Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2016-01-19 Cont ID  
Sent By jgomez Date 2016-01-19 Time 17:47 Rev Time 0.00
Received By jgomez Date 2016-01-19 Time 17:47 Sent To  
Notes
2016-01-19 17:56:01RE-ROOF SECOND BUILDING REVIEW CHECKLIST.
 CODE: FBC-5TH EDITION (2014).
  
 1- ENGINEER TO REVISE RAS 117 CALCULATIONS SUBMITTED:
 A) ACCORDING TO SECTION 8.1 OF RAS 117 "THE MINIMUM
 FASTENER SEPARATION SHALL NOT BE LESS THAN 4 IN. O.C."
 . ENGINEER SUBMITTED SOME RAS 117 CALCULATIONS WITH
 FASTENER SPACING LESS THAN 4 IN. O.C. REVISE AS
 REQUIRED TO COMPLY WITH SEC. 8.1.
  
  
 NOTE:
 ANY A/C UNITS REMOVAL, PROPOSED 8 NEW SKYLIGHTS,
 RETROFIT AND NEW ROOF DRAINS, ELECTRICAL WORK, ETC.
 REQUIRE COMPLETE INFORMATION UNDER SEPARATE PERMITS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2016-01-14 Cont ID  
Sent By jgomez Date 2016-01-14 Time 07:54 Rev Time 0.00
Received By jgomez Date 2016-01-14 Time 07:54 Sent To  
Notes
2016-01-14 07:54:45RE-ROOF SECOND BUILDING REVIEW CHECKLIST.
 CODE: FBC-5TH EDITION (2014).
  
 1- ENGINEER TO REVISE RAS 117 CALCULATIONS SUBMITTED:
 A) ACCORDING TO SECTION 8.1 OF RAS 117 "THE MINIMUM
 FASTENER SEPARATION SHALL NOT BE LESS THAN 4 IN. O.C."
 . ENGINEER SUBMITTED SOME RAS 117 CALCULATIONS WITH
 FASTENER SPACING LESS THAN 4 IN. O.C. REVISE AS
 REQUIRED TO COMPLY WITH SEC. 8.1.
  
  
 NOTE:
 ANY A/C UNITS REMOVAL, PROPOSED 8 NEW SKYLIGHTS,
 RETROFIT AND NEW ROOF DRAINS, ELECTRICAL WORK, ETC.
 REQUIRE COMPLETE INFORMATION UNDER SEPARATE PERMITS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 (561)805-6712
 [email protected]

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-12-17 Cont ID  
Sent By jgomez Date 2015-12-16 Time 17:13 Rev Time 0.00
Received By jgomez Date 2015-12-16 Time 17:05 Sent To  
Notes
2015-12-16 17:13:32RE-ROOF BUILDING REVIEW COMMENTS.
 CODE: FBC-5TH EDITION (2014).
  
 1- ROOF ASSEMBLIES WITH MECHANICAL ATTACHMENT NEED
 FASTENER PULL OUT TEST (TAS 105) AS REQUIRED BY
 LIGHTWEIGHT CONCRETE DECK SYSTEM LIMITATION #1 AND BY
 GENERAL LIMITATION #6 ON LAST PAGE OF NOA 15-1008.02
 SUBMITTED. PROVIDE 2 COMPLETE TAS 105 PULL OUT TEST
 REPORTS. NOTE: ENGINEER TO REVISE RAS 117 CALCULATIONS
 ACCORDINGLY.
  
 2- ENGINEER TO REVISE RAS 117 CALCULATIONS SUBMITTED:
 A) THE BUILDING RISK CATEGORY IS INCORRECT. THIS
 BUILDING IS I-3, THEREFORE THE RISK CATEGORY IS III NOT
 II. REVISE AS AS REQUIRED. SEE TABLE 1604.5 OF FBC-5TH
 EDITION (2014). ALSO, REVISE DESIGN WIND SPEED AND ALL
 DESIGN PRESSURES AS REQUIRED BY FIGURE 1609B OF FBC-5TH
 EDITION (2014).
  
 B) CLARIFY WHY THE ENCLOSURE CLASS IS OPEN. SEC. 1609
 OF FBC-5TH EDITION (2014).
  
 NOTE:
 ANY A/C UNITS REMOVAL, PROPOSED 8 NEW SKYLIGHTS,
 RETROFIT AND NEW ROOF DRAINS, ELECTRICAL WORK, ETC.
 REQUIRE COMPLETE INFORMATION UNDER SEPARATE PERMITS.
  
 IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT
 JULIO GOMEZ
 COMMERCIAL COMBINATION PLANS EXAMINER
 DEVELOPMENT SERVICES DEPARTMENT
 (561)805-6712
 [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-01-19 Cont ID  
Sent By jgomez Date 2016-01-19 Time 17:47 Rev Time 0.00
Received By jgomez Date 2016-01-15 Time 15:02 Sent To  
Notes
2016-01-19 15:02:56RESUB ROUTED TO JGOMEZ

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-01-14 Cont ID  
Sent By jgomez Date 2016-01-14 Time 07:54 Rev Time 0.00
Received By jgomez Date 2016-01-08 Time 10:58 Sent To  
Notes
2016-01-08 11:24:59RESUB ROUTED JGOMEZ