID  
Sent By lmarchan Date 2016-01-11 Time 15:22 Rev Time 0.00
Received By lmarchan Date 2015-12-18 Time 16:10 Sent To  
Notes
***NONE***

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2016-01-22 Cont ID  
Sent By lmarchan Date 2016-01-22 Time 11:55 Rev Time 0.00
Received By lmarchan Date 2016-01-22 Time 11:55 Sent To  
Notes
2016-01-22 11:55:30ORIGINALS IN LIEU OF DIGITAL SIGNATURES.


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved