Plan Review Details - Permit 15111020
Plan Review Stops For Permit 15111020
Review Stop B BUILDING (STRUCTURAL)
Rev No 5 Status P Date 2017-02-06 Cont ID  
Sent By jwitmer Date 2017-02-06 Time 14:01 Rev Time 0.00
Received By jwitmer Date 2017-02-06 Time 09:10 Sent To  
Notes
2018-07-09 16:36:10PROVISO 4-1 WAS RESOLVED UNDER SUBMITTAL 17110020 (REG)
2017-02-06 14:01:03BUILDING PLAN REVIEW
 W. P. B. PERMIT: 15111020
 ADD: 1100 S. FLAGLER DR.
 CONT: SUFFOLK CONSTRUCTION CO.
 TEL: 561-832-1616
 E-MAIL: [email protected] / ED HANRATTY
  
 2010 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 5TH REVIEW
 DATE: MON. FEB. 06/ 2017
 ACTION:BUILDING PROVISO
  
  
 NOTE: THIS REVIEW IS GOING TO BE COMPLETED AS A MIXED
 USE BUILDING,(FEMA REGULATIONS) AND THE REQUIREMENTS AS
 SUCH. 2010 FBC-B 1612.4 DESIGN & CONSTRUCTION SHALL BE
 IN ACCORDANCE WITH ASCE 24-05. ASCE 24-05 TABLE 6-1
 MINIMUM ELEVATION OF FLOODPROOFING, RELATIVE TO THE
 BASE FLOOD (BFE) OR DESIGN FLOOD ELEVATION (DFE)-
 OUTSIDE OF HIGH RISK FLOOD HAZARD AREAS. STRUCTURE
 CATEGORY- II (FOOTNOTE) C. (C) DRY FLOODPROOFING OF
 RESIDENTIAL BUILDINGS AND RESIDENTIAL PORTIONS OF MIXED
 USE BUILDINGS SHALL NOT BE PERMITTED.
  
  
 1) BUILDING PROVISO: DEFERRED SUBMITTAL. ELEVATOR
 PRODUCT DATA SHEET FOR OTIS GEN 2 ELEVATOR.
  
 FEMA TECHNICAL BULLETIN 4-93. FEMA REGULATION
 60.3(A)(3) IF A PROPOSED BUILDING SITE WILL BE
 REASONABLY SAFE FROM FLOODING. IF A PROPOSED BUILDING
 SITE IS IN A FLOOD PRONE AREA, ALL NEW CONSTRUCTION AND
 SUBSTANTIAL IMPROVEMENTS SHALL? BE CONSTRUCTED WITH
 MATERIALS RESISTANT TO FLOOD DAMAGE,(III) BE
 CONSTRUCTED BY METHODS AND PRACTICES THAT MINIMIZE
 FLOOD DAMAGES, AND (IV) BE CONSTRUCTED WITH
 ELECTRICAL... EQUIPMENT AND OTHER SERVICES FACILITIES
 THAT ARE DESIGNED AND / OR LOCATED SO AS TO PREVENT
 WATER DAMAGE FROM ENTERING OR ACCUMULATING WITHIN THE
 COMPONENTS DURING CONDITIONS OF FLOODING.
 TO KEEP THE ELEVATOR CABS FROM HAVING SUBSTANTIAL
 DAMAGE FROM FLOODWATERS, IS THERE A INTERLOCKING
 CONTROL OR FLOAT SWITCH THAT WHEN ACTIVATED WILL KEEP
 THE CAB FROM DESCENDING INTO THE FLOODWATERS.
  
 2) PROVISO: ANY EUROPEAN CAR LIFT SYSTEM WILL NEED TO
 SUBMIT PRODUCT LISTINGS WHERE THEY HAVE AN NRTL
 (NATIONALLY RECOGNIZED TESTING LABORATORY) ACCREDITED
 BY THE US AUTHORITY OCCUPATIONAL SAFETY AND HEALTH
 ADMINISTRATION AND STAMPED FOR US MARKETS.
  
 3) BUILDING PROVISO: THE PLANS SHOW AT THE ENTRY LEVEL
 OF THE LOBBY A RECEPTION/ REGISTRATION DESK. PLEASE
 PROVIDE COMPLIANCE WITH FAIR HOUSING SPECIFICATION OF
 ANSI 4.31 ALSO SEE REACH RANGES.
  
 4) BUILDING PROVISO: DEFERRED SUBMITTALS : TEST REPORTS
 SHOWING COMPLIANCE WITH:
  
 4)(1) FBC-B 2014 1207.3 STRUCTURE-BORNE SOUND.
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492.
  
 4)(2) FBC-B 2014 1207.2 AIR-BORNE SOUND.
 WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES
 SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM
 PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION
 CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED)
 FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM
 E 90.
  
 4)(3) FLAME SPREAD- FBC-B 2014 603.1. EXCEPTION 2.
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200.
  
 FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS
 A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL
 MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A
 MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
  
 5) BUILDING PROVISO: DEFERRED SUBMITTALS: SHEET
 431-M4-01 MECHANICAL DETAILS EQUIPMENT SUPPORT CURB
 DETAIL & THYBAR VIBRATION CURB III DETAIL FOR OAU-1 &
 2. PLEASE PROVIDE THE PRODUCT APPROVALS FOR CURB
 DETAILS. TO BE REVIEWED BY THE STRUCTURAL ENGINEER OF
 RECORD, AND WITH THEIR SHOP DRAWING STAMP OF APPROVAL.
 PLEASE NOTE THE STRUCTURAL ANCHOR TO THE BASE OR
 SUPPORT AS WELL AS THE UNIT TO THE CURB FOR MOMENT OF
 OVERTURNING, WILL NEED TO BE DESIGNED BY THE STRUCTURAL
 ENGINEER OR HIS DELEGATE WITH THE STRUCTURAL ENGINEERS
 APPROVAL BEFORE SUBMITTAL TO THE BUILDING DEPARTMENT
 FOR REVIEW.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
 6)BUILDING PROVISO: DEFERRED SUBMITTAL FOR
 ARCHITECTURAL TRIM AND EMBELLISHMENTS METAL FINS ON
 LEVEL 26. 1407.5 APPROVAL. RESULTS OF APPROVED TESTS OR
 AN ENGINEERING ANALYSIS SHALL BE SUBMITTED TO THE
 BUILDING OFFICIAL TO VERIFY COMPLIANCE WITH THE
 REQUIREMENTS OF CHAPTER 16 FOR WIND LOADS. 1407.6
 WEATHER RESISTANCE. IF DELEGATED ENGINEERING THEN THE
 DOCUMENTS NEED TO BE FORWARDED TO THE ENGINEER OF
 RECORD FOR REVIEW AND APPROVAL BEFORE SUBMITTING TO THE
 BUILDING DEPARTMENT. 61G15-30.003.
  
 7) BUILDING PROVISO: DEFERRED SUBMITTAL FOR THE TERRA
 COTTA WALL CLADDING UNITS. FOR ARCHITECTURAL TRIM AND
 EMBELLISHMENTS THE TERRA COTTA UNITS WILL NEED TO
 COMPLY WITH 2010 FBC-B 1407.5 APPROVAL. RESULTS OF
 APPROVED TESTS OR AN ENGINEERING ANALYSIS SHALL BE
 SUBMITTED TO THE BUILDING OFFICIAL TO VERIFY COMPLIANCE
 WITH THE REQUIREMENTS OF CHAPTER 16 FOR WIND LOADS.
 1407.6 WEATHER RESISTANCE. IF DELEGATED ENGINEERING
 THEN THE DOCUMENTS NEED TO BE FORWARDED TO THE ENGINEER
 OF RECORD FOR REVIEW AND APPROVAL BEFORE SUBMITTING TO
 THE BUILDING DEPARTMENT. 61G15-30.003.
  
 8) BUILDING PROVISO: DEFERRED SUBMITTAL
 POLYISOCYANURATE BOARD. WITH SINGLE PLY RECOVERY BOARD
 AND SINGLE PLY PVC ROOFING MEMBRANE ROOFING. PLEASE
 PROVIDE THE PRODUCT APPROVALS FOR EACH OF THE MEMBERS.
 FOR ALL ROOFING PRODUCTS PLEASE IDENTIFY ALL ROOFING
 SUB-SYSTEMS AND THEIR ASSOCIATED PRESSURES FOR ROOF
 ZONE # 1. REVIEW THE PRODUCT APPROVAL LIMITATIONS, IF
 ENHANCED FASTENING IS ALLOWED FOR ROOF ZONES 2 & 3.
 FASTENER DENSITIES SHALL BE INCREASED FOR BOTH
 INSULATION & THE BASE SHEET AS CALCULATED IN COMPLIANCE
 WITH ROOFING APPLICATION STANDARDS RAS 117. CALCULATION
 PREPARED, SIGNED AND SEALED BY A FLORIDA REGISTERED
 PROFESSIONAL ENGINEER OR REGISTERED ARCHITECT.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
 9)BUILDING PROVISO: DEFERRED SUBMITTALS. DETAILS 3 & 4
 BOTH SHOW A TILE DECK ABOVE THE ROOFING SYSTEM. THE
 ROOFING SYSTEM WELL NEED TO PROVIDE PRODUCT APPROVALS
 FOR WIND AS WELL AS ENGINEERING FOR THE TILE DECK
 INSTALLATION THEY WILL MEET THE WIND LOADS FOR THE
 LOCATION ON THE BUILDING.2010 FBC-B COMPONENTS AND
 CLADDING. 1609.6.4.4.1 COMPONENTS & CLADDING.
  
 10) BUILDING PROVISO: DEFERRED SUBMITTAL. CANOPY
 SYSTEMS. ADDITIONAL ENGINEERING SHEETS (SHOP DRAWINGS)
 TO BE SUBMITTED AS A DEFERRED SUBMITTAL. PLEASE ALSO
 PROVIDE HOW CODE COMPLIANCE WITH 2010 FBC-B 2405.2
 ALLOWABLE GLAZING MATERIALS AND LIMITATIONS WILL BE
 COMPLIED WITH. FL 61G-15-30.006 (3) THE DELEGATED
 ENGINEER SHALL FORWARD THE DELEGATED ENGINEERING
 DOCUMENTS TO THE ENGINEER OF RECORD FOR REVIEW.
  
 11) BUILDING PROVISO: 107.3.4.2 DEFERRED SUBMITTALS.
 2010 FBC-B 1609.1.2 PROTECTION OF OPENINGS,
 1609.6.4.4.1 COMPONENTS & CLADDING
  
 FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV.
 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION
 SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS:
 (31)(A) EXTERIOR DOORS. ROOF HATCHES.
 (B) WINDOWS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, CURBS, INTAKE AND
 EXHAUST FANS ?
 (E) SHUTTERS
 (F) SKYLIGHTS
 (G) PRE-ENGINEERED A/C STANDS
 107.3.4.1 THOSE PRODUCTS WHICH ARE REGULATED BY DCA
 RULE 9N-3 SHALL BE REVIEWED AND APPROVED IN WRITING BY
 THE DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 4 Status F Date 2017-01-30 Cont ID  
Sent By jwitmer Date 2017-01-30 Time 10:05 Rev Time 0.00
Received By jwitmer Date 2017-01-30 Time   Sent To  
Notes
2017-01-30 10:48:26BUILDING PLAN REVIEW
 W. P. B. PERMIT: 15111020
 ADD: 1100 S. FLAGLER DR.
 CONT: SUFFOLK CONSTRUCTION CO.
 TEL: 561-832-1616
 E-MAIL: [email protected] / ED HANRATTY
  
 2010 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 4TH REVIEW
 DATE: MON. JAN. 30/ 2017
 ACTION: DENIED
  
  
 NOTE: THIS REVIEW IS GOING TO BE COMPLETED AS A MIXED
 USE BUILDING,(FEMA REGULATIONS) AND THE REQUIREMENTS AS
 SUCH. 2010 FBC-B 1612.4 DESIGN & CONSTRUCTION SHALL BE
 IN ACCORDANCE WITH ASCE 24-05.
 ASCE 24-05 TABLE 6-1 MINIMUM ELEVATION OF
 FLOODPROOFING, RELATIVE TO THE BASE FLOOD (BFE) OR
 DESIGN FLOOD ELEVATION (DFE)- OUTSIDE OF HIGH RISK
 FLOOD HAZARD AREAS. STRUCTURE CATEGORY- II (FOOTNOTE)
 C. (C) DRY FLOODPROOFING OF RESIDENTIAL BUILDINGS AND
 RESIDENTIAL PORTIONS OF MIXED USE BUILDINGS SHALL NOT
 BE PERMITTED.
  
 1) DENIED!!!!!!!! 2ND REQUEST!!!!!!. PLANS STILL SHOW
 AN OPENING WITHIN 10 FEET OF THE EXIT STAIR # 9. SEE
 079-A2-0P1, 182-A5-28 & 182-A5-28 NOR THE STRUCTURAL
 SHEETS 358-S2-0P1.
 THE MECHANICAL SHEET 397-M2-)P1 SHOWS (2) FIRE DAMPERS
 PGEF P2-1A & PGP2-1B THESE FIRE DAMPERS DO NOT LINE UP
 OR ARE SIZED FOR THE EXTERIOR WALL OPENINGS SEPARATING
 THE EXTERIOR OF THE BUILDING. THE LAST DATE THIS PLAN
 WAS UPDATED WAS 11/22/2016. THE BRISTOL MEETING
 ADDRESSING THIS ISSUE WAS ON JAN 11/2017.
 , MECHANICAL REVIEW HAS ASKED THIS COMMENT REPEATEDLY
 SEE SHEET 182-A5-28 THE DETAILS SHOW 2 ISSUES:
 1A) THE EXTERIOR EXIT STAIR SHOWS LOUVERS IN THE
 EXTERIOR WALL AND WITHIN 10 FEET OF THE EXTERIOR
 STAIRS. PLEASE REVIEW SECTION 2010 FBC-B 1026.6
 EXTERIOR STAIRWAY AND RAMP PROTECTION.
 EXTERIOR EXIT STAIRWAYS AND RAMPS SHALL BE SEPARATED
 FROM THE INTERIOR OF THE BUILDING AS REQUIRED IN
 SECTION 1022.2. OPENINGS SHALL BE LIMITED TO THOSE
 NECESSARY FOR EGRESS FROM NORMALLY OCCUPIED SPACES.
 1) BUILDING PROVISO: DEFERRED SUBMITTAL. ELEVATOR
 PRODUCT DATA SHEET FOR OTIS GEN 2 ELEVATOR.
  
 FEMA TECHNICAL BULLETIN 4-93. FEMA REGULATION
 60.3(A)(3) IF A PROPOSED BUILDING SITE WILL BE
 REASONABLY SAFE FROM FLOODING. IF A PROPOSED BUILDING
 SITE IS IN A FLOOD PRONE AREA, ALL NEW CONSTRUCTION AND
 SUBSTANTIAL IMPROVEMENTS SHALL? BE CONSTRUCTED WITH
 MATERIALS RESISTANT TO FLOOD DAMAGE,(III) BE
 CONSTRUCTED BY METHODS AND PRACTICES THAT MINIMIZE
 FLOOD DAMAGES, AND (IV) BE CONSTRUCTED WITH
 ELECTRICAL... EQUIPMENT AND OTHER SERVICES FACILITIES
 THAT ARE DESIGNED AND / OR LOCATED SO AS TO PREVENT
 WATER DAMAGE FROM ENTERING OR ACCUMULATING WITHIN THE
 COMPONENTS DURING CONDITIONS OF FLOODING.
 TO KEEP THE ELEVATOR CABS FROM HAVING SUBSTANTIAL
 DAMAGE FROM FLOODWATERS, IS THERE A INTERLOCKING
 CONTROL OR FLOAT SWITCH THAT WHEN ACTIVATED WILL KEEP
 THE CAB FROM DESCENDING INTO THE FLOODWATERS.
  
 2) PROVISO: ANY EUROPEAN CAR LIFT SYSTEM WILL NEED TO
 SUBMIT PRODUCT LISTINGS WHERE THEY HAVE AN NRTL
 (NATIONALLY RECOGNIZED TESTING LABORATORY) ACCREDITED
 BY THE US AUTHORITY OCCUPATIONAL SAFETY AND HEALTH
 ADMINISTRATION AND STAMPED FOR US MARKETS.
  
 3) BUILDING PROVISO: THE PLANS SHOW AT THE ENTRY LEVEL
 OF THE LOBBY A RECEPTION/ REGISTRATION DESK. PLEASE
 PROVIDE COMPLIANCE WITH FAIR HOUSING SPECIFICATION OF
 ANSI 4.31 ALSO SEE REACH RANGES.
  
 4) BUILDING PROVISO: DEFERRED SUBMITTALS : TEST REPORTS
 SHOWING COMPLIANCE WITH:
  
 4)(1) FBC-B 2014 1207.3 STRUCTURE-BORNE SOUND.
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492.
  
 4)(2) FBC-B 2014 1207.2 AIR-BORNE SOUND.
 WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES
 SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM
 PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION
 CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED)
 FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM
 E 90.
  
 4)(3) FLAME SPREAD- FBC-B 2014 603.1. EXCEPTION 2.
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200.
  
 FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS
 A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL
 MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A
 MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
  
 5) BUILDING PROVISO: DEFERRED SUBMITTALS: SHEET
 431-M4-01 MECHANICAL DETAILS EQUIPMENT SUPPORT CURB
 DETAIL & THYBAR VIBRATION CURB III DETAIL FOR OAU-1 &
 2. PLEASE PROVIDE THE PRODUCT APPROVALS FOR CURB
 DETAILS. TO BE REVIEWED BY THE STRUCTURAL ENGINEER OF
 RECORD, AND WITH THEIR SHOP DRAWING STAMP OF APPROVAL.
 PLEASE NOTE THE STRUCTURAL ANCHOR TO THE BASE OR
 SUPPORT AS WELL AS THE UNIT TO THE CURB FOR MOMENT OF
 OVERTURNING, WILL NEED TO BE DESIGNED BY THE STRUCTURAL
 ENGINEER OR HIS DELEGATE WITH THE STRUCTURAL ENGINEERS
 APPROVAL BEFORE SUBMITTAL TO THE BUILDING DEPARTMENT
 FOR REVIEW.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
 6)BUILDING PROVISO: DEFERRED SUBMITTAL FOR
 ARCHITECTURAL TRIM AND EMBELLISHMENTS METAL FINS ON
 LEVEL 26. 1407.5 APPROVAL. RESULTS OF APPROVED TESTS OR
 AN ENGINEERING ANALYSIS SHALL BE SUBMITTED TO THE
 BUILDING OFFICIAL TO VERIFY COMPLIANCE WITH THE
 REQUIREMENTS OF CHAPTER 16 FOR WIND LOADS. 1407.6
 WEATHER RESISTANCE. IF DELEGATED ENGINEERING THEN THE
 DOCUMENTS NEED TO BE FORWARDED TO THE ENGINEER OF
 RECORD FOR REVIEW AND APPROVAL BEFORE SUBMITTING TO THE
 BUILDING DEPARTMENT. 61G15-30.003.
  
 7) BUILDING PROVISO: DEFERRED SUBMITTAL FOR THE TERRA
 COTTA WALL CLADDING UNITS. FOR ARCHITECTURAL TRIM AND
 EMBELLISHMENTS THE TERRA COTTA UNITS WILL NEED TO
 COMPLY WITH 2010 FBC-B 1407.5 APPROVAL. RESULTS OF
 APPROVED TESTS OR AN ENGINEERING ANALYSIS SHALL BE
 SUBMITTED TO THE BUILDING OFFICIAL TO VERIFY COMPLIANCE
 WITH THE REQUIREMENTS OF CHAPTER 16 FOR WIND LOADS.
 1407.6 WEATHER RESISTANCE. IF DELEGATED ENGINEERING
 THEN THE DOCUMENTS NEED TO BE FORWARDED TO THE ENGINEER
 OF RECORD FOR REVIEW AND APPROVAL BEFORE SUBMITTING TO
 THE BUILDING DEPARTMENT. 61G15-30.003.
  
 8) BUILDING PROVISO: DEFERRED SUBMITTAL
 POLYISOCYANURATE BOARD. WITH SINGLE PLY RECOVERY BOARD
 AND SINGLE PLY PVC ROOFING MEMBRANE ROOFING. PLEASE
 PROVIDE THE PRODUCT APPROVALS FOR EACH OF THE MEMBERS.
 FOR ALL ROOFING PRODUCTS PLEASE IDENTIFY ALL ROOFING
 SUB-SYSTEMS AND THEIR ASSOCIATED PRESSURES FOR ROOF
 ZONE # 1. REVIEW THE PRODUCT APPROVAL LIMITATIONS, IF
 ENHANCED FASTENING IS ALLOWED FOR ROOF ZONES 2 & 3.
 FASTENER DENSITIES SHALL BE INCREASED FOR BOTH
 INSULATION & THE BASE SHEET AS CALCULATED IN COMPLIANCE
 WITH ROOFING APPLICATION STANDARDS RAS 117. CALCULATION
 PREPARED, SIGNED AND SEALED BY A FLORIDA REGISTERED
 PROFESSIONAL ENGINEER OR REGISTERED ARCHITECT.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
 9)BUILDING PROVISO: DEFERRED SUBMITTALS. DETAILS 3 & 4
 BOTH SHOW A TILE DECK ABOVE THE ROOFING SYSTEM. THE
 ROOFING SYSTEM WELL NEED TO PROVIDE PRODUCT APPROVALS
 FOR WIND AS WELL AS ENGINEERING FOR THE TILE DECK
 INSTALLATION THEY WILL MEET THE WIND LOADS FOR THE
 LOCATION ON THE BUILDING.2010 FBC-B COMPONENTS AND
 CLADDING. 1609.6.4.4.1 COMPONENTS & CLADDING.
  
 10) BUILDING PROVISO: DEFERRED SUBMITTAL. CANOPY
 SYSTEMS. ADDITIONAL ENGINEERING SHEETS (SHOP DRAWINGS)
 TO BE SUBMITTED AS A DEFERRED SUBMITTAL. PLEASE ALSO
 PROVIDE HOW CODE COMPLIANCE WITH 2010 FBC-B 2405.2
 ALLOWABLE GLAZING MATERIALS AND LIMITATIONS WILL BE
 COMPLIED WITH. FL 61G-15-30.006 (3) THE DELEGATED
 ENGINEER SHALL FORWARD THE DELEGATED ENGINEERING
 DOCUMENTS TO THE ENGINEER OF RECORD FOR REVIEW.
  
 11) BUILDING PROVISO: 107.3.4.2 DEFERRED SUBMITTALS.
 2010 FBC-B 1609.1.2 PROTECTION OF OPENINGS,
 1609.6.4.4.1 COMPONENTS & CLADDING
  
 FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV.
 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION
 SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS:
 (31)(A) EXTERIOR DOORS. ROOF HATCHES.
 (B) WINDOWS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, CURBS, INTAKE AND
 EXHAUST FANS ?
 (E) SHUTTERS
 (F) SKYLIGHTS
 (G) PRE-ENGINEERED A/C STANDS
 107.3.4.1 THOSE PRODUCTS WHICH ARE REGULATED BY DCA
 RULE 9N-3 SHALL BE REVIEWED AND APPROVED IN WRITING BY
 THE DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status F Date 2016-12-21 Cont ID  
Sent By jwitmer Date 2016-12-21 Time 12:10 Rev Time 0.00
Received By jwitmer Date 2016-12-19 Time 10:46 Sent To  
Notes
2016-12-21 12:10:40BUILDING PLAN REVIEW
 W. P. B. PERMIT: 15111020
 ADD: 1100 S. FLAGLER DR.
 CONT: SUFFOLK CONSTRUCTION CO.
 TEL: 561-832-1616
 E-MAIL: [email protected] / ED HANRATTY
  
 2010 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 3RD REVIEW
 DATE: WED. DEC. 21/ 2016
 ACTION: DENIED
  
  
 NOTE: THIS REVIEW IS GOING TO BE COMPLETED AS A MIXED
 USE BUILDING,(FEMA REGULATIONS) AND THE REQUIREMENTS AS
 SUCH. 2010 FBC-B 1612.4 DESIGN & CONSTRUCTION SHALL BE
 IN ACCORDANCE WITH ASCE 24-05.
 ASCE 24-05 TABLE 6-1 MINIMUM ELEVATION OF
 FLOODPROOFING, RELATIVE TO THE BASE FLOOD (BFE) OR
 DESIGN FLOOD ELEVATION (DFE)- OUTSIDE OF HIGH RISK
 FLOOD HAZARD AREAS. STRUCTURE CATEGORY- II (FOOTNOTE)
 C. (C) DRY FLOODPROOFING OF RESIDENTIAL BUILDINGS AND
 RESIDENTIAL PORTIONS OF MIXED USE BUILDINGS SHALL NOT
 BE PERMITTED.
  
 1) NEW BUILDING COMMENT, MECHANICAL REVIEW HAS ASKED
 THIS COMMENT REPEATEDLY SEE SHEET 182-A5-28 THE DETAILS
 SHOW 2 ISSUES:
 1A) THE EXTERIOR EXIT STAIR SHOWS LOUVERS IN THE
 EXTERIOR WALL AND WITHIN 10 FEET OF THE EXTERIOR
 STAIRS. PLEASE REVIEW SECTION 2010 FBC-B 1026.6
 EXTERIOR STAIRWAY AND RAMP PROTECTION.
 EXTERIOR EXIT STAIRWAYS AND RAMPS SHALL BE SEPARATED
 FROM THE INTERIOR OF THE BUILDING AS REQUIRED IN
 SECTION 1022.2. OPENINGS SHALL BE LIMITED TO THOSE
 NECESSARY FOR EGRESS FROM NORMALLY OCCUPIED SPACES.
  
 1B) DETAILS SHOW REENTRY INTO THE BUILDING, THIS DESIGN
 DOES NOT COMPLY WITH FBC-B 1027.1 THE EXIT DISCHARGE
 SHALL NOT REENTER A BUILDING.
  
  
 1) BUILDING PROVISO: DEFERRED SUBMITTAL. ELEVATOR
 PRODUCT DATA SHEET FOR OTIS GEN 2 ELEVATOR.
  
 FEMA TECHNICAL BULLETIN 4-93. FEMA REGULATION
 60.3(A)(3) IF A PROPOSED BUILDING SITE WILL BE
 REASONABLY SAFE FROM FLOODING. IF A PROPOSED BUILDING
 SITE IS IN A FLOOD PRONE AREA, ALL NEW CONSTRUCTION AND
 SUBSTANTIAL IMPROVEMENTS SHALL? BE CONSTRUCTED WITH
 MATERIALS RESISTANT TO FLOOD DAMAGE,(III) BE
 CONSTRUCTED BY METHODS AND PRACTICES THAT MINIMIZE
 FLOOD DAMAGES, AND (IV) BE CONSTRUCTED WITH
 ELECTRICAL... EQUIPMENT AND OTHER SERVICES FACILITIES
 THAT ARE DESIGNED AND / OR LOCATED SO AS TO PREVENT
 WATER DAMAGE FROM ENTERING OR ACCUMULATING WITHIN THE
 COMPONENTS DURING CONDITIONS OF FLOODING.
 TO KEEP THE ELEVATOR CABS FROM HAVING SUBSTANTIAL
 DAMAGE FROM FLOODWATERS, IS THERE A INTERLOCKING
 CONTROL OR FLOAT SWITCH THAT WHEN ACTIVATED WILL KEEP
 THE CAB FROM DESCENDING INTO THE FLOODWATERS.
  
 2) PROVISO: ANY EUROPEAN CAR LIFT SYSTEM WILL NEED TO
 SUBMIT PRODUCT LISTINGS WHERE THEY HAVE AN NRTL
 (NATIONALLY RECOGNIZED TESTING LABORATORY) ACCREDITED
 BY THE US AUTHORITY OCCUPATIONAL SAFETY AND HEALTH
 ADMINISTRATION AND STAMPED FOR US MARKETS.
  
 3) BUILDING PROVISO: THE PLANS SHOW AT THE ENTRY LEVEL
 OF THE LOBBY A RECEPTION/ REGISTRATION DESK. PLEASE
 PROVIDE COMPLIANCE WITH FAIR HOUSING SPECIFICATION OF
 ANSI 4.31 ALSO SEE REACH RANGES.
  
 4) BUILDING PROVISO: DEFERRED SUBMITTALS : TEST REPORTS
 SHOWING COMPLIANCE WITH:
  
 4)(1) FBC-B 2014 1207.3 STRUCTURE-BORNE SOUND.
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492.
  
 4)(2) FBC-B 2014 1207.2 AIR-BORNE SOUND.
 WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES
 SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM
 PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION
 CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED)
 FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM
 E 90.
  
 4)(3) FLAME SPREAD- FBC-B 2014 603.1. EXCEPTION 2.
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200.
  
 FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS
 A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL
 MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A
 MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
  
 5) BUILDING PROVISO: DEFERRED SUBMITTALS: SHEET
 431-M4-01 MECHANICAL DETAILS EQUIPMENT SUPPORT CURB
 DETAIL & THYBAR VIBRATION CURB III DETAIL FOR OAU-1 &
 2. PLEASE PROVIDE THE PRODUCT APPROVALS FOR CURB
 DETAILS. TO BE REVIEWED BY THE STRUCTURAL ENGINEER OF
 RECORD, AND WITH THEIR SHOP DRAWING STAMP OF APPROVAL.
 PLEASE NOTE THE STRUCTURAL ANCHOR TO THE BASE OR
 SUPPORT AS WELL AS THE UNIT TO THE CURB FOR MOMENT OF
 OVERTURNING, WILL NEED TO BE DESIGNED BY THE STRUCTURAL
 ENGINEER OR HIS DELEGATE WITH THE STRUCTURAL ENGINEERS
 APPROVAL BEFORE SUBMITTAL TO THE BUILDING DEPARTMENT
 FOR REVIEW.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
 6)BUILDING PROVISO: DEFERRED SUBMITTAL FOR
 ARCHITECTURAL TRIM AND EMBELLISHMENTS METAL FINS ON
 LEVEL 26. 1407.5 APPROVAL. RESULTS OF APPROVED TESTS OR
 AN ENGINEERING ANALYSIS SHALL BE SUBMITTED TO THE
 BUILDING OFFICIAL TO VERIFY COMPLIANCE WITH THE
 REQUIREMENTS OF CHAPTER 16 FOR WIND LOADS. 1407.6
 WEATHER RESISTANCE. IF DELEGATED ENGINEERING THEN THE
 DOCUMENTS NEED TO BE FORWARDED TO THE ENGINEER OF
 RECORD FOR REVIEW AND APPROVAL BEFORE SUBMITTING TO THE
 BUILDING DEPARTMENT. 61G15-30.003.
  
 7) BUILDING PROVISO: DEFERRED SUBMITTAL FOR THE TERRA
 COTTA WALL CLADDING UNITS. FOR ARCHITECTURAL TRIM AND
 EMBELLISHMENTS THE TERRA COTTA UNITS WILL NEED TO
 COMPLY WITH 2010 FBC-B 1407.5 APPROVAL. RESULTS OF
 APPROVED TESTS OR AN ENGINEERING ANALYSIS SHALL BE
 SUBMITTED TO THE BUILDING OFFICIAL TO VERIFY COMPLIANCE
 WITH THE REQUIREMENTS OF CHAPTER 16 FOR WIND LOADS.
 1407.6 WEATHER RESISTANCE. IF DELEGATED ENGINEERING
 THEN THE DOCUMENTS NEED TO BE FORWARDED TO THE ENGINEER
 OF RECORD FOR REVIEW AND APPROVAL BEFORE SUBMITTING TO
 THE BUILDING DEPARTMENT. 61G15-30.003.
  
 8) BUILDING PROVISO: DEFERRED SUBMITTAL
 POLYISOCYANURATE BOARD. WITH SINGLE PLY RECOVERY BOARD
 AND SINGLE PLY PVC ROOFING MEMBRANE ROOFING. PLEASE
 PROVIDE THE PRODUCT APPROVALS FOR EACH OF THE MEMBERS.
 FOR ALL ROOFING PRODUCTS PLEASE IDENTIFY ALL ROOFING
 SUB-SYSTEMS AND THEIR ASSOCIATED PRESSURES FOR ROOF
 ZONE # 1. REVIEW THE PRODUCT APPROVAL LIMITATIONS, IF
 ENHANCED FASTENING IS ALLOWED FOR ROOF ZONES 2 & 3.
 FASTENER DENSITIES SHALL BE INCREASED FOR BOTH
 INSULATION & THE BASE SHEET AS CALCULATED IN COMPLIANCE
 WITH ROOFING APPLICATION STANDARDS RAS 117. CALCULATION
 PREPARED, SIGNED AND SEALED BY A FLORIDA REGISTERED
 PROFESSIONAL ENGINEER OR REGISTERED ARCHITECT.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
 9)BUILDING PROVISO: DEFERRED SUBMITTALS. DETAILS 3 & 4
 BOTH SHOW A TILE DECK ABOVE THE ROOFING SYSTEM. THE
 ROOFING SYSTEM WELL NEED TO PROVIDE PRODUCT APPROVALS
 FOR WIND AS WELL AS ENGINEERING FOR THE TILE DECK
 INSTALLATION THEY WILL MEET THE WIND LOADS FOR THE
 LOCATION ON THE BUILDING.2010 FBC-B COMPONENTS AND
 CLADDING. 1609.6.4.4.1 COMPONENTS & CLADDING.
  
 10) BUILDING PROVISO: DEFERRED SUBMITTAL. CANOPY
 SYSTEMS. ADDITIONAL ENGINEERING SHEETS (SHOP DRAWINGS)
 TO BE SUBMITTED AS A DEFERRED SUBMITTAL. PLEASE ALSO
 PROVIDE HOW CODE COMPLIANCE WITH 2010 FBC-B 2405.2
 ALLOWABLE GLAZING MATERIALS AND LIMITATIONS WILL BE
 COMPLIED WITH. FL 61G-15-30.006 (3) THE DELEGATED
 ENGINEER SHALL FORWARD THE DELEGATED ENGINEERING
 DOCUMENTS TO THE ENGINEER OF RECORD FOR REVIEW.
  
 11) BUILDING PROVISO: 107.3.4.2 DEFERRED SUBMITTALS.
 2010 FBC-B 1609.1.2 PROTECTION OF OPENINGS,
 1609.6.4.4.1 COMPONENTS & CLADDING
  
 FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV.
 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION
 SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS:
 (31)(A) EXTERIOR DOORS. ROOF HATCHES.
 (B) WINDOWS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, CURBS, INTAKE AND
 EXHAUST FANS ?
 (E) SHUTTERS
 (F) SKYLIGHTS
 (G) PRE-ENGINEERED A/C STANDS
 107.3.4.1 THOSE PRODUCTS WHICH ARE REGULATED BY DCA
 RULE 9N-3 SHALL BE REVIEWED AND APPROVED IN WRITING BY
 THE DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  
  
  
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status F Date 2016-08-29 Cont ID  
Sent By jwitmer Date 2016-08-29 Time 17:12 Rev Time 0.00
Received By jwitmer Date 2016-08-23 Time 08:38 Sent To  
Notes
2016-08-29 17:12:53BUILDING PLAN REVIEW
 W. P. B. PERMIT: 15111020
 ADD: 1100 S. FLAGLER DR.
 CONT: SUFFOLK CONSTRUCTION CO.
 TEL: 561-832-1616
 E-MAIL: [email protected] / ED HANRATTY
  
 2010 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2ND REVIEW
 DATE: SAT.- AUG. 26- /2016
 ACTION: DENIED
  
 NOTE: THIS REVIEW IS GOING TO BE COMPLETED AS A MIXED
 USE BUILDING,(FEMA REGULATIONS) AND THE REQUIREMENTS AS
 SUCH. 2010 FBC-B 1612.4 DESIGN & CONSTRUCTION SHALL BE
 IN ACCORDANCE WITH ASCE 24-05.
 ASCE 24-05 TABLE 6-1 MINIMUM ELEVATION OF
 FLOODPROOFING, RELATIVE TO THE BASE FLOOD (BFE) OR
 DESIGN FLOOD ELEVATION (DFE)- OUTSIDE OF HIGH RISK
 FLOOD HAZARD AREAS. STRUCTURE CATEGORY- II (FOOTNOTE)
 C. (C) DRY FLOODPROOFING OF RESIDENTIAL BUILDINGS AND
 RESIDENTIAL PORTIONS OF MIXED USE BUILDINGS SHALL NOT
 BE PERMITTED.
  
 1) SHEET 078-A2-0P2 PARKING 2 (LOWER LEVEL):
  
 1A) COMPLIED2010 FBC-B 1612.4 DESIGN & CONSTRUCTION
 SHALL BE IN ACCORDANCE WITH ASCE 24-05. ASCE 24-05
 TABLE 6-1. (FOOTNOTE) C. ( C ) DRY FLOODPROOFING OF
 RESIDENTIAL BUILDINGS AND RESIDENTIAL PORTIONS OF MIXED
 USE BUILDINGS SHALL NOT BE PERMITTED.
  
 1B)2ND REQUEST. THE RESPONSE LETTER INDICATES THE
 ELEVATOR IS A TRACTION ELEVATOR AS IDENTIFIED. THERE IS
 NO REFERENCE TO THE ELEVATOR BEING A TRACTION ELEVATOR
 OR A REVISION NUMBER AND BEING CLOUDED, BUBBLED OR A
 DELTA.
 ELEVATOR # 9 IS NOT IDENTIFIED ON SHEET 012-LS-P1/ P2.
 SHEET 176-A5.15 DOES NOT INDICATE IF THIS ELEVATOR IS A
 HYDRAULIC ELEVATOR? PLEASE IF THE ELEVATOR IS HYDRAULIC
 SHOW COMPLIANCE WITH 2010 FBC-B 3011. (1-4). IF THIS
 ELEVATOR IS HYDRAULIC IN WILL THE SUMP PUMP BE TIED
 INTO THE EMERGENCY ELECTRICAL PANEL TO KEEP DAMAGE TO
 THE HYDRAULIC SYSTEM AND CAB A MINIMUM. FEMA BULLETIN
 4-93.
  
 1C) 2ND REQUEST. THE RESPONSE LETTER INDICATES THE
 ELEVATOR IS A TRACTION ELEVATOR, WHICH IS MACHINE
 ROOMLESS ELEVATOR AS IDENTIFIED. THERE IS NO REFERENCE
 TO THE ELEVATOR BEING A TRACTION ELEVATOR OR A REVISION
 NUMBER AND BEING CLOUDED, BUBBLED OR A DELTA.
 ELEVATOR # 9 PLEASE IDENTIFY WHERE THE MACHINE ROOM FOR
 ELEVATOR # 9 IS LOCATED? PLEASE SHOW COMPLIANCE WITH
 2010 FBC-B 3006.4. 1 HOUR FIRE RATING.
  
 1D) 2ND REQUEST. THE RESPONSE INDICATES THE ELEVATOR TO
 BE A OTIS GEN 2 AND INCLUDES FLOAT SWITCH AND SOFTWARE,
 IT WOULD APPEAR THERE WOULD BE PRODUCT LITERATURE
 SUBMITTED, RESEARCHED THE EQUIPMENT SPEC SHEETS 33
 SHEETS NOT INCLUDED IN THIS FILE.
 THE OTHER ISSUE WITH ALL OF THE OTHER ELEVATORS THAT
 TRAVEL TO THE LOWER P2 PARKING LEVEL DEALS WITH THE
 FEMA TECHNICAL BULLETIN 4-93. FEMA REGULATION
 60.3(A)(3) IF A PROPOSED BUILDING SITE WILL BE
 REASONABLY SAFE FROM FLOODING. IF A PROPOSED BUILDING
 SITE IS IN A FLOOD PRONE AREA, ALL NEW CONSTRUCTION AND
 SUBSTANTIAL IMPROVEMENTS SHALL? BE CONSTRUCTED WITH
 MATERIALS RESISTANT TO FLOOD DAMAGE,(III) BE
 CONSTRUCTED BY METHODS AND PRACTICES THAT MINIMIZE
 FLOOD DAMAGES, AND (IV) BE CONSTRUCTED WITH
 ELECTRICAL... EQUIPMENT AND OTHER SERVICES FACILITIES
 THAT ARE DESIGNED AND / OR LOCATED SO AS TO PREVENT
 WATER DAMAGE FROM ENTERING OR ACCUMULATING WITHIN THE
 COMPONENTS DURING CONDITIONS OF FLOODING.
 TO KEEP THE ELEVATOR CABS FROM HAVING SUBSTANTIAL
 DAMAGE FROM FLOODWATERS, IS THERE A INTERLOCKING
 CONTROL OR FLOAT SWITCH THAT WHEN ACTIVATED WILL KEEP
 THE CAB FROM DESCENDING INTO THE FLOODWATERS.
 THE OTHER QUESTION, IS NORMALLY WITH LOSS OF POWER THE
 ELEVATOR CABS DESCEND TO THE LOWEST LEVEL , WILL THE
 INTERLOCK AND OR FLOAT SWITCH ALLOW THE OVERRIDE?
 DURING TIMES OF FLOOD THIS WILL ENABLE ACCESSIBILITY TO
 THE LOWER PARKING GARAGE UNLESS THE OCCUPANT TRAVELS
 DOWN THE STAIRS.
  
 1E) COMPLIED. SMOKE DOORS. DOORS P202/ ELEV. LOBBY 1,
 DOOR P203/ ELEV. LOBBY 2, DOOR P205 ELEV. LOBBY 3/ DOOR
 P206/ ELEV. LOBBY #4. ,
  
 1F) COMPLIED. FBC-B 905.3. STANDPIPES IN STAIRWELLS.
  
 1G)SEMI-COMPLIED, SHEET 166-A5-01 IDENTIFIES VARIOUS
 WALLS WITH TAGS:
  
 1G)(1) WALL IDENTIFICATION TAGGED WALLS 70, 71, 73, 74
 & 75 ALL SHOW AN ANGLE IRON BRACING SYSTEM ATTACHED TO
 THE UNDERSIDE OF THE NEXT CONCRETE SLAB AND A NOTE
 INDICATING A CONTINUOUS FIRE RESISTIVE JOINT SYSTEM.
 UL LISTING U905 & U906 ARE THE LISTING FOR THE WALL
 ONLY. PLEASE PROVIDE COMPLIANCE WITH 2010 FBC-B 714.2
 AN RATED ASSEMBLY FOR THE DISSIMILAR MATERIALS AT THE
 JOINT WALL /SLAB JOINT (FIRE ?RESISTANT JOINT SYSTEM).
  
 1ST ROUND COMMENT. THE BUILDING CORES CONTAINING
 STAIRWELLS 1 & 2 AND 3 & 4 DO NOT HAVE WALL
 IDENTIFICATION TAGS AS THE WALLS SURROUNDING THE
 PERIMETER OF THE BUILDING. SHEET 012-A0-31 THE LIFE
 SAFETY SHEET FOR THE PARKING GARAGES INDICATES FIRE
 RATED WALLS. 107.2.1.3 ADDITIONAL INFORMATION IS
 REQUIRED.
  
 1H) SEMI-COMPLIED. THE RESPONSE INDICATES THE VOID
 SPACE BETWEEN THE INTERSTITIAL FLOOR OF THE FPL VAULT
 WILL BE FILLED WITH STRUCTURAL GEOFOAM. PLEASE PROVIDE
 TESTING IN COMPLIANCE WITH 2603.3 SURFACE BURNING
 CHARACTERISTICS. ASTM E84 OR UL 723.
  
 1ST ROUND OF COMMENTS. THE EAST WALL OF THE FPL VAULT
 DOES NOT INDICATE A WALL TAG. THE FLOOR ELEVATION IS
 INDICATED AT ELEVATION 6?-0? THIS WALL WILL STILL BE ON
 THIS LEVEL. 107.2.1.3 ADDITIONAL INFORMATION IS
 REQUIRED, WALL NOT IDENTIFIED AS TO TYPE.
  
 NEW COMMENTS:
 1I) COMMON COMMENT TO ALL FLOORS THE DOOR SCHEDULES
 FOUND ON SHEETS 331_A8.11 & 332_A8.12 LABEL ALL FIRE
 RATED DOORS AS B OR C LABEL. PLEASE RATE THEM IN
 MINUTES AND HOURS AS FBC-B TABLE 715.5.
  
 2) SHEET 079-A2-0P1 (PARKING LEVEL 1 UPPER LEVEL):
  
 2A-D) COMPLIED
  
  
  
  
 2E) SEMI-COMPLIED. PLEASE BE AWARE THIS IS A EUROPEAN
 SYSTEM THAT PROBABLY DOES NOT HAVE AN UL LISTING, NOR
 WILL THE 50 HZ 3-PHASE HOOK UP TO THE US STANDARD 60 HZ
 ELECTRICAL SYSTEM.
 ELECTRICAL NOTE # 6 INDICATES THE NEED OF A CORNER PIT
 IN THE FLOOR. ADDITIONAL INFORMATION REQUIRED WHEREAS
 THE PIT LOCATION AND THE SIZE OF THE PIT. 107.2.1.3.
 1ST REVIEW COMMENT. THIS LEVEL SHOWS STACKED PARKING,
 PLEASE PROVIDE DETAILS FOR THIS TYPE OF LIFT. HOW THE
 LIFT WILL OPERATE, MANUFACTURERS SPEC, ANCHORAGE FOR
 LIFT, IS THERE A VALET THAT PUTS THE CARS ON THE LIFT,
 ETC. 107.2.1.3 ADDITIONAL INFORMATION IS REQUIRED.
  
 2F-G) COMPLIED
  
 3) SHEET 013-A)-32 & 080-A2-01 LEVEL 1 (LOBBY):
  
 3A-D) COMPLIED.
  
 3E) SEMI-COMPLIED. ON THE LOBBY LEVEL THE DOORS TO THE
 GUEST SUITES LABELED GS01 ARE NOT FOUND IN THE DOOR
 SCHEDULE PAGE 331_A8-11.
  
 1ST ROUND COMMENT. PLEASE BE AWARE THAT THE DOORS ARE
 NOT IDENTIFIED ON THIS SHEET, NOR ARE THEY IDENTIFIED
 ON SHEET 166-A5-01. 107.2.1.3 ADDITIONAL INFORMATION IS
 REQUIRED.
  
 3F)SEMI-COMPLIED. SHEET 098_A2-51A GUEST SUITE 1 COMMON
 WALL BATHROOM TO ATRIUM IS LABELED A WALL TYPE 3A. THIS
 WALL IS A 1 HOUR WALL AND HAS A STC RATING OF 47.
 PLEASE SEE FBC-B 1207.2 AIR-BORNE SOUND MINIMUM STC OF
 50, ASTM E90.
 1ST ROUND COMMENTS. PLEASE BE AWARE THAT THE WALL
 IDENTIFICATION TAGS ON THIS SHEET ARE MISSING AS WELL
 AS ON SHEET 166-A5-01. 107.2.1.3 ADDITIONAL INFORMATION
 IS REQUIRED.
  
 3G)2ND REQUEST. PLEASE NOTE IS FOR ALL FLOORS WITH
 ELEVATOR DOOR OPENINGS. THE PLANS DO NOT INDICATE A
 FIRE RATED DOOR ON THE ELEVATOR SHAFT. FBC-B 3002.1.1
 OPENING PROTECTIVES OPENINGS IN HOISTWAY ENCLOSURES
 SHALL BE PROTECTED AS REQUIRED IN CHAPTER 7. OPENING
 PROTECTIVES TABLE 715.5.EXCEPTION THE FLOOR LEVEL
 DESIGNATED FOR RECALL SHALL REMAIN OPEN DURING PHASE I
 EMERGENCY RECALL OPERATION. WHAT FLOOR LEVEL WILL BE
 THE LEVEL DESIGNATED FOR RECALL?
 1ST ROUND OF COMMENTS. GUEST ROOM CORRIDOR 102 SHOWS
 THE WALLS TO BE A MINIMUM OF A 1 HOUR FIRE RATING WITH
 THE EXCEPTION OF THE ELEVATOR OPENING? PLEASE PROVIDE
 COMPLIANCE WITH 2010 FBC-B TABLE 1018.1.
  
 3H-K) COMPLIED..
  
 3L) 2ND REQUEST. THE 1ST LEVEL SHEET 080-A2-01/
 013-A)-32 LIFE SAFETY AND 2ND LEVEL SHEET 081-A2-02/
 014-A0-33 LIFE SAFETY 2ND LEVEL. THESE SHEETS DEPICT A
 2 STORY ATRIUM. I?M NOT SPEAKING OF THE STAIRWAY TO
 BELOW. THE LOBBY FLOOR SHEET 080_A2.01 AND THE SHEET
 081_A2.02 LEVEL 2 OF AMENITIES CONSTITUTES AN ATRIUM,
 WHERE THE AIR COMMUNICATES BETWEEN 2 STORIES. THESE
 WALLS IN COMMON SHOULD BE FIRE RATED FBC-B 404.6 WITH
 OPENING PROTECTIVES IN ACCORDANCE WITH TABLE 715.5.
  
 1ST ROUND OF COMMENTS. THE 1ST LEVEL SHEET 080-A2-01/
 013-A)-32 LIFE SAFETY AND 2ND LEVEL SHEET 081-A2-02/
 014-A0-33 LIFE SAFETY 2ND LEVEL. THESE SHEETS DEPICT A
 2 STORY ATRIUM. WHAT THE LIFE SAFETY SHEETS FAIL TO
 PROVIDE IS THE 1 HOUR FIRE BARRIER (2010 FBC-B 404.6)
 CONSTRUCTED IN ACCORDANCE WITH SECTION 707. THE PLANS
 DO NOT SHOW A CUT SECTION WHERE ONE OF THE EXCEPTIONS
 WAS TAKEN. ONE HOUR FIRE RATED WALLS WOULD BE REQUIRED
 WITH ANY SPACE THAT COMMUNICATED WITH THE ATRIUM AND
 OPENING PROTECTIVE IN COMPLIANCE WITH 2010 FBC-B TABLE
 715.4. SMOKE CONTROL IS NOT REQUIRED SINCE THIS IS A 2
 STORY ATRIUM.
  
 3M-O) COMPLIED. 2010 FBC-B 404.8 INTERIOR FINISHES.
  
 3O)(6) SEMI-COMPLIED. SHEET 184A-A5-52, THE DESIGNER OF
 RECORD HAS PROVIDED THE CHART SHOWING THE EXIT STAIR &
 RESIDENTIAL UNIT DISTRIBUTION TABLE. THE QUESTION STILL
 IS HOW WILL THE FIRE FIGHTERS KNOW THIS CHART EXIST,
 WILL A COPY OF THIS CHART BE POSTED IN THE FIRE COMMAND
 ROOM OR IN AN OVERALL FIRE MANUAL?
  
 1ST ROUND OF COMMENTS. A CUT SECTION THROUGH THE
 BUILDING SHOWING WHICH STAIRWELLS SERVICE WHICH SUITES
 SINCE THE FLOORS WITH 3 SUITES USE STAIRWELLS 2 & 3 SO
 FIRE FIGHTERS WILL KNOW WHICH STAIRWELLS AND FIREMENS
 ELEVATORS TO USE FOR FIREFIGHTING AND OR EMERGENCIES.
 107.2.1.3 ADDITIONAL INFORMATION REQUIRED.
  
 3P-R) COMPLIED. 2010 FBC-B SECTION 403.3.2 WATER SUPPLY
 TO REQUIRED FIRE PUMPS
  
 3S) BUILDING PROVISO: THE PLANS SHOW AT THE ENTRY LEVEL
 OF THE LOBBY A RECEPTION/ REGISTRATION DESK. PLEASE
 PROVIDE COMPLIANCE WITH FAIR HOUSING SPECIFICATION OF
 ANSI 4.31 ALSO SEE REACH RANGES.
  
 3T) 2ND REQUEST. THIS COMMENT WILL STAND FOR ALL FLOORS
 WITH MULTIPLE R2 DWELLING UNITS ON THE SAME FLOOR OR
 DWELLING UNITS ABOVE OR BELOW THE OCCUPIED UNIT. PLEASE
 NOTE ALL 3 TEST ARE REQUIRED FOR ANY FLOOR
 UNDERLAYMENT. IF THERE IS TO BE TILE AND OR MARBLE THE
 UNDERLAYMENT HAS TO BEEN TESTED ALL 3 TEST, THIS HOLDS
 TRUE FOR WOOD VENEERS AS WELL. PLEASE KEEP THE 3 TEST
 CRITERIA TOGETHER, IF THEY ARE POSTED ON THE SAME PLANS
 SHEET, WE CAN THEN LET THE ACTUAL TEST APPROVALS TO BE
 A DEFERRED SUBMITTAL AFTER THE ISSUANCE OF THE PERMIT.
 WE NEED THE CONTRACTOR OR SUB-CONTRACTORS OR VENDORS TO
 SEE THERE ARE 3 DIFFERENT CRITERIA IN THE SELECTING
 FLOOR UNDER-LAYMENTS. THANK YOU FOR YOUR HELP IN THIS
 MATTER.
  
 PLEASE PROVIDE TEST REPORTS SHOWING COMPLIANCE WITH:
  
 3T)(1) FBC-B 2014 1207.3 STRUCTURE-BORNE SOUND.
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492.
  
 3T)(2) FBC-B 2014 1207.2 AIR-BORNE SOUND.
 WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES
 SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM
 PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION
 CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED)
 FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM
 E 90.
  
 3T)(3) FLAME SPREAD- FBC-B 2014 603.1. EXCEPTION 2.
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200.
  
 FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS
 A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL
 MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A
 MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
  
 3U) COMPLIED.
  
  
 4) SHEET 014-A0-33/ 082-A2-03: 2ND LEVEL GUEST SUITES.
  
 4A) COMPLIED. GUEST SUITES ARE PURCHASED BY THE CURRENT
 OWNERS TO BE USED AS A ALTERNATE SLEEPING ROOM.
 4B)2ND REQUEST. THE SHAFT WALLS HAVE NOW BEEN
 IDENTIFIED AS WALL IDENTIFICATION TAGS, 1 & 52. PLEASE
 NOTE THESE WALLS ARE COMMON WITHIN THE TENANT SPACE AND
 ONLY HAVE A STC RATING OF 47 NOT THE REQUIRED 50.
 FBC-B 2010 SECTION 1207.2 AIR-BORNE SOUND.
  
 1ST ROUND OF COMMENTS. THERE IS A DISCREPANCY IN PLANS
 IT WOULD APPEAR. SHEET 014-A0-33 LEVEL 2 GUEST SUITES
 IT APPEARS THE MECHANICAL UNIT HP-1IN GUEST SUITES 11 &
 12 ARE LOCATED IN A ONE HOUR SHAFT WHEREAS THE UNITS 9
 & 10 THE UNITS ARE NOT LOCATED IN A RATED WALL. IT
 APPEARS IN UNITS 11 & 12 THERE IS A VERTICAL 8X16 INCH
 EXHAUST DUCT NOT SHOWN IN A SHAFT, MECHANICAL SHEETS
 INDICATE THAT IN SOME AREA 2 HOUR FLAME BAR IS TO BE
 INSTALLED. PLEASE PROVIDE DETAILED INFORMATION IN
 RESPONSE AS TO WHAT AREAS ARE TO BE SHAFTS, HOUR RATING
 OF SHAFTS, WHERE THE FLAME BAR IS TO BE INSTALLED AND
 FIRE STOPPING ASSEMBLIES FOR THROUGH PENETRATIONS. THIS
 COMMENT WILL BE COMMON FOR THE 3 FLOORS OF GUEST
 SUITES. 2010 FBC-B 708.2.4 /716.6 HORIZONTAL
 ASSEMBLIES. THIS CONDITION APPEARS ON THE 3RD LEVEL OF
 GUEST SUITES AS WELL.
  
 4C-D) COMPLIED
 .
  
 5) SHEET 014-A)-33/ 098-A2-51A2: 2ND LEVEL AMENITIES/
 103-A2.53A THE 3RD LEVEL GUEST SUITES.
  
 5A-B) COMPLIED.
  
 5C)2ND REQUEST. SHEET 098_A2-51A2 &/ 103-A2.53A THE 3RD
 LEVEL GUEST SUITES IS MISSING BOTH THE WALL & DOOR
 IDENTIFICATION TAGS. CODE COMPLIANCE CANNOT BE
 DETERMINED. 107.2.1.3 ADDITIONAL INFORMATION IS
 REQUIRED.
  
 5D) 2ND REQUEST. SHEET 014-A)-33 IS THE 2ND LEVEL OF
 THE ATRIUM. THIS SHEETS DEPICTS THE 2ND FLOOR OF THE
 ATRIUM. WHAT THE LIFE SAFETY SHEETS FAIL TO PROVIDE IS
 THE 1 HOUR FIRE BARRIER (2010 FBC-B 404.6) CONSTRUCTED
 IN ACCORDANCE WITH SECTION 707. THE PLANS DO NOT SHOW A
 CUT SECTION WHERE ONE OF THE EXCEPTIONS WAS TAKEN. ONE
 HOUR FIRE RATED WALLS WOULD BE REQUIRED WITH ANY SPACE
 THAT COMMUNICATED WITH THE ATRIUM AND OPENING
 PROTECTIVE IN COMPLIANCE WITH 2010 FBC-B TABLE 715.4.
 SMOKE CONTROL IS NOT REQUIRED SINCE THIS IS A 2 STORY
 ATRIUM. PLEASE NOTE THE 3 LEVELS OF THE R2 GUEST ROOMS
 TRAVEL THROUGH A 1 HOUR FIRE RATED ACCESS CORRIDOR INTO
 THE ATRIUM.
  
 5E) COMPLIED
  
 5F) 2ND REQUEST. THIS SHEET INDICATES THE BRIDGE
 SECTION OF THE 2ND LEVEL IS INDICATED AS A MEZZANINE
 LOBBY. THE 2ND FLOOR AREA THAT IS OPEN AND COMMUNICATES
 IS OVER THE 1/3RD OF THE OPEN AREAS ALLOWED BY FBC-B
 505.2 EXCEPTION # 2 FOR TYPE I TYPE II BUILDINGS. THIS
 IS A TRUE 2 STORY ATRIUM, FBC-B 404.6 ENCLOSURES OF
 ATRIUMS.
  
 5G)2ND REQUEST. SHEET 014-A0-33 POOL DECK STAIR # 6 & 7
 SHOW THE USE OF AN AREA OF RESCUE ASSISTANCE.
 THE RESPONSE INDICATES TWO-WAY COMMUNICATION SYSTEM HAS
 BEEN PROVIDED, SEE SHEET A0.33.
 PLEASE SHOW COMPLIANCE WITH ALL ASPECTS OF THE 2003 IBC
 1007.6.
  
 AREA OF REFUGE. 2003 IBC-B 1007.6 .3 TWO-WAY
 COMMUNICATION. AREAS OF REFUGE SHALL BE PROVIDED WITH
 TWO-WAY COMMUNICATION SYSTEM BETWEEN THE AREA OF REFUGE
 AND A CONTROL POINT. IF THE CENTRAL CONTROL POINT IS
 NOT CONSTANTLY ATTENDED, THE AREA OF REFUGE SHALL ALSO
 HAVE CONTROLLED ACCESS TO A PUBLIC TELEPHONE SYSTEM.
 LOCATION OF THE CENTRAL CONTROL POINT SHALL BE APPROVED
 BY THE FIRE DEPARTMENT. TWO-WAY COMMUNICATION SYSTEM
 SHALL INCLUDE BOTH AUDIBLE AND VISIBLE SIGNALS.
  
 1007.6.4 INSTRUCTIONS. IN AREAS OF REFUGE THAT HAVE A
 TWO-WAY EMERGENCY COMMUNICATIONS SYSTEM, INSTRUCTIONS
 ON THE USE OF THE AREA UNDER EMERGENCY CONDITIONS SHALL
 BE POSTED ADJOINING THE COMMUNICATIONS SYSTEM. THE
 INSTRUCTIONS SHALL INCLUDE ALL OF THE FOLLOWING;
 1) DIRECTIONS TO FIND OTHER MEANS OF EGRESS.
 2) PERSONS ABLE TO USE THE EXIT STAIRWAY DO SO AS SOON
 AS POSSIBLE, UNLESS THEY ARE ASSISTING OTHERS.
 3) INFORMATION ON THE PLANNED AVAILABILITY OF
 ASSISTANCE IN THE USE OF STAIRS OR SUPERVISED OPERATION
 OF ELEVATORS AND HOW TO SUMMON SUCH ASSISTANCE. 4)
 DIRECTIONS FOR THE USE OF THE EMERGENCY COMMUNICATIONS
 SYSTEM.
  
 1007.6.5 IDENTIFICATION. EACH DOOR PROVIDING ACCESS TO
 AN AREA OF REFUGE FROM AN ADJACENT FLOOR AREA SHALL BE
 IDENTIFIED BY A SIGN COMPLYING WITH ICC A117., STATING
 AREA OF REFUGE, AND INCLUDING THE INTERNATIONAL SYMBOL
 OF ACCESSIBILITY. WHERE EXIT SIGN ILLUMINATION IS
 REQUIRED BY SECTION 1011.2, THE AREA OF REFUGE SIGN
 SHALL BE ILLUMINATED. ADDITIONALLY, TACTILE SIGNAGE
 COMPLYING WITH ICC A117.1 SHALL BE LOCATED AT EACH DOOR
 TO AN AREA OF REFUGE.
  
 1007.7. SIGNAGE. AT EXITS AND ELEVATORS SERVING A
 REQUIRED ACCESSIBLE SPACE BUT NOT PROVIDING AN APPROVED
 ACCESSIBLE MEANS OF EGRESS, SIGNAGE SHALL BE INSTALLED
 INDICATING THE LOCATION OF ACCESSIBLE MEANS OF EGRESS
  
 1ST ROUND COMMENT. SHEET 014-A0-33 POOL DECK STAIR # 6
 & 7 SHOW THE USE OF AN AREA OF RESCUE
 ASSISTANCE. THE 2010 FBC-B 1007.1 ACCESSIBLE MEANS OF
 EGRESS. ACCESSIBLE MEANS OF EGRESS SHALL BE PROVIDED IN
 ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE FLORIDA
 BUILDING CODE, ACCESSIBILITY.
 2010 FBC-ACCESSIBILITY CODE. ACCESSIBLE MEANS OF EGRESS
 . 207.1 GENERAL. MEANS OF EGRESS SHALL COMPLY WITH
 SECTION 1003.2.13 OF THE INTERNATIONAL BUILDING CODE
 (2000 EDITION AND 2001 SUPPLEMENT) OR SECTION 1007 OF
 THE INTERNATIONAL BUILDING CODE (2003 EDITION)
 (INCORPORATED BY REFERENCE, SEE "REFERENCED STANDARDS"
 IN CHAPTER 1).
 PLEASE SHOW FULL COMPLIANCE FOR THE AREA OF REFUGE
 ASSISTANCE, 2003 IBC-B REQUIREMENTS 1007.6.(1-7) &
 1007.8(1-3).
  
  
 START REVIEWS MON. 8/29/16
  
  
 5H) COMPLIED. FAIR HOUSING. THE DINING ROOM, BEAUTY
 PARLOR AND GUEST ROOMS ARE UNDER FAIR HOUSING ACT. FAIR
 HOUSING IS TO BE APPLIED THEN ONLY ACCESS TO THE POOL
 DECK WILL BE REQUIRED.
  
 5I) COMPLIED. FAIR HOUSING. AN ACCESSIBLE ROUTE TO THE
 LOWER POOL DECK AREA. FAIR HOSING ANSI A117.1 4.3 (C)
 CONNECTING ACCESSIBLE BUILDING OR FACILITY ENTRANCES
 WITH ACCESSIBLE SPACES AND ELEMENTS WITHIN THE BUILDING
 OR FACILITY, INCLUDING ADAPTABLE DWELLING UNITS.
  
 5J) COMPLIED. FAIR HOUSING COMPLIANCE FOR THE STEAM
 ROOMS AND SAUNAS. FAIR HOUSING COMMON USE SPACES AND
 FACILITIES. WHEN ANSI DOES NOT CONTAIN SPECIFICATIONS
 FOR SPECIFIC FACILITIES OR FEATURE IN QUESTION RELATED
 HUMAN FACTORS AND PERFORMANCE SPECIFICATIONS MUST BE
 USED TO ACHIEVE ACCESSIBILITY. SUCH SPECIFICATIONS
 INCLUDE, BUT ARE NOT LIMITED TO, 4.2 SPACE ALLOWANCES
 AND REACH RANGES, 4.3 ACCESSIBLE ROUTE, 4.4 PROTRUDING
 OBJECTS, 4.5 GROUND & FLOOR SURFACES, AND 4.25
 OPERATING MECHANISMS.
  
 5K) 2ND REQUEST, SEMI-COMPLIED, THE RESPONSE INDICATES
 HOW COMPLIANCE CAN BE OBTAINED. COMPLIANCE WITH COMMENT
 5G MUST BE MET FOR COMMENT TO BE COMPLIED WITH.
 1ST ROUND COMMENT. SHEET 014-A0-33 THE LOWER POOL DECK
 IT APPEARS THERE IS ONLY ONE RAMP (NOT MARKED, NOR
 ELEVATION CHANGES GIVEN) BETWEEN THE POOL DECK AND POOL
 THERE ARE 116 OCCUPANTS AND WHAT APPEARS TO BE ONLY ONE
 ACCESSIBLE MEANS OF EGRESS. PLEASE SHOW COMPLIANCE
 WITH: 2010 FBC-BUILDING CODE 1007.1 ACCESSIBLE MEANS OF
 EGRESS. ACCESSIBLE MEANS OF EGRESS SHALL BE PROVIDED IN
 ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE FLORIDA
 BUILDING CODE, ACCESSIBILITY.
 2010 FBC-ACCESSIBILITY CODE SECTION 207.1 MEANS OF
 EGRESS SHALL COMPLY WITH SECTION 1003.2.13 OF THE
 INTERNATIONAL BUILDING CODE (2000 EDITION AND 2001
 SUPPLEMENT) OR SECTION 1007 OF THE INTERNATIONAL
 BUILDING CODE (2003 EDITION).
 2003 IBC-B 1007.1 WHERE MORE THAN ONE MEANS OF EGRESS
 IS REQUIRED BY SECTIONS 1014.1 OR 1018.1 FROM ANY
 ACCESSIBLE SPACE, EACH ACCESSIBLE PORTION OF THE SPACE
 SHALL BE SERVED BY NOT LESS THAN TWO MEANS OF EGRESS.
  
  
  
 6) SHEETS 015-A0-34 LEVELS 5-10. 11-17 (TIER 1) LEVELS
 18-19 TIER 2. / 083-A2-05 LEVEL 5/ 084-A2-06 LEVELS
 6-9, 11 TIER 1;
 6A) 2ND REQUEST. THIS COMMENT IS A COMMON COMMENT FOR
 ALL DWELLING UNITS TIER 1 LEVELS 5-9 &11. THE LIFE
 SAFETY PLAN SHOWS (2) REQUIRED MEANS OF EGRESS PER UNIT
 OVER 3 STORIES, COMMON PATH OF TRAVEL EXCEEDED WITH ONE
 MEANS OF EGRESS, BECAUSE THEY ARE OVER THE 125 FEET
 REQUIRED BY 2010 FBC-B 1014.3 EXCEPTION # 4.
  
 6A)(1) COMPLIED. THE PLANS SHOW THE 1ST COMMON PATH OF
 TRAVEL EXITING THROUGH THE FRONT ENTRY DOORS THROUGH AN
 ELEVATOR LOBBY, THE LIFE SAFETY PLANS WILL NEED TO
 INDICATE IF THE ELEVATOR HOIST WAYS ARE PRESSURIZED TO
 ALLOW EXITING THROUGH THE ELEVATOR LOBBY. 2010 FBC-B
 708.14.1 ELEVATOR LOBBIES.
  
 6A)(2) 2ND REQUEST. THE RESPONSE INDICATES A ISSUE WITH
 LOCKABLE DOORS ONLY NOT THE CODE SECTION OF NO EGRESS
 THROUGH STORAGE ROOMS, CLOSETS OR SPACES USED FOR
 SIMILAR PURPOSES.
  
 1ST ROUND COMMENTS. THE 2ND ISSUE IS THE COMMON PATH OF
 TRAVEL THROUGH THE LAUNDRY/ STORAGE/ UTILITY ROOM.
 PLEASE SEE THE 2010 FBC-B SECTION 1014.2.1(4) 4. EGRESS
 SHALL NOT PASS THROUGH KITCHENS, STORAGE ROOMS, CLOSETS
 OR SPACES USED FOR SIMILAR PURPOSES. NOTE THE EXCEPTION
 IS ONLY FOR A KITCHEN AREA SERVING ADJOINING ROOMS
 CONSTITUTING PART OF THE SAME DWELLING UNIT OR SLEEPING
 UNIT.
  
 6B) COMPLIED. COMMON COMMENT FOR ALL FLOORS. EXITING
 CAPACITY ANALYSIS FOR ALL TIERS SHOW A 36 INCH DOORWAY
 AND THE EXIT CAPACITY AT 180 OCCUPANTS. THIS WOULD MEAN
 YOU HAVE OFFSET HINGES ON THE EXIT DOORS SO THERE IS A
 FULL 36 INCHES CLEAR WIDTH FROM THE FACE OF THE DOOR
 WHEN OPEN AT 90 DEGREES TO THE OPPOSING LATCH SIDE OF
 THE DOOR AND NOT INCLUDING THE DOOR STOP. SEE 2010
 FBC-B 1008.1.1. CLEAR OPENINGS OF DOORWAYS WITH
 SWINGING DOORS SHALL BE MEASURED BETWEEN THE FACE OF
 THE DOOR AND THE STOP, WITH THE DOOR OPEN 90 DEGREES.
 THE ACTUAL ALLOWABLE MAXIMUM OCCUPANT LOAD IS CLOSER TO
 167.
  
 7) 2ND REQUEST. SHEET 016-A0-35 LEVELS 20 & 21 /
 090-A2-20 LEVEL 20 REFERS TO SHEET 089- A2.18 FOR UNITS
 A & B. SHEET 090-A2-20 FOR UNIT C. SAME COMMENTS AND
 ISSUES AS COMMENTS 6A AND 6B.
  
 8)2ND REQUEST. SHEET 017-A0-36 LIFE SAFETY PLANS FOR
 LEVEL 22 & 23/ 092-A2-22 & 093-A2-23. SAME COMMENTS AND
 ISSUES AS COMMENTS 6A AND 6B.
  
 9) PROVISO: SHEET 017-A0-36 LIFE SAFETY PLANS FOR LEVEL
 23/ SHEET 093-A2-23. AT OWN RISK!!!!!
 THE COMMON PATH OF TRAVEL THROUGH THE LAUNDRY/ STORAGE/
 UTILITY ROOM. PLEASE SEE THE 2010 FBC-B SECTION
 1014.2.1(4) 4. EGRESS SHALL NOT PASS THROUGH KITCHENS,
 STORAGE ROOMS, CLOSETS OR SPACES USED FOR SIMILAR
 PURPOSES. NOTE THE EXCEPTION IS ONLY FOR A KITCHEN AREA
 SERVING ADJOINING ROOMS CONSTITUTING PART OF THE SAME
 DWELLING UNIT OR SLEEPING UNIT.
  
 10) SHEET 018-A0-37 LEVELS 24 &25/ SHEET 094-A2-24
 LEVEL 24 & 095-A2-25.
  
 10A)2ND REQUEST. UNIT PH-24N & PH25N HAS THE SAME
 ISSUES AS COMMENT 6A)(1) ELEVATOR LOBBY & 6A)(2) EGRESS
 THROUGH STORAGE/ UTILITY CLOSET / LAUNDRY ROOM. THE
 2010 FBC-B SECTION 1014.2.1(4) 4. EGRESS SHALL NOT PASS
 THROUGH KITCHENS, STORAGE ROOMS, CLOSETS OR SPACES USED
 FOR SIMILAR PURPOSES.
  
 10B) COMPLIED 2010 FBC-B 708.14.1 ELEVATOR SHAFTS ARE
 PRESSURIZED.
  
 11) SHEET 019-A)-38 LEVEL 26 MECHANICAL FLOOR - ROOF /
 096-A2-26 ARCH. MECHANICAL FLOOR
 PLAN. A122-A2-76ALEVEL 26 NORTH, 411-M2-26 & 374.S2-26
 STRUCTURAL MECHANICAL ROOF FRAMING PLAN.
  
  
  
 11A) NEW COMMENT.. SHEET 122-A2-76A ONE WALL THAT
 ENCLOSES STAIR # 2 IS IDENTIFIED WITH A WALL TAG # 78
 THIS WALL DESIGNATION IS NOT FOUND ON SHEET 330-A8-02.
 1ST ROUND OF COMMENTS. SHEET 122-A2-76A NONE OF THE
 ARCHITECTURAL NOR STRUCTURAL SHEETS, PROVIDE A ROOM &
 WALL IDENTIFICATION TAG FOR THE WALL IN THE UPPER RIGHT
 CORNER OF THE BUILDING, THE SAME WALL IS ALSO COMMON TO
 STAIR TOWER #2 AND FIREMANS VESTIBULE 2601. ADDITIONAL
 INFORMATION IS REQUIRED BOTH THE FIREMANS VESTIBULE
 (1HR.) AND THE STAIR SHAFT(2 HR.) ARE FIRE RATED
 PROTECTED. 3007.4.2 & 708.4.
  
 11B-G) COMPLIED.
  
 11H)COMPLIED. SHEET 122-A2-76A LEVEL 26 PLEASE NOTE
 ROOFTOP AND FLOOR ELEVATION TAGS ARE PROVIDED.
  
 11I) 2ND REQUEST. SEMI-COMPLIED. RESPONSE INDICATES SEE
 SHEETS A2,56A AND A2.76B. SHEET A2-76B SHOWS THE DOORS
 WITH IDENTIFICATION TAGS BUR NOT THE WALLS. SHEET
 A2.56A IS THE FLOOR LEVELS 5-9, 11-17? DO YOU MEAN
 A2-26 NEITHER THE WALLS NOR DOORS ARE IDENTIFIED?
 107.2.1.3. ADDITIONAL INFORMATION IS REQUIRED.
 1ST ROUND OF COMMENTS. SHEET 171-A5-06 PLEASE NOTE NONE
 OF THE WALLS NOR DOORS ARE PROVIDED WITH IDENTIFICATION
 TAGS, PLANS ARE INCOMPLETE, 107.2.1.3 ADDITIONAL
 INFORMATION IS REQUIRED.
  
 11J) COMPLIED. SHEET 171-A5-06 AND 096-A2-26 ELEVATOR
 CONTROL ROOM 3, 4 &6.
  
 11K-N) COMPLIED.
  
 11O) 2ND REQUEST. THE SHEET 123_A2-76B DOES HAVE A NOTE
 WHERE THE VERTICAL BRACING OCCURS IN THE EXTERIOR
 CORRIDOR 2604 OUTLINE OF SCREEN WALL & STEEL BRACING
 ABOVE. THE STRUCTURAL SHEETS 374_S2-26 DOES NOT
 INDICATE SUCH DETAILS. A DIFFERENT VERSION IS FOUND ON
 SHEET 375_S2-27 WHERE THE VERTICAL LEG AND BRACING
 STILL APPEAR TO BE IN THE CORRIDOR.
 1ST ROUND COMMENT. SHEET 096-A2-26 THE MECHANICAL
 EQUIPMENT SCREEN BRACING SYSTEM AS DRAWN HAS LEGS THAT
 GO INTO THE CORRIDOR 2604 BLOCKING ACCESS, BLOCKING
 ENTRY TO A EXTERIOR MECHANICAL ROOM 2603 AND ALSO TO
 ROOM 2606. PLEASE CORRECT THESE AREAS.
  
 12) SEMI- COMPLIED. SHEET 431-M4-01 MECHANICAL DETAILS,
 DETAIL 20 COOLING TOWER VIBRATION ISOLATOR.
 RESPONSE INDICATES SEE SHEET 395_A-S5-31 SEE DETAIL # 4
 FOR CONCRETE PIER FOR A/C ROOF TOP EQUIPMENT. PLEASE
 PROVIDE REQUIRED CLEARANCES BELOW RAISED ROOF MOUNTED
 MECHANICAL UNITS, SEE TABLE 1509.7
 FBC-B. TAKE THE MEASUREMENTS FROM THE LOWEST HORIZONTAL
 FRAMING MEMBER.
  
 1ST ROUND OF COMMENTS. SHEET 431-M4-01 MECHANICAL
 DETAILS, DETAIL 20 COOLING TOWER VIBRATION ISOLATOR
 DETAIL TO BE REVIEWED BY THE STRUCTURAL ENGINEER OF
 RECORD, AND WITH THEIR SHOP DRAWING STAMP OF APPROVAL.
 PLEASE NOTE THE STRUCTURAL BASE OR SUPPORT WILL NEED TO
 BE DESIGNED BY THE STRUCTURAL ENGINEER OR HIS DELEGATE
 WITH THE STRUCTURAL ENGINEERS APPROVAL BEFORE SUBMITTAL
 TO THE BUILDING DEPARTMENT FOR REVIEW.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
  
 13) BUILDING PROVISO: DEFERRED SUBMITTALS: SHEET
 431-M4-01 MECHANICAL DETAILS EQUIPMENT SUPPORT CURB
 DETAIL & THYBAR VIBRATION CURB III DETAIL FOR OAU-1 &
 2. PLEASE PROVIDE THE PRODUCT APPROVALS FOR CURB
 DETAILS. TO BE REVIEWED BY THE STRUCTURAL ENGINEER OF
 RECORD, AND WITH THEIR SHOP DRAWING STAMP OF APPROVAL.
 PLEASE NOTE THE STRUCTURAL ANCHOR TO THE BASE OR
 SUPPORT AS WELL AS THE UNIT TO THE CURB FOR MOMENT OF
 OVERTURNING, WILL NEED TO BE DESIGNED BY THE STRUCTURAL
 ENGINEER OR HIS DELEGATE WITH THE STRUCTURAL ENGINEERS
 APPROVAL BEFORE SUBMITTAL TO THE BUILDING DEPARTMENT
 FOR REVIEW.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
 14) SHEET 131-A3-21.
 14A) COMPLIED.
  
 14B) ELEVATORS 2/4 DO NOT CONTINUE THROUGH TO THE ROOF.
 PLEASE PROVIDE WHERE COMPLIANCE WITH SECTIONS OF THE
 2010 FBC-B CAN BE FOUND:
  
 14B)(1) 2ND REQUEST IDENTIFY THE SHAFT THAT GOES TO THE
 ROOF TOP. 3004.1 VENTS REQUIRED. HOISTWAYS OF ELEVATORS
 PENETRATING MORE THAN THREE STORIES SHALL BE PROVIDED
 WITH A MEANS FOR VENTING SMOKE AND HOT GASES TO THE
 OUTER AIR IN CASE OF FIRE. FOR R1 AND R2 OCCUPANCIES
 VENTING IS REQUIRED.
  
 14B)(2) 2ND REQUEST IDENTIFY THE SHAFT AND ROOF TOP
 VENT, SIZE OF THE AREA VENTING. 3004.2 LOCATION OF
 VENTS. VENTS SHALL BE LOCATED AT THE TOP THE HOISTWAY
 AND SHALL OPEN EITHER DIRECTLY TO THE OUTER AIR OR
 THROUGH NONCOMBUSTIBLE DUCTS TO THE OUTER AIR.
 NONCOMBUSTIBLE DUCTS SHALL BE PERMITTED TO PASS THROUGH
 THE ELEVATOR MACHINE ROOM, PROVIDED THAT PORTIONS OF
 THE DUCTS LOCATED OUTSIDE THE HOISTWAY OR MACHINE ROOM
 ARE ENCLOSED BY CONSTRUCTION HAVING NOT LESS THAN THE
 FIRE-RESISTANCE RATING REQUIRED FOR THE HOISTWAY. HOLES
 IN THE MACHINE ROOM FLOORS FOR THE PASSAGE OF ROPES,
 CABLES OR OTHER MOVING ELEVATOR EQUIPMENT SHALL BE
 LIMITED AS NOT TO PROVIDE GREATER THAN 2 INCHES (51 MM)
 OF CLEARANCE ON ALL SIDES.
  
 14)(3) 2ND REQUEST. 3004.3 AREA OF VENTS. EXCEPT AS
 PROVIDED FOR IN SECTION 3004.3.1, THE AREA OF THE VENTS
 SHALL NOT BE LESS THAN 31/2 PERCENT OF THE AREA OF THE
 HOISTWAY NOR LESS THAN 3 SQUARE FEET (0.28 M2) FOR EACH
 ELEVATOR CAR, AND NOT LESS THAN 31/2 PERCENT NOR LESS
 THAN 0.5 SQUARE FEET (0.047 M2) FOR EACH DUMBWAITER CAR
 IN THE HOISTWAY, WHICHEVER IS GREATER. OF THE TOTAL
 REQUIRED VENT AREA, NOT LESS THAN ONE-THIRD SHALL BE
 PERMANENTLY OPEN. CLOSED PORTIONS OF THE REQUIRED VENT
 AREA SHALL CONSIST OF OPENINGS GLAZED WITH ANNEALED
 GLASS NOT GREATER THAN 1/8 INCH (3.2 MM) IN THICKNESS.
  
  
 15) SHEET 137-A3-31 DETAILS 1 & 2 & SHEET A0.23
 EXTERIOR SYSTEMS.
  
 15A)2ND REQUEST. THE SHEET 137-A3-31 SHOWS VARIOUS
 AREAS WHERE METAL PANELS ARE GOING TO BE INSTALLED ON
 THE EXTERIOR OF THE BUILDING. TO DATE NO PLANS HAVE
 BEEN SUBMITTED FOR COMPLIANCE. THE RESPONSE STATES
 THESE PANELS ARE METAL PLATE PANELS AND POSSIBLY THE
 USE OF MCM PANELS. THE SYSTEM IS GOING TO HAVE TO BE
 BETTER DEFINED AS TO USAGE WEATHER ABILITY, MATERIALS
 AND ANCHORAGE FOR THE COMPONENT PORTION OF THE
 BUILDING.
 AT THE 26TH LEVEL THERE ARE METAL SKINNED ARCHES
 ARCHITECTURAL ELEMENTS AS WELL AS LEVEL 1 FIN , THAT
 NEED STRUCTURAL DETAILS THE PAGES REFERENCED S5.31 ARE
 FOR THE A/C CHILLER SCREEN AND FOR PILLARS FOR THE A/C
 CHILLER. IS THIS AN ELEMENT THAT YOU WOULD LIKE TO A
 DEFERRED SUBMITTAL.
  
 BOTH INDICATE THE USE OF METAL WALL PANELS, THERE ARE
 NO CUT SECTIONS INDICATING MORE INFORMATION ON THE
 PANELS. COMPONENTS AND CLADDING FBC-B, 1609.6.4.4.1
 COMPONENTS & CLADDING. PLEASE SEE THE 2010 FBC-B
 SECTION 1407.3 ARCHITECTURAL TRIM AND EMBELLISHMENTS.
 MCM USED AS ARCHITECTURAL TRIM OR EMBELLISHMENTS SHALL
 COMPLY WITH SECTIONS 1407.7 THROUGH 1407.14.
 1407.4 STRUCTURAL DESIGN. MCM SYSTEMS SHALL BE DESIGNED
 AND CONSTRUCTED TO RESIST WIND LOADS AS REQUIRED BY
 CHAPTER 16 FOR COMPONENTS AND CLADDING.
  
 1407.5 APPROVAL. RESULTS OF APPROVED TESTS OR AN
 ENGINEERING ANALYSIS SHALL BE SUBMITTED TO THE BUILDING
 OFFICIAL TO VERIFY COMPLIANCE WITH THE REQUIREMENTS OF
 CHAPTER 16 FOR WIND LOADS. 1407.6 WEATHER RESISTANCE.
  
 15B) COMPLIED. BALCONY DIVIDER GLASS TO HAVE A ARTIC
 SNOW PVB INNER CORE, FBC-B 2407
  
 15C) COMPLIED.
  
 16)2ND REQUEST. SHEETS 108-A2-68A & DETAIL # 2/
 278-A6-85C BALCONY DEMISING GLASS WALL. THE FLOOR PLAN
 108-A2-68A DOES SHOW THE USE OF BALCONY DEMISING GLASS
 WALL AS WELL AS THE ELEVATION SHEET 137-A3-31. THE
 DETAIL 2 ON SHEET 278-A6-85C APPEAR TO BE FOR INSULATED
 SPANDREL PANEL BUT NOT FOR THE GLASSED DEMISING WALL IT
 WOULD APPEAR THIS IS THE WRONG DETAIL.
  
 17) SHEET 157-A4-14 DETAIL 11 SHOWS THE INSTALLATION OF
 A TERRA COTTA RAIN SCREEN. REFERENCES DETAIL 11/
 157-A4-14 PLEASE PROVIDE COMPLIANCE WITH 2010 FBC-B
 SECTIONS:
  
 17A) 2ND REQUEST, PLEASE PROVIDE PRODUCT TESTING.
 1403.2 WEATHER PROTECTION.
  
 17B) 2ND REQUEST. RESPONSE INDICATES REFER TO
 STRUCTURAL LOADS REPORT. THE PLANS DO NOT PROVIDE
 ANCHORAGE, TYPE OF ANCHOR, AT WHAT SPACING AN NO
 PRODUCT DATA HAS BEEN SUBMITTED FOR THIS SYSTEM. 1403.3
 STRUCTURAL. EXTERIOR WALLS, AND THE ASSOCIATED
 OPENINGS, SHALL BE DESIGNED AND CONSTRUCTED TO RESIST
 SAFELY THE SUPERIMPOSED LOADS REQUIRED BY CHAPTER 16.
  
 17C) 2ND REQUEST. THE PLANS DO NOT PROVIDE ANCHORAGE,
 TYPE OF ANCHOR, AT WHAT SPACING AN NO PRODUCT DATA HAS
 BEEN SUBMITTED FOR THIS SYSTEM.
  
 1405.9 TERRA COTTA. ANCHORED TERRA COTTA OR CERAMIC
 UNITS NOT LESS THAN 15/8 INCHES (41 MM) THICK SHALL BE
 ANCHORED DIRECTLY TO MASONRY, CONCRETE OR STUD
 CONSTRUCTION. TIED TERRA COTTA OR CERAMIC VENEER UNITS
 SHALL BE NOT LESS THAN 15/8 INCHES (41 MM) THICK WITH
 PROJECTING DOVETAIL WEBS ON THE BACK SURFACE SPACED
 APPROXIMATELY 8 INCHES (203 MM) O.C. THE FACING SHALL
 BE TIED TO THE BACKING WALL WITH CORROSION-RESISTANT
 METAL ANCHORS OF NOT LESS THAN NO. 8 GAGE WIRE
 INSTALLED AT THE TOP OF EACH PIECE IN HORIZONTAL BED
 JOINTS NOT LESS THAN 12 INCHES (305 MM) NOR MORE THAN
 18 INCHES (457 MM) O.C.; THESE ANCHORS SHALL BE SECURED
 TO 1/4-INCH (6.4 MM) CORROSION-RESISTANT PENCIL RODS
 THAT PASS THROUGH THE VERTICAL ALIGNED LOOP ANCHORS IN
 THE BACKING WALL. THE VENEER TIES SHALL HAVE SUFFICIENT
 STRENGTH TO SUPPORT THE FULL WEIGHT OF THE VENEER IN
 TENSION. THE FACING SHALL BE SET WITH NOT LESS THAN A
 2-INCH (51 MM) SPACE FROM THE BACKING WALL AND THE
 SPACE SHALL BE FILLED SOLIDLY WITH PORTLAND CEMENT
 GROUT AND PEA GRAVEL. IMMEDIATELY PRIOR TO SETTING, THE
 BACKING WALL AND THE FACING SHALL BE DRENCHED WITH
 CLEAN WATER AND SHALL BE DISTINCTLY DAMP WHEN THE GROUT
 IS POURED.
  
 18) 2ND REQUEST. SHEET 395-S5-33 HAS A CONCEPTUAL
 DRAWING INDICATING THE TYPE OF TUBE STEEL HSS20X12X
 ?(LSH) THERE ARE NO DIMENSION FOR ANY OF THE ELEMENTS,
 ANGLE BETWEEN FRAMING MEMBERS, WELDS, TYPE OF
 ATTACHMENT TO DECKS BOTH TOP AND BOTTOM. 197.2.1.3
 ADDITIONAL INFORMATION IS REQUIRED.
  
 1ST REVIEW. SHEETS 160-A4.15 PODIUM METAL FIN,
 161-A4.16 PODIUM METAL FIN, THE DETAIL # 2 ON SHEET 160
 INDICATES A HSS TUBE POST, REFER TO STRUCTURAL SHEETS.
 THE STRUCTURAL SHEETS DO NOT PROVIDE DETAILS OF THIS
 STRUCTURAL TUBE. SHEET 395-S5-33 HAS A CONCEPTUAL
 DRAWING INDICATING THE TYPE OF TUBE STEEL HSS20X12X
 ?(LSH) THERE ARE NO DIMENSION FOR ANY OF THE ELEMENTS,
 ANGLE BETWEEN FRAMING MEMBERS, WELDS, TYPE OF
 ATTACHMENT TO DECKS BOTH TOP AND BOTTOM. 197.2.1.3
 ADDITIONAL INFORMATION IS REQUIRED.
  
 19) SHEET 162-A4-31 ROOF DETAILS:
 19A) DETAILS 1 & 2 SHOW THE USE OF POLYISOCYANURATE
 BOARD. WITH SINGLE PLY RECOVERY BOARD AND SINGLE PLY
 PVC ROOFING MEMBRANE ROOFING. PLEASE PROVIDE THE
 PRODUCT APPROVALS FOR EACH OF THE MEMBERS. FOR ALL
 ROOFING PRODUCTS PLEASE IDENTIFY ALL ROOFING
 SUB-SYSTEMS AND THEIR ASSOCIATED PRESSURES FOR ROOF
 ZONE # 1. REVIEW THE PRODUCT APPROVAL LIMITATIONS, IF
 ENHANCED FASTENING IS ALLOWED FOR ROOF ZONES 2 & 3.
 FASTENER DENSITIES SHALL BE INCREASED FOR BOTH
 INSULATION & THE BASE SHEET AS CALCULATED IN COMPLIANCE
 WITH ROOFING APPLICATION STANDARDS RAS 117. CALCULATION
 PREPARED, SIGNED AND SEALED BY A FLORIDA REGISTERED
 PROFESSIONAL ENGINEER OR REGISTERED ARCHITECT.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
 19B) DEFERRED SUBMITTALS. DETAILS 3 & 4 BOTH SHOW A
 TILE DECK ABOVE THE ROOFING SYSTEM. THE ROOFING SYSTEM
 WELL NEED TO PROVIDE PRODUCT APPROVALS FOR WIND AS WELL
 AS ENGINEERING FOR THE TILE DECK INSTALLATION THEY WILL
 MEET THE WIND LOADS FOR THE LOCATION ON THE
 BUILDING.2010 FBC-B COMPONENTS AND CLADDING.
 1609.6.4.4.1 COMPONENTS & CLADDING.
  
 20) BUILDING PROVISO: SHEETS 164-A4-41 AND 165-A4-41A
 S2.02 PROVIDE A BASIC DESIGN FOR THE CANOPY SYSTEMS.
 ADDITIONAL ENGINEERING SHEETS (SHOP DRAWINGS) TO BE
 SUBMITTED AS A DEFERRED SUBMITTAL. PLEASE ALSO PROVIDE
 HOW CODE COMPLIANCE WITH 2010 FBC-B 2405.2 ALLOWABLE
 GLAZING MATERIALS AND LIMITATIONS WILL BE COMPLIED
 WITH. FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
 21) BUILDING PROVISO: 107.3.4.2 DEFERRED SUBMITTALS.
 2010 FBC-B 1609.1.2 PROTECTION OF OPENINGS,
 1609.6.4.4.1 COMPONENTS & CLADDING
  
 FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV.
 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION
 SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS:
 (31)(A) EXTERIOR DOORS. ROOF HATCHES.
 (B) WINDOWS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, CURBS, INTAKE AND
 EXHAUST FANS ?
 (E) SHUTTERS
 (F) SKYLIGHTS
 (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C
 STANDS
 107.3.4.1 THOSE PRODUCTS WHICH ARE REGULATED BY DCA
 RULE 9N-3 SHALL BE REVIEWED AND APPROVED IN WRITING BY
 THE DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL.
  
 22) WHEN RESUBMITTING PLANS PLEASE INDICATE THE
 REVISION & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES
 AS NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
 A THOROUGH REVIEW CANNOT BE MADE AT THIS TIME, AS A
 RESULT OF THE ADDITIONAL INFORMATION REQUESTED
 ADDITIONAL COMMENTS MAY APPEAR THAT WERE NOT PART OF
 THIS REVIEW.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2016-02-01 Cont ID  
Sent By jwitmer Date 2016-02-01 Time 10:44 Rev Time 0.00
Received By jwitmer Date 2016-01-27 Time 05:58 Sent To  
Notes
2016-02-01 10:44:07BUILDING PLAN REVIEW
 W. P. B. PERMIT: 15111020
 ADD: 1100 S. FLAGLER DR.
 CONT: SUFFOLK CONSTRUCTION CO.
 TEL: 561-832-1616
 E-MAIL: [email protected] / ED HANRATTY
  
 2010 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
  
 1ST REVIEW
 DATE: MON. FEB. 01/2016
 ACTION: DENIED
  
 NOTE: THIS REVIEW IS GOING TO BE COMPLETED AS A MIXED
 USE BUILDING, AND THE REQUIREMENTS FOR THE FOUNDATION
 PERMIT WILL BE MET AND THE ISSUANCE OF THE FOUNDATION
 PERMIT WILL BE FORTH COMING. PLEASE NOTE SOME COMMENTS
 MAY APPEAR AS WAS IN THE FOUNDATION PERMIT.
 2010 FBC-B 1612.4 DESIGN & CONSTRUCTION SHALL BE IN
 ACCORDANCE WITH ASCE 24-05.
 ASCE 24-05 TABLE 6-1 MINIMUM ELEVATION OF
 FLOODPROOFING, RELATIVE TO THE BASE FLOOD (BFE) OR
 DESIGN FLOOD ELEVATION (DFE)- OUTSIDE OF HIGH RISK
 FLOOD HAZARD AREAS. STRUCTURE CATEGORY- II (FOOTNOTE)
 C. (C) DRY FLOODPROOFING OF RESIDENTIAL BUILDINGS AND
 RESIDENTIAL PORTIONS OF MIXED USE BUILDINGS SHALL NOT
 BE PERMITTED.
  
 1) SHEET 078-A2-0P2 PARKING 2 (LOWER LEVEL) :
 1A) PLEASE SEE NOTE ABOVE THE LOWER LEVEL OF THE
 PARKING GARAGE CANNOT BE USED FOR THE PARKING OF
 RESIDENTIAL VEHICLES OR STORAGE FOR THE RESIDENTS OF
 THE BUILDING. THE PLANS INDICATE 9 PRIVATE PARKING
 GARAGES AND VARIOUS AREAS THROUGHOUT THE LOWER PARKING
 AREA THAT INDICATE RESIDENT STORAGE.
 2010 FBC-B 1612.4 DESIGN & CONSTRUCTION SHALL BE IN
 ACCORDANCE WITH ASCE 24-05. ASCE 24-05 TABLE 6-1.
 (FOOTNOTE) C. ( C ) DRY FLOODPROOFING OF RESIDENTIAL
 BUILDINGS AND RESIDENTIAL PORTIONS OF MIXED USE
 BUILDINGS SHALL NOT BE PERMITTED.
  
 1B) ELEVATOR # 9 IS NOT IDENTIFIED ON SHEET 012-LS-P1/
 P2. SHEET 176-A5.15 DOES NOT INDICATE IF THIS ELEVATOR
 IS A HYDRAULIC ELEVATOR? PLEASE IF THE ELEVATOR IS
 HYDRAULIC SHOW COMPLIANCE WITH 2010 FBC-B 3011. (1-4).
 IF THIS ELEVATOR IS HYDRAULIC IN WILL THE SUMP PUMP BE
 TIED INTO THE EMERGENCY ELECTRICAL PANEL TO KEEP DAMAGE
 TO THE HYDRAULIC SYSTEM AND CAB A MINIMUM. FEMA
 BULLETIN 4-93.
  
 1C) ELEVATOR # 9 PLEASE IDENTIFY WHERE THE MACHINE ROOM
 FOR ELEVATOR # 9 IS LOCATED? PLEASE SHOW COMPLIANCE
 WITH 2010 FBC-B 3006.4. 1 HOUR FIRE RATING.
  
 1D) THE OTHER ISSUE WITH ALL OF THE OTHER ELEVATORS
 THAT TRAVEL TO THE LOWER P2 PARKING LEVEL DEALS WITH
 THE FEMA TECHNICAL BULLETIN 4-93. FEMA REGULATION
 60.3(A)(3) IF A PROPOSED BUILDING SITE WILL BE
 REASONABLY SAFE FROM FLOODING. IF A PROPOSED BUILDING
 SITE IS IN A FLOOD PRONE AREA, ALL NEW CONSTRUCTION AND
 SUBSTANTIAL IMPROVEMENTS SHALL? BE CONSTRUCTED WITH
 MATERIALS RESISTANT TO FLOOD DAMAGE,(III) BE
 CONSTRUCTED BY METHODS AND PRACTICES THAT MINIMIZE
 FLOOD DAMAGES, AND (IV) BE CONSTRUCTED WITH
 ELECTRICAL... EQUIPMENT AND OTHER SERVICES FACILITIES
 THAT ARE DESIGNED AND / OR LOCATED SO AS TO PREVENT
 WATER DAMAGE FROM ENTERING OR ACCUMULATING WITHIN THE
 COMPONENTS DURING CONDITIONS OF FLOODING.
 TO KEEP THE ELEVATOR CABS FROM HAVING SUBSTANTIAL
 DAMAGE FROM FLOODWATERS, IS THERE A INTERLOCKING
 CONTROL OR FLOAT SWITCH THAT WHEN ACTIVATED WILL KEEP
 THE CAB FROM DESCENDING INTO THE FLOODWATERS.
 THE OTHER QUESTION, IS NORMALLY WITH LOSS OF POWER THE
 ELEVATOR CABS DESCEND TO THE LOWEST LEVEL , WILL THE
 INTERLOCK AND OR FLOAT SWITCH ALLOW THE OVERRIDE?
 DURING TIMES OF FLOOD THIS WILL ENABLE ACCESSIBILITY TO
 THE LOWER PARKING GARAGE UNLESS THE OCCUPANT TRAVELS
 DOWN THE STAIRS.
  
 1E) DOORS P202/ ELEV. LOBBY 1, DOOR P203/ ELEV. LOBBY
 2, DOOR P205 ELEV. LOBBY 3/ DOOR P206/ ELEV. LOBBY #4,
 ON THE DOOR SCHEDULE SHEET 332-A8-11 DO NOT INDICATE A
 FIRE RATING, PLEASE SEE 2010 FBC-B 708.14.1 REQUIRING A
 FIRE PARTITION AS IN 709 OR ONE OF THE EXCEPTIONS.
  
 1F) STAIR # 1 IS MISSING THE STAND PIPE IN THE
 STAIRWELL. 2010 FBC-B 905.3. REQUIRED INSTALLATION.
 ALSO NOT SHOWN ON 177-A5-21.
  
 1G) THE BUILDING CORES CONTAINING STAIRWELLS 1 & 2 AND
 3 & 4 DO NOT HAVE WALL IDENTIFICATION TAGS AS THE WALLS
 SURROUNDING THE PERIMETER OF THE BUILDING. SHEET
 012-A0-31 THE LIFE SAFETY SHEET FOR THE PARKING GARAGES
 INDICATES FIRE RATED WALLS. 107.2.1.3 ADDITIONAL
 INFORMATION IS REQUIRED.
  
 1H) THE EAST WALL OF THE FPL VAULT DOES NOT INDICATE A
 WALL TAG. THE FLOOR ELEVATION IS INDICATED AT ELEVATION
 6?-0? THIS WALL WILL STILL BE ON THIS LEVEL. 107.2.1.3
 ADDITIONAL INFORMATION IS REQUIRED, WALL NOT IDENTIFIED
 AS TO TYPE.
  
 2) SHEET 079-A2-0P1 (PARKING LEVEL 1 UPPER LEVEL):
 2A) ROOM # P123, THE FPL VAULT INDICATES AN EXTERIOR
 PAIR OF DOORS P123B AS THE ONLY DOORS. THE DOOR
 SCHEDULE INDICATES FOR THIS ROOM DOORS P123A AND P123B
 BOTH SETS OF DOORS ARE PAIRS OF DOORS. WHERE IS THE 2ND
 SET OF DOORS? 107.2.1.3 ADDITIONAL INFORMATION IS
 REQUIRED. MISSING DOOR LOCATION.
  
 2B) THE FPL VAULT DOORS SHOW ON THE HARDWARE SCHEDULE,
 HARDWARE TYPE 41. THERE ARE NO SHEETS IN THE INDEX THAT
 SHOW A HARDWARE SCHEDULE. PLEASE NOTE IF THE HARDWARE
 SCHEDULE IS IN A SPEC BOOK, WE DO NOT REVIEW SPEC
 BOOKS. PLEASE PROVIDE THE HARDWARE SCHEDULE. 2010 FBC-B
 1008.1.10 PANIC AND FIRE EXIT HARDWARE. ELECTRICAL
 ROOMS WITH EQUIPMENT RATED 1,200 AMPERES OR MORE AND
 OVER 6 FEET (1829 MM) WIDE THAT CONTAIN OVERCURRENT
 DEVICES, SWITCHING DEVICES OR CONTROL DEVICES WITH EXIT
 OR EXIT ACCESS DOORS SHALL BE EQUIPPED WITH PANIC
 HARDWARE OR FIRE EXIT HARDWARE. THE DOORS SHALL SWING
 IN THE DIRECTION OF EGRESS TRAVEL.
  
 2C) THE DOOR SCHEDULE SHEET 331-A8-11 DOOR # UNDER THE
 HEADING OF NOTES INDICATES EXTERIOR DOOR WITH FLOOD
 BARRIER. PLEASE PROVIDE WHAT STEPS ARE GOING TO TAKE
 PLACE FOR A FLOOD BARRIER FOR THIS DOOR. THIS CONDITION
 WILL NEED TO BE PART OF THE FLOOD EMERGENCY OPERATION
 PLAN, INSPECTION AND MAINTENANCE PLAN AND MINIMUM
 ENGINEERING CONSIDERATIONS (2) SEE FEMA?S TECHNICAL
 BULLETIN 3-93 NON-RESIDENTIAL FLOODPROOFING-
 REQUIREMENTS AND CERTIFICATION.
  
 2D) THE MAIN ELECTRIC ROOM P124 DOES INDICATE 2 DOORS
 BUT ONE DOOR HAS DIFFERENT HARDWARE THAN THE FPL VAULT
 AND THE OTHER DOOR OF THE ELECTRICAL ROOM. HARDWARE
 TYPE 44 THE OTHER DOORS HAVE A HARDWARE TYPE 41. THERE
 IS NO HARDWARE SCHEDULE TO IDENTIFY THE TYPES OF
 HARDWARE. PLEASE PROVIDE CODE COMPLIANCE WITH 2010
 FBC-B B 1008.1.10 PANIC AND FIRE EXIT HARDWARE.
 ELECTRICAL ROOMS WITH EQUIPMENT RATED 1,200 AMPERES OR
 MORE AND OVER 6 FEET (1829 MM) WIDE THAT CONTAIN
 OVERCURRENT DEVICES, SWITCHING DEVICES OR CONTROL
 DEVICES WITH EXIT OR EXIT ACCESS DOORS SHALL BE
 EQUIPPED WITH PANIC HARDWARE OR FIRE EXIT HARDWARE. THE
 DOORS SHALL SWING IN THE DIRECTION OF EGRESS TRAVEL.
  
 2E) THIS LEVEL SHOWS STACKED PARKING, PLEASE PROVIDE
 DETAILS FOR THIS TYPE OF LIFT. HOW THE LIFT WILL
 OPERATE, MANUFACTURERS SPEC, ANCHORAGE FOR LIFT, IS
 THERE A VALET THAT PUTS THE CARS ON THE LIFT, ETC?
 107.2.1.3 ADDITIONAL INFORMATION IS REQUIRED.
  
 2F) THE SOUTH CORE PLAN SHOWS A WALL IDENTIFICATION TAG
 # 76 AS A 6 INCH CMU NON-BEARING WALL WITH A 2 HOUR
 FIRE RATING. PLEASE SHOW HOW A 2 HOUR FIRE RESISTANCE
 RATING WILL BE ACHIEVED. 2010 FBC-B TABLE 721.3.2.
 PLEASE PROVIDE FROM THE BLOCK MANUFACTURERS EQUIVALENT
 THICKNESS IN COMPLIANCE.
  
 2G) TRASH ROOM P114 IS MISSING THE DOOR IDENTIFICATION
 TAG AND OPENING PROTECTIVE FIRE RATING. 2010 FBC-B
 TABLE 715.4.
  
 3) SHEET 013-A)-32 & 080-A2-01 LEVEL 1 (LOBBY) :
 3A) STAIR # 1 VERSUS THE FIRE EXIT CORRIDOR. THE STAIR
 EXIT CORRIDOR IS ACTUALLY AN EXIT PASSAGE WAY, WHICH
 REQUIRES THE EXIT ENCLOSURE TO BE SEPARATED FROM THE
 EXIT PASSAGEWAY BY A FIRE BARRIER. A FIRE DOOR ASSEMBLY
 COMPLYING WITH SECTION 715.4/ TABLE 715.4 (1 ? HR.
 PROTECTIVE) SHALL BE INSTALLED IN THE FIRE BARRIER TO
 PROVIDE A MEANS OF EGRESS FROM THE EXIT ENCLOSURE TO
 THE EXIT PASSAGE WAY. SEE 2010 FBC-B 1022.1.
  
 3B) PLEASE SEE THE STAIR # 1 WITH THE NEW 1 ? HR.
 OPENING PROTECTIVE ON THE VERTICAL EXIT SEPARATING THE
 VERTICAL EXIT FROM THE EXIT PASSAGEWAY WILL NEED THE
 PLANS REVISED BECAUSE THE 2 DOORWAYS THAT SWING INTO
 THE EXIT PASSAGE WAY WILL CREATE A BOTTLENECK AND BLOCK
 ONE OF THE DOORS THAT SWING INTO THE EXIT PASSAGEWAY.
 2010 FBC-B 1003.3 PROTRUDING OBJECTS.
  
 3C) PLEASE BE AWARE OF FBC-B 1023.6. PENETRATIONS.
 PENETRATIONS INTO AND OPENINGS THROUGH AN EXIT
 PASSAGEWAY ARE PROHIBITED EXCEPT FOR REQUIRED EXIT
 DOORS, EQUIPMENT AND DUCTWORK NECESSARY FOR INDEPENDENT
 PRESSURIZATION, SPRINKLER PIPING, STANDPIPES,
 ELECTRICAL RACEWAY FOR FIRE DEPARTMENT COMMUNICATION
 AND ELECTRICAL RACEWAY SERVING THE EXIT PASSAGEWAY AND
 TERMINATING AT A STEEL BOX NOT EXCEEDING 16 SQUARE
 INCHES.
  
 3D) STAIR # 1 IS MISSING THE REQUIRED STANDPIPE 2010
 FBC-B 905.3.1. THIS STATEMENT WILL STAND FOR ALL
 FLOORS.
  
 3E) PLEASE BE AWARE THAT THE DOORS ARE NOT IDENTIFIED
 ON THIS SHEET, NOR ARE THEY IDENTIFIED ON SHEET
 166-A5-01. 107.2.1.3 ADDITIONAL INFORMATION IS
 REQUIRED.
  
 3F) PLEASE BE AWARE THAT THE WALL IDENTIFICATION TAGS
 ON THIS SHEET ARE MISSING AS WELL AS ON SHEET
 166-A5-01. 107.2.1.3 ADDITIONAL INFORMATION IS
 REQUIRED.
  
 3G) GUEST ROOM CORRIDOR 102 SHOWS THE WALLS TO BE A
 MINIMUM OF A 1 HOUR FIRE RATING WITH THE EXCEPTION OF
 THE ELEVATOR OPENING? PLEASE PROVIDE COMPLIANCE WITH
 2010 FBC-B TABLE 1018.1.
  
 3H) THE CORRIDOR 102 FOR THE GUEST SUITES REQUIRES THE
 1 HOUR RATING, THE 2010 FBC-B 1018.6 CORRIDOR
 CONTINUITY. FIRE-RESISTANCE-RATED CORRIDORS SHALL BE
 CONTINUOUS FROM THE POINT OF ENTRY TO AN EXIT, AND
 SHALL NOT BE INTERRUPTED BY INTERVENING ROOMS.
 EXCEPTION: FOYERS, LOBBIES OR RECEPTION ROOMS
 CONSTRUCTED AS REQUIRED FOR CORRIDORS SHALL NOT BE
 CONSTRUED AS INTERVENING ROOMS.
 PLEASE NOTE THE 1 HOUR FIRE RATING WAS NOT CONTINUED TO
 THE EXIT DOORWAY, LOBBY DOORS.
  
 3I) STAIR TOWER # 4 IS MISSING THE REQUIRED FIRE DOOR
 BETWEEN THE VERTICAL EXIT AND THE EXIT PASSAGE WAY.
 2010 FBC-B. A FIRE DOOR ASSEMBLY COMPLYING WITH SECTION
 715.4/ TABLE 715.4 (1 ? HR. PROTECTIVE) SHALL BE
 INSTALLED IN THE FIRE BARRIER TO PROVIDE A MEANS OF
 EGRESS FROM THE EXIT ENCLOSURE TO THE EXIT PASSAGE WAY.
 SEE 2010 FBC-B 1022.1.
  
 3J) ROOM 143 THERE IS WHAT APPEARS TO BE A 2 HOUR RATED
 SHAFT ENCLOSURE NEXT TO A COLUMN WITH ONE END OF THE
 SHAT ENCLOSURE NOT RATED. 2010 FBC-B 708.4. 2 HOUR
 SHAFT ENCLOSURE REQUIRED.
  
 3K) PLEASE REVIEW THE (2) PAIR OF DOUBLE DOORS IN
 CORRIDOR 114 AND THE BEAUTY SALON 143. THERE IS LESS
 THAN 4 FEET BETWEEN DOORS. FAIR HOUSING ANSI A117-1998
 SECTION. 404.2.6 DOORS IN SERIES.
  
 3L) THE 1ST LEVEL SHEET 080-A2-01/ 013-A)-32 LIFE
 SAFETY AND 2ND LEVEL SHEET 081-A2-02/ 014-A0-33 LIFE
 SAFETY 2ND LEVEL. THESE SHEETS DEPICT A 2 STORY ATRIUM.
 WHAT THE LIFE SAFETY SHEETS FAIL TO PROVIDE IS THE 1
 HOUR FIRE BARRIER (2010 FBC-B 404.6) CONSTRUCTED IN
 ACCORDANCE WITH SECTION 707. THE PLANS DO NOT SHOW A
 CUT SECTION WHERE ONE OF THE EXCEPTIONS WAS TAKEN. ONE
 HOUR FIRE RATED WALLS WOULD BE REQUIRED WITH ANY SPACE
 THAT COMMUNICATED WITH THE ATRIUM AND OPENING
 PROTECTIVE IN COMPLIANCE WITH 2010 FBC-B TABLE 715.4.
 SMOKE CONTROL IS NOT REQUIRED SINCE THIS IS A 2 STORY
 ATRIUM.
  
 3M) ATRIUM. PLEASE SHOW HOW CODE COMPLIANCE WITH
 SECTION OF THE 2010 FBC-B 404.8 INTERIOR FINISHES. THE
 INTERIOR FINISHES OF WALLS AND CEILINGS OF THE ATRIUM
 SHALL NOT BE LESS THAN CLASS B WITH NO REDUCTIONS IN
 CLASS FOR SPRINKLER PROTECTION.
  
 3N) BOTH ELEVATOR 7 & 9 BOTH ARE MISSING THE ELEVATOR
 LOBBY OR ONE OF THE EXCEPTIONS FOR ELEVATORS IN A
 HIGH-RISE BUILDING. 2010 FBC-B 708.14.1 AND OR
 EXCEPTIONS. PLEASE REVIEW BOAF (BUILDING OFFICIALS
 INFORMAL INTERPRETATION 3762.
 DATE: TUE JUN 28 2005
 REPORT #: 3762
 CODE: BUILDING
 SECTION: 412.6
 QUESTION:
 IS IT THE INTENT OF SECTION 412.6 TO REQUIRE THE
 ELEVATOR LOBBIES FOR ALL ELEVATORS WITHIN A HIGH-RISE
 BUILDING? ARE ELEVATORS THAT DO NOT SERVE THE HIGH-RISE
 PORTION OF THE BUILDING EXEMPT FROM THE ELEVATOR
 LOBBY REQUIREMENTS?
 ANSWER:
 YES. ELEVATOR LOBBIES ARE REQUIRED FOR LOW-RISE
 PORTIONS OF HIGH-RISE BUILDINGS. ELEVATOR LOBBIES SERVE
 AS
 A STAGING AREA FOR EMERGENCY PERSONNEL DURING A FIRE
 EMERGENCY AND A COMPARATIVELY SMOKE-FREE SPACE
 FOR HANDLING OCCUPANTS NEEDING SPECIAL ASSISTANCE WITH
 EVACUATION.
 COMMENTARY:
 IT IS THE INTENT OF SECTION 412.6 TO, AMONG OTHER
 THINGS, (1)PREVENT MIGRATION OF HEAT AND HARMFUL
 PRODUCTS OF COMBUSTION THROUGH THE ELEVATOR HOISTWAY TO
 OTHER FLOORS IN HIGH-RISE BUILDINGS (2)PROVIDE
 PROTECTION FOR FIRE FIGHTER OPERATIONS IN THE EVENT THE
 ELEVATORS ARE USED FOR EMERGENCY RESPONSE IN A
 HIGH-RISE STRUCTURE (3)INHIBIT POTENTIAL EFFECTS OF THE
 ELEVATOR HOISTWAY ON THE PERFORMANCE OF HIGH-RISE SMOKE
 CONTROL SYSTEMS AND (4) ENHANCE LIFE SAFETY IN EXIT
 ACCESS CORRIDORS THAT REQUIRE OCCUPANTS TO TRAVERSE AN
 ELEVATOR LOBBY THAT SERVES AS PART OF THE EXIT ACCESS
 IN A HIGH-RISE BUILDING.
 NOTICE:
 THE BUILDING OFFICIALS ASSOCIATION OF FLORIDA, IN
 COOPERATION WITH THE FLORIDA BUILDING COMMISSION, THE
 FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS, ICC, AND
 INDUSTRY AND PROFESSIONAL EXPERTS OFFER THIS
 INTERPRETATION OF THE FLORIDA BUILDING CODE IN THE
 INTEREST OF CONSISTENCY IN THEIR APPLICATION STATEWIDE.
 THIS INTERPRETATION IS INFORMAL, NON-BINDING AND
 SUBJECT TO ACCEPTANCE AND APPROVAL BY THE LOCAL
 BUILDING OFFICIAL.
  
 3O) THE FIRE COMMAND CENTER MEETS THE 200 SQUARE FOOT
 REQUIREMENT BUT PLEASE PROVIDE A DETAILED LAYOUT OF THE
 FIRE COMMAND CENTER TO BE APPROVED BY FIRE PRIOR TO
 INSTALLATION. 2010 FBC-B 911.1.4.
 PLEASE REVIEW FBC-B 911.1.5 FOR REQUIRED FEATURES.
  
 3O)(1) PLEASE SHOW COMPLIANCE WITH 2010 FBC-B: 403.4.3
 EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM.
  
 3O)(2) PLEASE SHOW COMPLIANCE WITH 2010 FBC-B: 403.4.4
 EMERGENCY RESPONDER RADIO COVERAGE. AN EMERGENCY
 VOICE/ALARM COMMUNICATION SYSTEM SHALL BE PROVIDED IN
 ACCORDANCE WITH SECTION 907.5.2.2.
 EMERGENCY RESPONDER RADIO COVERAGE SHALL BE PROVIDED IN
 ACCORDANCE WITH THE FLORIDA FIRE PREVENTION CODE.
 SECTION 907.5.2.2.
  
 3O)(3) PLEASE SHOW COMPLIANCE WITH 2010: 403.5.3
 STAIRWAY DOOR OPERATION. STAIRWAY DOORS OTHER THAN THE
 EXIT DISCHARGE DOORS SHALL BE PERMITTED TO BE LOCKED
 FROM THE STAIRWAY SIDE. STAIRWAY DOORS THAT ARE LOCKED
 FROM THE STAIRWAY SIDE SHALL BE CAPABLE OF BEING
 UNLOCKED SIMULTANEOUSLY WITHOUT UNLATCHING UPON A
 SIGNAL FROM THE FIRE COMMAND CENTER.
  
 3O)(4) 403.5.3.1 STAIRWAY COMMUNICATION SYSTEM. A
 TELEPHONE OR OTHER TWO-WAY COMMUNICATIONS SYSTEM
 CONNECTED TO AN APPROVED CONSTANTLY ATTENDED STATION
 SHALL BE PROVIDED AT NOT LESS THAN EVERY FIFTH FLOOR IN
 EACH STAIRWAY WHERE THE DOORS TO THE STAIRWAY ARE
 LOCKED.
  
 3O)(5) 403.5.5 LUMINOUS EGRESS PATH MARKINGS. LUMINOUS
 EGRESS PATH MARKINGS SHALL BE PROVIDED IN ACCORDANCE
 WITH 2010 FBC-B SECTION 1024.
  
 3O)6) A CUT SECTION THROUGH THE BUILDING SHOWING WHICH
 STAIRWELLS SERVICE WHICH SUITES SINCE THE FLOORS WITH 3
 SUITES USE STAIRWELLS 2 & 3 SO FIRE FIGHTERS WILL KNOW
 WHICH STAIRWELLS AND FIREMEN?S ELEVATORS TO USE FOR
 FIREFIGHTING AND OR EMERGENCIES. 107.2.1.3 ADDITIONAL
 INFORMATION REQUIRED.
  
 3P) PLEASE PROVIDE WHERE COMPLIANCE WITH THE 2010 FBC-B
 SECTION 403.3.2 WATER SUPPLY TO REQUIRED FIRE PUMPS.
 REQUIRED FIRE PUMPS SHALL BE SUPPLIED BY CONNECTIONS TO
 A MINIMUM OF TWO WATER MAINS LOCATED IN DIFFERENT
 STREETS. SEPARATE SUPPLY PIPING SHALL BE PROVIDED
 BETWEEN EACH CONNECTION TO THE WATER MAIN AND THE
 PUMPS. EACH CONNECTION AND THE SUPPLY PIPING BETWEEN
 THE CONNECTION AND THE PUMPS SHALL BE SIZED TO SUPPLY
 THE FLOW AND PRESSURE REQUIRED FOR THE PUMPS TO
 OPERATE.
  
 EXCEPTION: TWO CONNECTIONS TO THE SAME MAIN SHALL BE
 PERMITTED PROVIDED THE MAIN IS VALVED SUCH THAT AN
 INTERRUPTION CAN BE ISOLATED SO THAT THE WATER SUPPLY
 WILL CONTINUE WITHOUT INTERRUPTION THROUGH AT LEAST ONE
 OF THE CONNECTIONS. TO BE APPROVED BY THE FIRE
 DEPARTMENT.
  
 3R) THE LAUNDRY ROOM WILL NEED TO MEET FAIR HOUSING, AT
 LEAST ONE OF EACH TYPE OF APPLIANCES PROVIDED IN EACH
 LAUNDRY AREA, EXPECT THAT LAUNDRY ROOMS SERVING COVERED
 MULTIPLE-FAMILY DWELLINGS WOULD NOT BE REQUIRED TO HAVE
 FRONT-LOADING WASHERS IN ORDER TO MEET THE REQUIREMENTS
 OF 100.205?(1). (WHERE FRONT LOADING WASHERS ARE NOT
 PROVIDED, MANAGEMENT WILL BE EXPECTED TO PROVIDE
 ASSISTANCE DEVICES ON REQUEST IF NECESSARY TO PERMIT A
 RESIDENT TO USE A TOP LOADING WASHER. ANSI
 A117.1SECTION 4.32.6. ALSO IF COIN OPERATED VENDING
 MACHINES ARE AVAILABLE ANSI A117.1 4.25 OPERATING
 MECHANISMS.
  
 3S) THE PLANS SHOW AT THE ENTRY LEVEL OF THE LOBBY A
 RECEPTION/ REGISTRATION DESK. PLEASE PROVIDE COMPLIANCE
 WITH FAIR HOUSING SPECIFICATION OF ANSI 4.31 ALSO SEE
 REACH RANGES.
  
 3T) THIS COMMENT WILL STAND FOR ALL FLOORS WITH
 MULTIPLE R2 DWELLING UNITS ON THE SAME FLOOR OR
 DWELLING UNITS ABOVE OR BELOW THE OCCUPIED UNIT. PLEASE
 PROVIDE TEST REPORTS SHOWING COMPLIANCE WITH:
  
 3T)(1) FBC-B 2014 1207.3 STRUCTURE-BORNE SOUND.
 FLOOR/CEILING ASSEMBLIES BETWEEN DWELLING UNITS OR
 BETWEEN A DWELLING UNIT AND A PUBLIC OR SERVICE AREA
 WITHIN THE STRUCTURE SHALL HAVE AN IMPACT INSULATION
 CLASS (IIC) RATING OF NOT LESS THAN 50 (45 IF FIELD
 TESTED) WHEN TESTED IN ACCORDANCE WITH ASTM E 492.
  
 3T)(2) FBC-B 2014 1207.2 AIR-BORNE SOUND.
 WALLS, PARTITIONS AND FLOOR/CEILING ASSEMBLIES
 SEPARATING DWELLING UNITS FROM EACH OTHER OR FROM
 PUBLIC OR SERVICE AREAS SHALL HAVE A SOUND TRANSMISSION
 CLASS (STC) OF NOT LESS THAN 50 (45 IF FIELD TESTED)
 FOR AIR-BORNE NOISE WHEN TESTED IN ACCORDANCE WITH ASTM
 E 90.
  
 3T)(3) FLAME SPREAD- FBC-B 2014 603.1. EXCEPTION 2.
 INSULATION INSTALLED BETWEEN A FINISHED FLOOR AND SOLID
 DECKING WITHOUT INTERVENING AIRSPACE SHALL BE ALLOWED
 TO HAVE A FLAME SPREAD INDEX OF NOT MORE THAN 200.
  
 FLAME SPREAD INDEX. A COMPARATIVE MEASURE, EXPRESSED AS
 A DIMENSIONLESS NUMBER, DERIVED FROM VISUAL
 MEASUREMENTS OF THE SPREAD OF FLAME VERSUS TIME FOR A
 MATERIAL TESTED IN ACCORDANCE WITH ASTM E 84 OR UL 723.
  
 3U) THE STRUCTURAL SHEETS INDICATE THE THICKNESS OF THE
 FLOOR SLABS FOR THE MOST PART. I COULD NOT IDENTIFY THE
 THICKNESS OF THE FLOOR SLABS FOR SHEETS:
 0360-S2.01M
 361-S2.02 GUEST SUITES LEVELS 2 & 3
 S361-S2.02 LEVEL 2
 S362-S2.02A POOL DECK FRAMING
  
 LEVEL DECK 1 (LOBBY) IS 12 INCH DECK
 ALL OTHER DECKS ARE 10 INCH WITH EXCEPTION OF LEVEL 20
 WHICH IS ? OF DECK 14 INCHES DECK.
  
  
 4) SHEET 014-A0-33/ 082-A2-03: 2ND LEVEL GUEST SUITES.
  
 4A) THE PLANS INDICATE 3 FLOORS OF GUEST SUITES. THE
 TERM GUEST SUITES LEAD ONE TO BELIEVE THAT THE SUITES
 ARE FOR SHORT TERM USE. IT IS UNCLEAR IF THESE UNITS
 SHOULD BE REVIEWED UNDER FAIR HOUSING OR IF THEY SHOULD
 BE REVIEWED UNDER THE FLORIDA ACCESSIBILITY CODE OR
 BOTH. PLEASE SEE 2010 FBC-ACCESSIBILITY CODE
 DEFINITIONS: RESORT CONDOMINIUM. (SECTION 509.242,
 F.S.). A RESORT CONDOMINIUM IS ANY UNIT OR GROUP OF
 UNITS IN A CONDOMINIUM, COOPERATIVE, OR TIME-SHARE PLAN
 WHICH IS RENTED MORE THAN THREE TIMES A CALENDAR YEAR
 FOR PERIODS OF LESS THAN 30 DAYS OR ONE CALENDAR MONTH,
 WHICHEVER IS LESS, OR WHICH IS ADVERTISED OR HELD OUT
 TO THE PUBLIC AS A PLACE REGULARLY RENTED FOR PERIODS
 OF LESS THAN 30 DAYS OR ONE CALENDAR MONTH, WHICHEVER
 IS LESS (SEE ALSO, PLACES OF LODGING).
  
 4B) THERE IS A DISCREPANCY IN PLANS IT WOULD APPEAR.
 SHEET 014-A0-33 LEVEL 2 GUEST SUITES IT APPEARS THE
 MECHANICAL UNIT HP-1IN GUEST SUITES 11 & 12 ARE LOCATED
 IN A ONE HOUR SHAFT WHEREAS THE UNITS 9 & 10 THE UNITS
 ARE NOT LOCATED IN A RATED WALL. IT APPEARS IN UNITS 11
 & 12 THERE IS A VERTICAL 8X16 INCH EXHAUST DUCT NOT
 SHOWN IN A SHAFT, MECHANICAL SHEETS INDICATE THAT IN
 SOME AREA 2 HOUR FLAME BAR IS TO BE INSTALLED. PLEASE
 PROVIDE DETAILED INFORMATION IN RESPONSE AS TO WHAT
 AREAS ARE TO BE SHAFTS, HOUR RATING OF SHAFTS, WHERE
 THE FLAME BAR IS TO BE INSTALLED AND FIRE STOPPING
 ASSEMBLIES FOR THROUGH PENETRATIONS. THIS COMMENT WILL
 BE COMMON FOR THE 3 FLOORS OF GUEST SUITES. 2010 FBC-B
 708.2.4 /716.6 HORIZONTAL ASSEMBLIES. THIS CONDITION
 APPEARS ON THE 3RD LEVEL OF GUEST SUITES AS WELL.
  
 4C) SUITE # 7 & 11 IS MISSING THE SHOWER ENCLOSURE ON
 014-A0-33. 107.2.1.3 ADDITIONAL INFORMATION REQUIRED.
  
 4D) SUITE # 5 & 9 IS MISSING THE SHOWER ON SHEET
 014-A0-33. 107.2.1.3 ADDITIONAL INFORMATION REQUIRED.
  
 5) SHEET 014-A)-33/ 081-A2-02: 2ND LEVEL AMENITIES/ 3RD
 LEVEL GUEST SUITES.
 5A) SHEET 081-A2-02, STAIR # 1 ON THE 3RD LEVEL OF THE
 GUEST ROOMS IS MISSING THE 1 ? HR. FIRE RATED DOOR.
 2010 FBC-B TABLE 715.4.
  
 5B) SHEET 014-A)-33 STAIR # 1 IS MISSING THE
 ILLUSTRATED DOWN PORTION OF STAIRS IN THE STAIRWELL
 ENCLOSURE. 107.2.1.3 ADDITIONAL INFORMATION, TYPO.
  
 5C) SHEET 081-A2-02 IS MISSING BOTH THE WALL & DOOR
 IDENTIFICATION TAGS. CODE COMPLIANCE CANNOT BE
 DETERMINED. 107.2.1.3 ADDITIONAL INFORMATION IS
 REQUIRED.
  
 5D) SHEET 014-A)-33 IS THE 2ND LEVEL OF THE ATRIUM.
 THIS SHEETS DEPICTS THE 2ND FLOOR OF THE ATRIUM. WHAT
 THE LIFE SAFETY SHEETS FAIL TO PROVIDE IS THE 1 HOUR
 FIRE BARRIER (2010 FBC-B 404.6) CONSTRUCTED IN
 ACCORDANCE WITH SECTION 707. THE PLANS DO NOT SHOW A
 CUT SECTION WHERE ONE OF THE EXCEPTIONS WAS TAKEN. ONE
 HOUR FIRE RATED WALLS WOULD BE REQUIRED WITH ANY SPACE
 THAT COMMUNICATED WITH THE ATRIUM AND OPENING
 PROTECTIVE IN COMPLIANCE WITH 2010 FBC-B TABLE 715.4.
 SMOKE CONTROL IS NOT REQUIRED SINCE THIS IS A 2 STORY
 ATRIUM. PLEASE NOTE THE 3 LEVELS OF THE R2 GUEST ROOMS
 TRAVEL THROUGH A 1 HOUR FIRE RATED ACCESS CORRIDOR INTO
 THE ATRIUM.
  
 5E) . PLEASE SHOW HOW CODE COMPLIANCE WITH SECTION OF
 THE 2010 FBC-B 404.8 INTERIOR FINISHES. THE INTERIOR
 FINISHES OF WALLS AND CEILINGS OF THE ATRIUM SHALL NOT
 BE LESS THAN CLASS B WITH NO REDUCTIONS IN CLASS FOR
 SPRINKLER PROTECTION.
  
 5F) THIS SHEET INDICATES THE BRIDGE SECTION OF THE 2ND
 LEVEL IS INDICATED AS A MEZZANINE LOBBY. THE 2ND FLOOR
 AREA THAT IS OPEN AND COMMUNICATES IS OVER ? OF THE
 OPEN AREAS ALLOWED BY FBC-B 505.2 EXCEPTION # 2 FOR
 TYPE I TYPE II BUILDINGS. THIS IS A TRUE 2 STORY
 ATRIUM, FBC-B 404.6 ENCLOSURES OF ATRIUMS.
  
 5G) SHEET 014-A0-33 POOL DECK STAIR # 6 & 7 SHOW THE
 USE OF AN AREA OF RESCUE ASSISTANCE. THE 2010 FBC-B
 1007.1 ACCESSIBLE MEANS OF EGRESS. ACCESSIBLE MEANS OF
 EGRESS SHALL BE PROVIDED IN ACCORDANCE WITH THE
 APPLICABLE SECTIONS OF THE FLORIDA BUILDING CODE,
 ACCESSIBILITY.
 2010 FBC-ACCESSIBILITY CODE. ACCESSIBLE MEANS OF EGRESS
 . 207.1 GENERAL. MEANS OF EGRESS SHALL COMPLY WITH
 SECTION 1003.2.13 OF THE INTERNATIONAL BUILDING CODE
 (2000 EDITION AND 2001 SUPPLEMENT) OR SECTION 1007 OF
 THE INTERNATIONAL BUILDING CODE (2003 EDITION)
 (INCORPORATED BY REFERENCE, SEE "REFERENCED STANDARDS"
 IN CHAPTER 1).
 PLEASE SHOW FULL COMPLIANCE FOR THE AREA OF REFUGE
 ASSISTANCE, 2003 IBC-B REQUIREMENTS 1007.6.(1-7) &
 1007.8(1-3).
  
 5H) DEPENDING ON THE CLASSIFICATION AND OR OF THE
 DINING ROOM, BEAUTY PARLOR AND GUEST ROOMS THERE MAYBE
 ELEMENTS OF THIS BUILDING THAT MAY FALL UNDER THE 2010
 FBC-ACCESSIBILITY CODE. THE POOL DECK AND ACCESS TO THE
 POOL WOULD THEN NEED TO MEET THE REQUIREMENTS OF 1009.
 SWIMMING POOLS AND SPAS AS WELL AS WHERE PROVIDED, POOL
 LIFTS SLOPED ENTRIES, TRANSFER WALLS, TRANSFER SYSTEMS,
 AND POOL STAIRS SHALL COMPLY WITH 1009. IF THE END
 RESULT OF THE RESEARCH IS COMPLETED AND ONLY FAIR
 HOUSING IS TO BE APPLIED THEN ONLY ACCESS TO THE POOL
 DECK WILL BE A FACTOR.
  
 5I) PLEASE NOTE THE POOL DECK DOES SHOW STEPS BUT THERE
 ARE NO RAMPS DESIGNATED ON THE PLANS FOR AN ACCESSIBLE
 ROUTE TO THE LOWER POOL DECK AREA. FAIR HOSING ANSI
 A117.1 4.3 (C) CONNECTING ACCESSIBLE BUILDING OR
 FACILITY ENTRANCES WITH ACCESSIBLE SPACES AND ELEMENTS
 WITHIN THE BUILDING OR FACILITY, INCLUDING ADAPTABLE
 DWELLING UNITS.
  
 5J) PLEASE PROVIDE FAIR HOUSING COMPLIANCE FOR THE
 STEAM ROOMS AND SAUNAS. FAIR HOUSING COMMON USE SPACES
 AND FACILITIES. WHEN ANSI DOES NOT CONTAIN
 SPECIFICATIONS FOR SPECIFIC FACILITIES OR FEATURE IN
 QUESTION RELATED HUMAN FACTORS AND PERFORMANCE
 SPECIFICATIONS MUST BE USED TO ACHIEVE ACCESSIBILITY.
 SUCH SPECIFICATIONS INCLUDE, BUT ARE NOT LIMITED TO,
 4.2 SPACE ALLOWANCES AND REACH RANGES, 4.3 ACCESSIBLE
 ROUTE, 4.4 PROTRUDING OBJECTS, 4.5 GROUND & FLOOR
 SURFACES, AND 4.25 OPERATING MECHANISMS.
  
 5K) SHEET 014-A0-33 THE LOWER POOL DECK IT APPEARS
 THERE IS ONLY ONE RAMP (NOT MARKED, NOR ELEVATION
 CHANGES GIVEN) BETWEEN THE POOL DECK AND POOL THERE ARE
 116 OCCUPANTS AND WHAT APPEARS TO BE ONLY ONE
 ACCESSIBLE MEANS OF EGRESS. PLEASE SHOW COMPLIANCE
 WITH: 2010 FBC-BUILDING CODE 1007.1 ACCESSIBLE MEANS OF
 EGRESS. ACCESSIBLE MEANS OF EGRESS SHALL BE PROVIDED IN
 ACCORDANCE WITH THE APPLICABLE SECTIONS OF THE FLORIDA
 BUILDING CODE, ACCESSIBILITY.
 2010 FBC-ACCESSIBILITY CODE SECTION 207.1 MEANS OF
 EGRESS SHALL COMPLY WITH SECTION 1003.2.13 OF THE
 INTERNATIONAL BUILDING CODE (2000 EDITION AND 2001
 SUPPLEMENT) OR SECTION 1007 OF THE INTERNATIONAL
 BUILDING CODE (2003 EDITION).
 2003 IBC-B 1007.1 WHERE MORE THAN ONE MEANS OF EGRESS
 IS REQUIRED BY SECTIONS 1014.1 OR 1018.1 FROM ANY
 ACCESSIBLE SPACE, EACH ACCESSIBLE PORTION OF THE SPACE
 SHALL BE SERVED BY NOT LESS THAN TWO MEANS OF EGRESS.
  
 6) SHEETS 015-A0-34 LEVELS 5-10. 11-17 (TIER 1) LEVELS
 18-19 TIER 2. / 083-A2-05 LEVEL 5/ 084-A2-06 LEVELS
 6-9, 11 TIER 1;
 6A) THIS COMMENT IS A COMMON COMMENT FOR ALL DWELLING
 UNITS TIER 1 LEVELS 5-9 &11. THE LIFE SAFETY PLAN SHOWS
 (2) REQUIRED COMMON PATHS OF TRAVEL BECAUSE THEY ARE
 OVER THE 125 FEET REQUIRED BY 2010 FBC-B 1014.3
 EXCEPTION # 4.
  
 6A) (1)THE PLANS SHOW THE 1ST COMMON PATH OF TRAVEL
 EXITING THROUGH THE FRONT ENTRY DOORS THROUGH AN
 ELEVATOR LOBBY, THE LIFE SAFETY PLANS WILL NEED TO
 INDICATE IF THE ELEVATOR HOIST WAYS ARE PRESSURIZED TO
 ALLOW EXITING THROUGH THE ELEVATOR LOBBY. 2010 FBC-B
 708.14.1 ELEVATOR LOBBIES.
  
 6A)(2) THE 2ND ISSUE IS THE COMMON PATH OF TRAVEL
 THROUGH THE LAUNDRY/ STORAGE/ UTILITY ROOM. PLEASE SEE
 THE 2010 FBC-B SECTION 1014.2.1(4) 4. EGRESS SHALL NOT
 PASS THROUGH KITCHENS, STORAGE ROOMS, CLOSETS OR SPACES
 USED FOR SIMILAR PURPOSES. NOTE THE EXCEPTION IS ONLY
 FOR A KITCHEN AREA SERVING ADJOINING ROOMS CONSTITUTING
 PART OF THE SAME DWELLING UNIT OR SLEEPING UNIT.
  
 6B) COMMON COMMENT FOR ALL FLOORS. EXITING CAPACITY
 ANALYSIS FOR ALL TIERS SHOW A 36 INCH DOORWAY AND THE
 EXIT CAPACITY AT 180 OCCUPANTS. THIS WOULD MEAN YOU
 HAVE OFFSET HINGES ON THE EXIT DOORS SO THERE IS A FULL
 36 INCHES CLEAR WIDTH FROM THE FACE OF THE DOOR WHEN
 OPEN AT 90 DEGREES TO THE OPPOSING LATCH SIDE OF THE
 DOOR AND NOT INCLUDING THE DOOR STOP. SEE 2010 FBC-B
 1008.1.1. CLEAR OPENINGS OF DOORWAYS WITH SWINGING
 DOORS SHALL BE MEASURED BETWEEN THE FACE OF THE DOOR
 AND THE STOP, WITH THE DOOR OPEN 90 DEGREES. THE ACTUAL
 ALLOWABLE MAXIMUM OCCUPANT LOAD IS CLOSER TO 167.
  
 7) SHEET 016-A0-35 LEVELS 20 & 21 / 090-A2-20 LEVEL 20
 REFERS TO SHEET 089- A2.18 FOR UNITS A & B. SHEET
 090-A2-20 FOR UNIT C. SAME COMMENTS AND ISSUES AS
 COMMENTS 6A AND 6B.
  
 8) SHEET 017-A0-36 LIFE SAFETY PLANS FOR LEVEL 22 & 23/
 092-A2-22 & 093-A2-23. SAME COMMENTS AND ISSUES AS
 COMMENTS 6A AND 6B.
  
 9) SHEET 017-A0-36 LIFE SAFETY PLANS FOR LEVEL 22 & 23/
 SHEET 093-A2-23. ON NEITHER THE LIFE SAFETY PLAN NOR
 THE ARCHITECTURAL SHEET ARE THE WALLS FILED IN TO SEE
 IF THE TRAVEL DISTANCES SHOWN ARE CORRECT. 107.2.1.3
 ADDITIONAL INFORMATION IS REQUIRED. 2010 FBC-B 1014.3
 EXCEPTION # 4.
  
 10) SHEET 018-A0-37 LEVELS 24 &25/ SHEET 094-A2-24
 LEVEL 24 & 095-A2-25.
 10A) UNIT PH-24N & PH25N HAS THE SAME ISSUES AS COMMENT
 6A)(1) ELEVATOR LOBBY & 6A)(2) EGRESS THROUGH STORAGE/
 UTILITY CLOSET / LAUNDRY ROOM.
  
 10B) UNIT PH-24S &PH-25S ONLY NEEDS THE VERIFICATION OF
 2010 FBC-B 708.14.1 ELEVATOR LOBBY?S AND OR EXCEPTION.
  
 11) SHEET 019-A)-38 LEVEL 26 MECHANICAL FLOOR - ROOF /
 096-A2-26 ARCH. MECHANICAL FLOOR
 PLAN. A122-A2-76ALEVEL 26 NORTH, 411-M2-26 & 374.S2-26
 STRUCTURAL MECHANICAL ROOF FRAMING PLAN.
  
 11A) SHEET 122-A2-76A NONE OF THE ARCHITECTURAL NOR
 STRUCTURAL SHEETS, PROVIDE A ROOM & WALL IDENTIFICATION
 TAG FOR THE WALL IN THE UPPER RIGHT CORNER OF THE
 BUILDING, THE SAME WALL IS ALSO COMMON TO STAIR TOWER
 #2 AND FIREMAN?S VESTIBULE 2601. ADDITIONAL INFORMATION
 IS REQUIRED BOTH THE FIREMAN?S VESTIBULE (1HR.) AND THE
 STAIR SHAFT(2 HR.) ARE FIRE RATED PROTECTED. 3007.4.2 &
 708.4.
  
 11B) THIS SAME ROOM IN THE UPPER RIGHT HAND CORNER OF
 THE MECHANICAL PENTHOUSE SHOWS MECHANICAL EQUIPMENT
 SHEET 411-M2-26 MECHANICAL LEVEL 26. NONE OF THE PLANS
 SHOW ACCESS TO THE EQUIPMENT IN THIS ROOM. USE OF ROOM
 NOR IS THE ROOM IDENTIFIED ON NEITHER PLANS NOR ACCESS.
 2010 FBC-B 302.1 STRUCTURES OR PORTIONS OF STRUCTURES
 SHALL BE CLASSIFIED WITH RESPECT TO OCCUPANCY IN ONE OR
 MORE OF THE GROUPS LISTED BELOW. A ROOM OR SPACE THAT
 IS INTENDED TO BE OCCUPIED AT DIFFERENT TIMES FOR
 DIFFERENT PURPOSES SHALL COMPLY WITH ALL OF THE
 REQUIREMENTS THAT ARE APPLICABLE TO EACH OF THE
 PURPOSES FOR WHICH THE ROOM OR SPACE WILL BE OCCUPIED.
  
 11C) THIS SAME ROOM SHOWS THE WALLS OF THIS ROOM
 CONTINUING INTO THE EXTERIOR WALL TO THE CENTERLINE OF
 THE SHEER WALL CONSTRUCTION? 107.2.1.3 ADDITIONAL
 INFORMATION IS REQUIRED. TYPO.
  
 11D) ROOM 2607 IS IDENTIFIED AS AN ELEVATOR STORAGE? IS
 THE USE AN ELEVATOR MACHINE ROOM? 107.2.1.3 ADDITIONAL
 INFORMATION IS REQUIRED.
  
 11E) THE ROOM IN THE UPPER LEFT HAND CORNER OF THE
 SHEET IS NOT IDENTIFIED, THE USE NOR IS THE DOOR.
 107.2.1.3 ADDITIONAL INFORMATION IS REQUIRED.
  
 11F) THE STAIRWELL 1 & 2 BOTH INDICATE HANDRAILS ON
 BOTH SIDES OF THE STAIRS, THE PLANS ARE NOT CLEAR AS IF
 THERE IS A KNEEWALL OR A GUARDRAIL AT THE LANDING
 ADJACENT TO THE STAIRS. FBC-B 1013.1.
  
 11G) DOORS ARE MISSING FROM THE DOOR SCHEDULE ON
 331-A8-11 DOORS 2602 & 2604A. 107.2.1.3 ADDITIONAL
 INFORMATION IS REQUIRED.
  
 11H)SHEET 122-A2-76A LEVEL 26 PLEASE NOTE ROOFTOP AND
 FLOOR ELEVATION TAGS ARE NOT PROVIDED.
 EXTERIOR OF THE BUILDING GRID LINES ARE GIVEN TO THE
 HIGH POINTS AND ROOF DRAINS AS TO THE HIGH AND LOW
 POINTS AGAIN ELEVATION TAGS WERE NOT PROVIDED. WILL THE
 ROOF DECK BE SLOPED OR WILL ROOFTOP INSULATION MAKE UP
 THE DIFFERENCE IN HEIGHT, WHAT TYPE OF ROOF TOP
 INSULATION WILL BE USED? 107.2.1.3 ADDITIONAL
 INFORMATION REQUIRED, PLANS LACKING DETAILS OR SECTIONS
 THROUGH TO LOCATE DOCUMENTS WITH THIS INFORMATION.
  
 11I) SHEET 171-A5-06 PLEASE NOTE NONE OF THE WALLS NOR
 DOORS ARE PROVIDED WITH IDENTIFICATION TAGS, PLANS ARE
 INCOMPLETE, 107.2.1.3 ADDITIONAL INFORMATION IS
 REQUIRED.
  
 11J) SHEET 171-A5-06 AND 096-A2-26 THERE IS A
 DISCREPANCY IN THE PLANS, SHEET 096-A2-26 HAS AN
 ADDITIONAL DOOR INTO THE ELEVATOR CONTROL ROOM 3, 4 &6.
  
 11K) SHEET 171-A5-06, 096-A2-26 & 374-S2-26 NONE OF
 THESE SHEETS DEPICT A SECTION THROUGH CORRIDOR 2604 AS
 TO IF THIS IS WITHIN THE BUILDING OR ON THE EXTERIOR OF
 THE BUILDING. AS OF WHAT MATERIALS IT WILL BE
 CONSTRUCTED FROM. THE STRUCTURAL DRAWING 3374-S2-26
 SHOWS A VERTICAL TUBE, THE SIZE, MATERIAL, SPACING NOR
 ATTACHMENT DETAILS ARE NOT PROVIDED. INCOMPLETE
 PLANS.107.2.1.3. ADDITIONAL INFORMATION IS REQUIRED.
  
 11M) SHEET 096-A2-26 SHOWS WHAT APPEARS TO BE A
 MECHANICAL EQUIPMENT SCREEN. THE STRUCTURAL SHEETS DO
 NOT PROVIDE DETAILS OF THIS SYSTEM. PLEASE PROVIDE CODE
 COMPLIANCE WITH 2010 FBC-B SECTIONS;
  
  1509.6 MECHANICAL EQUIPMENT SCREENS. MECHANICAL
 EQUIPMENT SCREENS SHALL BE CONSTRUCTED OF THE MATERIALS
 SPECIFIED FOR THE EXTERIOR WALLS IN ACCORDANCE WITH THE
 TYPE OF CONSTRUCTION OF THE BUILDING. WHERE THE FIRE
 SEPARATION DISTANCE IS GREATER THAN 5 FEET (1524 MM),
 MECHANICAL EQUIPMENT SCREENS SHALL NOT BE REQUIRED TO
 COMPLY WITH THE FIRE-RESISTANCE RATING REQUIREMENTS.
 WIND DESIGN CRITERIA NOT GIVEN.
  
  1509.6.1 HEIGHT LIMITATIONS. MECHANICAL EQUIPMENT
 SCREENS SHALL NOT EXCEED 18 FEET (5486 MM) IN HEIGHT
 ABOVE THE ROOF DECK, AS MEASURED TO THE HIGHEST POINT
 ON THE MECHANICAL EQUIPMENT SCREEN.
  
 11N) SHEET 096-A2-26 THE MECHANICAL EQUIPMENT SCREEN
 APPEARS TO HAVE BRACING LEGS, MATERIAL NOT KNOWN, SIZE
 OF MATERIAL NOT KNOWN, SPACING NOT GIVEN NOR THE
 ATTACHMENT TO NEITHER THE EQUIPMENT SCREEN NOR THE WALL
 OR FLOOR ASSEMBLY. PLANS NOT COMPLETE. 107.2.1.3
 ADDITIONAL INFORMATION IS REQUIRED.
  
 11O) SHEET 096-A2-26 THE MECHANICAL EQUIPMENT SCREEN
 BRACING SYSTEM AS DRAWN HAS LEGS THAT GO INTO THE
 CORRIDOR 2604 BLOCKING ACCESS, BLOCKING ENTRY TO A
 EXTERIOR MECHANICAL ROOM 2603 AND ALSO TO ROOM 2606.
 PLEASE CORRECT THESE AREAS.
  
 12) SHEET 431-M4-01 MECHANICAL DETAILS, DETAIL 20
 COOLING TOWER VIBRATION ISOLATOR DETAIL TO BE REVIEWED
 BY THE STRUCTURAL ENGINEER OF RECORD, AND WITH THEIR
 SHOP DRAWING STAMP OF APPROVAL. PLEASE NOTE THE
 STRUCTURAL BASE OR SUPPORT WILL NEED TO BE DESIGNED BY
 THE STRUCTURAL ENGINEER OR HIS DELEGATE WITH THE
 STRUCTURAL ENGINEER?S APPROVAL BEFORE SUBMITTAL TO THE
 BUILDING DEPARTMENT FOR REVIEW.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
  
 13) SHEET 431-M4-01 MECHANICAL DETAILS EQUIPMENT
 SUPPORT CURB DETAIL & THYBAR VIBRATION CURB III DETAIL
 FOR OAU-1 & 2. PLEASE PROVIDE THE PRODUCT APPROVALS FOR
 CURB DETAILS. TO BE REVIEWED BY THE STRUCTURAL ENGINEER
 OF RECORD, AND WITH THEIR SHOP DRAWING STAMP OF
 APPROVAL. PLEASE NOTE THE STRUCTURAL ANCHOR TO THE BASE
 OR SUPPORT AS WELL AS THE UNIT TO THE CURB FOR MOMENT
 OF OVERTURNING, WILL NEED TO BE DESIGNED BY THE
 STRUCTURAL ENGINEER OR HIS DELEGATE WITH THE STRUCTURAL
 ENGINEER?S APPROVAL BEFORE SUBMITTAL TO THE BUILDING
 DEPARTMENT FOR REVIEW.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
 14) SHEET 131-A3-21.
 14A) THROUGH THE CUT SECTION OF THE BUILDING THERE ARE
 VARIOUS FLOORS (EXAMPLE ELEV. # 1 LEVELS 23-20, 15-12,
 10 IN THE UPPER PORTION OF THE ELEVATOR LOBBY A RED
 OBJECT THAT EITHER IS HANGING FORM THE CEILING OR CLOSE
 TO THE CEILING. THIS DEPICTED THROUGHOUT THE SHEET IN
 VARIOUS ELEVATOR LOBBY LOBBIES? 107.2.1.3 ADDITIONAL
 INFORMATION IS REQUIRED.
  
 14B) ELEVATORS 2/4 DO NOT CONTINUE THROUGH TO THE ROOF.
 PLEASE PROVIDE WHERE COMPLIANCE WITH SECTIONS OF THE
 2010 FBC-B CAN BE FOUND:
  
 14B)(1) 3004.1 VENTS REQUIRED. HOISTWAYS OF ELEVATORS
 AND DUMBWAITERS PENETRATING MORE THAN THREE STORIES
 SHALL BE PROVIDED WITH A MEANS FOR VENTING SMOKE AND
 HOT GASES TO THE OUTER AIR IN CASE OF FIRE. FOR R1 AND
 R2 OCCUPANCIES VENTING IS REQUIRED.
  
 14B)(2) 3004.2 LOCATION OF VENTS. VENTS SHALL BE
 LOCATED AT THE TOP THE HOISTWAY AND SHALL OPEN EITHER
 DIRECTLY TO THE OUTER AIR OR THROUGH NONCOMBUSTIBLE
 DUCTS TO THE OUTER AIR. NONCOMBUSTIBLE DUCTS SHALL BE
 PERMITTED TO PASS THROUGH THE ELEVATOR MACHINE ROOM,
 PROVIDED THAT PORTIONS OF THE DUCTS LOCATED OUTSIDE THE
 HOISTWAY OR MACHINE ROOM ARE ENCLOSED BY CONSTRUCTION
 HAVING NOT LESS THAN THE FIRE-RESISTANCE RATING
 REQUIRED FOR THE HOISTWAY. HOLES IN THE MACHINE ROOM
 FLOORS FOR THE PASSAGE OF ROPES, CABLES OR OTHER MOVING
 ELEVATOR EQUIPMENT SHALL BE LIMITED AS NOT TO PROVIDE
 GREATER THAN 2 INCHES (51 MM) OF CLEARANCE ON ALL
 SIDES.
  
 14)(3) 3004.3 AREA OF VENTS. EXCEPT AS PROVIDED FOR IN
 SECTION 3004.3.1, THE AREA OF THE VENTS SHALL NOT BE
 LESS THAN 31/2 PERCENT OF THE AREA OF THE HOISTWAY NOR
 LESS THAN 3 SQUARE FEET (0.28 M2) FOR EACH ELEVATOR
 CAR, AND NOT LESS THAN 31/2 PERCENT NOR LESS THAN 0.5
 SQUARE FEET (0.047 M2) FOR EACH DUMBWAITER CAR IN THE
 HOISTWAY, WHICHEVER IS GREATER. OF THE TOTAL REQUIRED
 VENT AREA, NOT LESS THAN ONE-THIRD SHALL BE PERMANENTLY
 OPEN. CLOSED PORTIONS OF THE REQUIRED VENT AREA SHALL
 CONSIST OF OPENINGS GLAZED WITH ANNEALED GLASS NOT
 GREATER THAN 1/8 INCH (3.2 MM) IN THICKNESS.
  
  
 15) SHEET 137-A3-31 DETAILS 1 & 2 & SHEET A0.23
 EXTERIOR SYSTEMS.
  
 15A) BOTH INDICATE THE USE OF METAL WALL PANELS, THERE
 ARE NO CUT SECTIONS INDICATING MORE INFORMATION ON THE
 PANELS. COMPONENTS AND CLADDING FBC-B, 1609.6.4.4.1
 COMPONENTS & CLADDING. PLEASE SEE THE 2010 FBC-B
 SECTION 1407.3 ARCHITECTURAL TRIM AND EMBELLISHMENTS.
 MCM USED AS ARCHITECTURAL TRIM OR EMBELLISHMENTS SHALL
 COMPLY WITH SECTIONS 1407.7 THROUGH 1407.14.
 1407.4 STRUCTURAL DESIGN. MCM SYSTEMS SHALL BE DESIGNED
 AND CONSTRUCTED TO RESIST WIND LOADS AS REQUIRED BY
 CHAPTER 16 FOR COMPONENTS AND CLADDING.
  
 1407.5 APPROVAL. RESULTS OF APPROVED TESTS OR AN
 ENGINEERING ANALYSIS SHALL BE SUBMITTED TO THE BUILDING
 OFFICIAL TO VERIFY COMPLIANCE WITH THE REQUIREMENTS OF
 CHAPTER 16 FOR WIND LOADS. 1407.6 WEATHER RESISTANCE.
  
 15B) GLASS EXTERIOR HAND/ GUARD RAIL SYSTEMS. PLEASE
 PROVIDE COMPLIANCE WITH FBC-B 1607.7.1 & SECTION 2407.
 WILL THE BALCONY DEMISING GLASS WALL SECTIONS HAVE
 PATTERNS IN THE GLASS OR SANDBLASTED GLASS IN THE
 FRAMES? IF SO COMPLIANCE WITH 2404.3
 . 2404.3.3 VERTICAL PATTERNED GLASS. PATTERNED GLASS
 SLOPED 15 DEGREES (0.26 RAD) OR LESS FROM VERTICAL IN
 WINDOWS, CURTAIN AND WINDOW WALLS, DOORS AND OTHER
 EXTERIOR APPLICATIONS SHALL BE DESIGNED TO RESIST THE
 WIND LOADS IN SECTION 1609 FOR COMPONENTS AND CLADDING
 ACCORDING TO THE FOLLOWING EQUATION:
 FGW < 1.0 FGE (EQUATION 24-9)
 2404.3.5 VERTICAL SANDBLASTED GLASS.
 SANDBLASTED GLASS SLOPED 15 DEGREES (0.26 RAD) OR LESS
 FROM VERTICAL IN WINDOWS, CURTAIN AND WINDOW WALLS,
 DOORS, AND OTHER EXTERIOR APPLICATIONS SHALL BE
 DESIGNED TO RESIST THE WIND LOADS IN SECTION 1609 FOR
 COMPONENTS AND CLADDING ACCORDING TO THE FOLLOWING
 EQUATION:
 FG< 0.5 FGE (EQUATION 24-12)
  
 15C) 137-A3-31 DETAILS 1 & 2 & SHEET A0.23 EXTERIOR
 SYSTEMS & 144-A4-01. DETAILS 10 & 11. BOTH THESE
 DETAILS SHOW A 1 INCH AIR GAP BETWEEN THE EDGE OF THE
 SLAB AND THE METAL SLAB EDGE COVER PLATE.
  
  
 16) SHEETS 138-A3-32, 108-A2-68A & DETAIL # 2/
 278-A6-85C BALCONY DEMISING GLASS WALL. THIS WILL MEAN
 THE GLASS HAND RAIL SYSTEM IS FULLY SUPPORTED BY THE
 VERTICAL FRAMING ELEMENT. THERE IS NO CLEAR DETAIL IN
 EITHER THE ARCHITECTURAL SHEETS NOR THE STRUCTURAL
 SHEETS AS TO THE ANCHORAGE OF SYSTEM NOR THE SPACING OF
 THE HANDRAIL. THERE IS NO COMMENT THESE DETAILS ARE TO
 BE SUPPLIED FROM A DELEGATE ENGINEER EITHER. WITH FBC-B
 1607.7.1 & SECTION 2407.
  
 THE FLOOR PLAN 108-A2-68A DOES SHOW THE USE OF BALCONY
 DEMISING GLASS WALL AND DETAIL 2/0278-A6.85C AS WELL AS
 THE ELEVATION SHEET 137-A3-31. THE DETAIL 2 ON SHEET
 278-A6-85C APPEAR TO BE FOR INSULATED SPANDREL PANEL
 BUT NOT FOR THE GLASSED DEMISING WALL. PLEASE SHOW HOW
 CODE COMPLIANCE WILL BE ACHIEVED FOR SECTION 439.2
 SEPARATION WALLS. WALLS SEPARATING DWELLING UNITS IN
 THE SAME BUILDING, WALLS SEPARATING SLEEPING UNITS IN
 THE SAME BUILDING AND WALLS SEPARATING DWELLING OR
 SLEEPING UNITS FROM OTHER OCCUPANCIES CONTIGUOUS TO
 THEM IN THE SAME BUILDING SHALL BE CONSTRUCTED AS FIRE
 PARTITIONS IN ACCORDANCE WITH SECTION 709. UL U# 419 IS
 NOT A GLASS DEMISING WALL.
  
 17) SHEET 157-A4-14 DETAIL 11 SHOWS THE INSTALLATION OF
 A TERRA COTTA RAIN SCREEN. REFERENCES DETAIL 11/
 157-A4-14 PLEASE PROVIDE COMPLIANCE WITH 2010 FBC-B
 SECTIONS:
  
 17A) 1403.2 WEATHER PROTECTION.
  
 17B) 1403.3 STRUCTURAL. EXTERIOR WALLS, AND THE
 ASSOCIATED OPENINGS, SHALL BE DESIGNED AND CONSTRUCTED
 TO RESIST SAFELY THE SUPERIMPOSED LOADS REQUIRED BY
 CHAPTER 16.
  
 17C) 1405.9 TERRA COTTA. ANCHORED TERRA COTTA OR
 CERAMIC UNITS NOT LESS THAN 15/8 INCHES (41 MM) THICK
 SHALL BE ANCHORED DIRECTLY TO MASONRY, CONCRETE OR STUD
 CONSTRUCTION. TIED TERRA COTTA OR CERAMIC VENEER UNITS
 SHALL BE NOT LESS THAN 15/8 INCHES (41 MM) THICK WITH
 PROJECTING DOVETAIL WEBS ON THE BACK SURFACE SPACED
 APPROXIMATELY 8 INCHES (203 MM) O.C. THE FACING SHALL
 BE TIED TO THE BACKING WALL WITH CORROSION-RESISTANT
 METAL ANCHORS OF NOT LESS THAN NO. 8 GAGE WIRE
 INSTALLED AT THE TOP OF EACH PIECE IN HORIZONTAL BED
 JOINTS NOT LESS THAN 12 INCHES (305 MM) NOR MORE THAN
 18 INCHES (457 MM) O.C.; THESE ANCHORS SHALL BE SECURED
 TO 1/4-INCH (6.4 MM) CORROSION-RESISTANT PENCIL RODS
 THAT PASS THROUGH THE VERTICAL ALIGNED LOOP ANCHORS IN
 THE BACKING WALL. THE VENEER TIES SHALL HAVE SUFFICIENT
 STRENGTH TO SUPPORT THE FULL WEIGHT OF THE VENEER IN
 TENSION. THE FACING SHALL BE SET WITH NOT LESS THAN A
 2-INCH (51 MM) SPACE FROM THE BACKING WALL AND THE
 SPACE SHALL BE FILLED SOLIDLY WITH PORTLAND CEMENT
 GROUT AND PEA GRAVEL. IMMEDIATELY PRIOR TO SETTING, THE
 BACKING WALL AND THE FACING SHALL BE DRENCHED WITH
 CLEAN WATER AND SHALL BE DISTINCTLY DAMP WHEN THE GROUT
 IS POURED.
  
 18) SHEETS 160-A4.15 PODIUM METAL FIN, 161-A4.16 PODIUM
 METAL FIN, THE DETAIL # 2 ON SHEET 160 INDICATES A HSS
 TUBE POST, REFER TO STRUCTURAL SHEETS. THE STRUCTURAL
 SHEETS DO NOT PROVIDE DETAILS OF THIS STRUCTURAL TUBE.
 197.2.1.3 ADDITIONAL INFORMATION IS REQUIRED.
  
 19) SHEET 162-A4-31 ROOF DETAILS:
 19A) BETWEEN THE DIFFERENT DETAILS THEY SHOW A
 DIFFERENCE BETWEEN SPRAY FOAM INSULATION ON THE ROOF
 DECK DETAIL 14 TO THE USE OF TAPERED INSULATION BOARD.
 107.2.1.3 ADDITIONAL INFORMATION IS REQUIRED.
 ENGINEERED DRAWINGS FOR THE TAPERED ROOF INSULATION
 WILL BE REQUIRED, AND TO BE REVIEWED BY THE ENGINEER OF
 RECORD BEFORE SUBMITTAL TO THE BUILDING DEPARTMENT. FL
 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL FORWARD
 THE DELEGATED ENGINEERING DOCUMENTS TO THE ENGINEER OF
 RECORD FOR REVIEW.
  
 19B) DETAILS 3 & 4 BOTH SHOW A TILE DECK ABOVE THE
 ROOFING SYSTEM. THE ROOFING SYSTEM WELL NEED TO PROVIDE
 PRODUCT APPROVALS FOR WIND AS WELL AS ENGINEERING FOR
 THE TILE DECK INSTALLATION THEY WILL MEET THE WIND
 LOADS FOR THE LOCATION ON THE BUILDING.2010 FBC-B
 COMPONENTS AND CLADDING. 1609.6.4.4.1 COMPONENTS &
 CLADDING.
  
 20) SHEETS 164-A4-41 AND 165-A4-41A CANOPY SYSTEMS
 SHEETS ARE CONCEPTUAL DRAWINGS AT BEST, THERE ARE NO
 PLANS IN THE STRUCTURAL DOCUMENTS PROVIDES STRUCTURAL
 ELEMENTS OR LOADS TO BE RESISTED. THESE LOADS WILL NEED
 TO BE KNOWN FOR THE ECCENTRIC LOADING ONTO THE FRAMING
 MEMBERS. ONCE THE LOADS ARE KNOWN THEN THE STRUCTURAL
 DRAWINGS WILL BE ABLE TO REACT TO THE ECCENTRIC LOADS
 BEING PLACED ON THE VARIOUS COLUMNS AND BEAMS. IF THE
 CANOPY IS TO BE DESIGNED BY A DELEGATE ENGINEER THEN
 COMPLIANCE WITH FL 61G-15-30.006 WILL NEED TO BE MET.
 FL 61G-15-30.006 (3) THE DELEGATED ENGINEER SHALL
 FORWARD THE DELEGATED ENGINEERING DOCUMENTS TO THE
 ENGINEER OF RECORD FOR REVIEW.
  
 21) THIS REVIEW NO PRODUCT APPROVALS WERE SUBMITTED.
 THE DESIGNER OF RECORD OR THE CONTRACTOR CAN ELECT TO
 SUBMIT THE PRODUCT APPROVALS FOR THE EXTERIOR CLADDING
 AS A DEFERRED SUBMITTAL PER:
 2010 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION 107.3.4.2 DEFERRED SUBMITTALS. FOR THE
 PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS ARE
 DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE NOT
 SUBMITTED AT THE TIME OF THE APPLICATION AND THAT ARE
 TO BE SUBMITTED TO THE BUILDING OFFICIAL WITHIN A
 SPECIFIED PERIOD. DEFERRAL OF ANY SUBMITTAL ITEMS SHALL
 HAVE THE PRIOR APPROVAL OF THE BUILDING OFFICIAL. THE
 REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE
 SHALL LIST THE DEFERRED SUBMITTALS ON THE CONSTRUCTION
 DOCUMENTS FOR REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
  
 21A) 2010 FBC-B 1609.1.2 PROTECTION OF OPENINGS,
 1609.6.4.4.1 COMPONENTS & CLADDING
  
 FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV.
 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION
 SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS:
 (31)(A) EXTERIOR DOORS. ROOF HATCHES.
 (B) WINDOWS
 (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL
 LOUVERS, EFIS SYSTEMS,
 (D) ROOFING PRODUCTS AND ASSEMBLIES, CURBS, INTAKE AND
 EXHAUST FANS ?
 (E) SHUTTERS
 (F) SKYLIGHTS
 (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C
 STANDS
  
  
 21B) 107.3.4.1 THOSE PRODUCTS WHICH ARE REGULATED BY
 DCA RULE 9N-3 SHALL BE REVIEWED AND APPROVED IN WRITING
 BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL.
  
 22) THE PLANS WERE SUBMITTED EARLY FOR REVIEW BEFORE
 THE FOUNDATION PERMIT WOULD BE ISSUED. THE SUBMITTED
 BUILDING PLANS WERE NOT 100% DRAWINGS AND WILL NEED TO
 BE RESUBMITTED BEFORE A THROUGH REVIEW CAN BE
 COMPLETED.
 WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION &
 REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS
 NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL
 REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE
 REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION
 PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO
 EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED
 COOPERATION.
 A THOROUGH REVIEW CANNOT BE MADE AT THIS TIME, AS A
 RESULT OF THE ADDITIONAL INFORMATION REQUESTED
 ADDITIONAL COMMENTS MAY APPEAR THAT WERE NOT PART OF
 THIS REVIEW.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
  
  
  
  
  
  
  
  
  
  

Review Stop E ELECTRICAL
Rev No 4 Status P Date 2017-01-30 Cont ID  
Sent By vperez Date 2017-01-30 Time 15:00 Rev Time 0.00
Received By vperez Date 2017-01-30 Time 15:00 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2016-12-08 Cont ID  
Sent By vperez Date 2016-12-08 Time 12:05 Rev Time 0.00
Received By vperez Date 2016-12-08 Time 11:54 Sent To  
Notes
2016-12-08 12:09:53PROVISO:
  
 FPL LETTER WILL BE PROVISO; WE WILL NEED COPY FOR OUR
 RECORDS. AIC CALCS PENDING NEC 110.9-10
 NOTE TO RISER INDICATING SELECTIVE COORDINATION
 REQUIRED FOR GFP OF MAINS SHOWN HAS BEEN PROVIDED.
 STUDY REQUIRED.
  
 VAL PEREZ
 *6717

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2016-08-03 Cont ID  
Sent By vperez Date 2016-08-03 Time 11:48 Rev Time 0.00
Received By vperez Date 2016-07-28 Time 08:51 Sent To  
Notes
2016-08-03 11:48:202ND ELECTRICAL PLAN REVIEW
  
 APPLICABLE CODES IN EFFECT:
 FLORIDA BUILDING CODE 2014 5TH EDITION
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2014 5TH
 EDITION
 NFPA 70- 2011
 PENDING COMMENTS:
  
 1. MAIN ELECTRICAL ROOMS MUST COMPLY WITH NEC 110.26C2,
 THERE SHALL BE ONE ENTRANCE AT EACH END OF THE WORKING
 SPACE. SHOW TWO MEANS OF EGRESS. PER OUR MEETING,
 SECOND OPENING NOT REFLECTED. PLEASE SHOW LOCATION OF
 SECOND MEANS OF EGRESS.
 2. SHEET E2-01- IDENTIFY ALL AREAS ON FLOOR PLAN.
 MINIMUM CRITERIA FOR PLAN REVIEW, ALL PANEL AND CIRCUIT
 DESIGNATIONS FOR LIGHTING FIXTURES WITH CIRCUIT NUMBERS
 ASSIGNED TO EQUIPMENT SHOWN. SOME AREAS ARE STILL NOT
 DESIGNATED.
 3. FPL LETTER WILL BE PROVISO; WE WILL NEED COPY FOR
 OUR RECORDS. AIC CALCS PENDING NEC 110.9-10
 4. COULDN?T LOCATE VOLTAGE DROP CALCULATIONS FOR
 FEEDERS AND BRANCH PER FBC EC C405.7
 5. NOTE TO RISER INDICATING SELECTIVE COORDINATION
 REQUIRED FOR GFP OF MAINS SHOWN.
 6. NOTE THAT THE FIRE PUMP CONDUCTORS STATE COPPER ON
 RISER AND ALUMINUM ON PANEL SCHEDULE. FIRE PUMP BREAKER
 IN GDP PANEL TO COMPLY WITH NEC 695.6 AND 430.52 TABLE
 7. SHEET 2-54A- SEE KITCHEN AREAS NEXT TO CIRCUIT #7,
 ADDRESS COUNTERTOP AREAS SPACING TO COMPLY WITH NEC
 210.52C1- NOT ADDRESSED PLEASE ADD A GENERAL NOTE
 INDICATING NEC 210.52 KITCHEN SPACING REQUIREMENTS.
 8. COMMENTS MAY FOLLOW UPON RE-REVIEW. PLEASE FEEL FREE
 TO CONTACT ME SHOULD YOU HAVE ANY QUESTIONS REGARDING
 THIS PROJECT.
  
 VALENTINO PEREZ
 ELECTRICAL PLANS EXAMINER II
 561-805-6717
 [email protected]
  
  
  
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2016-02-10 Cont ID  
Sent By vperez Date 2016-02-10 Time 06:37 Rev Time 0.00
Received By vperez Date 2016-02-08 Time 15:03 Sent To  
Notes
2016-02-10 06:37:21INITIAL ELECTRICAL PLAN REVIEW
  
 APPLICABLE CODES IN EFFECT:
 FLORIDA BUILDING CODE ENERGY CONSERVATION 2010
 NFPA 70- 2008 NEC
 COMMENTS:
  
 1. GENERAL NOTES TO CONSTRUCTION DOCUMENTS: PLEASE
 PROVIDE A BLOCK NOTE INDICATING THE REQUIRED SEPARATE
 PERMITS AND DATA CUT SHEET SUBMITTALS FOR ALL SITE
 LIGHTING AND ASSOCIATED EQUIPMENT, GENERATOR, ALL LOW
 VOLTAGE SYSTEMS TO INCLUDE BUT NOT LIMITED TO FIRE
 ALARM, ACCESS CONTROLS, CCTV, PHONE AND DATA, SIGNAGE,
 WIRELESS SYSTEMS, ELEVATORS, CAR CHARGING STATIONS,
 ETC. A NOTE WILL SUFFICE.
 2. SHEET E1.01- PLEASE ADD A GENERAL NOTE TO SHEET TO
 INDICATE THE REQUIREMENTS OF NEC 300.5D3 AND TABLE
 300.5 FOR MINIMUM COVER REQUIREMENTS FOR CONDUITS AND
 THE PLACEMENT OF A WARNING RIBBON FOR THE SERVICE
 LATERAL CONDUCTORS SHOWN FOR THIS PROJECT. A NOTE WILL
 SUFFICE
 3. SHEET E1.01- ADD A NOTE TO MAINTAIN ALL ELECTRICAL
 EQUIPMENT ABOVE THE BASELINE FLOOD ELEVATION PER STATE
 AND CITY REGULATORY AGENCIES.
 4. SHEET E2.0P1- SHOW ON FLOOR PLAN THE ELEVATOR PIT
 CIRCUIT DESIGNATIONS FOR PIT LIGHTING, RECEPTACLES AND
 PUMP EQUIPMENT AS NOTED IN NEC 620.24 A,B AND C
 5. SHEET E2.0P1- REFLECT ON FLOOR PLAN, PER FBC 107,
 MINIMUM CRITERIA FOR PLAN REVIEW, ALL PANEL AND CIRCUIT
 DESIGNATIONS FOR LIGHTING FIXTURES, RECEPTACLES AND
 MECHANICAL DISCONNECT WITH CIRCUIT NUMBERS ASSIGNED TO
 EQUIPMENT SHOWN. ALSO ID THE CIRCULATING FANS SHOWN.
 6. SHEET E2-0P2- REFLECT ON FLOOR PLAN, PER FBC 107,
 MINIMUM CRITERIA FOR PLAN REVIEW, ALL PANEL AND CIRCUIT
 DESIGNATIONS FOR LIGHTING FIXTURES, RECEPTACLES AND
 MECHANICAL DISCONNECT WITH CIRCUIT NUMBERS ASSIGNED TO
 EQUIPMENT SHOWN. ALSO ID THE CIRCULATING FANS AND
 ROLLING DOORS
 7. SHEET E2-01- IDENTIFY ALL AREAS ON FLOOR PLAN. GFCI
 PROTECTION REQUIRED WITHIN 6FT OF EVERY SINK PER NEC
 210.8B5, SEE LAUNDRY ROOM ADJACENT AREA. MINIMUM
 CRITERIA FOR PLAN REVIEW, ALL PANEL AND CIRCUIT
 DESIGNATIONS FOR LIGHTING FIXTURES, RECEPTACLES AND
 MECHANICAL DISCONNECT WITH CIRCUIT NUMBERS ASSIGNED TO
 EQUIPMENT SHOWN.
 8. SHEET E2-01L- SEE NOTE ABOVE REGARDING
 IDENTIFICATION OF ALL ELECTRICAL OUTLETS, LUMINAIRES
 ETC. FBC 107. ENTIRE SHEET TO BE ADDRESSED FOR A
 COMPLETE REVIEW.
 9. SHEET E2-02- SAME AS ABOVE COMMENT #8. ALSO GFCI
 PROTECTION IS REQUIRED FOR THE SPA AND RESTROOMS AREAS
 SHOWN.
 10. SHEET E2-05 THROUGH E2-17, E2.18 THROUGH E2.26L-
 SAME AS ABOVE COMMENT #8. FURTHER COMMENTS TO FOLLOW
 UPON RE-REVIEW.
 11. SHEET 2.26L- PER NEC 700.20 SWITCH REQUIREMENTS-
 3WAY SWITCHES SHALL NOT BE USED AS SHOWN ON EMERGENCY
 LIGHTING CIRCUITS. PLEASE CLARIFY DESIGN INTENT.
 12. SHEET 2-27- PROVIDE A NOTE TO INDICATE LIGHTNING
 PROTECTION AND EQUIPMENT TO BE SUBMITTED UNDER SEPARATE
 PERMIT. ALSO PROVIDE THE OBSTRUCTION LIGHT/AIRCRAFT
 WARNING LIGHTS.
 13. SHEET 2-51A THROUGH 2-53A- SAME AS ABOVE COMMENT #8
 14. SHEET 2-54A- SEE KITCHEN AREAS NEXT TO CIRCUIT #7,
 ADDRESS COUNTERTOP AREAS SPACING TO COMPLY WITH NEC
 210.52C1
 15. SHEET 2-54B- SEE KITCHEN AREAS NEXT TO CIRCUIT #7,
 ADDRESS COUNTERTOP AREAS SPACING TO COMPLY WITH NEC
 210.52C1
 16. SHEET 2-55A- SEE KITCHEN AREAS NEXT TO CIRCUIT #7,
 ADDRESS COUNTERTOP AREAS SPACING TO COMPLY WITH NEC
 210.52C1
 17. SHEET 2-55B- SEE KITCHEN AREAS NEXT TO CIRCUIT #7,
 ADDRESS COUNTERTOP AREAS SPACING TO COMPLY WITH NEC
 210.52C1
 18. SHEET 2-56A- SEE KITCHEN AREAS NEXT TO CIRCUIT #7,
 ADDRESS COUNTERTOP AREAS SPACING TO COMPLY WITH NEC
 210.52C1
 19. SHEET 2-56B- SEE KITCHEN AREAS NEXT TO CIRCUIT #7,
 ADDRESS COUNTERTOP AREAS SPACING TO COMPLY WITH NEC
 210.52C1
 20. SHEET 2-58B- SEE KITCHEN AREAS NEXT TO CIRCUIT #3,
 ADDRESS COUNTERTOP AREAS SPACING TO COMPLY WITH NEC
 210.52C1
 21. SHEET 2-59A- SEE KITCHEN AREAS NEXT TO CIRCUIT #7,
 ADDRESS COUNTERTOP AREAS SPACING TO COMPLY WITH NEC
 210.52C1
 22. RISER DIAGRAM AND PANEL SCHEDULES SHEET 5-01
 THROUGH E6-12- PLEASE PROVIDE AVAILABLE FAULT CURRENT
 AVAILABLE AT THE FPL SERVICE. ATTACH TO DOCUMENTS
 LETTER FROM FLORIDA POWER & LIGHT INDICATING AIC. SHOW
 AIC CALCULATION BASED ON INFORMATION PROVIDED BY
 UTILITY FOR APPROVAL. NEC 110.24 FBC 107
 23. SHOW THE SIZE OF THE TAP BOX ON RISER DIAGRAM. FBC
 107
 24. MAINS THAT ARE OVER 1000AMP 277/480VOLTS TO BE GFCI
 PROTECTED. NEC 240.13
 25. PROVIDE VOLTAGE DROP CALCULATIONS NOT ONLY FOR
 FEEDERS BUT ALSO THE BRANCH CIRCUIT FBC EC 505.7
 26. PANEL HR NOT ON PANEL SCHEDULE TO VERIFY LOADS AS
 SHOWN ON RISER DIAGRAM, PLEASE CLARIFY. FBC 107
 27. THE SUBMETTERING STANDBY POWER TO RESIDENTIAL UNITS
 ARE TOO VAGUE AS FAR AS MEETING THE REQUIREMENTS OF NEC
 702.5A, B2. CLARIFY INTENT.
 28. WILL NEED TO CORRELATE PANEL DESIGNATIONS SHOWN
 FEEDING FROM OTHER PANEL BOARDS; FOR EXAMPLE PANEL HS3
 FROM HS2, NO OVERCURRENT PROTECTION SHOWN ON PANEL
 SCHEDULE. THIS IS JUST ONE EXAMPLE AS THIS CONDITION
 REPEATS ITSELF THROUGHOUT DESIGN. PLEASE REVISE A SHOW
 ALL CORRECTLY. FBC 107
 29. THERE ARE MULTIPLE PANEL LOAD SCHEDULES THAT
 REFLECT DIFFERENT AMPERAGES THAT THOSE SHOWN ON RISER
 DIAGRAM. EXAMPLE ; SEE PANEL EM
 30. DESIGNATION OF PANEL BOARDS IS NOT ACCURATE. GEAR
 LABELED M1 IS ALSO LABELED MDP1. M2 IS LABELED MDP2.
 MAINTAIN CONSISTENCY TO PROVIDE AN ACCURATE REVIEW OF
 CONDUCTOR?S SIZES ETC. FBC 107
 31. ONE-LINE DIAGRAM TO REFLECT CONDUCTOR SIZES
 THROUGHOUT.
 32. REVISIT LOAD CALCULATIONS FOR ACCURACY. SEE PANEL
 GDP WHICH IS SHOWN WITH NO CALCULATED LOADS YET RISER
 SHOWS LOADS OBVIOUSLY BEING DRAWN FROM THIS PANEL
 BOARD. NEED TO REVIEW MULTIPLE PANELS WITH SAME
 CONDITION. SELECTED CONDUCTORS ARE ALSO UNDERSIZED PER
 NEC 310.16 FOR 250AL. AS SHOWN. TOO MANY ITEMS TO LIST.
 NEC 220, FBC 107.
 33. CORRECT AMPERAGE FOR GDP PANEL BOARD SHOWN AT
 3000AMP ON RISER DIAGRAM BUT 800 AMPS MAIN BUS. PLEASE
 CLARIFY.
 34. ATS #3 NOT SHOWN ON GDP PANEL BOARD SCHEDULE. SEE
 RISER DIAGRAM. SAME SCENARIO REPEATS ITSELF THROUGHOUT
 DESIGN. NEED TO ADDRESS.
 35. NOTE THAT CONNECTED CALCULATED LOADS AND TOTAL
 DEMANDS ARE INACCURATE. ADDRESS PANEL BOARDS
 CALCULATION, FOR EXAMPLE SEE PANEL P, LNR, AND HNR,
 ETC. MULTIPLE PANEL BOARDS. NEC 220 FBC 107.
 36. MAIN ELECTRICAL ROOMS MUST COMPLY WITH NEC
 110.26C2, THERE SHALL BE ONE ENTRANCE AT EACH END OF
 THE WORKING SPACE. SHOW TWO MEANS OF EGRESS. ALSO NEC
 110.26C3 REQUIRES PERSONNEL DOORS TO BE EQUIPPED WITH
 PANIC HARDWARE AND OPEN IN THE DIRECTION OF EGRESS. A
 NOTE WILL SUFFICE.
 37. PROVIDE INFORMATION ON DRAWINGS AND DATA SHEETS FOR
 LIGHTING CONTROL PANEL, NOT ADDRESSED FOR REVIEW.
 38. ALL ELECTRICAL ROOMS THAT CONTAIN TRANSFORMER MUST
 BE ID TO INDICATE IF TRANSFORMERS ARE BEING HUNG OR
 NOT,TO VERIFY CLEARANCE REQUIREMENTS PER NEC 110.26.
 SEE ROOM LEVEL 11, 18 AND 25.
 39. CLARIFY AS NO ELEVATOR MACHINE ROOMS ARE SHOWN TO
 COMPLY WITH NEC 620.23 A,B AND C.
 40. SHOW ELECTRICAL REQUIREMENTS FOR THE GENERATOR FUEL
 TANK.
 41. COMMENTS MAY FOLLOW UPON RE-REVIEW. PLEASE FEEL
 FREE TO CONTACT ME SHOULD YOU HAVE ANY QUESTIONS
 REGARDING THIS PROJECT.
  
  
 VALENTINO PEREZ
 ELECTRICAL PLANS EXAMINER II
 561-805-6717
 [email protected]
  
  
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 2 Status P Date 2016-12-13 Cont ID  
Sent By mgonzale Date 2016-12-13 Time   Rev Time 1.00
Received By mgonzale Date 2016-12-13 Time   Sent To I
Notes
2016-12-13 10:28:45PLAN SUBMITTED WITH LANDSCAPING IS NOT IN CONFLICT WITH
 CITY OF WPB PUBLIC UTILITIES.
  
 MANUEL JULIAN GONZALEZ
 ENGINEERING PROJECT COORDINATOR
 PUBLIC WORKS DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 EMAIL: [email protected]
 HTTP://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS
 /FORMS,-PERMITS-APPLICATIONS
  
 IMPORTANT MESSAGE: AS OF DECEMBER 20, 2015 THE CITY OF
 WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 MAKING KNOWN THAT "ALL BACKFLOW DEVICES MUST BE LEAD
 FREE."
 FOR MORE INFORMATION REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
  
  
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status F Date 2016-03-31 Cont ID  
Sent By mgonzale Date 2016-03-31 Time   Rev Time 1.00
Received By mgonzale Date 2016-03-31 Time   Sent To Z
Notes
2016-03-31 19:38:58RESPOND TO COMMENTS IN WIRTING:
  
 #1 FIRE HYDRANT FLOW TEST(S) SHALL BE NOTED ON CIVIL
 PLAN WHERE SERVICES ENTER THE SITE.
  
 #2 ADDRESS FIRE REIVIEW COMMENTS AND REVISE ENGINEERING
 DEVELOPMENT REVIEW SUBMITTAL.
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 4 Status P Date 2017-02-01 Cont ID  
Sent By pleduc Date 2017-02-01 Time   Rev Time 0.00
Received By pleduc Date 2017-01-30 Time 08:26 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 3 Status F Date 2016-12-22 Cont ID  
Sent By pleduc Date 2016-12-22 Time   Rev Time 0.00
Received By pleduc Date 2016-12-22 Time 14:33 Sent To  
Notes
2016-12-22 14:50:48THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
  
 1) THERE ARE NO INDICATIONS THAT THE PREVIOUS FIRE
 COMMENTS WERE ADDRESSED.
  
 PLEASE PROVIDE THE APPLICABLE RESPONSES TO THE PREVIOUS
 FIRE COMMENTS.
  
  
  
 1) SHEET AO 32 - THE 2 DOORS OF THE EMERGENCY ROOM AND
 THE DOOR TO THE POOL EQUIPMENTROOM SWING INTO THE EXIT
 CORRIDOR -
  
 PER NFPA 101 CHAPTER 7, MEANS OF EGRESS
 7.2.1.4.3 DOOR LEAF ENCROACHMENT
 7.2.1.4.3.1 DURING ITS SWING, ANY DOOR LEAF IN A MEANS
 OF EGRESS SHALL LEAVE NOT LESS THAN ONE-HALF OF THE
 REQUIRED WIDTH OF AN AISLE, A CORRIDOR, A PASSAGEWAY,
 OR A LANDING UNOBSTRUCTED AND SHALL NOT PROJECT NOT
 MORE THAN 7 IN. INTO THE REQUIRED WIDTH OF AN AISLE, A
 CORRIDOR, A PASSAGE WAY, OR A LANDING, WHEN FULLY OPEN,
 UNLESS BOTH OF THE FOLLOWING CONDITIONS ARE MET:
 (1) THE DOOR OPENING PROVIDES ACCESS TO A STAIR IN AN
 EXISTING BUILDING.
 (2) THE DOOR OPENING MEETS THE REQUIREMENTS THAT LIMITS
 PROJECTION TO NOT MORE THAN 7 IN. INTO THE REQUIRED
 WIDTH OF THE STAIR LANDING WHEN THE DOOR LEAF IS FULLY
 OPEN.
  
 PLEASE REVIEW AND CORRECT OR JUSTIFY.
  
  
 2) SHEET AO 32 - A NOTE IS INDICATED STATING FOR A
 STAIR WIDER THAN 44" "THE FOLLOWING FORMULA WAS
 PROVIDED BY THE WEST PALM BEACH FIRE DEPARTMENT".
  
 I HAVE BEEN THE SOLE CONTACT FOR THE FIRE DEPARMTNAT
 AND I DO NOT RECALL PROVIDING THIS FORMULA; HOWEVER, IT
 CAN BE USED PER NFPA 101, CHAPTER 7, 7.3.3.2.
  
 HOWEVER, THE SUM OF THE CALCULATION PROVIDED APPEARS TO
 BE INCORRECT. 60-44/.218 + 146.7 = 220; NOT 495 WHICH
 IS INDICATED AND INCORRECT
  
 PLEASE REVIEW AND CORRECT OR JUSTIFY.
  
  
 3) SHEET AO 32 & ALL A2'S - THE FRONT DOORS TO ALL
 UNITS ON EACH LIFE SAFETY PLAN SHEET INDICATE IT WITHIN
 IN AN 1 HOUR ORANGE WALL. THE DOOR SCHEDULE SHEET
 INDICATE THOSE DOORS AS U01A AND HAVE NO FIRE RATING.
  
 WHICH IS CORRECT ?
  
 PLEASE REVIEW AND CORRECT.
  
  
 4) SHEET AO 32 - THE LOBBY LEVEL EXIT CAPACITY LOADS
 ARE DIFFICULT TO FOLLOW AND THE FRONT LOBBY DOOR
 APPEARS TO BE TOO SMALL.
  
 PLEASE PROVIDE A DETAILED EXIT LOAD CALCULATION FROM
 EACH OCCUPANY AREA THAT EQUALS 89 AT THE FRONT DOOR. MY
 CALCULATIONS INDICATE NEARLY MORE AT THE FRONT DOOR.100
 @ THE LOBBY, 27 @ THE LOBBY LOUNGE, 6 @ THE GUEST
 SUITES, 185 @ COMBO # 2 STAIR,(48 FROM BELOW 137 ABOVE)
 = 318.
  
 PLEASE REVIEW, CORRECT OR JUSTIFY.
  
  
 5) SHEET AO 32 - UNDER THE GENERAL NOTES # 6 IT
 INDICATES FOR STAIRWAY # 3 NO REENTRY FOR LEVELS 23,
 24, 25. PER NFPA 101, CHAPTER 7 APPEARS TO BE IN
 CONFLICT WITH REQUIRERMENT (3).
  
 7.2.1.5.8.1 DOOR ASSEMBLIES ON STAIR ENCLOSURES SHALL
 BE PERMITTED TO BE EQUIPPED WITH HARDWARE THAT PREVENTS
 RE-ENTRY INTO THE INTERIOR OF THE BUILDING, PROVIDED
 THAT ALL OF THE FOLLOWING CRITERIA ARE MET:
 (1) THERE SHALL BE NOT LESS THAN TWO LEVELS WHERE IT IS
 POSSIBLE TO LEAVE THE STAIR ENCLOSURE TO ACCESS ANOTHER
 EXIT.
 (2) THERE SHALL BE NOT MORE THAN FOUR STORIES
 INTERVENING BETWEEN STORIES WHERE IT IS POSSIBLE TO
 LEAVE THE STAIR ENCLOSURE TO ACCESS ANOTHER EXIT.
 (3) RE-ENTRY SHALL BE POSSIBLE ON THE TOP STORY OR
 NEXT-TO-TOP STORY SERVED BY THE STAIR ENCLOSURE, AND
 SUCH STORY SHALL ALLOW ACCESS TO ANOTHER EXIT.
 (4) DOOR ASSEMBLIES ALLOWING RE-ENTRY SHALL BE
 IDENTIFIED AS SUCH ON THE STAIR SIDE OF THE DOOR LEAF.
 (5) DOOR ASSEMBLIES NOT ALLOWING RE-ENTRY SHALL BE
 PROVIDED WITH A SIGN ON THE STAIR SIDE INDICATING THE
 LOCATION OF THE NEAREST DOOR OPENING, IN EACH DIRECTION
 OF TRAVEL, THAT ALLOWS RE-ENTRY OR EXIT.
  
  
 PLEASE REVIEW AND CORRECT OR JUSTIFY.
  
  
 6) SHEET FP 201 - FIRE CODE REFERENCES REMIAN
 INCORRECT. PLEASE REVIEW AND ENSURE COMPLIANCE WITH THE
 CURRENT FLORIDA FIRE PREVENTION CODE, 5TH EDITION AND
 ALL APPLICABLE CODES REFERENCES CONTAINED WITHIN IT.
  
  
 PLEASE REVIEW AND CORRECT - 1, 10, 13, 14, 20, 37, 88A
 & 101.
  
  
 7) SHEET A5 27, AO 32 & A2 01 - THE DIMENSIONS OF THE
 EAST OUTSIDE STAIR ARE NOT INDICATED AND CAN NOT BE
 CONFIMRED TO MEET THE EGRESS REQUIREMENTS. I WAS UNABLE
 TO IDENTIFY ANY SHEET WITH THE DIMENSIONS.
  
 PLEASE CORRECT OR PROVIDE THE REFERNECED SHEET
  
  
 8) SHEET A2 51A - A FIREPLACE IS INDICATED IN THE
 LOUNGE 2; HOWEVER, NO FUEL SOURCE OR VENTING COULD BE
 IDENTIFIED.
  
 PLEASE REVIEW AND CORRECT AND/OR IDENTIFY THE SHEET.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status F Date 2016-08-24 Cont ID  
Sent By pleduc Date 2016-08-24 Time   Rev Time 0.00
Received By pleduc Date 2016-08-12 Time 09:55 Sent To  
Notes
2016-08-23 09:29:54THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
  
 1) SHEET AO 32 - THE 2 DOORS OF THE EMERGENCY ROOM AND
 THE DOOR TO THE POOL EQUIPMENTROOM SWING INTO THE EXIT
 CORRIDOR -
  
 PER NFPA 101 CHAPTER 7, MEANS OF EGRESS
 7.2.1.4.3 DOOR LEAF ENCROACHMENT
 7.2.1.4.3.1 DURING ITS SWING, ANY DOOR LEAF IN A MEANS
 OF EGRESS SHALL LEAVE NOT LESS THAN ONE-HALF OF THE
 REQUIRED WIDTH OF AN AISLE, A CORRIDOR, A PASSAGEWAY,
 OR A LANDING UNOBSTRUCTED AND SHALL NOT PROJECT NOT
 MORE THAN 7 IN. INTO THE REQUIRED WIDTH OF AN AISLE, A
 CORRIDOR, A PASSAGE WAY, OR A LANDING, WHEN FULLY OPEN,
 UNLESS BOTH OF THE FOLLOWING CONDITIONS ARE MET:
 (1) THE DOOR OPENING PROVIDES ACCESS TO A STAIR IN AN
 EXISTING BUILDING.
 (2) THE DOOR OPENING MEETS THE REQUIREMENTS THAT LIMITS
 PROJECTION TO NOT MORE THAN 7 IN. INTO THE REQUIRED
 WIDTH OF THE STAIR LANDING WHEN THE DOOR LEAF IS FULLY
 OPEN.
  
 PLEASE REVIEW AND CORRECT OR JUSTIFY.
  
  
 2) SHEET AO 32 - A NOTE IS INDICATED STATING FOR A
 STAIR WIDER THAN 44" "THE FOLLOWING FORMULA WAS
 PROVIDED BY THE WEST PALM BEACH FIRE DEPARTMENT".
  
 I HAVE BEEN THE SOLE CONTACT FOR THE FIRE DEPARMTNAT
 AND I DO NOT RECALL PROVIDING THIS FORMULA; HOWEVER, IT
 CAN BE USED PER NFPA 101, CHAPTER 7, 7.3.3.2.
  
 HOWEVER, THE SUM OF THE CALCULATION PROVIDED APPEARS TO
 BE INCORRECT. 60-44/.218 + 146.7 = 220; NOT 495 WHICH
 IS INDICATED AND INCORRECT
  
 PLEASE REVIEW AND CORRECT OR JUSTIFY.
  
  
 3) SHEET AO 32 & ALL A2'S - THE FRONT DOORS TO ALL
 UNITS ON EACH LIFE SAFETY PLAN SHEET INDICATE IT WITHIN
 IN AN 1 HOUR ORANGE WALL. THE DOOR SCHEDULE SHEET
 INDICATE THOSE DOORS AS U01A AND HAVE NO FIRE RATING.
  
 WHICH IS CORRECT ?
  
 PLEASE REVIEW AND CORRECT.
  
  
 4) SHEET AO 32 - THE LOBBY LEVEL EXIT CAPACITY LOADS
 ARE DIFFICULT TO FOLLOW AND THE FRONT LOBBY DOOR
 APPEARS TO BE TOO SMALL.
  
 PLEASE PROVIDE A DETAILED EXIT LOAD CALCULATION FROM
 EACH OCCUPANY AREA THAT EQUALS 89 AT THE FRONT DOOR. MY
 CALCULATIONS INDICATE NEARLY MORE AT THE FRONT DOOR.100
 @ THE LOBBY, 27 @ THE LOBBY LOUNGE, 6 @ THE GUEST
 SUITES, 185 @ COMBO # 2 STAIR,(48 FROM BELOW 137 ABOVE)
 = 318.
  
 PLEASE REVIEW, CORRECT OR JUSTIFY.
  
  
 5) SHEET AO 32 - UNDER THE GENERAL NOTES # 6 IT
 INDICATES FOR STAIRWAY # 3 NO REENTRY FOR LEVELS 23,
 24, 25. PER NFPA 101, CHAPTER 7 APPEARS TO BE IN
 CONFLICT WITH REQUIRERMENT (3).
  
 7.2.1.5.8.1 DOOR ASSEMBLIES ON STAIR ENCLOSURES SHALL
 BE PERMITTED TO BE EQUIPPED WITH HARDWARE THAT PREVENTS
 RE-ENTRY INTO THE INTERIOR OF THE BUILDING, PROVIDED
 THAT ALL OF THE FOLLOWING CRITERIA ARE MET:
 (1) THERE SHALL BE NOT LESS THAN TWO LEVELS WHERE IT IS
 POSSIBLE TO LEAVE THE STAIR ENCLOSURE TO ACCESS ANOTHER
 EXIT.
 (2) THERE SHALL BE NOT MORE THAN FOUR STORIES
 INTERVENING BETWEEN STORIES WHERE IT IS POSSIBLE TO
 LEAVE THE STAIR ENCLOSURE TO ACCESS ANOTHER EXIT.
 (3) RE-ENTRY SHALL BE POSSIBLE ON THE TOP STORY OR
 NEXT-TO-TOP STORY SERVED BY THE STAIR ENCLOSURE, AND
 SUCH STORY SHALL ALLOW ACCESS TO ANOTHER EXIT.
 (4) DOOR ASSEMBLIES ALLOWING RE-ENTRY SHALL BE
 IDENTIFIED AS SUCH ON THE STAIR SIDE OF THE DOOR LEAF.
 (5) DOOR ASSEMBLIES NOT ALLOWING RE-ENTRY SHALL BE
 PROVIDED WITH A SIGN ON THE STAIR SIDE INDICATING THE
 LOCATION OF THE NEAREST DOOR OPENING, IN EACH DIRECTION
 OF TRAVEL, THAT ALLOWS RE-ENTRY OR EXIT.
  
  
 PLEASE REVIEW AND CORRECT OR JUSTIFY.
  
  
 6) SHEET FP 201 - FIRE CODE REFERENCES REMIAN
 INCORRECT. PLEASE REVIEW AND ENSURE COMPLIANCE WITH THE
 CURRENT FLORIDA FIRE PREVENTION CODE, 5TH EDITION AND
 ALL APPLICABLE CODES REFERENCES CONTAINED WITHIN IT.
  
  
 PLEASE REVIEW AND CORRECT - 1, 10, 13, 14, 20, 37, 88A
 & 101.
  
  
 7) SHEET A5 27, AO 32 & A2 01 - THE DIMENSIONS OF THE
 EAST OUTSIDE STAIR ARE NOT INDICATED AND CAN NOT BE
 CONFIMRED TO MEET THE EGRESS REQUIREMENTS. I WAS UNABLE
 TO IDENTIFY ANY SHEET WITH THE DIMENSIONS.
  
 PLEASE CORRECT OR PROVIDE THE REFERNECED SHEET
  
  
 8) SHEET A2 51A - A FIREPLACE IS INDICATED IN THE
 LOUNGE 2; HOWEVER, NO FUEL SOURCE OR VENTING COULD BE
 IDENTIFIED.
  
 PLEASE REVIEW AND CORRECT AND/OR IDENTIFY THE SHEET.
  
  
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  
  
  
  
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2016-02-08 Cont ID  
Sent By pleduc Date 2016-02-08 Time   Rev Time 0.00
Received By pleduc Date 2016-01-12 Time 14:29 Sent To  
Notes
2016-01-14 12:00:08THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1. SHEET 008-A0-25 - THERE IS AN INCORRECT REFERENCE TO
 THE FIRE CODE.
  
 THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE
 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING
 THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER
 APPLICABLE CODES OR STANDARDS.
 FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS
 OF NFPA 13, 2010 EDITION.
 FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF
 NFPA 72, 2010 EDITION.
 CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF
 NFPA 241, 2009 EDITION.
 FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS
 OF NFPA 10, 2010 EDITION.
 ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION.
  
 2. SHEET 027-C3-01 - THE LOCATION OF THE FIRE HYDRANTS
 AND FDC'S IS LIMITED AND NOT CONDUCIVE TO FIRE GROUND
 OPERATIONS.AND NOT APPROVED.
  
 THE FIRE LANE AROUND THE ENTIRE BUILDING IS NOT
 REQUIRED AND CAN BE ELIMINATED.
  
 RELOCATION OF THE FIRE HYDRANT AND FDC ON THE NORTH
 SIDE TO THE LANDSCAPE ISLAND AREA IN THE FRONT ON THE
 MAIN ENTRANCE ACCESS. ON SHEET 071-L9-10 THE AREA
 MARKED WITH TREES FD9 AND 4FD IS STRONGLY ENCOURAGED.
 3FT TO THE SIDE AND REAR IS REQUIRED AND, IF DESIRED,
 THE EQUIPMENT CAN BE COLORED TO MATCH THE LANDSCAPE.
  
 RELOCATION OF THE SOUTHEAST FIRE HYDRANT AND FDC TO THE
 AREA OF THE BACK FLOW PREVENTORS BEFORE THE GATE IS
 STRONGLY ENCOURAGED.
  
 CLOSE COORDINATION WITH THE PREVNETION BUREAU WOULD BE
 EXTRMELY BENEFICIAL.
  
 3. SHEET 603-FP2-OP1 & OP2 - PROVIDE NOTE INDICATING
 THAT FIRE SPRINKLER COVERAGE COMPLIES WITH THE
 REQUIRMENTS AND DESIGN OF STACKED PARKING WHERE
 APPLICABLE.
  
 4. SHEET 603-FP2-OP1 - NO SPRINKLER PROTECTION SHOWN IN
 CENTER CORE AREAS. COMPLETE FIRE SPRINKLER SYSTEM IS
 REQUIRED BE NFPA 1, 101, AND 13.
  
 5. SHEET 605 FP2-01 - NO SPRINKLER PROTECTION SHOWN IN
 EMEGENCY RM.
  
 6. SHEET 605 FP2-01 - NO FIRE PROTECTION SHOWN IN FPL
 VAULT RM.
  
 7. SHEET 605 FP2-01 - NO SPRINKLER PROTECTION SHOWN IN
 EXIT CORRIDOR 114 ALONG LAUNDRY RM.
  
 8. SHEET 605 FP2-01 - NO SPRINKLER PROTECTION IN TRASH
 CHUTE ( NOT SHOWN FOR THE ENTIRE BLDG)
  
 9. SHEET 606 FP2-02 - A FCVA COULD NOT BE LOCATED OR IS
 NOT INDICATED.
  
 (PROVIDE A NOTE FOR EACH FCVA ON EACH FLOOR ON WHAT IT
 SHUTS DOWN.)
  
 10. SHEET 606 FP2-24 - A FCVA COULD NOT BE LOCATED OR
 IS NOT INDICATED ON THE 18TH & 19TH LEVEL.
  
 11. SHEET 608 FP2-05 - A FCVA COULD NOT BE LOCATED OR
 IS NOT INDICATED.
  
 12. SHEET 612 FP2-20 - A FCVA COULD NOT BE LOCATED AND
 INDICATED ITS ON THE 18TH & 19TH LEVEL.
  
 13. SHEET 613 FP2-21 - A FCVA COULD NOT BE LOCATED AND
 INDICATED ITS ON THE 18TH & 19TH LEVEL.
  
 14. SHEET 614 FP2-22 - A FCVA COULD NOT BE LOCATED AND
 INDICATED ITS ON THE 18TH & 19TH LEVEL.
  
 15. SHEET 615 FP2-23 - A FCVA COULD NOT BE LOCATED AND
 INDICATED ITS ON THE 18TH & 19TH LEVEL.
  
 16. SHEET 617-FP2-25 - A FCVA COULD NOT BE LOCATED AND
 INDICATED ITS ON THE 18TH & 19TH LEVEL.
  
 17. SHEET 621-FP4-03 - A REGULATING HOSE VALVE IS NOT
 INDICATED. ( EACH FLLOR SHALL HAVE A NOTE INDICATING
 THE PSI AND LOCATION OF A RHV PER NFPA 14)
  
 18. SHEET 180-A5-26 - NO DETAIL IS PROVIDED FOR
 INDICATED HANDRAILS, ALL HANDRAILS SHALL COMPLY WITH
 NFPA 101. CHAPTER 7, 7.2.2.4.4.1. MIN. 34"
  
 19. SHEET 181-A5-27 - NO DETAIL IS PROVIDED FOR
 INDICATED HANDRAILS, ALL HANDRAILS SHALL COMPLY WITH
 NFPA 101. CHAPTER 7, 7.2.2.4.4.1. MIN. 34".
  
 20. SHEET 182-A5-28 - NO DETAIL IS PROVIDED FOR
 INDICATED HANDRAILS, ALL HANDRAILS SHALL COMPLY WITH
 NFPA 101. CHAPTER 7, 7.2.2.4.4.1. MIN. 34".
  
 21. SHEET 184-A5-51 - SECTIONS 1 & 2 HANDRAILS SHALL
 COMPLY WITH NFPA 101. CHAPTER 7, 7.2.2.4.4.1. MIN. 34".
  
 22. GENRAL STAIRWAY SHEETS - STAIRWAY TREAD MARKING AND
 HANDRAIL MARKINGS SHALL COMPLY WITH NFPA 101, CHAPTER
 7, 7.2.2.5.4.3, THROUGH 7.2.2.5.5.3
  
 23. SHEET 187-A5-21 - PROVIDE STAIWAY IDENTIFICATION
 SIGNAGE IS NOT INDICATED. STAIRWAY INDENTIFICATION
 SHALL COMPLY WITH NFPA 101, CHAPTER 7, 7.2.2.5.4.
  
 24. MECHANICAL SHEETS 396 - 430 - IT IS NOT CLEARLY
 INDICATED WHAT AREAS WILL BE SMOKE CONTROL, SMOKE EVAC,
 STAIRWELL PRESSURIZATION OR ELEVATOR SHAFT
 PERSSURIZATION.
  
 25. ELECTRICAL SHEETS 448 - 469 = IT IS NOT CLEARLY
 INDICATED THE LOCATION OF EXIT LIGHTING ON ANY LEVEL.
  
 26. GENERAL SHEETS - IT IS NOT CLEARLY INDICATED THE
 INITIAL OR BACK-UP POWER OF THE FIRE PUMP.
  
 27. GENERAL SHEETS - IT IS NOT CLEARLY INDICATED, IF
 ANY, THE EMERGENCY POWER TO THE EMERGENCY GENERATOR.
  
 28. THE FIRE COMMAND CENTER SHALL COMPLY WITH NFPA 1,
 CHAPTER 11, BUILDING SERVICES; 11.9 AND SHALL CONTAIN
 THE FOLLOWING FEATURES:
  
 1. SHALL BE A MINIMUM OF 200 FT SQUARED WITH A MINIMUM
 DIMENSION OF 10 FT.
 2. THE FIRE DEPARTMENT COMMUNICATIONS SYSTEM.
 3. A TELEPHONE FOR FIRE DEPARTMENT USE WITH CONTROLLED
 ACCESS TO THE PUBLIC TELEPHONE SYSTEM
 4. SCHEMATIC BUILDING PLANS INDICATING THE TYPICAL
 FLOOR PLAN AND DETAILING THE BUILDING CORE, MEANS OF
 EGRESS, FIRE PROTECTION SYSTEMS, FIRE-FIGHTING
 EQUIPMENT AND FIRE DEPARTMENT ACCESS AND THE LOCATION
 OF FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE
 BARRIERS AND SMOKE PARTITIONS
 5. A WORK TABLE.
 6. IF APPLICABLE, A HAZARDOUS MATERIAL MANAGEMENT PLAN
 FOR THE BUILDING.
 7. THE EMERGENCY VOICE/ALARM COMMUNICATION SYSTEM
 CONTROL UNIT.
 8. ANNUNCIATOR UNIT VISUALLY INDICATING THE LOCATION OF
 THE ELEVATORS AND WHETHER THEY ARE OPERATIONAL
 9. STATUS INDICATORS AND CONTROLS FOR AIR DISTRIBUTION
 SYSTEMS.
 10. CONTROLS FOR UNLOCKING STAIRWAY DOORS
 SIMULTANEOUSLY
 11. SPRINKLER VALVE AND WATER FLOW DETECTOR DISPLAY
 PANELS
 12. EMERGENCY AND STANDBY POWER STATUS INDICATORS
 13. FIRE PUMP STATUS INDICATORS
 14. GENERATOR SUPERVISION DEVICES AND MANUAL START AND
 TRANSFER FEATURES.
 15. PUBLIC ADDRESS SYSTEM, WHERE SPECIFICALLY REQUIRED
 BY OTHER SECTIONS OF THIS CODE
 16. CONTROLS REQUIRED FOR SMOKE CONTROL
 17. ELEVATOR FIRE RECALL SWITCH IN ACCORDANCE WITH ASME
 A17.1.
 18. ELEVATOR EMERGENCY OR STANDBY POWER SELECTOR
 SWITCH(ES), WHERE EMERGENCY OR STANDBY POWER IS
 PROVIDED
  
 29. THE BUREAU'S APPROVAL OF THIS SUBMITTED PROJECT
 DOES NOT CONSTITUTE IT'S FINAL REVIEW OR APPROVAL.
  
 35. THE BUREAU SHALL REVIEW ALL RE-SUBMITTED BUILDING
 PLANS AT THE APPROPRIATE TIME AND IN ACCORDANCE WITH
 THE REQUIREMENTS OF ALL APPLICABLE CODES AND STANDARDS.
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
  
  
  
  
  
  

Review Stop G GAS REVIEW
Rev No 4 Status P Date 2017-02-06 Cont ID  
Sent By gjohnson Date 2017-02-06 Time 15:49 Rev Time 0.00
Received By gjohnson Date 2017-02-06 Time 16:49 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 3 Status F Date 2016-12-28 Cont ID  
Sent By gjohnson Date 2016-12-28 Time 16:03 Rev Time 0.00
Received By gjohnson Date 2016-12-28 Time 16:03 Sent To  
Notes
2016-12-28 16:30:32 
  
 2ND REVIEW: FBC 2010
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
 GAS COMMENTS:3RD REQUEST
  
 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR EACH
 APPLIANCE WITH CUBIC FT. REQUIRED AND WHAT IS PROVIDED
 PER THE FBC-2010 FUEL GAS CODE SEC. 304.
  
 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND
 TERMINATION OF THE GAS VENTS PER FBC-2010 FUEL GAS CODE
 SEC. 502 THRU 505.
  
 3RD REVIEW:
  
 1. BTU LOADS ON THE GAS RISER ARE SHOWN AS CFH SHOULD
 THEY BE MBH OR BTU PLEASE CLARIFY. PER WPB AMEND TO FBC
 107.2.1
  
 2. UNDER THE GAS CALCULATIONS THE TOTAL GAS
 CONSUMMATION IS SHOWN AS CFH PLEASE CLARIFY. PER WPB
 AMEND TO FBC 107.2.1
  
 3.TABLE LISTED FOR SIZING IS FOR LESS THAN 2PSI WITH A
 PRESSURE DROP OF 0.6 IN. THE MAIN SYSTEM IS SHOWN AS
 2PSI PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 4. PLEASE PROVIDE A RISER DIAGRAM FOR UNIT SHOWING
 LOCATION IF THE UNITS. PER WPB AMEND TO FBC 107.2.1
  
 IN ORDER TO EXPEDITE ISSUANCE OF THIS PERMIT I SUGGEST
 THE WE SET UP A MEETING PLEASE CONTACT ME CONTACT INFO
 I
  
  
  
 DUE TO THE DEFICIENCIES OF THIS PLAN A COMPLETE AND
 THOROUGH REVIEW CANNOT BE DONE AT THIS TIME. UPON
 RESUBMITTAL THERE MAYBE ADDITIONAL COMMENTS.
  
  
  

Review Stop G GAS REVIEW
Rev No 2 Status F Date 2016-08-17 Cont ID  
Sent By gjohnson Date 2016-08-17 Time 10:11 Rev Time 0.00
Received By gjohnson Date 2016-08-17 Time 10:11 Sent To  
Notes
2016-08-17 10:38:40 
  
 2ND REVIEW: FBC 2010
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
 GAS COMMENTS: 1ST REVIEW HAVE NOT COMPLIED
  
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL
 CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS FOR 2PSI
 AND .5PSI SYSTEMS PER FBC-2010 FUEL GAS, SECS. 402.4.1,
 402.4.2.
  
  
  
  
  
 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON
 THE SYSTEM. REFER TO THE FBC-2010 FUEL GAS SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(37).
  
  
  
 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR FOR EACH
 APPLIANCE WITH CUBIC FT. REQUIRED AND WHAT IS PROVIDED
 PER THE FBC-2010 FUEL GAS CODE SEC. 304.
  
  
  
 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND
 TERMINATION OF THE GAS VENTS PER FBC-2010 FUEL GAS CODE
 SEC. 502 THRU 505.
  
 2ND REVIEW:
  
 1. IN THE NOTE FOR GAS CALCULATIONS YOU LISTED TABLE
 402.4(6) IN THE FBC FUEL GAS THIS TABLE IS FOR COPPER
 TUBING THE PLAN SHOWS SCHEDULE 40 METALLIC PLEASE
 CLARIFY. PER WPB AMEND TO FBC 107.2.1
 2. NOTE #1 PLEASE CLARIFY WHAT TYPE OF PIPING IS GOING
 TO BE USED UNDERGROUND. METALLIC PIPING IS EXTREMELY
 RESTRICTIVE ON USE UNDERGROUND. PER WPB AMEND TO FBC
 107.2.1 FBC FUEL GAS 404.9
 3. SHOW REGULATORS AND DRIP LEGS.1. IN THE NOTE FOR GAS
 CALCULATIONS YOU LISTED TABLE 402.4(6) IN THE FBC FUEL
 GAS THIS TABLE IS FOR COPPER TUBING THE PLAN SHOWS
 SCHEDULE 40 METALLIC PLEASE CLARIFY. PER WPB AMEND TO
 FBC 107.2.1
  
  
 4. BRANCH SIZE FOR TYPICAL UNIT ON GAS RISER 4 SHOWS
 3/4 THE REST OF THE RISERS SHOW 1/2 PLEASE CLARIFY. PER
 WPB AMEND TO FBC 107.2.1
 5. NOTE #4 PROVIDE ISOMETRIC AND FLOOR PLAN DRAWING
 SHOWING THE VENT LOCATIONS OF THE PRESSURE REGULATORS.
 PER WPB AMEND TO FBC 107.2.1
 6. SHOW GAS LINE ON A FLOOR PLAN. PER WPB AMEND TO FBC
 107.2.1
  
  
 DUE TO THE DEFICIENCIES OF THIS PLAN A COMPLETE AND
 THOROUGH REVIEW CANNOT BE DONE AT THIS TIME. UPON
 RESUBMITTAL THERE MAYBE ADDITIONAL COMMENTS.
  
  
  

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2016-01-29 Cont ID  
Sent By gjohnson Date 2016-01-29 Time 17:33 Rev Time 0.00
Received By gjohnson Date 2016-01-29 Time 17:33 Sent To  
Notes
2016-01-29 17:36:06 
  
 1ST REVIEW: FBC 2014
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
 GAS COMMENTS:
  
  
 1. SUBMIT AN ISOMETRIC DRAWING THAT CLEARLY SHOWS ALL
 CUT SECTIONS OF PIPE AND CORRESPONDING LENGTHS PER
 FBC-2014 FUEL GAS, SECS. 402.4.1, 402.4.2.
  
 2. SHOW TYPE OF PIPING MATERIAL BEING INSTALLED, ALL
 PIPE SIZES, AND THE EHD NUMBER OF CORRUGATED STAINLESS
 STEEL TUBING FOR EACH PIPE SIZE IF BEING USED. WPB
 AMENDMENTS TO FBC SEC. 107.2.1.
  
 3. TYPE OF GAS, (LP OR NATURAL).
  
 4. BTU LOAD OF EACH APPLIANCE AND THE TOTAL BTU LOAD ON
 THE SYSTEM. REFER TO THE FBC-2014 FUEL GAS SECS. 401.8
 THRU 402.6.1 AND TABLES 402.4(1) THRU 402.4(37).
  
 5. SHOW THE DISTANCE FROM THE POINT OF DELIVERY,
 (METER), TO THE MOST REMOTE OUTLET IN THE BUILDING
 AND/OR SYSTEM PER THE FBC-2014 FUEL GAS APPENDIX A ?
 USE OF CAPACITY SECTION A.3.1(4) & 2014 FUEL GAS CODE
 SEC. 402.4.1.
  
 6. SUBMIT CALCULATIONS FOR COMBUSTION AIR PER THE
 FBC-2014 FUEL GAS CODE SEC. 304.
  
 7. INDICATE THE DELIVERY PRESSURE (PSI) PER FBC-2014
 FUEL GAS SEC. 402.2. IF NATURAL GAS SPECIFY .5 PSI OR 2
 PSI.
  
 8. SUBMIT A DETAIL SHOWING THE TYPE, LOCATION, SIZE AND
 TERMINATION OF THE GAS VENTS PER FBC-2014 FUEL GAS CODE
 SEC. 502 THRU 505.
  
 9. SUBMIT MANUFACTURER?S SPECIFICATION SHEETS FOR ALL
 GAS EQUIPMENT TO VERIFY COMPLIANCE WITH STANDARDS NFPA
 54, NFPA 58, AND FBC-2014 FUEL GAS SEC. 402.2
  

Review Stop I INCOMING/PROCESSING
Rev No 4 Status N Date 2017-02-10 Cont ID  
Sent By lmarchan Date 2017-02-10 Time 10:47 Rev Time 0.00
Received By lmarchan Date 2017-01-24 Time 14:01 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2017-01-11 Cont ID  
Sent By lmarchan Date 2017-01-11 Time 09:31 Rev Time 0.00
Received By lmarchan Date 2016-11-23 Time 08:06 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-10-20 Cont ID  
Sent By cpuell Date 2016-10-20 Time 15:48 Rev Time 0.00
Received By cpuell Date 2016-07-26 Time 14:51 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2016-04-13 Cont ID  
Sent By cpuell Date 2016-04-13 Time 16:55 Rev Time 0.00
Received By cpuell Date 2016-01-07 Time 08:29 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 4 Status P Date 2017-02-01 Cont ID  
Sent By jwitmer Date 2017-01-30 Time 10:06 Rev Time 0.00
Received By jwitmer Date 2017-01-30 Time 10:06 Sent To  
Notes
2017-02-01 14:31:332/01/2017 RECEIVED AND VERIFIED PALM BEACH COUNTY
 IMPACT FEE RECEIPT:
 MU-2017-001622-0000
 TOTALFEES: $516294.03
  
 JAMES A. WITMER BN, PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION/ DEVELOPMENT SERVICES
 DEPARTMENT
 401 CLEMATIS ST.
 WEST PALM BEACH. FL 33402
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  
2017-01-30 10:07:07BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT
 FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL
 PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND
 A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT
 APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
  
 JAMES A. WITMER BN, PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 3 Status F Date 2016-12-20 Cont ID  
Sent By jwitmer Date 2016-12-20 Time 13:30 Rev Time 0.00
Received By jwitmer Date 2016-12-20 Time 13:30 Sent To  
Notes
2016-12-20 13:30:15IMPACT FEES
 BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT
 FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL
 PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND
 A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT
 APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
  
 JAMES A. WITMER PX,CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status F Date 2016-08-29 Cont ID  
Sent By jwitmer Date 2016-08-29 Time 17:13 Rev Time 0.00
Received By jwitmer Date 2016-08-29 Time 17:13 Sent To  
Notes
2016-08-29 17:13:48BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT
 FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL
 PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND
 A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT
 APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2016-01-27 Cont ID  
Sent By jwitmer Date 2016-01-23 Time 09:34 Rev Time  
Received By jwitmer Date 2016-01-23 Time 09:33 Sent To  
Notes
2016-01-23 09:54:06IMPACT FEES
 BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT
 FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL
 PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND
 A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT
 APPLICATION. PLEASE CALL (561)233-5025 FOR MORE
 INFORMATION.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 5 Status P Date 2017-02-07 Cont ID  
Sent By ccole Date 2017-02-07 Time 12:08 Rev Time 0.00
Received By ccole Date 2017-02-03 Time 13:58 Sent To  
Notes
2017-02-07 12:13:35MECHANICAL PROVISOS:
 2/7/17
  
 1) A REVISION TO THE APPROVED PLANS IS REQUIRED TO SHOW
 THE MISSING FIRE OR FIRE/SMOKE DAMPERS AT THE LOCATIONS
 LISTED BELOW.
  
 * M2.0P2 NORTH CORE: 4X4 O/A DUCT PENETRATION RESIDENT
 STORAGE WALL
 * M2.0P2 EAST: 6X4 O/A DUCT PENETRATING STORAGE ROOM
 WALL AT EAST SIDE OF BUILDING.
 * M2.0P1: 4X4 O/A DUCT AT WATER FEATURE WALL
 * M2.0P1: 4X4 O/A DUCT AT MAINTENANCE WALL
 * M2.0P1: 6X6 O/A DUCT AT RESIDENT STORAGE
 * M2.0P1: 4X4 O/A DUCT AT CORRIDOR
 * M2.0P1: 6' FLEX DUCT AT STORAGE P116.
 * M2.0P1: 12X6 DUCT PENETRATING WALLS AT MEP/CAR
 WASH/DOG SPA.
 * M2.0P1: 12X12 EXHAUST DUCT AT DOG SPA.
 * M2.01: INTAKE OPENING AND EXHAUST OUTLET AT GENERATOR
 ROOM.
 * M2.01: EXHAUST DUCT AT MANICURE ROOM WALL.
 * M2.01: 12X6 O/A DUCT AT CORRIDOR
 * M2.02: SOUTH CORE- 10X10 DUCT AT JANITOR/FIRE VEST. &
 FIRE VEST./ELEV. LOBBY.
 * M2.02: 26X12 DUCT AT MEP CLOSET.
 * M2.02 18X10 DUCT AT YOGA ROOM..
 * M2.05: SOUTH CORE- 18X10 DUCT PENETRATING THE SHAFT
 NEAR STAIR #3.
 * M2.05: NORTH CORE- TWO DUCTS SHOWN IN STAIR #1
 ENCLOSURE PENETRATING STAIR ENCLOSURE/UTILITY ROOM
 WALL.
 * M2.17, 18, 20, 21, 22: 18X10 DUCT ATR SHAFT
 PENETRATION.
 * M2.22: SOUTH CORE- 50X16 O/A DUCT AND 14X6 SUPPLY
 DUCT AT SHAFT.
 * M2.22 NORTH CORE- 22X6 O/A DUCT AT SHAFT PENETRATION.
 * M2.23: NORTH CORE- 22X6 O/A DUCT AT SHAFT
 PENETRATION.
 * M2.24: SOUTH CORE- EXHAUST DUCTS PENETRATING SHAFTS.
 * M2.25: SOUTH CORE- 18X10 AT SHAFT.
 * M2.26: SOUTH CORE: EXHAUST DUCT KEF #3 AT SHAFT.
 * M2.26: NORTH CORE: OA-1 DUCT AT SHAFTI
  
 2) ACCESS FOR MAINTENANCE AND REPLACEMENT OF ALL
 MECHANICAL EQUIPMENT SHALL BE PROVIDED. SUBMIT
 STRUCTURAL DETAILS FOR PANELS WHERE NECESSARY.
  
 3) THE FOLLOWING LIST OF DEFERRED SUBMITTALS SHALL BE
 SUBMITTED PRIOR TO FIELD INSPECTION REQUESTS:
  
 A) STRUCTURAL DETAILS AND WIND LOAD ENGINEERING FOR ALL
 ROOFTOP AND EXTERIOR MECHANICAL EQUIPMENT AND
 COMPONENTS INCLUDING THE COOLING TOWER, THE DOA UNITS,
 THE FANS AND FAN CURBS, LOUVERS, ETC.
  
 B) STRUCTURAL DRAWINGS AND DETAILS FOR THE COOLING
 TOWER ACCESS PLATFORM AND LADDER.
  
 C) MANUFACTURER'S SPECIFICATIONS FOR:
 COOLING TOWER
 GENERATOR
 SMOKE CONTROL AND PRESSURIZATION FANS
 BOILER AND BOILER VENTING
 HEAT EXHANGERS
 FLAMEBAR DUCT
 FSD & FD DAMPERS
 O/A MOTORIZED DAMPERS
 CO AND NO2 DETECTORS
 FIRESTOPPING
 ACCESS PANELS FOR ABOVE CEILNG HP'S
 CHILLED WATER PIPING INSULATION
  
 D) FLORIDA PRODUCT APPROVALS AND/OR MIAMI-DADE NOA'S
 FOR LOUVERS AND ROOF STANDS
  
 1) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
  
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 2) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT
 APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE
 DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  
  
  

Review Stop M MECHANICAL (A/C)
Rev No 4 Status F Date 2017-01-30 Cont ID  
Sent By ccole Date 2017-01-30 Time 10:50 Rev Time 0.00
Received By ccole Date 2017-01-27 Time 10:50 Sent To  
Notes
2017-01-30 11:06:024TH REVIEW FBC-2014 MECHANICAL
 PERMIT #15111020
 1/27/17
  
 THE FOLLOWING LIST OF COMMENTS FROM THE 3RD REVIEW
 STILL EXIST OR HAVE NOT BEEN ADDRESSED IN ENTIRETY.
  
 1) COMMENT #1: THE REVISED PLANS UPLOADED ON 1/20/2017
 HAVE ELECTRONIC SEALS AND SIGNATURES. ALL OTHER
 EXISTING PLAN SHEETS DO NOT.
  
 2) COMMENT #3: THE REVISED ENERGYGAUGE COMPLIANCE MUST
 BE ELECTRONICALLY SIGNED AND SEALED.
  
 3) COMMENT #5: PLAN SHEETS M2.0P1, M2.0P2, & M6.02 HAVE
 NOT BEEN REVISED PER THE COMMENTS OR NARRATIVE
 RESPONSE.
  
 4) COMMENT #8, M2.0P1: REQUESTED SEPARATION DISTANCE
 BETWEEN THE GENERATOR AIR INTAKE AND EXHAUST NOT
 PROVIDED.
  
 5) COMMENT #9, M2.0P1: REQUESTED MOTORIZED DAMPERS FOR
 O/A DUCTS TO GUESTROOMS.
  
 6) COMMENT #11, M6.02: FAN SCHEDULE NOTES NOT UPDATED.
  
 7) COMMENT #12, M5.04: PRINT ON PLAN SHEET STILL FAINT
 AND ILLEGIBLE.
  
 8) COMMENT #13, M6.02: SCHEDULE NOT UPDATED TO PROVIDE
 CORRECT NOTES AND NOA #S.
  
 9) COMMENT #14, M2.0P1: PLAN NOT REVISED TO SHOW
 RELOCATION OF GARAGE EXHAUST FANS OVER STAIRWELL AS
 STATED IN THE RESPONSE NARRATIVE.
  
 10) COMMENT #17, M2.01: REQUESTED COMBUSTION AIR
 CALCULATIONS NOT PROVIDED.
  
 11) COMMENT #18, M2.01: REQUESTED AIR BALANCE
 CALCULATIONS NOT PROVIDED.
  
 12) COMMENT #21, M2.01: REQUESTED DEMAND CONTROLLED
 VENTILATION NOT SHOWN IN THE CLUB DINING ROOM.
  
 13) COMMENT #23, M2.02: ABOVE CEILING PLENUM SPACES NOT
 IDENTIFIED CLEARLY.
  
 14) COMMENT #25, M2.23: REQUESTED DUCTWORK NOT SHOWN.
  
 15) BELOW IS A LIST OF MISSING FIRE OR FIRE/SMOKE
 DAMPERS FOR DUCTS PENETRATING RATED WALLS. PLEASE
 PROVIDE THE DAMPERS FOR DUCTS WHERE REQUIRED, OR IF
 CLAIMING ANY EXCEPTIONS WRITTEN IN THE CODE, PLEASE
 PROVIDE THE SECTION NUMBER.
  
 * M2.0P2 NORTH CORE: 4X4 O/A DUCT PENETRATION RESIDENT
 STORAGE WALL
 * M2.0P2 EAST: 6X4 O/A DUCT PENETRATING STORAGE ROOM
 WALL AT EAST SIDE OF BUILDING.
 * M2.0P1: 4X4 O/A DUCT AT WATER FEATURE WALL
 * M2.0P1: 4X4 O/A DUCT AT MAINTENANCE WALL
 * M2.0P1: 6X6 O/A DUCT AT RESIDENT STORAGE
 * M2.0P1: 4X4 O/A DUCT AT CORRIDOR
 * M2.0P1: 6" FLEX DUCT AT STORAGE P116.
 * M2.0P1: 12X6 DUCT PENETRATING WALLS AT MEP/CAR
 WASH/DOG SPA.
 * M2.0P1: 12X12 EXHAUST DUCT AT DOG SPA.
 * M2.01: INTAKE OPENING AND EXHAUST OUTLET AT GENERATOR
 ROOM.
 * M2.01: EXHAUST DUCT AT MANICURE ROOM WALL.
 * M2.01: 8X6 O/A DUCT AT CORRIDOR
 * M2.02: 10X10 DUCT AT JANITOR/FIRE VEST. & FIRE
 VEST./ELEV. LOBBY.
 * M2.02: 26X12 DUCT AT MEP CLOSET.
 * M2.02 18X10 DUCT AT YOGA ROOM.
 * M2.03: TRANSFER DUCT AT CORRIDOR BY GUEST SUITE 11.
 PLEASE NOTE THAT THE CORRIDOR CANNOT BE USED AS A
 SUPPLY, RETURN, EXHAUST, RELIEF, OR AS A VENTILATION
 AIR DUCTS. SECTION 601.2.
 * M2.03: DUCTS PENETRATING RATED SHAFTS BY RESTROOMS IN
 GUEST SUITES 9, 10, & 11.
 * M2.05: SOUTH CORE- 18X10 DUCT IN STAIR #3 ENCLOSURE
 NOT PERMITTED AND NOT DAMPERED.
 * M2.05: NORTH CORE- TWO DUCTS SHOWN IN STAIR #1
 ENCLOSURE /UTILITY NOT PERMITTED/NOT DAMPERED.
 * M2.17, 18, 20, 21, 22: DUCTS NOT PERMITTED OR
 DAMPERED IN STAIR #3 ENCLOSURE.
 * M2.22: SOUTH CORE- 50X16 O/A DUCT AND 14X6 SUPPLY
 DUCT AT SHAFT.
 * M2.22 NORTH CORE- 16X8 AT SHAFT.
 * M2.23: NORTH CORE- NO DUCTS SHOWN IN DRAWING.
 * M2.24: SOUTH CORE- EXHAUST DUCTS PENETRATING SHAFTS.
 * M2.25: SOUTH CORE- 18X10 AT SHAFT.
 * M2.25: NORTH CORE: NO SIZE OR DAMPER FOR DUCT AT
 FIREMAN'S VEST./CORRIDOR WALL.
 * M2.26: SOUTH CORE: EXHAUST DUCT KEF #3 AT SHAFT.
 * M2.26: NORTH CORE: OA-1 DUCT AT SHAFT.
  
 16) IN ORDER TO EXPEDITE THE REVIEW OF THE SUBMITTED AC
 CALCULATIONS FOR THE APARTMENTS, PLEASE LABEL THE
 APARTMENT NUMBERS AND ZONES ON THE ENLARGED MECHANICAL
 FLOOR PLANS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2016-12-21 Cont ID  
Sent By ccole Date 2016-12-21 Time 17:47 Rev Time 0.00
Received By ccole Date 2016-12-20 Time 11:31 Sent To  
Notes
2016-12-21 17:48:243RD REVIEW FBC-2014 MECHANICAL
 PERMIT #15111020
 12/20/16
  
 1) ALL SUBMITTED ENGINEERED MECHANICAL PLANS,
 DOCUMENTS, AND CALCULATIONS SHALL BEAR THE ELECTRONIC
 SEAL AND SIGNATURE OF THE ENGINEER OF RECORD- SECTION
 471.025 F.S. AND SECTION 61G15-23.005 FLORIDA
 ADMINISTRATIVE CODE. CURRENTLY NONE OF THE UPLOADED
 PLANS, DOCUMENTS, OR CALCULATIONS ARE IN COMPLIANCE.
  
 2) THE FOLLOWING SHEETS DO NOT BEAR THE TITLE BLOCK OF
 THE APPARENT ENGINEER OF RECORD- EDWARDS & ZUCK: SHEETS
 M2.54E, M2.54F, M4.01- M4.05, & M5.01- M5.03, & M6.01.
  
 3) 3RD REQUEST FOR THE ENERGYGAUGE SUBMITTAL TO BE
 CORRECTED TO MATCH THE EQUIPMENT SCHEDULES- 3RD REQUEST
 TO COMPLY. REFER BACK TO 1ST REVIEW COMMENT #1
  
 4) 3RD REQUEST FOR AC COOLING AND HEATING CALCULATIONS.
 REFER BACK TO 1ST REVIEW COMMENT #2
  
 5) SHEET M2.0P1 & M2.0P2: PLACE A NOTE ON THE PLANS
 REFERENCING SHEET M5-07 FOR CONTROLS OPERATIONS FOR THE
 GARAGE EXHAUST FANS. REVISE THE NOTES ON M5-07 TO SHOW
 A CONTINUOUS MINIMUM EXHAUST RATE OF .05 CFM PER
 SQ.FT.- SECTION 404.2
  
 6) M2.0P1 & M6.02: THE NOTES IN THE FAN SCHEDULE
 INDICATE THE GARAGE EXHAUST FANS ARE NOT HIGH WIND
 RATED.
  
 7) M2.0P2 & M6.02: PGEF-P2- 1C & 1D LISTED IN THE
 EXHAUST CALCULATIONS ARE NOT IN THE SCHEDULE.
 PGEF-P2-1A & 1B DO NOT HAVE LARGE ENOUGH CAPACITY TO
 EXHAUST THE REQUIRED 38,790 CFMS OF EXHAUST.
  
 8) M2.01: VERIFY WITH NOTES ON MEASUREMENTS THE
 SEPARATION DISTANCES BETWEEN THE GENERATOR AND TANK
 ROOM EXHAUST OUTLETS AND THE GENERATOR ROOM AIR INTAKE
 LOUVER. THE ELEVATION DRAWING APPEARS TO INDICATE
 NON-COMPLIANCE- SEE SHEET A3.35.
  
 9) M2.01: IT APPEARS THAT THE DRYER AND IRONER EXHAUST
 DUCTS ARE RUNNING THROUGH AN ABOVE CEILING PLENUM WHICH
 IS PROHIBITED PER SECTION 504.4. PLEASE CLEARLY
 DESIGNATE THE LOCATIONS OF ABOVE CEILING PLENUMS.
  
 10) M2.01: IT APPEARS MOTORIZED DAMPERS ARE MISSING FOR
 THE O/A SUPPLY TO THE GUESTROOMS.
  
 11) M5.04 & M6.02: REFER TO THE SUMMARY TABLE ON PAGE
 26 OF THE SMOKE CONTROL RATIONAL ANALYSIS. THE
 LOCATIONS OF THE STAIRWELL PRESSURIZATIONS FANS AND FAN
 CAPACITIES SPECIFIED IN THE UPDATED REPORT DIFFER FROM
 THE SPECIFICATIONS IN THE DRAWINGS AND THE SCHEDULE. A)
 THE NOTES IN THE SCHEDULE INDICATE THE STAIRWELL AND
 ELEVATOR PRESSURIZATION FANS ARE NOT HIGH-WIND RATED,
 AND NOT UL LISTED FOR SMOKE CONTROL.
  
 12) M5.04: ALL OF THE PRINTED NOTES AND LABELS ON THE
 PLAN ARE BARELY LEGIBLE AND NEED TO BE EMBOLDENED. THE
 LETTERS "N.C." ARE SHOWN AT EACH HORIZONTAL SHAFT
 OPENING. PLEASE CLARIFY WHAT THOSE LETTERS STAND FOR.
  
 13) M6.02 FAN SCHEDULE: THE NOTES IN THE REMARKS COLUMN
 ARE CONFUSING FOR THE TEF'S AND THE KEF'S. SOME OF THE
 TEF'S ON THE ROOF HAVE NOAS AND SOME DON'T. AND HOW CAN
 A TEF AND A KEF HAVE THE SAME NOA NUMBER? PLEASE NOTE
 NOA#14-0325-06 LISTED IN THE NOTES WAS NOT FOUND ON THE
 MIAMI-DADE PRODUCT CONTROL WEBSITE.
  
 14) A5.28: THE GARAGE EXHAUST FAN OUTLETS CANNOT BE
 LOCATED OVER STAIRWELL #9 PLATFORM AND STAIRS- SEE
 SECTIONS 501.3, 501.3.1(10) & 501.3.1.1.
  
 15) M5.05 & M5.06: PLEASE CIRCLE OR HIGHLIGHT THE
 LOCATION OF OAU-3 IN THE CONDENSER WATER RISER DRAWING.
  
 16) M2.01: IN REFERENCE TO COMMENT #28 FROM THE 2ND
 REVIEW, THE PLAN STILL APPEARS TO INDICATE HP-1L-5 AND
 HP-1L-6 ARE SHARING A COMMON PLENUM WHICH WOULD REQUIRE
 A SMOKE DETECTOR. I AM NOT SEEING A DUCTED RETURN FROM
 THE CONFERENCE ROOM AS STATED IN THE NARRATIVE.
  
 17) M2.01: COMMENT #29 FROM THE 2ND REVIEW STILL
 EXISTS: PROVIDE COMBUSTION AIR CALCULATIONS FOR THE
 DRYERS AND IRONER- SEE SECTION 304 FBC-14 FUEL GAS. A)
 SEE PREVIOUS COMMENT #9.
  
 18) M2.01: PROVIDE AIR BALANCE CALCULATIONS FOR THE
 LAUNDRY AND MANICURE ROOMS.
  
 19) M2.01: TELECOM HP NOT LABELED AS REQUESTED.
  
 20) M2.01: COMMENT #35 FROM THE 2ND REVIEW STILL
 EXISTS- PLEASE COMPLY.
  
 21) M2.01: DEMAND CONTROLLED VENTILATION IS REQUIRED
 FOR THE CLUB DINING ROOM- SECTION 503.2.1 FBC-10 ENERGY
 CONSERVATION. INDICATE A MEANS ON THE PLANS.
  
 22) M2.02: AS PREVIOUSLY REQUESTED LABEL THE EXHAUST
 FANS IN THE WOMEN'S AMENITY AREA.
  
 23) M2.02: PLEASE CLEARLY DESIGNATE ON THE PLAN THE
 LOCATIONS OF ALL ABOVE CEILING PLENUM SPACES.
  
 24) M2.02 & A6.87: REFER TO SECTION 602.2 & 606.2.1 AND
 VERIFY THE LIGHT COVES BEING USED AS RETURN GRILLS ARE
 IN COMPLIANCE.
  
 25) M2.03 AND ALL OTHER PLAN SHEETS SHOWING CHILLED
 WATER PIPING: IDENTIFY ALL HP UNITS BEING SERVICED BY
 THE PIPING ON EACH FLOOR.
  
 26) M2.23: THE DUCTWORK IS NOT SHOWN IN THE NORTH CORE.
  
 27) M2.5B: PROVIDE A NOTE OR DETAIL SHOWING THE 2HR.
 RATED SOFFIT ENCLOSING THE RETURN DUCT IN THE NORTH
 STAIR TOWER, AND PROVIDE FS DAMPERS AT RATED WALL
 PENETRATIONS.
  
 28) BASED ON THE RESPPONSES TO THE COMMENTS THERE WILL
 BE MANY DEFERRED SUBMITTALS FOR THE PROPOSED PROJECT.
 PLESASE REVIEW THE FOLLWOING SECTIONS FROM THE WPB
 AMENDMENTS TO THE FLORIDA BUILDING CODE.
  
 1) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
  
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 2) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT
 APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE
 DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
  
 THE CURRENT LIST OF DEFERRED SUBMITTALS BASED ON
 COMMENT RESPONSES ARE:
 A) STRUCTURAL DETAILS AND WIND LOAD ENGINEERING FOR ALL
 ROOFTOP AND EXTERIOR MECHANICAL EQUIPMENT AND
 COMPONENTS INCLUDUNG THE COOLING TOWER, THE DOA UNITS,
 THE FANS AND FAN CURBS, LOUVERS, ETC.
 B) STRUCTURAL DRAWINGS AND DETAILS FOR THE COOLING
 TOWER ACCESS PLATFORM AND LADDER.
 C) MANUFACTURER'S SPECIFICATIONS FOR THE COOLING TOWER,
 CHILLED WATER PIPING INSULATION, SMOKE CONTROL AND
 PRESSURIZATION FANS, BOILER AND BOILER VENTING, THE
 HEAT EXHANGERS, FLAMEBAR DUCT, FS DAMPERS, O/A
 MOTORIZED DAMPERS, CO DETECTORS, AND FIRESTOPPING
 SEALERS AND CAULKS.
 D) ACCESS PANELS FOR ABOVE CEILNG HP'S
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2016-08-19 Cont ID  
Sent By ccole Date 2016-08-19 Time 15:59 Rev Time 0.00
Received By ccole Date 2016-08-11 Time 14:42 Sent To  
Notes
2016-08-19 16:03:502ND REVIEW FBC-2014 MECHANICAL
 PERMIT #15111020
 8/8/16
  
 THIS SECOND REVIEW OF THE PLANS WILL REFERENCE COMMENTS
 FROM THE 1ST REVIEW THAT EITHER STILL EXIST, OR HAVE
 BEEN PARTIALLY RESOLVED. PLEASE NOTE THAT A
 PRE-SUBMITTAL MEETING WAS HELD ON JUNE 20TH MEETING
 HERE AT THE WPB BUILDING DEPARTMENT WHICH I ATTENDED.
 AT THAT MEETING THE DESIGN TEAM FOR THE PROJECT
 REVIEWED THE 1ST REVIEW MECHANICAL COMMENTS IN ENTIRETY
 AND CONCLUDED THAT ALL ISSUES WOULD BE RESOLVED ON THE
 SECOND SUBMITTAL.
  
  
 1 ) COMMENT #1 INCLUDING SUB-COMMENTS 1-A THROUGH 1-I
 STILL EXIST. ALTHOUGH THE NARRATIVE RESPONSE STATES
 THAT THESE ISSUES HAVE BEEN ADDRESSED, THE CORRECTED
 DOCUMENTS AND PLANS WERE NOT SUBMITTED.
  
 2) COMMENT # 2A STILL EXISTS. PROVIDE THE AC COOLING
 AND HEATING CALCULATIONS FOR THE SYSTEMS. COMMENT #2B
 HAS BEEN PARTIALLY ADDRESSED BUT MANY OF THE REQUESTED
 VENTILATION CALCULATIONS HAVE NOT BEEN PROVIDED- SEE
 ADDITIONAL COMMENTS BELOW.
  
 3) COMMENT #2C, SHEET M2.0P1: THE REQUESTED EXHAUST
 VENTILATION CALCULATIONS FOR THE P1 PARKING GARAGE
 LEVEL HAVE NOT BEEN PROVIDED. PLEASE CLARIFY HOW MAKEUP
 AIR FOR P1 EXHAUST IS BEING PROVIDED- THE RESPONSE
 NARRATIVE FROM THE DESIGN PROFESSIONALS STATE THAT THE
 PGSF- 1A & 1B SHOWN AT LEVEL P1 ARE MAKEUP AIR FANS FOR
 LEVEL P2 EXHAUST.
 3A) EXHAUST VENTILATION CALCULATIONS FOR THE DOG SPA
 NOT PROVIDED. PLEASE SUBMIT SPECS FOR THE PET DRYER IN
 THE SPA AND PROVIDE EXHAUST DUCT DETAILS (IF
 APPLICABLE).
  
 4) MANY OF THE EXHAUST FANS SHOWN ON THE PLANS DO NOT
 HAVE EQUIPMENT SCHEDULES. PLEASE PROVIDE SCHEDULES FOR
 EF-P1-1, EF-P2-2, EF-P2-3, PEEF-1, PEEF-2, PEEF-3,
 PESF-1, PGEF-P1-E, PGEF-P2-C, AND ANY OTHERS NOT
 CURRENTLY SHOWN IN THE SCHEDULES.
  
 5) COMMENT #2 D, SHEET M2.01: THE EXHAUST CALCULATIONS
 FOR THE GENERATOR AND TANK ROOMS ARE NOT IN COMPLIANCE
 WITH TABLE 403.3 (NOTE 1). PLEASE INDICATE WHICH CODE
 STANDARD WAS USED TO ESTABLISH THE EXHAUST OR ACH
 RATES.
  
 6) COMMENT #2B, SHEET M2.01: THE GUEST SUITE ID NUMBERS
 IN THE O/A SCHEDULE DO NOT MATCH THE SUITE NUMBERS ON
 THE PLANS. CALCULATIONS NOT PROVIDED FOR CLUB DINING,
 SERVICE PANTRY, LOBBY LOUNGE, LOUNGE 2, ENTRY LOBBY,
 ELEVATOR LOBBIES, MAIL AND STORAGE ROOMS- PLEASE COMPLY
 AS PREVIOUSLY REQUESTED.
  
 7) COMMENT #3 INCLUDING 3A, B, & C STILL EXIST. THE
 INCONSISTENCIES AND CONFLICTS BETWEEN THE MECHANICAL
 PLANS, AND SPECIFICATIONS, AND THE SMOKE CONTROL
 RATIONAL ANALYSIS HAVE NOT BEEN ADDRESSED AND
 CORRECTED. PLEASE COMPLY. SHEET M5.04: NOTE THE AIR
 FLOW DIRECTIONAL ARROWS FOR OAU-1 & 2 ARE POINTING IN
 THE OPPOSITE DIRECTION OF THE FLOW.
  
 8) COMMENT #3D STILL EXISTS AND IS REPRINTED HERE: D)
 SHEETS M2.26, M2.27, M5.05, M-602: THE FOLLOWING LIST
 OF PRESSURIZATION AND SMOKE CONTROL FANS ARE SHOWN IN
 THE SCHEDULE AND RISER BUT NOT SHOWN ON THE 26TH LEVEL
 OR ROOF LEVEL MECHANICAL PLANS: SPF-2, SPF-3, EPF-2,
 EPF-4, AND SEF-1. PLEASE SHOW THE LOCATIONS OF THE FANS
 ON THE ROOF PLANS AND PROVIDE CLEARANCE DISTANCE
 MEASUREMENTS FOR ALL INLETS TO MECHANICAL AND GRAVITY
 EXHAUST OUTLETS. REFER TO SECTION 708.14.2.1 FBC-10
 BUILDING FOR PRESSURIZATION INLET MINIMUM CLEARANCE
 DISTANCES TO EXHAUST OUTLETS.
 9) COMMENT #5 STILL EXISTS. PLEASE PROVIDE THE
 REQUESTED EQUIPMENT SCHEDULES FOR THE TOILET AND
 KITCHEN EXHAUST FANS.
  
 10) COMMENT # 8 STILL EXISTS, SEE DETAIL 2 ON SHEET
 A3.35: IT APPEARS THAT THE OUTLETS FOR THE GARAGE
 EXHAUST FANS PGEF-P2-1A & 1B ARE DIRECTLY OVER STAIR
 #9.
 10 A) SHEETS A3.31- A3.37: PLEASE IDENTIFY AND LABEL
 THE LOCATIONS OF ALL EXHAUST OUTLETS AND AIR INTAKE
 OPENINGS ON LEVELS P1, P2, 1, 2 & 3 AND PROVIDE NOTES
 AND DIMENSIONS ON THE PLANS TO VERIFY COMPLIANCE WITH
 CLEARANCE DISTANCE REQUIREMENTS.
  
 11 COMMENT #9 HAS AN INCOMPLETE RESPONSE. THE FIRE
 RATED ASSEMBLIES ON SHEET A8.31 ARE THE FIGURES
 ASSOCIATED WITH THE ASSEMBLIES, HOWEVER THE PRINTED
 NOTES AND SPECIFICATIONS FOR EACH ASSEMBLY WERE NOT
 INCLUDED.
  
 12) COMMENT #11D STILL EXISTS. AS PREVIOUSLY PLEASE
 SHOW THE LOCATIONS OF THE NITROGEN DIOXIDE DETECTORS ON
 THE PARKING LEVELS.
  
 13) COMMENT #11E STILL EXISTS. THE RESPONSE NARRATIVE
 STATES THAT THE REQUESTED FLAMEBAR SPECIFICATIONS AND
 DRAWINGS ARE FOUND ON SHEET M4.07, HOWEVER THAT PLAN
 SHEET WAS NOT INCLUDED IN THE UPLOADED PLAN SETS.
  
 14) COMMENTS #11G, 11H, 11I, 11J, 11K, 11L, 11M, 11O,
 11Q, & 11P, 11Q, 11R, 11S, 11T, & 11V STILL EXIST:
 REFER BACK TO 1ST REVIEW COMMENTS AND CORRECT THE PLANS
 ACCORDINGLY.
  
 15) COMMENT #12A: REQUESTED EVIDENCE OF FLOOD PROOF
 CONSTRUCTION TO PROTECT MECHANICAL EQUIPMENT NOT
 PROVIDED. THE COMMENT FROM THE 1ST REVIEW IS REPRINTED
 HERE:
 A) SHEET M2.0P2: REFER TO SECTION 301.16 AND PROVIDE
 EVIDENCE TO INDICATE COMPLIANCE FOR MECHANICAL
 EQUIPMENT LOCATED IN A FLOOD HAZARD AREA. SOME OF THE
 EQUIPMENT INCLUDED ARE THE HEAT PUMPS, THE FANS, THE
 DAMPERS, THE DUCTWORK, THE DETECTORS, THE LOUVERS ETC.
 301.16 FLOOD HAZARD.
 FOR STRUCTURES LOCATED IN FLOOD HAZARD AREAS,
 MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES SHALL BE
 LOCATED AT OR ABOVE THE ELEVATION REQUIRED BY SECTION
 1612 OF THE FLORIDA BUILDING CODE, BUILDING FOR
 UTILITIES AND ATTENDANT EQUIPMENT.
 EXCEPTION: MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES
 ARE PERMITTED TO BE LOCATED BELOW THE ELEVATION
 REQUIRED BY SECTION 1612 OF THE OF THE FLORIDA BUILDING
 CODE, BUILDING FOR UTILITIES AND ATTENDANT EQUIPMENT
 PROVIDED THAT THEY ARE DESIGNED AND INSTALLED TO
 PREVENT WATER FROM ENTERING OR ACCUMULATING WITHIN THE
 COMPONENTS AND TO RESIST HYDROSTATIC AND HYDRODYNAMIC
 LOADS AND STRESSES, INCLUDING THE EFFECTS OF BUOYANCY,
 DURING THE OCCURRENCE OF FLOODING UP TO SUCH ELEVATION.
  
 16) COMMENT #12D, 12F, 12G, 12H STILL EXIST. REFER BACK
 TO 1ST REVIEW COMMENTS AND CORRECT THE PLANS
 ACCORDINGLY.
  
 17) COMMENT #12I STILL EXISTS: THE REQUESTED LOUVER
 IDENTIFICATIONS AND CLEARANCES NOT SHOWN AS INDICATED
 IN THE RESPONSE NARRATIVE.
 18) COMMENT #12J STILL EXISTS: DUCT FIRESTOPPING DETAIL
 AT MEMBRANE PENETRATION NOT PROVIDED. PLEASE NOTE THAT
 THE FLAMEBAR INSTALLATION DETAILS AND FIRESTOPPING
 ASSEMBLIES HAVE NOT BEEN SUBMITTED.
  
 19) COMMENT #12K STILL EXISTS: FAN SCHEDULE AND
 CLEARANCE HEIGHTS FOR THE GARAGE CIRCULATION FANS NOT
 PROVIDED.
  
 20) COMMENT #12L STILL EXISTS: DUCT CLEARANCE HEIGHTS
 IN THE PARKING GARAGES NOT PROVIDED.
  
 21) COMMENTS #12N & 12O STILL EXIST: NO CORRECTIONS OR
 UPDATES TO THE PLAN SHEETS HAVE BEEN MADE IN REGARD TO
 THESE COMMENTS.
  
 22 ) COMMENT #13B: THE NOTE REGARDING TRANSFER TIME
 FULL STANDBY POWER FOR THE GENERATOR HAS NOT BEEN ADDED
 TO THE RATIONAL ANALYSIS AS INDICATED IN THE NARRATIVE.
 PLEASE INDICATE ON WHICH ELECTRICAL PAGE THE EQUIPMENT
 SCHEDULE FOR THE GENERATOR CAN BE FOUND, AND AS
 PREVIOUSLY REQUESTED, PROVIDE THE MANUFACTURER?S
 SPECIFICATIONS FOR THE GENERATOR AND FUEL TANK.
  
 23) COMMENTS 13C, 13D, & 13E: SEE SHEET A3.36 (AS
 INDICATED IN THE RESPONSE NARRATIVE) AND LABEL THE
 GENERATOR AND TANK ROOM AIR INLETS AND EXHAUST OUTLETS.
  
 24) COMMENT #13F STILL EXISTS: THE RESPONSE NARRATIVE
 STATES "SEE PLUMBING DRAWINGS". PLEASE INDICATE WHICH
 PLUMBING PLAN SHEET THE PIPING DIAGRAMS AND
 SPECIFICATIONS FOR THE GENERATOR AND FUEL TANK CAN BE
 FOUND.
  
 25) COMMENTS #13G, 13H, & 13I STILL EXIST: AS STATED IN
 THE NARRATIVE PLEASE SHOW AND LABEL THE LOCATIONS OF
 THE AIR INLETS AND EXHAUST OUTLETS IN QUESTION- REFER
 TO 1ST REVIEW COMMENTS.
  
 26) COMMENT #13J1 STILL EXISTS: SOME OF THE REQUESTED
 DETAILS AND PLAN VIEWS OF THE MANICURE AND PEDICURE
 EXHAUST SYSTEMS WERE FOUND ON SHEET M4.06. PLEASE ADD
 THIS INFORMATION TO THE DRAWINGS: A) TYPE OF EXHAUST
 DUCTWORK. B) SEQUENCE OF OPERATION FOR THE EXHAUST
 SYSTEM.
  
 27) COMMENT #13J2 STILL EXISTS: NAIL SALON EXHAUST FAN
 EQUIPMENT SCHEDULE NOT PROVIDED.
  
 28 ) COMMENT #13J3 STILL EXISTS: RECIRCULATION OF AIR
 FROM THE HAIR DRESSING AND NAIL SALON TO THE CONFERENCE
 ROOM IS PROHIBITED- HP-1L-5 & HP-1L6 ARE SHARING A
 COMMON PLENUM. THE REQUIRED SMOKE DETECTOR HAS NOT BEEN
 PROVIDED AND SHOWN IN THE PLENUM.
  
 29) SHEET M2.01: THE 8 IN. FLEX DUCTS IN THE SALON
 SUPPLYING 400 CFMS OF AIR ARE UNDERSIZED. PLEASE REVIEW
 ALL FLEX DUCT SIZES FOR COMPLIANCE WITH ASHRAE SIZING
 STANDARDS.
  
 30) COMMENTS #13K1-7 STILL EXIST. SHEET M2.01: THE FIRE
 DAMPER SYMBOL AT THE SHAFT WAS NOT PLACED ON THE PLAN.
 M4.06: THE INFORMATION PROVIDED IN THE NARRATIVE
 RESPONSE SHOULD BE ADDED TO THE EXHAUST DETAILS. SEE
 SECTION 504.8 FOR ADDITIONAL COMPLIANCES AND REVISE THE
 DETAIL TO INDICATE COMPLIANCE FPR: GAUGE OF EXHAUST
 DUCT STEEL, LOCATION OF THE EXHAUST FAN MOTOR
 (EF-GL-1), CONTINUOUS EXHAUST OPERATION AND CONNECTION
 TO STANDBY POWER, LINKAGE TO MAKEUP AIR SOURCE,
 LOCATION AND DETAILS FOR REQUIRED CLEANOUT.
  
 31) SHEET M4.06: A B-VENT IS SHOWN FOR THE IRONER
 EXHAUST. CLARIFY IF THE IRONER AND DRYERS ARE GAS-FIRED
 AND PROVIDE COMBUSTION AIR CALCULATIONS, AND INDICATE
 HOW THE COMBUSTION AIR IS TO BE PROVIDED IF APPLICABLE-
 SEE SECTION 304 FBC-10 FUEL GAS. REFER TO TABLE
 504.2(1) AND PROVIDE COMPLETE VENTING DIAGRAMS, AND AS
 PREVIOUSLY REQUESTED, PROVIDE MANUFACTURER?S
 SPECIFICATIONS FOR THE APPLIANCES, INCLUDING
 MANUFACTURER?S GUIDELINES FOR VENTING.
  
 32) COMMENT 13L STILL EXISTS: EXHAUST SYSTEM FOR THE
 SOUTH CORE TRASH ROOM NOT PROVIDED. A) THERE IS A
 MISSING FIRE DAMPERS FOR THE 10"X6" DUCT PENETRATING
 THE FIRE-RATED TRASH/STORAGE ROOM WALL.
  
 33) COMMENT #13N STILL EXISTS: LABEL THE HEAT PUMPS IN
 THE PACKAGE ROOM AND THE TEL/ELEC ROOMS AND INCLUDE
 THEM IN THE SCHEDULES. MECHANICAL CLOSET AND PLENUM
 DETAILS NOT PROVIDED AS REQUESTED.
  
 34) COMMENT #13O STILL EXISTS- REFER TO 1ST REVIEW
 COMMENT.
  
 35 ) COMMENTS #13Q, 13R, & 13S STILL EXIST- REFER TO
 1ST REVIEW COMMENTS. PLEASE NOTE: IN REGARD TO 13R,
 ACCESS PANELS SHALL BE PROVIDED FOR ALL MECHANICAL
 EQUIPMENT AND APPLIANCES THAT ARE LOCATED ABOVE HARD
 CEILINGS. REVISE THE PLANS TO SHOW THE LOCATIONS OF
 REQUIRED PANELS AND PROVIDE ARCHITECTURAL AND
 INSTALLATION DETAILS.
  
 36) COMMENT #13T, SHEET M2.01: IT APPEARS THAT O/A IS
 NOW BEING PROVIDED MECHANICALLY TO THE GUEST SUITES,
 HOWEVER THE NARRATIVE IS STATING THAT NATURAL
 VENTILATION WILL BE PROVIDED THROUGH OPERABLE OPENINGS-
 SEE MECHANICAL DRAWINGS.
  
 37) COMMENT #13U, SHEET M2.01: THE RESPONSE NARRATIVE
 INDICATES ACCESS FOR MAINTENANCE OF THE HP-1 UNITS IN
 THE GUEST SUITES WILL BE THROUGH THE RETURN GRILLS.
 PROVIDE THE DIMENSIONS OF THE GRILLS AND VERIFY THEY
 WILL BE SIZED LARGE ENOUGH TO REPLACE THE UNITS- SEE
 SECTION 306.1. AS PREVIOUSLY REQUESTED IN THE 1ST
 REVIEW, PROVIDE AN ENLARGED DETAIL OF THE HP CLOSET.
  
 38) COMMENT #14A STILL EXISTS: LABEL THE AIR INTAKE AND
 EXHAUST OUTLET OPENINGS ON THE ARCHITECTURAL
 ELEVATIONS.
  
 39) COMMENT #14H STILL EXISTS: PROVIDE AN EXHAUST
 SYSTEM FOR THE TRASH ROOM AND THE JANITOR'S CLOSET-
 TABLE 6-4 ASHRAE 62.1-2007.
  
 40) COMMENT #14K STILL EXISTS: FIRE DAMPERS ARE MISSING
 FOR THE 26?X12? SUPPLY AND RETURN DUCTS OF HP-2L-3. THE
 RESPONSE NARRATIVE IS CLAIMING AN EXCEPTION PER SECTION
 716.5.2 FBC-10 BUILDING. PLEASE INDICATE WHICH OF THE
 THREE EXCEPTIONS LISTED IN THE SECTION IS BEING CLAIMED
 AND PLACE NOTES ON THE PLAN TO CLARIFY.
  
 41) COMMENT #14L STILL EXISTS: SEE COMMENT #37 ABOVE
 FOR COMPLIANCE INFORMATION.
  
 42) COMMENT #14M FROM THE 1ST REVIEW WAS ?ADVISORY?
 PENDING BUILDING REVIEW REGARDING THE 2-STORY ATRIUM AT
 THE LOBBY.
  
 43) SHEET M2.02: PROVIDE AIR BALANCE CALCULATIONS
  
 44) M2.02: PROVIDE EQUIPMENT SCHEDULES FOR THE VARIOUS
 UNLABELED (EF) EXHAUST FANS SERVING THE MEN'S AND
 WOMEN'S BATH AND LOCKER ROOMS IN THE SOUTH CORE.
  
 45) M2.02: SHOW THE RETURN SYSTEM IN THE MASSAGE ROOM.
  
 46) M2.02: PROVIDE A MOTORIZED DAMPER FOR THE O/A DUCT
 TO HP-2L-1.
  
 47) M2.02: PROVIDE A DETAIL FOR THE RETURN AIR THROUGH
 THE CEILING COVES, AND INDICATE THE RETURN AIR CFM
 CAPACITIES OF THE DEVICES- SEE NOTE #2.
  
 48) COMMENTS #15 STILL EXISTS: AS DIRECTED BY THE
 RESPONSE NARRATIVE, I REVIEWED SHEET M2.53A, HOWEVER
 THE DUCT LAYOUT PLANS APPEAR INCOMPLETE WITH MANY OF
 THE DUCT SIZES IN THE CORE AND THE SUITES NOT SHOWN AND
 DIFFUSERS AND OTHER COMPONENTS NOT IDENTIFIED OR TAGGED
 PROPERLY. ADDITIONALLY THERE IS AN UNIDENTIFIED DUCT
 FROM THE NORTH CORE SHAFT THAT APPEARS TO BE CONVEYING
 O/A INTO THE CORRIDOR AND AIR INTO THE GUEST SUITE 11-1
 BATH. THIS DOES NOT MATCH THE REVISE O/A SYSTEM SHOWN
 ON M2.02. A) PLEASE CLARIFY WHY CONDENSER WATER PIPING
 IS SHOWN ON THIS RCP PLAN. TYPICALLY THE PIPING LAYOUTS
 AND DETAIL ARE PLACED ON MECHANICAL PIPING PLAN SHEETS.
  
 49) COMMENTS #16- 19 STILL EXIST FOR SHEETS M2.03,
 M2.05, M2.17, M2.18, M2.20, M2.21, M2.22, M2.23, M2.24,
 & M2.25 ALL OF THESE PLAN SHEETS HAVE INCOMPLETE DUCT
 LAYOUT PLANS IN THE NORTH AND SOUTH CORES, AND ONLY
 PROVIDE RCP FOR THE RESIDENTIAL AREAS. THE NARRATIVE
 STATES THAT THE DETAILS ARE FOUND ON THE ENLARGED
 SHEETS, HOWEVER THE CORE LAYOUTS ON THESE SHEETS ARE
 ALSO INCOMPLETE. PLEASE REVIEW AND REVISE. PLEASE NOTE
 THAT SOME SHEETS HAVE WATER PIPING DETAILS WHICH, AS
 STATED BEFORE, SHOULD BE ON SEPARATE MECHANICAL SHEETS.
  
 50) COMMENTS #20A, 20B, & 20C REGARDING THE BOILER
 INSTALLATION AND VENTING ARE RESERVED PENDING SUBMITTAL
 OF MANUFACTURER'S SPECIFICATIONS WITH APPROVAL
 SIGNATURE BY THE EOR.
  
 51) COMMENT #20D IS RESERVED PENDING APPROVED
 SUBMITTALS.
  
 52 ) COMMENT #20E STILL EXISTS: THE NARRATIVE
 REFERENCES SHEET M4.01 FOR THE REQUESTED DETAILS
 HOWEVER THE DETAILS ARE SHOWN ARE INCOMPLETE. PLEASE
 PROVIDE THE CLEARANCE HEIGHT ABOVE THE ROOF SURFACE TO
 THE BOTTOM OF THE COOLING TOWER- SEE DETAIL (4/S5.31)
 AND PROVIDE THE DIMENSION. PLEASE NOTE THAT SHEET
  
 53 ) COMMENT #20F STILL EXISTS. AS NOTED IN THE DETAILS
 ON SHEET M4.01, PROVIDE COMPLETE ENGINEERED PLANS AND
 DETAILS FOR INSTALLATION OF ALL ROOFTOP MECHANICAL
 EQUIPMENT AND SUPPORTS.
  
 54) COMMENT #20G IS RESERVED PENDING FURTHER
 INFORMATION AND PLAN REVISIONS.
  
 55) SHEET M5.03: PLEASE REVIEW THE FOLLOWING LIST OF
 MECHANICAL CODE COMPLIANCES FOR THE DRYER EXHAUST:
  
 504.8 COMMON EXHAUST SYSTEMS FOR CLOTHES DRYERS LOCATED
 IN MULTISTORY STRUCTURES.
 WHERE A COMMON MULTISTORY DUCT SYSTEM IS DESIGNED AND
 INSTALLED TO CONVEY EXHAUST FROM MULTIPLE CLOTHES
 DRYERS, THE CONSTRUCTION OF THE SYSTEM SHALL BE IN
 ACCORDANCE WITH ALL OF THE FOLLOWING:
  
 1. THE SHAFT IN WHICH THE DUCT IS INSTALLED SHALL BE
 CONSTRUCTED AND FIRE-RESISTANCE RATED AS REQUIRED BY
 THE FLORIDA BUILDING CODE, BUILDING.
  
 2. DAMPERS SHALL BE PROHIBITED IN THE EXHAUST DUCT.
 PENETRATIONS OF THE SHAFT AND DUCTWORK SHALL BE
 PROTECTED IN ACCORDANCE WITH SECTION 607.5.5, EXCEPTION
 2.
  
 3. RIGID METAL DUCTWORK SHALL BE INSTALLED WITHIN THE
 SHAFT TO CONVEY THE EXHAUST. THE DUCTWORK SHALL BE
 CONSTRUCTED OF SHEET STEEL HAVING A MINIMUM THICKNESS
 OF 0.0187 INCH (0.4712 MM) (NO. 26 GAGE) AND IN
 ACCORDANCE WITH SMACNA DUCT CONSTRUCTION STANDARDS.
  
 4. THE DUCTWORK WITHIN THE SHAFT SHALL BE DESIGNED AND
 INSTALLED WITHOUT OFFSETS.
  
 5. THE EXHAUST FAN MOTOR DESIGN SHALL BE IN ACCORDANCE
 WITH SECTION 503.2.
  
 6. THE EXHAUST FAN MOTOR SHALL BE LOCATED OUTSIDE OF
 THE AIRSTREAM.
  
 7. THE EXHAUST FAN SHALL RUN CONTINUOUSLY, AND SHALL BE
 CONNECTED TO A STANDBY POWER SOURCE.
  
 8. EXHAUST FAN OPERATION SHALL BE MONITORED IN AN
 APPROVED LOCATION AND SHALL INITIATE AN AUDIBLE OR
 VISUAL SIGNAL WHEN THE FAN IS NOT IN OPERATION.
  
 9. MAKEUP AIR SHALL BE PROVIDED FOR THE EXHAUST SYSTEM.
  
 10. A CLEANOUT OPENING SHALL BE LOCATED AT THE BASE OF
 THE SHAFT TO PROVIDE ACCESSTO THE DUCT TO ALLOW FOR
 CLEANING AND INSPECTION. THE FINISHED OPENING SHALL BE
 NOT LESS THAN 12 INCHES BY 12 INCHES (305 MM BY 305
 MM).
  
 11. SCREENS SHALL NOT BE INSTALLED AT THE TERMINATION.
  
 12. THE COMMON MULTISTORY DUCT SYSTEM SHALL SERVE ONLY
 CLOTHES DRYERS AND SHALL BE INDEPENDENT OF OTHER
 EXHAUST SYSTEMS.
  
 PROVIDE NOTES AND DETAILS ON THE PLANS TO INDICATE
 COMPLIANCE WITH ALL REQUIREMENTS. A) SHOW THE LOCATION
 OF THE DRYER EXHAUST SHAFT MAKE UP AIR DUCTS AND
 DAMPERS ON THE MECHANICAL FLOOR PLANS. PROVIDE
 CALCULATIONS.
  
 56) SHEET M5.07 SHOWS CT-01 AND CT-2, HOWEVER THE
 COOLING TOWER IS INDICATED AS CT-1 ON ALL OTHER SHEETS-
 PLEASE CLARIFY.
  
 57) M2.54A: THE 30"X10" DUCT CANNOT PENETRATE INTO
 STAIR #3- SECTION 1022.4 FBC-10 BUILDING A) LABEL ALL
 THE EXHAUST FAN CHASES. B) SHOW ALL COMPONENTS OF THE
 RETURN AIR SYSTEMS AND PROVIDE DETAILS B) CLARIFY HOW
 THE UNITS WILL BE VENTILATED- NATURALLY OR MECHANICALLY
 AND PROVIDE DETAILS AND CALCULATIONS. C) PROVIDE AN AIR
 DEVICE SCHEDULE D) INDICATE HOW ACCESS FOR SERVICE AND
 REPLACEMENT OF THE HP UNITS WILL BE PROVIDED. E) SHOW
 ALL DUCT DIMENSIONS IN THE NORTH CORE. F) INDICATE HOW
 THE TEL/ELEC ROOMS WILL BE VENTILATED.
  
 58) M2.54B: THE 18"X10" RETURN DUCT TO HP-F CANNOT
 PENETRATE INTO STAIR #1- SECTION 1022.4 FBC-10 BUILDING
 A) LABEL ALL THE EXHAUST FAN CHASES. B) SHOW ALL
 COMPONENTS OF THE RETURN AIR SYSTEMS AND PROVIDE
 DETAILS B) CLARIFY HOW THE UNITS WILL BE VENTILATED-
 NATURALLY OR MECHANICALLY, AND PROVIDE DETAILS AND
 CALCULATIONS. C) PROVIDE AN AIR DEVICE SCHEDULE D)
 INDICATE HOW ACCESS FOR SERVICE AND REPLACEMENT OF THE
 HP UNITS WILL BE PROVIDED. E) SHOW ALL DUCT DIMENSIONS
 IN THE SOUTH CORE. F) INDICATE HOW THE TEL/ELEC ROOMS
 WILL BE VENTILATED.
  
 59) SHEETS M2.55A&B, M2.56A B, M2.56A&B, M2.57A&B,
 M2.58B, M2.59A&B, M2.60B, M2.61A & M2.61A: THE DUCTS
 PENETRATING THE EXIST STAIRWAY ENCLOSURES ARE NOT
 PERMITTED PER SECTION 1022.4 FBC-10 BUILDING. PLEASE
 REVIEW AND REVISE THE PLANS PER COMMENTS #57 & 58 A-F
 PRINTED ABOVE. SHOW ALL DUCT, DIFFUSER, AND RETURN
 GRILL DIMENSIONS AND CFM CAPACITIES.
  
 60) IN ORDER TO EXPEDITE THE REVIEW PROCESS, PLEASE
 OVERLAY THE LIFE SAFETY PLANS ONTO THE MECHANICAL DUCT
 LAYOUT PLANS SO THAT FIRE-RATED AND REQUIRED FD'S AND
 FSD'S ARE READILY IDENTIFIED. IT IS ALSO HELPFUL TO
 PROVIDE ROOM IDENTIFICATIONS ON THE PLANS.
  
 THIS SECOND REVIEW IS CONCLUDED, HOWEVER THERE MAY BE
 ADDITIONAL COMMENTS FOLLOWING RESUBMITTAL OF CORRECTED
 PLANS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2016-02-04 Cont ID  
Sent By ccole Date 2016-02-04 Time 15:13 Rev Time 0.00
Received By ccole Date 2016-01-27 Time 12:10 Sent To  
Notes
2016-02-04 15:14:26 
 1ST REVIEW: FBC 2014 MECHANICAL
 PERMIT # 15111020
 THE BRISTOL
 1/28/16
  
 1) PLEASE COMPARE THE DATA FOR THE AC SYSTEMS LISTED IN
 THE SUBMITTED ENERGY CALCULATION FORM 506-2010 WITH THE
 EQUIPMENT SCHEDULES ON SHEETS M6.01 & M6.02 AND THE
 CONDENSER WATER RISERS SHOWN ON SHEETS M5.05 AND M5.06.
 THE CONFLICTS AND INCONSISTENCIES IN UNIT
 IDENTIFICATIONS AND SIZING ARE TOO NUMEROUS TO LIST IN
 THIS REVIEW BUT HERE ARE SOME OF THE MORE APPARENT
 ISSUES A) THE RISERS INDICATE 191 HEAT PUMPS HOWEVER
 THE TOTAL NUMBER OF HEAT PUMPS LISTED IN THE
 CALCULATIONS IS 39. B) THE RISER DRAWING SHOWS HP 135,
 136, AND 215, WHICH APPEAR TO BE DESIGNATED AS OAU- 1,
 2, & 3 IN THE SCHEDULES AND CALCULATIONS, HOWEVER THE
 CAPACITIES SHOWN FOR THESE UNITS IN THE RISERS DO NOT
 MATCH THE CAPACITIES LISTED IN THE SCHEDULES.
 C) THE CALCULATIONS SHOW 1-TON, 1.25-TON, AND 10-TON
 HEAT PUMPS WHICH ARE NOT SHOWN IN THE WSHP EQUIPMENT
 SCHEDULES ON SHEET M-601. D) OAU #2, AND THE 2.5-TON,
 3-TON, AND 5-TON HEAT PUMPS ARE NOT INCLUDED IN THE
 CALCULATIONS. E) THE AREA CALCULATION ON THE FRONT
 COVER OF THE ENERGY FORM INDICATES 412741 SF, HOWEVER
 THE PERMIT APPLICATION INDICATES 319,010 SF. F) THE
 FORM INDICATES A COOLING CAPACITY OF 183657 BTUH FOR A
 1.5 TON UNIT? G) THE EER'S LISTED IN THE CALCULATIONS
 FOR MANY OF THE SYSTEMS DO NOT MATCH THE EER'S LISTED
 IN THE SCHEDULES. H) NO COMPLIANCE DATA IS LISTED FOR
 THE SUPPLY AND RETURN CONDENSER WATER PIPING AND
 INSULATIONS. I) IT APPEARS THAT THERE ARE ALSO MANY
 CONFLICTS BETWEEN THE CONDENSER PIPING RISERS AND THE
 MECHANICAL LAYOUT PLANS PERTAINING TO UNIT
 IDENTIFICATIONS AND WATER PIPING SIZES NOT MATCHING.
 PLEASE CORRECT ALL OF THE PLANS, RISERS AND
 CALCULATIONS SO THEY MATCH AND PROVIDE A COMPLETE,
 ACCURATE ENERGY SUBMITTAL.
  
 2) CALCULATIONS REQUIRED BUT NOT PROVIDED: A) AC
 COOLING AND HEATING SYSTEM SIZING FOR ALL OF THE HEAT
 PUMPS AND DEDICATED OUTSIDE AIR UNITS- SECTION 503.2.1
 FBC-10 ENERGY CONSERVATION. B) MINIMUM VENTILATION
 CALCULATIONS FOR ALL OCCUPIED ROOMS AND SPACES- TABLE
 403.3 FBC-10 MECHANICAL. PROVIDE A TABLE THAT INDICATES
 THE REQUIRED AND PROVIDED CFM'S OF OUTDOOR AIR. C)
 EXHAUST VENTILATION CALCULATIONS FOR THE PARKING
 GARAGES AND PRIVATE GARAGES- REFER TO SECTION 404 AND
 TABLE 403.1. D) EXHAUST VENTILATION CALCULATIONS FOR
 REQUIRED ROOMS AND AREAS INCLUDING THE TRASH STORAGE,
 NAIL SALON, POOL EQUIPMENT ROOMS, GENERATOR AND TANK
 ROOMS, ETC.
  
 3) SMOKE CONTROL AND STAIRWELL/ELEVATOR PRESSURIZATION
 PLANS: THERE APPEARS TO BE SOME CONFLICTS AND MISSING
 INFORMATION BETWEEN THE ARCHITECTURAL AND MECHANICAL
 PLANS AND RISERS, AND THE RATIONAL ANALYSIS FROM SLF
 FIRE PROTECTION ENGINEERS. A) THE CAPACITIES AND
 LOCATIONS OF THE STAIRWAY AND ELEVATOR HOIST-WAY
 PRESSURIZATION FANS AS SHOWN ON THE PLANS AND THE
 EQUIPMENT SCHEDULES DIFFER FROM WHAT IS SPECIFIED IN
 THE SMOKE CONTROL ANALYSIS FROM SLS FIRE PROTECTION
 ENGINEERS. THE ANALYSIS SPECIFIES STAIRS #1-4
 PRESSURIZATIONS OF 10,000 CFM AT THE 25TH LEVEL AND
 5000 CFM'S AND THE 1ST LEVEL, HOWEVER THE RISER DRAWING
 ON SHEET M5.04 INDICATES 15,000 CFM FANS AT THE 26TH
 LEVEL FOR STAIRS #1-3, AND 15,000 CFM'S FOR STAIR #4 AT
 THE GROUND FLOOR PARKING LEVEL. THESE CFM CAPACITIES
 CONFLICT WITH THE FAN SCHEDULE ON SHEET M-602 WHICH
 INDICATES 10,000 CFM INLINE FANS FOR STAIRS #1-4. B)
 THE ANALYSIS SPECIFIES 20,000 CFM PRESSURIZATION FOR
 ELEVATOR HOIST-WAYS #1-4 AT THE 25TH LEVEL, HOWEVER THE
 SCHEDULE LISTS THEM AT 15,000 CFM'S, AND THE RISER
 SHOWS CAPACITIES OF 20,000 CFM'S FOR #1 & 2 AND 30,000
 CFM?S FOR #3 & 4. C) SHEET A3.21 SHOWS ELEVATOR
 HOIST-WAYS #2 & 4 TERMINATING AT THE 24TH LEVEL, BUT
 THE RISER DRAWING SHOWS THEM TERMINATING AT THE 26TH
 LEVEL. D) SHEETS M2.26, M2.27, M5.05, M-602: THE
 FOLLOWING LIST OF PRESSURIZATION AND SMOKE CONTROL FANS
 ARE SHOWN IN THE SCHEDULE AND RISER BUT NOT SHOWN ON
 THE 26TH LEVEL OR ROOF LEVEL MECHANICAL PLANS: SPF-2,
 SPF-3, EPF-2, EPF-4, AND SEF-1. PLEASE SHOW THE
 LOCATIONS OF THE FANS ON THE ROOF PLANS AND PROVIDE
 CLEARANCE DISTANCE MEASUREMENTS FOR ALL INLETS TO
 MECHANICAL AND GRAVITY EXHAUST OUTLETS. REFER TO
 SECTION 708.14.2.1 FBC-10 BUILDING FOR PRESSURIZATION
 INLET MINIMUM CLEARANCE DISTANCES TO EXHAUST OUTLETS.
 E) PLEASE NOTE THAT ALL MANUFACTURER?S SPECIFICATIONS
 FOR MECHANICAL EQUIPMENT AND COMPONENTS OF THE SMOKE
 CONTROL SYSTEM ( FANS, DAMPERS, DUCT AND AREA SMOKE
 DETECTORS, AIR INTAKE AND EXHAUST LOUVERS ETC.) SHALL
 BE REVIEWED AND APPROVED BY THE ENGINEER OF RECORD, AND
 SHALL BE PART OF THE SUBMITTAL PACKAGE- REFER TO
 SECTIONS 909.10 - 909-10.5 FBC-10 BUILDING.
  
 4) PROVIDE AIR DEVICE AND AIR DISTRIBUTION SCHEDULES
 FOR ALL COMPONENTS OF THE HVAC AND SMOKE CONTROL
 SYSTEMS- MANY DEVICE SYMBOLS ARE SHOWN ON THE PLANS
 WITH NO SCHEDULE TO REFERENCE.
  
 5) SHEETS M2.26 & M2.27: THE PLANS INDICATE MANY ROOF
 LEVEL TEF'S AND KEF'S. WHERE ARE THE EQUIPMENT
 SCHEDULES FOR THESE FANS?- I AM NOT SEEING THEM ON
 EITHER M-601 OR M-602.
  
 6) PROVIDE A CONDENSATE DISPOSAL RISER AND ALSO PIPING
 DIAGRAMS FOR EACH LEVEL. INDICATE THE TYPES AND SIZES
 OF THE PIPING, PIPING INSULATIONS AND DISCHARGE
 LOCATIONS. PLEASE NOTE THAT SEC. 90-126 WPB CODE OF
 ORDINANCES PROHIBITS CONDENSATE FROM COOLING COILS TO
 BE DISCHARGED INTO THE SANITARY SEWER SYSTEM.
  
 7) AS NUMEROUS MECHANICAL COMPONENTS SUCH AS LOUVERS
 AND EQUIPMENT STANDS SUBJECT TO WIND LOAD ARE SHOWN IN
 THE PLANS PLEASE NOTE THAT FLORIDA PRODUCT APPROVALS
 AND/OR MIAMI-DADE NOA'S MUST BE SUBMITTED WITH REVIEW
 AND APPROVAL SIGNATURES FROM THE EOR. IF ANY OF THESE
 PRODUCTS ARE TO BE SUBMITTED AFTER PERMITTING, PLEASE
 REVIEW THE FOLLOWING SECTIONS FOR THE WPB AMENDMENTS TO
 THE FBC-10 BUILDING: DEFERRED SUBMITTAL: 107.3.4.2
 DEFERRED SUBMITTALS. FOR THE PURPOSES OF THIS SECTION,
 DEFERRED SUBMITTALS ARE DEFINED AS THOSE PORTIONS OF
 THE DESIGN THAT ARE NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL. DOCUMENTS FOR DEFERRED
 SUBMITTAL ITEMS SHALL BE SUBMITTED TO THE REGISTERED
 DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE WHO SHALL
 REVIEW THEM AND FORWARD THEM TO THE BUILDING OFFICIAL
 WITH A NOTATION INDICATING THAT THE DEFERRED SUBMITTAL
 DOCUMENTS HAVE BEEN REVIEWED AND FOUND TO BE IN GENERAL
 CONFORMANCE TO THE DESIGN OF THE BUILDING. THE DEFERRED
 SUBMITTAL ITEMS SHALL NOT BE INSTALLED UNTIL THE
 DEFERRED SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE
 BUILDING OFFICIAL. A)DEFERRED SUBMITTAL. 2010 FBC
 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS WHICH ARE
 REGULATED BY THE DCA RULE 9N-03 SHALL BE REVIEWED AND
 APPROVED IN WRITING BY THE DESIGNER OF RECORD PRIOR TO
 SUBMITTAL FOR JURISDICTIONAL APPROVAL.
  
 8) THE VARIOUS AIR INTAKES AND EXHAUST OUTLETS LOCATED
 ON THE EXTERIOR WALLS OF THE BUILDING MUST BE REVIEWED
 TO MEET COMPLIANCE WITH REQUIRED CLEARANCE DISTANCES AS
 OUTLINED IN SECTION 401.1 AND 501.2.1. PROVIDE CLEAR,
 DIMENSIONED ELEVATION VIEWS OF THE OPENINGS AND NOTES
 IN ORDER TO VERIFY COMPLIANCE.
  
 9) PROVIDE UL TESTED AND APPROVED FIRE-STOPPING
 ASSEMBLIES AND DETAILS FOR ALL DUCTS PENETRATING RATED
 WALLS AND SHAFTS. IF THE DETAILS ARE SHOWN ON A
 ARCHITECTURAL PLAN, PLEASE PROVIDE A NOTE REFERENCING
 THAT PLAN SHEET.
  
 10) PROVIDE A DETAIL FOR A TYPICAL FIRE DAMPER ACCESS
 PANEL, AND SYMBOLS ON THE PLANS TO INDICATE LOCATIONS.
  
 11) SHEET M2.0P1:
 A) THE PLAN SHEET IS LABELED AS BOTH P1 AND P2: PLEASE
 CORRECT.
 B) VERIFY THE AIR INTAKES FOR SPF-4 ARE IN COMPLIANCE
 WITH SECTION 513.10.3. PROVIDE AN ELEVATION VIEW AND
 CLEARANCE DISTANCE MEASUREMENTS.
 C) CLARIFY THE PURPOSES OF THE AIR SUPPLY FANS PGSF-1A
 & 1B AND HOW THEY WERE SIZED. ARE THEY PROVIDING THE
 MAKE-UP AIR FOR THE GARAGE EXHAUST? IF THAT IS THE
 PURPOSE, PLEASE INCLUDE THEM IN THE CONTROL DIAGRAM ON
 SHEET M5.07. PROVIDE AN ELEVATION VIEW AND CLEARANCE
 DISTANCE MEASUREMENTS FOR THE INLETS.
 D) NITROGEN DIOXIDE DETECTORS IN CONJUNCTION WITH
 CARBON MONOXIDE DETECTORS ARE REQUIRED IN THE PARKING
 GARAGE, HOWEVER THE PLAN IS INDICATING ONLY THE CO
 DETECTORS. PLEASE NOTE THAT THE MANUFACTURER'S
 SPECIFICATIONS FOR THE DETECTORS SHALL BE REVIEWED AND
 APPROVED BY THE E.O.R AND BE PART OF THE SUBMITTAL
 PACKAGE. REFER BACK TO COMMENT #2C FOR EXHAUST
 CALCULATION REQUIREMENT.
 E) PROVIDE DUCT CONNECTION, REINFORCEMENT, SEALING, AND
 HANGING DETAILS FOR THE 2HR. FIRE-RATED FLAMEBAR DUCT,
 AND THE OUTSIDE AIR DUCTS IN THE GARAGE. INDICATE THE
 HEIGHTS OF THE DUCTS ABOVE THE FINISHED GARAGE FLOOR.
 PLEASE NOTE MANUFACTURER'S SPECIFICATIONS AND
 INSTALLATIONS FOR THE DUCTWORK MUST BE REVIEWED AND
 APPROVED BY THE E.O.R. AND INCLUDED IN THE SUBMITTAL
 PACKAGE.
 F) PROVIDE SUPPORT AND PROTECTION DETAILS FOR ALL
 EXPOSED PIPING IN THE GARAGE INCLUDING THE CONDENSER
 WATER SUPPLY AND RETURN PIPING, AND THE GENERATOR FUEL
 OIL PIPING. PROVIDE A SUBMITTAL FOR THE PIPE
 INSULATION.
 G) PROVIDE AN ELEVATION VIEW AND CLEARANCE DISTANCE
 MEASUREMENTS FOR THE OUTDOOR AIR INTAKE ON THE NORTH
 SIDE THAT IS SUPPLYING THE CORES- SEE SECTION 401.4.
 H) LABEL THE OUTSIDE AIR INTAKE FOR OAU-3 AND PROVIDE
 CLEARANCE DISTANCE MEASUREMENTS- SECTION 401.4
 I) PROVIDE ELEVATION VIEWS AND CLEARANCE DISTANCE
 MEASUREMENTS FOR THE GARAGE AND TRASH EXHAUST OUTLETS
 ON THE NORTH SIDE- REFER TO SECTION 501.3.1. PLEASE
 INCLUDE THE OUTLETS FOR PGEF-P2-1A & 1B BY THE STAIR #9
 J) SOUTH CORE: LABEL THE SUPPLY AND RETURN CFM'S AT THE
 SUPPLY DIFFUSER AND RETURN GRILLS IN THE FIREMAN'S
 VESTIBULE
 K) SOUTH CORE: PROVIDE AN EXHAUST FAN SCHEDULE FOR
 EF-P2-2.
 L) SOUTH CORE: FIRE AND FIRE/SMOKE DAMPERS MISSING AT
 ALL DUCTS PENETRATING THE EXTERIOR AND INTERIOR
 FIRE-RATED WALLS OF THE CORE.
 M) SOUTH CORE: INDICATE HOW ACCESS FOR SERVICE AND
 REPLACEMENT OF THE HEAT PUMPS ABOVE THE CEILING WILL BE
 PROVIDED. SHOW THE LOCATIONS OF THE PANELS AND
 CONSTRUCTION DETAILS.
 N) NORTH CORE: NO OUTSIDE AIR DUCT CONNECTIONS TO THE
 HEAT PUMPS INSIDE THE CORE ARE SHOWN IN THE DRAWING.
 O) NORTH CORE: THE SUPPLY AND RETURN DIFFUSERS AND
 GRILLS ARE NOT LABELED AND NO CFM'S ARE SHOWN.
 P) NORTH CORE: FIRE DAMPERS MISSING AT MOST OF THE DUCT
 PENETRATING THE EXTERIOR AND INTERIOR FIRE-RATED WALLS
 OF THE CORE.
 Q) NORTH CORE: INDICATE HOW ACCESS FOR SERVICE AND
 REPLACEMENT OF THE HEAT PUMPS ABOVE THE CEILING WILL BE
 PROVIDED. SHOW THE LOCATIONS OF THE PANELS AND
 CONSTRUCTION DETAILS.
 R) MEP ROOM: FIRE DAMPER MISSING FOR THE 28"X12" DUCT
 PENETRATING THE RATED MEP ROOM WALL.
 S) MEP ROOM: OAU-3 IS A WATER-COOLED UNIT PER THE
 SCHEDULE. INDICATE HOW WATER IS BEING SUPPLIED TO THE
 UNIT.
 T) POOL EQUIPMENT ROOM: IDENTIFY AND LABEL ALL
 EQUIPMENT IN THE ROOM AND PROVIDE SCHEDULES FOR EACH.
 PROVIDE EXHAUST VENTILATION CALCULATIONS FOR THE ROOM,
 FAN SCHEDULES FOR PEEF-1 AND PESF-1 (SHOWN ON THE LOBBY
 1 LEVEL), AND SUBMITTALS FOR THE SUPPLY AND EXHAUST
 DUCTWORK AND FANS REVIEWED AND APPROVED BY THE EOR. SEE
 SECTION 304.3.1 FOR REQUIREMENTS FOR FUEL-FIRED
 APPLIANCES IN THE ROOM.
 U) INDOOR DOG RUN: PROVIDE AN EXHAUST VENTILATION
 SYSTEM IN ACCORDANCE WITH TABLE 403.3. INCLUDE
 CALCULATIONS, FAN SCHEDULES, EXHAUST DUCT RUN DETAILS
 AND TERMINATION LOCATIONS, AND HOW MAKE-UP AIR IS TO BE
 PROVIDED.
 V) PROVIDE EQUIPMENT SCHEDULES FOR THE CIRCULATION FANS
 AND INDICATE THE HEIGHT MEASUREMENTS OF THE FANS FROM
 THE FINISH FLOORS TO THE LOWEST EDGE OF THE FAN- SEE
 SECTION 304.6.
  
 12) SHEET M2.0P2:
 A) REFER TO SECTION 301.16 AND PROVIDE EVIDENCE TO
 INDICATE COMPLIANCE FOR MECHANICAL EQUIPMENT LOCATED IN
 A FLOOD HAZARD AREA. SOME OF THE EQUIPMENT INCLUDED ARE
 THE HEAT PUMPS, THE FANS, THE DAMPERS, THE DUCTWORK,
 THE DETECTORS ETC. 301.16 FLOOD HAZARD.
 FOR STRUCTURES LOCATED IN FLOOD HAZARD AREAS,
 MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES SHALL BE
 LOCATED AT OR ABOVE THE ELEVATION REQUIRED BY SECTION
 1612 OF THE FLORIDA BUILDING CODE, BUILDING FOR
 UTILITIES AND ATTENDANT EQUIPMENT.
 EXCEPTION: MECHANICAL SYSTEMS, EQUIPMENT AND APPLIANCES
 ARE PERMITTED TO BE LOCATED BELOW THE ELEVATION
 REQUIRED BY SECTION 1612 OF THE OF THE FLORIDA BUILDING
 CODE, BUILDING FOR UTILITIES AND ATTENDANT EQUIPMENT
 PROVIDED THAT THEY ARE DESIGNED AND INSTALLED TO
 PREVENT WATER FROM ENTERING OR ACCUMULATING WITHIN THE
 COMPONENTS AND TO RESIST HYDROSTATIC AND HYDRODYNAMIC
 LOADS AND STRESSES, INCLUDING THE EFFECTS OF BUOYANCY,
 DURING THE OCCURRENCE OF FLOODING UP TO SUCH ELEVATION.
 B) GARAGE EXHAUST SYSTEM: CLARIFY HOW THE GARAGE
 EXHAUST VENT OPENING ON THE NORTH SIDE AND THE EXHAUST
 FANS (PGEF-P2-1A & 1B SHOWN ON M2.0P1) WERE SIZED-
 REFER TO COMMENT #2C. PROVIDE THE DIMENSIONS OF THE
 VENT OPENING AND CONSTRUCTION DETAILS.
 C) CLARIFY HOW MAKE-UP AIR IS BEING SUPPLIED FOR THE
 GARAGE EXHAUST.
 D) PGEF-P1-E AT THE LOADING DOCK IS NOT INCLUDED IN THE
 FAN SCHEDULE ON M-602, AND THE EXACT LOCATION OF THE
 FAN IS NOT CLEAR ON THE PLAN. PLEASE CORRECT AND
 PROVIDE EXHAUST VENTILATION CALCULATIONS.
 E) PROVIDE A MEANS OF VENTILATION FOR THE CORRIDORS
 ADJOINING THE PRIVATE GARAGES IN COMPLIANCE WITH
 SECTION 404.3.
 F) NITROGEN DIOXIDE DETECTORS IN CONJUNCTION WITH
 CARBON MONOXIDE DETECTORS ARE REQUIRED IN THE PARKING
 GARAGE, HOWEVER THE PLAN IS INDICATING ONLY THE CO
 DETECTORS. PLEASE NOTE THAT THE MANUFACTURER?S
 SPECIFICATIONS FOR THE DETECTORS SHALL BE REVIEWED AND
 APPROVED BY THE EOR AND BE PART OF THE SUBMITTAL
 PACKAGE. REFER BACK TO COMMENT #2C FOR EXHAUST
 CALCULATION REQUIREMENT.
 G) PROVIDE EQUIPMENT SCHEDULES FOR THE PRIVATE GARAGE
 INLINE FANS AND THE OTHER INLINE FANS SHOWN THROUGHOUT
 THE SPACE. AS PREVIOUSLY NOTED PROVIDE EXHAUST
 VENTILATION CALCULATIONS FOR THE PRIVATE GARAGES.
 H) PROVIDE FIRE DAMPERS FOR THE VENT LOUVERS SHOWN AT
 THE FPL VAULT AND LOADING DOCK WALLS.
 I) A SERIES OF LOUVERS ARE SHOWN ALONG THE SOUTH EAST
 WALLS OF THE LOADING DOCK. HOW WERE THESE OPENINGS
 SIZED AND ARE THEY BELOW THE FLOOD HEIGHT LEVEL.
 PROVIDE AN ELEVATION VIEW THAT SHOWS REQUIRED CLEARANCE
 DISTANCE MEASUREMENTS FOR AIR INTAKE AND EXHAUST.
 SUBMITTALS FOR THE LOUVERS AND DAMPERS REVIEWED AND
 APPROVED BY THE EOR ARE REQUIRED.
 J) PROVIDE A THROUGH UL PENETRATION FIRE-STOPPING
 ASSEMBLY DETAIL FOR THE O/A EXITING THE SHAFT ABOVE.
 PROVIDE NOTES BY THE SHAFT INDICATING WHERE THE SHAFT
 AND FIRE-STOPPING ASSEMBLY DETAILS CAN BE LOCATED IN
 THE ARCHITECTURAL PAGES.
 K) PROVIDE EQUIPMENT SCHEDULES FOR THE CIRCULATION FANS
 AND INDICATE THE HEIGHT MEASUREMENTS OF THE FANS FROM
 THE FINISH FLOORS TO THE LOWEST EDGE OF THE FAN- SEE
 SECTION 304.6.
 L) PROVIDE DUCT CONNECTION, REINFORCEMENT, SEALING, AND
 HANGING DETAILS FOR THE OUTSIDE AIR AND EXHAUST DUCTS
 IN THE GARAGE. INDICATE THE HEIGHTS OF THE DUCTS ABOVE
 THE FINISHED GARAGE FLOOR. PLEASE NOTE MANUFACTURER'S
 SPECIFICATIONS AND INSTALLATIONS FOR THE DUCTWORK MUST
 BE REVIEWED AND APPROVED BY THE E.O.R. AND INCLUDED IN
 THE SUBMITTAL PACKAGE.
 M) PROVIDE SUPPORT AND PROTECTION DETAILS FOR ALL
 EXPOSED PIPING IN THE GARAGE INCLUDING THE CONDENSER
 WATER SUPPLY AND RETURN PIPING. PROVIDE SUBMITTALS FOR
 ALL PIPE INSULATIONS.
 N) SOUTH CORE, NORTH CORE, AND ADJACENT RESIDENT
 STORAGE ROOMS: THE AC LAYOUT PLANS ARE IN- COMPLETE-
 PROVIDE DUCT SIZES, DIFFUSER AND RETURN GRILL SIZES,
 CFM CAPACITIES AT THE DIFFUSERS AND GRILLS, LOCATIONS
 OF REQUIRED FIRE AND FIRE/SMOKE DAMPERS AT DUCT
 PENETRATIONS, CONDENSER WATER PIPE SIZES ETC.
 O) SOUTH CORE, NORTH CORE: INDICATE HOW ACCESS FOR
 SERVICE AND REPLACEMENT OF THE HEAT PUMPS ABOVE THE
 CEILING WILL BE PROVIDED. SHOW THE LOCATIONS OF THE
 PANELS AND CONSTRUCTION DETAILS.
  
 13) SHEET M2.01:
 A) PROVIDE AN ELEVATION VIEW OF THE GENERATOR EXHAUST
 LOUVER INDICATING REQUIRED CLEARANCE DISTANCE
 MEASUREMENTS PER SECTION 501.2.1.
 B) PROVIDE MANUFACTURER'S SPECIFICATIONS FOR THE
 GENERATOR AND FUEL TANK REVIEWED AND APPROVED BY THE
 EOR, AND INCLUDE IN THE REQUIRED SUBMITTAL PACKAGE.
 PLEASE NOTE THAT IN ACCORDANCE WITH SECTION 909.11
 FBC-10 BUILDING, THE TRANSFER TO FULL STANDBY POWER
 SHALL BE AUTOMATIC AND WITHIN 60 SECONDS OF FAILURE OF
 THE PRIMARY POWER SYSTEMS. PLEASE REVIEW AND PROVIDE
 THIS NOTE IN THE RATIONAL ANALYSIS OF THE SMOKE CONTROL
 SYSTEM.
 C) INDICATE THE REQUIRED CLEARANCE DISTANCES FOR THE
 GENERATOR ROOM EXHAUST (501.2.1), SIZING CALCULATIONS
 FOR THE FANS, AND FAN SCHEDULES.
 D) PROVIDE AN ELEVATION VIEW OF THE GENERATOR ROOM
 COMBUSTION AIR LOUVER INDICATING REQUIRED CLEARANCE
 DISTANCE MEASUREMENTS, AND PROVIDE COMBUSTION AIR
 CALCULATIONS. MANUFACTURER'S SPECIFICATIONS FOR THE
 INTAKE LOUVER SHALL BE REVIEWED AND APPROVED BY THE EOR
 AND INCLUDED IN THE SUBMITTAL PACKAGE WITH A FLORIDA
 PRODUCT APPROVAL OR MIAMI-DADE NOA CERTIFYING WIND
 RESISTANCE AND IMPACT PROTECTION.
 E) PROVIDE ELEVATION VIEWS OF THE TANK ROOM AIR INTAKE
 AND EXHAUST OUTLET WITH CLEARANCE DISTANCE
 MEASUREMENTS. PROVIDE SIZING CALCULATIONS FOR THE
 SYSTEM AS PREVIOUSLY NOTED AND A EQUIPMENT SCHEDULE FOR
 THE FAN. PLEASE NOTE MANUFACTURER'S SPECIFICATIONS FOR
 THE TANK SHALL BE REVIEWED AND APPROVED BY THE EOR AND
 INCLUDED IN THE SUBMITTAL PACKAGE.
 F) PROVIDE ENLARGED FUEL PIPING DIAGRAMS FOR THE
 GENERATOR AND TANK.
 G) INDICATE THE CLEARANCE DISTANCE MEASUREMENTS FOR THE
 TWO O/A INTAKE INLETS ON THE EAST WALL ABOVE THE
 LOADING DOCK- SECTION 401.1.
 H) INDICATE THE CLEARANCE DISTANCE MEASUREMENTS FOR THE
 MANI/PEDI EXHAUST OUTLET ON THE EAST WALL- SECTION
 501.2.1.
 I) APPLY COMMENTS G & H ABOVE FOR THE POOL EQUIPMENT
 ROOM VENTILATION INLET AND OUTLET ON THE SOUTH WALL.
 J) NAIL SALON, REFER TO TABLE 403.3 FOOTNOTES B AND H
 PERTAINING TO THE NAIL SALON: 1) INDICATE HOW THE
 CONTAMINANTS AND ODORS FROM THE NAIL POLISHES ARE BEING
 CAPTURED AT THEIR SOURCES- THE MANICURE AND PEDICURE
 STATIONS. ADDITIONAL DETAILS AND PLAN VIEWS ARE
 REQUIRED. 2) PROVIDE AN EXHAUST FAN EQUIPMENT SCHEDULE.
 3) CLARIFY HOW MAKE-UP AIR FOR THE EXHAUST IS BEING
 PROVIDED AND REFER TO SECTION 403.2.1 (3) RECIRCULATION
 OF THE AIR FROM THE SPACE IS PROHIBITED. HOW WILL THAT
 BE ACCOMPLISHED WITH THE ABOVE CEILING PLENUM? PLEASE
 SHOW THE LOCATIONS OF THE RETURN GRILLS. 3) SHOW THE
 SUPPLY CFM?S AT THE DIFFUSER LOCATIONS, AND REFER TO
 SECTION 606.2.2 FOR REQUIRED SMOKE DETECTOR FOR THE
 COMMON PLENUM.
 K) LAUNDRY ROOM: 1) PROVIDE A FD SYMBOL AT THE 28?X12?
 DUCT PENETRATION INTO THE FIRE-RATED SHAFT. 2) THE
 DRYER EXHAUST MUST BE INDEPENDENT AND NOT CONNECTED
 WITH THE IRONER EXHAUST- SEE SECTION- 504.1. AND
 CORRECT. 3) SUBMIT MANUFACTURER?S SPECIFICATIONS FOR
 THE DRYERS AND IRONER WITH REVIEW AND APPROVAL
 SIGNATURES BY THE EOR- SEE SECTION 504.7 AND SHOW THE
 LOCATION OF THE EXHAUST FANS, AND INCLUDE FAN EQUIPMENT
 SCHEDULES (IF APPLICABLE). 4) PROVIDE EXHAUST DUCT
 DETAILS FOR BOTH THE DRYERS AND IRONER INCLUDING THE
 TYPES AND SIZES OF DUCTS, SUPPORT AND HANGING DETAILS-
 SEE SECTIONS 504.6.2, 504.6.4, 504.6.4.2, AND 504.7. 5)
 PROVIDE PLAN AND ELEVATION VIEWS SHOWING DUCT
 CONNECTIONS TO THE APPLIANCES, AND REQUIRED CLEARANCE
 DISTANCES TO COMBUSTIBLES. 6) PROVIDE FIRE-STOPPING
 DETAILS FOR DUCTS PENETRATING RATED WALLS. 7) PLEASE
 NOTE COMMON DRYER EXHAUST DUCTS SHALL RUN CONTINUOUSLY
 OR BE INTERLOCKED TO RUN TOGETHER.
 L) SOUTH CORE: PROVIDE AN EXHAUST SYSTEM FOR THE TRASH
 ROOM PER TABLE 6-4 ASHRAE 62.1-2010. PLEASE INCLUDE
 CALCULATIONS, EXHAUST FAN SCHEDULE, EXHAUST DUCT
 LAYOUT, TERMINATION LOCATION ETC.
 M) SOUTH CORE: SHOW THE EXHAUST DUCT RUNS AND DUCT
 SIZES AT THE MEN'S AND WOMEN'S TOILET ROOMS.
 N) SOUTH CORE: IDENTIFY THE 3.5 TON UNIT IN THE PACKAGE
 ROOM CLOSET. VERIFY A NON-COMBUSTIBLE DOOR WILL BE
 INSTALLED FOR THE CLOSET AND ALL OTHER MECHANICAL
 CLOSETS IN THE BUILDING- SECTION 603.1. SHOW THE
 LOCATION OF THE PLENUM RETURN GRILL AT THE CLOSET, AND
 THE LOCATIONS OF CEILING RETURN GRILLS IN THE LOBBY
 LOUNGE. PLEASE INCLUDE DIMENSIONS AND CFM CAPACITIES
 FOR EACH GRILL.
 O) SOUTH CORE CORRIDOR: THE AC PLAN IS INCOMPLETE.
 P) NORTH CORE: NO AC OR MEANS OF VENTILATION SHOWN IN
 THE TEL/ELEC ROOM.
 Q) NORTH CORE: CLARIFY IF A HP WILL BE INSTALLED FOR
 THE FIREMAN'S VESTIBULE IN THE SAME MANNER ONE IS SHOWN
 FOR THE SOUTH CORE, AN WHAT EQUIPMENT IS TO BE LOCATED
 IN MECH. CL. 127.
 R) NORTH CORRIDOR, LOUNGE 2, CLUB DINING: SHOW THE
 LOCATIONS OF THE VAV BOXES AND PROVIDE EQUIPMENT
 SCHEDULES. INDICATE HOW ACCESS FOR SERVICE AND
 REPLACEMENT FOR THE BOXES ABOVE THE CEILING WILL BE
 PROVIDED. SHOW THE LOCATION OF THE PLENUM RETURN GRILL
 AT THE MECHANICAL CLOSET FOR THE 17.5 T SYSTEM, AND IN
 THE CEILINGS OF THE CLUB DINING, LOUNGE 2, AND CORRIDOR
 105. PLEASE INCLUDE DIMENSIONS AND CFM CAPACITIES FOR
 EACH GRILL.
 S) GUEST SUITE 1-1 IS ALSO LABELED GUEST SUITE 1-2.
 T) GUEST SUITES 1-1, 2-1, 4, & 4-4: INDICATE HOW
 REQUIRED O/A IS BEING SUPPLIED TO THESE SUITES.
 U) GUEST SUITES AC CLOSETS: INDICATE HOW ACCESS FOR
 SERVICE AND REPLACEMENT OF THE HP-1 UNITS IN THE
 CLOSETS WILL BE PROVIDED- THERE ARE NO DOORS SHOWN AT
 THE CLOSETS. PLEASE PROVIDE ENLARGED PLAN VIEWS OF THE
 CLOSETS INDICATED REQUIRED CLEARANCES, THE MEANS OF
 RETURN AIR, PRIMARY AND SECONDARY AND CONDENSATE
 DISPOSAL, AND CONDENSER WATER PIPING DIAGRAMS.
 V) CLUB DINING AND SERVICE PANTRY: CLARIFY IF ANY
 COOKING APPLIANCES WILL BE INSTALLED AND PROVIDE
 DETAILS. PLEASE NOTE, TYPE I OR TYPE II EXHAUST HOODS
 MAY BE REQUIRED.
  
 14) M2.02:
 A) REFER BACK TO COMMENT #8- REQUIRED CLEARANCE
 DISTANCES FOR O/A INTAKES AND EXHAUST OUTLETS, AND SHOW
 COMPLIANCE.
 B) SOUTH: PROVIDE EQUIPMENT SCHEDULES FOR THE SAUNA AND
 STEAM ROOM EXHAUST FANS AND SIZING CALCULATIONS. PLEASE
 NOTE THE EXHAUST IS NOT SHOWN ACCURATELY PLACED IN THE
 WOMEN'S ROOMS, AND NO MAKE-UP AIR IS BEING PROVIDED FOR
 EITHER THE MEN'S OR WOMEN'S ROOMS.
 C) SOUTH: REQUIRED EXHAUST SYSTEMS FOR THE WOMEN'S
 SHOWER AND MEN'S HANDICAP SHOWER NOT SHOWN ON THE PLAN-
 TABLE 403.3
 D) SOUTH: MECHANICAL CLOSETS ON THE EAST AND WEST SIDES
 OF THE CORE BY THE RESTROOMS ARE SHOWN IN THE
 ARCHITECTURAL PLANS- PLEASE IDENTIFY THE CLOSETS ON
 THIS PLAN AND INDICATE WHAT EQUIPMENT IS CONTAINED IN
 THE CLOSETS.
 E) SOUTH: PLEASE SHOW THE LOCATIONS OF ALL RETURN
 GRILLS AT THE MECH CLOSETS AND AT ALL OF THE CEILINGS
 OF THE ROOMS AND THE SPACES. PROVIDE GRILL DIMENSIONS
 AND CFM CAPACITIES.
 F) ATRIUM: PROVIDE THE DIMENSIONS AND CFM CAPACITY OF
 THE RETURN GRILL FOR HP-L2-5.
 G) ATRIUM: SHOW THE REQUIRED DUCT SMOKE DETECTOR IN THE
 SUPPLY PLENUM OF HP-L2-5.
 H) NORTH CORE: PROVIDE AN EXHAUST SYSTEM FOR THE TRASH
 ROOM PER TABLE 6-4 ASHRAE 62.1-2010.
 I) NORTH CORE: PROVIDE VENTILATION FOR THE STORAGE ROOM
 J) NORTH: PLEASE SHOW THE LOCATIONS OF ALL RETURN
 GRILLS AT THE MECH CLOSETS AND AT ALL OF THE CEILINGS
 OF THE ROOMS AND THE SPACES. PROVIDE GRILL DIMENSIONS
 AND CFM CAPACITIES.
 K) FIRE DAMPERS MISSING FOR THE 26"X12" DUCTS
 PENETRATING THE FIRE-RATED MECHANICAL CLOSET WALLS.
 L) NORTH GUEST SUITES: INDICATE HOW REQUIRED O/A IS
 BEING SUPPLIED TO THESE SUITES. INDICATE HOW ACCESS FOR
 SERVICE AND REPLACEMENT OF THE HP-1 UNITS IN THE
 CLOSETS WILL BE PROVIDED- THERE ARE NO DOORS SHOWN AT
 THE CLOSETS. PLEASE PROVIDE ENLARGED PLAN VIEWS OF THE
 CLOSETS INDICATED REQUIRED CLEARANCES, THE MEANS OF
 RETURN AIR, PRIMARY AND SECONDARY AND CONDENSATE
 DISPOSAL, AND CONDENSER WATER PIPING DIAGRAMS.
 M) PLEASE NOTE THAT SUBJECT TO PLAN REVISIONS BASED ON
 STRUCTURAL REVIEW COMMENTS, ADDITIONAL FIRE AND
 FIRE/SMOKE DAMPERS FOR DUCTS MAY BE REQUIRED ON BOTH
 LOBBY LEVEL-1 AND AMENITY LEVEL-2.
  
 15) M2.03: INCOMPLETE RCP PLANS- THE AC DIFFUSERS AND
 GRILLS IN THE ROOMS ARE NOT LABELED AND NO DIMENSIONS
 ARE SHOWN. PLEASE REFER TO COMMENT #14(L) PRINTED ABOVE
 FOR THE GUEST SUITES ON THIS FLOOR. IDENTIFY ALL HP
 UNITS BEING SERVED BY THE SUPPLY AND RETURN WATER
 PIPING. DUCT LAYOUT PLANS FOR THE NORTH AND SOUTH CORES
 NOT SHOWN
  
 16) M2.05: INCOMPLETE RCP PLANS- THE AC DIFFUSERS AND
 GRILLS ARE NOT LABELED IN THE ROOMS AND NO DIMENSIONS
 ARE SHOWN. IDENTIFY ALL HP UNITS BEING SERVED BY THE
 SUPPLY AND RETURN WATER PIPING TAGS SHOWN. F/S DAMPERS
 MISSING AT THE NORTH CORE AC CLOSET AND AT WEST WALL OF
 THE NORTH CORE BY CORRIDOR.
  
 17) M2.17- M2.22: INCOMPLETE RCP PLANS- THE AC
 DIFFUSERS AND GRILLS ARE NOT LABELED IN THE ROOMS AND
 NO DIMENSIONS ARE SHOWN. IDENTIFY ALL HP UNITS BEING
 SERVED BY THE SUPPLY AND RETURN WATER PIPING TAGS
 SHOWN. F/S DAMPERS MISSING AT NORTH AND SOUTH CORES ON
 M2.17- PLEASE CHECK ALL CORES ON ALL PLANS FOR MISSING
 DAMPERS.
  
 18) M2.23: INCOMPLETE RCP PLANS- THE AC DIFFUSERS AND
 GRILLS ARE NOT LABELED IN THE ROOMS AND NO DIMENSIONS
 ARE SHOWN. IDENTIFY ALL HP UNITS BEING SERVED BY THE
 SUPPLY AND RETURN WATER PIPING TAGS SHOWN. THERE IS NO
 FLOOR PLAN LAYOUT FOR THE SOUTH SIDE SHOWING ROOMS AND
 SPACES.
  
 19) M2.25 & M2.25: INCOMPLETE RCP PLANS- THE AC
 DIFFUSERS AND GRILLS ARE NOT LABELED IN THE ROOMS AND
 NO DIMENSIONS ARE SHOWN. IDENTIFY ALL HP UNITS BEING
 SERVED BY THE SUPPLY AND RETURN WATER PIPING TAGS
 SHOWN.
  
 20) M2.26 & M2.27
 A) PROVIDE COMBUSTION AIR CALCULATIONS FOR THE BOILERS
 AND INDICATE HOW THE AIR IS BEING PROVIDED- SEE SECTION
 304 FBC-10 FUEL GAS.
 B) PROVIDE ENLARGED PLAN AND ELEVATION VIEWS OF THE
 BOILERS AND HEAT EXCHANGERS INDICATING REQUIRED WORKING
 CLEARANCES AND ID TAGS FOR ALL PARTS AND COMPONENTS.
 C) PROVIDE BOILER VENTING PLANS AND DETAILS- INCLUDING
 THE TYPES AND SIZES OF VENTS, LENGTH OF THE VENT RUNS,
 AND TERMINATION LOCATIONS.
 D) PROVIDE EOR REVIEWED AND APPROVED MANUFACTURER'S
 SPECS AND SHOP DRAWINGS FOR ALL MECHANICAL EQUIPMENT ON
 THE 26TH AND ROOF LEVELS INCLUDING THE BOILERS, HEAT
 EXHANGERS, COOLING TOWERS, AND PUMPS. ALL EQUIPMENT
 SHALL BE INCLUDED IN THE SUBMITTAL PACKAGE.
 E) PROVIDE ENLARGED VIEWS OF THE COOLING TOWERS AND OAU
 1 & 2 SHOWING THE REQUIRED CLEARANCE DISTANCES FROM THE
 FINISHED ROOF SURFACE TO THE BOTTOM OF THE UNITS.
 F) REFER TO SECTION 301.12 AND PROVIDE WIND LOAD
 ENGINEERING FOR TIE-DOWN OF ALL MECHANICAL EQUIPMENT
 AND COMPONENTS EXPOSED TO WIND ON THE 26TH LEVEL AND
 ROOF LEVELS OF THE BUILDING INCLUDING THE COOLING
 TOWERS, OAU-1 & 2, THE PRESSURIZATIONS FANS, THE
 EXHAUST FANS, THE SUPPLY AND EXHAUST DUCTWORK, PIPE AND
 DUCT STANDS ETC. IF THESE DETAILS ARE PROVIDED ON THE
 STRUCTURAL AND ARCHITECTURAL PLANS, PLEASE PROVIDE
 NOTES INDICATING THE PLAN SHEETS.
 G) PLEASE NOTE GUARDS AND PERMANENT LADDERS MAY BE
 REQUIRED FOR SOME OF THE EQUIPMENT- REFER TO SECTIONS
 304.11 AND 306.5.
  
 21) BASED ON THE PREVIOUS COMMENTS I HAVE PERFORMED
 ONLY A CURSORY REVIEW OF THE RESIDENTIAL SUITE PLANS.
 IT APPEARS THAT MANY OF THE ISSUES FOUND IN THE
 REVIEWED PLANS ARE OCCURRING IN THOSE PLANS ALSO. AT
 THIS TIME I AM CONCLUDING MY FIRST REVIEW OF THE PLANS
 AND WILL LOOK FORWARD TO A SECOND REVIEW OF THE REVISED
 AND CORRECTED PLANS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop NFIP NFIP REVIEW ACTIVITY
Rev No 1 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 5 Status P Date 2017-02-06 Cont ID  
Sent By gjohnson Date 2017-02-06 Time 16:47 Rev Time 0.00
Received By gjohnson Date 2017-02-06 Time 16:47 Sent To  
Notes
2017-02-06 16:48:54POOL PLANS APPROVED 2/6/17 BY GPJ

Review Stop P PLUMBING
Rev No 4 Status P Date 2017-02-06 Cont ID  
Sent By gjohnson Date 2017-02-06 Time 15:42 Rev Time 0.00
Received By gjohnson Date 2017-01-30 Time 10:11 Sent To  
Notes
2017-02-06 15:48:39PLUMBING APPROVED WITH PROVISO
  
 1. PROVIDE FLOOR PLANS P2-0P21, P2-01,P2-02, P2-03 WITH
 ALL THE SANITARY RISERS CLEARLY LABELED TO MATCH
 ISOMETRIC DRAWINGS.
  
 2. SHTS. P5-03C,D,E PLEASE SHOW THE LEVELS ON THE
 ISOMETRIC DRAWINGS.
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 3 Status F Date 2016-12-29 Cont ID  
Sent By gjohnson Date 2016-12-29 Time 13:36 Rev Time 0.00
Received By gjohnson Date 2016-12-03 Time 08:57 Sent To  
Notes
2016-12-29 13:36:003RD REVIEW
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
 PLUMBING COMMENTS: FROM 1ST REVIEW HAVE NOT BEEN FULLY
 COMPLIED
  
 41.PROVIDE MANUFACTURE SPEC SHEETS FOR ALL PUMPS
 ,THERMOSTATIC MIXING VALVES, TANKS, WATER HEATERS ECT.
 PER WPB AMEND. TO FBC SEC. 107.2.1 THE DETAILLS ON THE
 PLANS ARE NOT THE MANUFACTURE SPECIFICATION THESE CAN
 BE A DEFERRED SUBMITTAL.
  
 45.SHOW CONNECTION OF IRRIGATION SYSTEM ON WATER RISER
 DIAGRAM.
 PER WPB AMEND. TO FBC SEC. 107.2.1 A BACK FLOW IS
 REQUIRED
  
 47.SHT.M4-02 NOTE ON GENERATOR DETAIL STATES THAT FUEL
 PIPPING IS TO BE DONE BY ELECTRICAL CONTRACTOR. THAT IS
 NOT IN THERE SCOPE OF REG ALLOWED BY THE STATE PLEASE
 CLARIFY. SHEET HAS NOT BEEN REVISED
  
 51.PROVIDE PROVIDE DETAILED PIPING RISER DIAGRAM FOR
 DIESEL FUEL PIPING.
 PER WPB AMEND. TO FBC SEC. 107.2.1 PROVIDE SIZE AND
 TYPE OF PIPING
  
 2ND REVIEW COMMENTS: NOT COMPLIED
  
 6. PROVIDE A NOTE FOR BACKFLOW ON POOL FILL. PER WPB
 AMEND. TO FBC SEC. 107.2.1
  
 7. PLEASE PROVIDE PLUMBING FLOOR PLAN-FOR LEVEL 1 AND
 2-3 ASININITY'S WITH GRID LINES 9-17 . PER WPB AMEND.
 TO FBC SEC. 107.2.1 SHT. P2-52B IS MISSING.
  
 8. SHT. P5-28 THE HOT AND COLD WATER ISOMETRIC FOR SPA
 IS MISSING THE 2 SHOWERS IN WOMENS SPA. PER WPB AMEND.
 TO FBC SEC. 107.2.1
  
 9. SHT. P5-01+02 DOES NOT SHOW BRANCHES FOR AMENITY'S
 AND GUEST SUITES PLEASE CLARIFY. PER WPB AMEND. TO FBC
 SEC. 107.2.1
  
 12. PLEASE PROVIDE HOT AND COLD WATER ISOMETRICS FOR
 UNITS ON LEVELS 18,19, PH 20,26 PER WPB AMEND. TO FBC
 SEC. 107.2.1 A ISOMETRIC THAT IS SIMILAR DOES NOT
 COMPLY ALL FIXTURES MUST BE SHOWN!
  
 15. SHT. P5-27 ISOMETRIC FOR UNIT C IS MISSING THE
 LAUNDRY SINK. PER WPB AMEND. TO FBC SEC. 107.2.1
  
 16. SHT. P5-01 SHOW CONNECTION FOR TRASH SHOOT WASH
 RING ON RISER. PER WPB AMEND. TO FBC SEC. 107.2.1
  
 22. P5-23 SHOWS 12IN LINE FROM POOL DECK DRAINS SHT
 P5-04 SHOWS 8IN CLARIFY. PER WPB AMEND. TO FBC SEC.
 107.2.1
  
  
 27. SHT. P-28 SHOWS 2 SINKS NEXT TO WASHING MACHINES I
 COULD NOT FIND THEM ON THE FLOOR PLAN. PER WPB AMEND.
 TO FBC SEC. 107.2.1 SHOW ON PLUMBING FLOOR PLAN!
  
 28. P5-06 LABEL RISER AN AND INDICATE LOCATION ON FLOOR
 PLAN. PER WPB AMEND. TO FBC SEC. 107.2.1
  
 29. P5-06 THRU 21 ISOMETRICS ARE UNCLEAR WHERE PIPES
 CONNECT SOME PIPES DO NOT CONNECT . PROVIDE A CLEAR AND
 CONCISE DRAWING SHOWING ALL PIPE SIZING AND VENT STACKS
 VS SOIL STACKS , EXPAND THE ISOMETRICS LARGER SO
 BATHROOM GROUPS DON'T RUN TOGETHER AND APPEAR TO
 CONNECT.LABEL EACH ISOMETRIC WITH LOCATION OR FLOOR
 LEVEL. PER WPB AMEND. TO FBC SEC. 107.2.1
  
 3RD REVIEW:
  
 1. SHT. P5-03D AND 03E LABEL LOCATION OF EACH ISOMETRIC
 AND EXPAND EACH ISOMETRIC. PER WPB AMEND TO FBC 107.2.1
  
 2. SHT. A0-45 THE FLORIDA BUILDING ACCESSIBILITY CODE
 SHOULD BE 2014 5TH EDITION NOT 2012
  
 3. SHT. A0-45B THE ACCESSIBLE SHOWERS SHALL COMPLY WITH
 FBC ACC 608 IF YOUR GOING TO USE TH ALTERNATE ROLL IN
 TYPE SHOWER COMPARTMENTS SHALL BE 36 INCHES WIDE EXACT.
 THE WAY THEY ARE DESIGNED NOW IS NOT COMPLIANT.
  
 4. SHT. A0-45B THE BATHROOM IN THE WOMENS SPA THE
 CLEARANCE AROUND THE THE TOILET CAN NOT HAVE ANY THING
 ELSE IN IT THE WING WALL ON THE RIGHT SIDE OF THE
 TOILET DOES NOT COMPLY. PER FBC ACC 604.3.2
  
 5. PLEASE PROVIDE DETAILS FOR HIGHT DIMENSIONS FOR
 ACCESSIBILITY IN COMMON AREAS. PER WPB AMEND TO FBC
 107.2.1
  
 6. SHT. P5-03B S16 ON LEVEL 16 IS MISSING THE SHOWER IN
 MASTER BATHROOM BETWEEN HIS AND HERS UNIT C. PER WPB
 AMEND TO FBC 107.2.1
  
 7. SHT P5-03B S13 SHOWS A SHOWER THE FLOOR PLAN SHOWS A
 T8UB PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 8. SHT. P2-54E-F THE WALLS AND FIXTURES DID NOT SHOW UP
 PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 9. SHT. P5- 03B S10 SHOWS DOUBLE LAVS AND A SHOWER THE
 FLOOR PLAN SHOWS A TUB AND A SINGLE LAV PLEASE CLARIFY.
 PER WPB AMEND TO FBC 107.2.1
  
 10. SHT. P2-54C BATH 4 SHOWS ATUB S11 SHOWS A SHOWER
 PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 11. SHT. P5 -11 RISER TAGS MISSING PLEASE CLARIFY. PER
 WPB AMEND TO FBC 107.2.1
  
 12. SHT. P2-54C+ B REMOVE NOTE ON KITCHEN REFERRING TO
 AAV IF A LOOP VENT IS BEING USED. PLEASE CLARIFY. PER
 WPB AMEND TO FBC 107.2.1
  
 13. IF THE OIL SEPARATOR IS INSTALLED IN A PIT A DRAIN
 IS REQUIRED. PER WPB AMEND TO FBC 107.2.1
  
 14. SHT. P5-01 ON LEVEL 3 THE RISER FOR HW-9 SHOWS 1"
 THE DETAIL ON SHT. P5-28 SHOWS 11/2 FOR HW-9 + CW-9 .
 PLEASE CLARIFY. PER WPB AMEND TO FBC 107.2.1
  
 15. SHT.P5-01 + 02 THE BRANCHES FOR LEVELS 1,2,3 ARE
 NOT SHOWN . PLEASE CLARIFY. PER WPB AMEND TO FBC
 107.2.1
  
 16. SHT. P5-27 THE RISER DETAI FOR TYP. UNIT A 5-17 IS
 MISSING BATH2 . PLEASE CLARIFY. PER WPB AMEND TO FBC
 107.2.1
  
 IN ORDER TO EXPEDITE THIS PERMIT I WOULD ADVISE A
 MEETING TO GO OVER COMMENT AND CLARIFY ANY ISSUES
 PLEASE CONTACT ME. [email protected] OR 561-805-6711
  
 DUE TO THE DEFICIENCIES OF THIS PLAN A COMPLETE AND
 THOROUGH REVIEW CANNOT BE DONE AT THIS TIME. UPON
 RESUBMITTAL THERE MAYBE ADDITIONAL COMMENTS.
  
  
  
  
  
 POOL COMMENTS:
  
 1. POOL ,HOT SPA POOL , HIS AND HER JACUZZIS AND ALL
 WATER FEATURES REQUIRE SEPARATE PERMIT FROM MAIN
 BUILDING.\
 2. SHALL OBTAIN OPERATING PERMIT FROM PALM BEACH COUNTY
 HEALTH DEPARTMENT. SHOW NOTE ON PLAN
 PER FBC SEC. 454
 NOTE: OTHER ADMINISTRATIVE AND PROGRAMMATIC PROVISIONS
 APPLY. SEE DEPARTMENT OF HEALTH (DOH) RULE 64E-9,
 FLORIDA ADMINISTRATIVE CODE AND CHAPTER 514, FLORIDA
 STATUTES. THE REGULATION AND ENFORCEMENT OF THE INITIAL
 AND ANNUAL OPERATION PERMIT FOR PUBLIC POOLS ARE
 PREEMPTED TO THE DOH. THE CONSTRUCTION PERMIT HOLDER IS
 RESPONSIBLE FOR OBTAINING AN OPERATION PERMIT ISSUED BY
 DOH, AS A PUBLIC SWIMMING POOL SHALL NOT BE PUT INTO
 OPERATION WITHOUT AN INSPECTION AND OPERATION PERMIT
 ISSUED FROM THE DOH. DOH MAY GRANT VARIANCES FROM THE
 PROVISIONS OF THE FLORIDA BUILDING CODE SPECIFICALLY
 PERTAINING TO PUBLIC SWIMMING POOLS AND BATHING PLACES
 AS AUTHORIZED BY SECTION 514.0115, FLORIDA STATUTES.
 BUILDING OFFICIALS SHALL RECOGNIZE AND ENFORCE VARIANCE
 ORDERS ISSUED BY THE DEPARTMENT OF HEALTH PURSUANT TO
 SECTION 514.0115(5), FLORIDA STATUTES INCLUDING ANY
 CONDITIONS ATTACHED TO THE GRANTING OF THE VARIANCE.
  
  
 14. ONE URINAL IS REQUIRED IN MEN?S POOL BATHROOM. PER
 FBC PL TABLE 403.6 AND SEC 403.6 SHT. A2.52B DOES NOT
 SHOW URINAL IN MENS BATHROOM.
  
 18. SHOW COMPLIANCE FOR OZONE EQUIPMENT ROOM
 VENTILATION MUST COMPLY WITH FBC SEC. 545.1.6.5.16.4.5
 PLEASE PROVIDE SHT. NUMBERS
  
 24. PROVIDE MSDS SHEETS FOR ALL CHEMICALS USED. PER WPB
 AMEND. TO FBC 107.2.
  
 28. OZONE GENERATING EQUIPMENT ELECTRICAL COMPONENTS
 AND WIRING SHALL COMPLY WITH THE REQUIREMENTS OF
 CHAPTER 27 OF THIS CODE AND THE MANUFACTURER SHALL
 PROVIDE A CERTIFICATE OF CONFORMANCE. THE PROCESS
 EQUIPMENT SHALL BE PROVIDED WITH AN EFFECTIVE MEANS TO
 ALERT THE USER WHEN A COMPONENT OF THIS EQUIPMENT IS
 NOT OPERATING PER FBC 454.1.6.5.16.4.1 SHOW NOTE ON
 PLAN
  
 29. PROVIDE SPECS FOR CHANNEL DRAINS FOR SPAL. PER WPB
 AMEND. TO FBC SEC. 107.2.1
  
 NEW COMMENTS
  
 1. FOR THE TRANSFER WALL AT HOT SPA SHOW COMPLIANCE
 WITH FBC ACC (A) 1009.4.1 CLEAR DECK SPACE.
 A CLEAR DECK SPACE OF 60 INCHES (1525 MM) MINIMUM BY 60
 INCHES (1525 MM) MINIMUM WITH A SLOPE NOT STEEPER THAN
 1:48 SHALL BE PROVIDED AT THE BASE OF THE TRANSFER
 WALL. WHERE ONE GRAB BAR IS PROVIDED, THE CLEAR DECK
 SPACE SHALL BE CENTERED ON THE GRAB BAR. WHERE TWO GRAB
 BARS ARE PROVIDED, THE CLEAR DECK SPACE SHALL BE
 CENTERED ON THE CLEARANCE BETWEEN THE GRAB BARS.
 (B)1009.4.2 HEIGHT.
 THE HEIGHT OF THE TRANSFER WALL SHALL BE 16 INCHES (405
 MM) MINIMUM AND 19 INCHES (485 MM) MAXIMUM MEASURED
 FROM THE DECK.
 (C)1009.4.5 GRAB BARS.
 AT LEAST ONE GRAB BAR COMPLYING WITH 609 SHALL BE
 PROVIDED ON THE TRANSFER WALL. GRAB BARS SHALL BE
 PERPENDICULAR TO THE POOL WALL AND SHALL EXTEND THE
 FULL DEPTH OF THE TRANSFER WALL. THE TOP OF THE
 GRIPPING SURFACE SHALL BE 4 INCHES (100 MM) MINIMUM AND
 6 INCHES (150 MM) MAXIMUM ABOVE TRANSFER WALLS. WHERE
 ONE GRAB BAR IS PROVIDED, CLEARANCE SHALL BE 24 INCHES
 (610 MM) MINIMUM ON BOTH SIDES OF THE GRAB BAR. WHERE
 TWO GRAB BARS ARE PROVIDED, CLEARANCE BETWEEN GRAB BARS
 SHALL BE 24 INCHES (610 MM) MINIMUM.
  
 2. DETAILS NOT SHOWN FOR BACKFLOW /AIR GAP ON FILL
 LINES AND OVER FLOW FILL LINE BOX FOR WATER FEATURE.
 PER WPB AMEND TO FBC 107.2.1
  
 3. THE CRYSTAL FOUNTAIN SHOWS AN OVERFLOW CONNECTING TO
 A SEWER YOU SHALL RECEIVE APPROVAL FROM ENGINEERING
 DEPARTMENT TO CONNECT ANY OVERFLOW FROM WATER FEATURES
 OR POOL EQUIPMENT CONTACT MANUEL GONZALEZ 561-494-1085
  
  
  
  
  
  
  
 DO TO THE DEFICIENCY'S AND SOME SHEETS BEING UNCLEAR A
 COMPLETE AND COMPREHENSIVE REVIEW OF THE PLUMBING
 SYSTEMS CAN NOT BE COMPLETED AT THIS TIME. THIS MAY
 GENERATE MORE COMMENTS UPON SECOND REVIEW.
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2016-08-31 Cont ID  
Sent By gjohnson Date 2016-08-31 Time 16:15 Rev Time 0.00
Received By gjohnson Date 2016-08-01 Time 16:19 Sent To  
Notes
2016-08-11 08:55:422ND REVIEW
  
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
  
 PLUMBING COMMENTS:
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
 PLUMBING COMMENTS: FROM 1ST REVIEW HAVE NOT BEEN FULLY
 COMPLIED
  
 1. SHT. A6-70F DETAIL 3 IS CALLING OUT BATH 2 FOR SPEC
 B FHA, DETAIL 2 IS CALLING OUT BATH 2 AS STANDARD ,IT
 APPEARS TO BE A TYPO PLEASE CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 2. SHOLL WHICH BATHROOM IS DESIGNATED FOR FHA UNIT
 21A-21B.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
  
 5. SHOW ACCESSIBILITY LEVEL FOR AMENITY BATH ROOMS ON
 LEVEL 1-3.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 11. SHT. P5-01 SHOWS 6IN. CW RISER RUNNING UP FROM
 PUMPS TO BLADDER TANKS WHERE DOES IT CONNECT WITH THE
 REST OF THE WATER RISER PLEASE CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 14.INDICATE DIRECTION OF FLOW MORE CLEARLY ON HOT WATER
 RECIRCULATION SYSTEM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 16.SHT. P5-13 SHOWS S-13A NOT SHOWN ON P5-05 PLEASE
 CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
  
 31. SHT.P2-01 DD-2 BETWEEN LINES 1-2 AND A-D IS MISSING
 ON RISER DIAGRAM ON SHT. P5-24 ALSO MISSING PD BETWEEN
 LINES 1-2 A-D.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 34.SHT. C3-01 SHOWS EXISTING SEWER TO BE USED AS DRAIN
 FOR FOUNTAIN. WATER FROM FOUNTAIN POOLS AND WATER
 FEATURES SHALL NOT DRAIN INTO SANITARY PER. WPB ORD.
 SEC. 90-126.(5)
 35. PROVIDE CALCULATIONS FOR STORM SUMP PUMP AND OIL
 SAND SEPARATORS.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 36. SHT. P5-24 SHORT TRENCH DRAINS MISSING SQ FT CALC .
 PLEASE PROVIDE.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 39. PROVIDE MANUFACTURE SECS FOR OIL SAND SEPARATOR.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 41.PROVIDE MANUFACTURE SPEC SHEETS FOR ALL PUMPS
 ,THERMOSTATIC MIXING VALVES, TANKS, WATER HEATERS ECT.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 45.SHOW CONNECTION OF IRRIGATION SYSTEM ON WATER RISER
 DIAGRAM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 46. SEPARATE PERMITS REQUIRED FOR BACKFLOW PREVENTER'S
 AT METERS. FOR IRRIGATION, DOMESTIC, AND COOLING TOWERS
 POOL FILL,FIRE
 47.SHT.M4-02 NOTE ON GENERATOR DETAIL STATES THAT FUEL
 PIPPING IS TO BE DONE BY ELECTRICAL CONTRACTOR. THAT IS
 NOT IN THERE SCOPE OF REG ALLOWED BY THE STATE PLEASE
 CLARIFY.
  
 51.PROVIDE PROVIDE DETAILED PIPING RISER DIAGRAM FOR
 DIESEL FUEL PIPING.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 52. WHERE DOES THE SUMP DRAINS ON FUEL PUMPS DISCHARGE
 TO.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 IN YOUR RESPONSE LETTER MANY OF YOUR NARRATIVES JUST
 SAY REFER TO REVISED SHEET THIS DOES NOT GIVE ME MUCH
 INFORMATION. IF YOU COULD REFERENCE A SPECIFIC SHEET IT
 WOULD GREATLY EXPEDITE MY PLAN REVIEW PROCESS AND BE
 GREATLY APPRECIATED THANK YOU.
  
  
 2ND REVIEW COMMENTS:
  
 1. IN REFERENCE TO PREVIOUS COMMENT #5 PLEASE PROVIDE
 DETAILS SHOWING COMPLIANCE WITH TH E FBC ACC. SHOW ALL
 THE HEIGHTS OF GRAB BARS, TOILET SEATS, LAVATORY'S,
 MIRRORS, TOILET PAPER DISPENSERS, SHOWER CONTROL
 LOCATIONS AND SHOWER SEATS, DRINKING FOUNTAIN SHOW
 CLEAR FLOOR SPACE FOR ALL FIXTURES. PER WPB AMEND. TO
 FBC SEC. 107.2.1
  
 2. SHT. A2-52A SHOW INSIDE DIMENSIONS OF BATHROOMS
 207-205. PER WPB AMEND. TO FBC SEC. 107.2.1
  
 3. BATHROOMS NEXT TO JACUZZI IN MENS AND WOMENS SPA
 SHALL BE ACCESSIBLE.PER FBC ACC. 213.2
  
 4. USING YOUR OCCUPANT TYPE AND LOAD FROM SHT. A0-32 I
 HAVE DETERMINED THAT ON THE 1ST LEVEL ( LOBBY) IT IS
 REQUIRED TO HAVE 4 WATER CLOSETS FOR THE MEN AND 4 FOR
 THE WOMEN 6 LAVS 2 DRINKING FOUNTAINS AND 1 SERVICE
 SINK . IT APPEARS THAT YOU ARE SHORT 3 WATER CLOSETS 5
 LAVS PER SEX AND 2 DRINKING FOUNTAIN AND 1 SERVICE
 SINK. PER FBC PL TABLE 403.1
  
 5. 4. USING YOUR OCCUPANT TYPE AND LOAD FROM SHT. A0-33
 I HAVE DETERMINED THAT ON THE 2ND LEVEL (AMENITY'S) IT
 IS REQUIRED TO HAVE 3 WATER CLOSETS FOR THE MEN AND 4
 FOR THE WOMEN 2 LAVS PER SEX 2 DRINKING FOUNTAINS AND 1
 SERVICE SINK . IT APPEARS THAT YOU ARE SHORT 1 WATER
 CLOSET-FOR THE WOMEN 2 DRINKING FOUNTAIN AND 1 SERVICE
 SINK. PER FBC PL TABLE 403.1
  
 6. PROVIDE A NOTE FOR BACKFLOW ON POOL FILL. PER WPB
 AMEND. TO FBC SEC. 107.2.1
  
 7. PLEASE PROVIDE PLUMBING FLOOR PLAN-FOR LEVEL 1 AND
 2-3 ASININITY'S WITH GRID LINES 9-17 . PER WPB AMEND.
 TO FBC SEC. 107.2.1
  
 8. SHT. P5-28 THE HOT AND COLD WATER ISOMETRIC FOR SPA
 IS MISSING THE 2 SHOWERS IN WOMENS SPA. PER WPB AMEND.
 TO FBC SEC. 107.2.1
  
 9. SHT. P5-01+02 DOES NOT SHOW BRANCHES FOR AMENITY'S
 AND GUEST SUITES PLEASE CLARIFY. PER WPB AMEND. TO FBC
 SEC. 107.2.1
  
 10. SHT. P5-27 ISOMETRICS FOR UNITS 3,7,11 ARE MISSING
 THE WATER CLOSET AND LAVATORY'S. PER WPB AMEND. TO FBC
 SEC. 107.2.1
  
 11. SHT. P5-27 THE PIPE SIZING IS TO LITE TO BE EASILY
 READ PLEASE CHECK ALL SHEETS AND CORRECT. PER WPB
 AMEND. TO FBC SEC. 107.2.1
  
 12. PLEASE PROVIDE HOT AND COLD WATER ISOMETRICS FOR
 UNITS ON LEVELS 18,19, PH 20,26 PER WPB AMEND. TO FBC
 SEC. 107.2.1
  
 13. SHT. P5-27 ISOMETRIC FOR UNIT A IS MISSING THE TUB
 IN THE BATHROOM AT GRID LINES S+6 ON SHT. P2-54C. PER
 WPB AMEND. TO FBC SEC. 107.2.1
  
 13 SHT P5-27 THE ISOMETRIC FOR UNIT B IS MISSING THE
 LAV IN THE BATHROOM AT GRID LINES P-8.5 ON SHT P2-54C.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 14. SHT.P5-27 THE BATHROOM ON GRID LINES P.5-6 ON SHT
 P2-54C IS SHOWN AS A SHOWER ON THE ISOMETRIC AND A TUB
 ON THE FLOOR PLAN PLEASE CLARIFY. PER WPB AMEND. TO FBC
 SEC. 107.2.1
  
 15. SHT. P5-27 ISOMETRIC FOR UNIT C IS MISSING THE
 LAUNDRY SINK. PER WPB AMEND. TO FBC SEC. 107.2.1
  
 16. SHT. P5-01 SHOW CONNECTION FOR TRASH SHOOT WASH
 RING ON RISER. PER WPB AMEND. TO FBC SEC. 107.2.1
  
 17. SHT. P5-01 AT THE MECHANICAL LEVEL IT SHOWS THE 4IN
 AND 6IN CW CONNECTING TOGETHER CONNECTING TWICE PROVIDE
 A RISER THAT CLEARLY SHOWS WHERE PIPES CONNECT AND
 WHERE THEY CROSS. PER WPB AMEND. TO FBC SEC. 107.2.1
  
 18. UNABLE TO LOCATE SANITARY RISER FROM LEVEL 16 DOWN.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 19. SHT P5-06 LABEL STACKS AND INDICATE ON THE DRAWING
 FLOOR LEVEL . PER WPB AMEND. TO FBC SEC. 107.2.1
  
 20. SHT P5-03-10 FIXTURE LAYOUT AND PIPE SIZING DO NOT
 MATCHISOMETRCS ON P5-10 THEYE UNCLEAR AND DON'T SEAM TO
 BE COMPLETE SOME OF THE BRANCHES SEAM TO CONNECT AT TWO
 DIFFERENT STACKS SOME STACKS DON'T CONNECT ANY WHERE.
 PLEASE CLARIFY. PER WPB AMEND. TO FBC SEC. 107.2.1
  
 21. PLEASE LABEL STORM RISERS ON THE ISOMETRIC DRAWINGS
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 22. P5-23 SHOWS 12IN LINE FROM POOL DECK DRAINS SHT
 P5-04 SHOWS 8IN CLARIFY. PER WPB AMEND. TO FBC SEC.
 107.2.1
  
 23. SHT- 23 DETAIL #2 I WAS UNABLE TO LOCATE THESE
 DRAINS ON FOR PLANS LABEL WITH LOCATION. PER WPB AMEND.
 TO FBC SEC. 107.2.1
  
 24. SHT P5-04 PROVIDE SQFT ON RISERS. PER WPB AMEND. TO
 FBC SEC. 107.2.1
  
 25. SHT. P5-21 INDICATE ON PLAN AT WHAT PITCH THE
 PIPING WILL BE INSTALLED AND-SHOW SQFT ON EACH SECTION
 OF PIPE. PER WPB AMEND. TO FBC SEC. 107.2.1
  
 26. SHT. P5-21 THE ISOMETRIC FOR RD 11,19,20,21IT IS
 UNCLEAR HOW OR WHERE TO THE RISERS. PER WPB AMEND. TO
 FBC SEC. 107.2
  
 27. SHT. P-28 SHOWS 2 SINKS NEXT TO WASHING MACHINES I
 COULD NOT FIND THEM ON THE FLOOR PLAN. PER WPB AMEND.
 TO FBC SEC. 107.2.1
  
 28. P5-06 LABEL RISER AN AND INDICATE LOCATION ON FLOOR
 PLAN. PER WPB AMEND. TO FBC SEC. 107.2.1
  
 29. P5-07THRU21 ISOMETRICS ARE UNCLEAR WHERE PIPES
 CONNECT SOME PIPES DO NOT CONNECT . PROVIDE A CLEAR AND
 CONCISE DRAWING SHOWING ALL PIPE SIZING AND VENT STACKS
 VS SOIL STACKS , YOU MAY HAVE TO EXPAND THE ISOMETRICS
 LARGER SO BATHROOM GROUPS DON'T RUN TOGETHER AND APPEAR
 TO CONNECT. PER WPB AMEND. TO FBC SEC. 107.2.1
  
  
 IN YOUR RESPONSE LETTER MANY OF YOUR NARRATIVES JUST
 SAY REFER TO REVISED SHEET THIS DOES NOT GIVE ME MUCH
 INFORMATION. IF YOU COULD REFERENCE A SPECIFIC SHEET IT
 WOULD GREATLY EXPEDITE MY PLAN REVIEW PROCESS AND BE
 GREATLY APPRECIATED THANK YOU.
  
 DUE TO THE DEFICIENCIES OF THIS PLAN A COMPLETE AND
 THOROUGH REVIEW CANNOT BE DONE AT THIS TIME. UPON
 RESUBMITTAL THERE MAYBE ADDITIONAL COMMENTS.
  
  
  
  
  
 POOL COMMENTS:
  
 1. POOL ,HOT SPA POOL , HIS AND HER JACUZZIS AND ALL
 WATER FEATURES REQUIRE SEPARATE PERMIT FROM MAIN
 BUILDING.\
 2. SHALL OBTAIN OPERATING PERMIT FROM PALM BEACH COUNTY
 HEALTH DEPARTMENT. SHOW NOTE ON PLAN
 PER FBC SEC. 454
 NOTE: OTHER ADMINISTRATIVE AND PROGRAMMATIC PROVISIONS
 APPLY. SEE DEPARTMENT OF HEALTH (DOH) RULE 64E-9,
 FLORIDA ADMINISTRATIVE CODE AND CHAPTER 514, FLORIDA
 STATUTES. THE REGULATION AND ENFORCEMENT OF THE INITIAL
 AND ANNUAL OPERATION PERMIT FOR PUBLIC POOLS ARE
 PREEMPTED TO THE DOH. THE CONSTRUCTION PERMIT HOLDER IS
 RESPONSIBLE FOR OBTAINING AN OPERATION PERMIT ISSUED BY
 DOH, AS A PUBLIC SWIMMING POOL SHALL NOT BE PUT INTO
 OPERATION WITHOUT AN INSPECTION AND OPERATION PERMIT
 ISSUED FROM THE DOH. DOH MAY GRANT VARIANCES FROM THE
 PROVISIONS OF THE FLORIDA BUILDING CODE SPECIFICALLY
 PERTAINING TO PUBLIC SWIMMING POOLS AND BATHING PLACES
 AS AUTHORIZED BY SECTION 514.0115, FLORIDA STATUTES.
 BUILDING OFFICIALS SHALL RECOGNIZE AND ENFORCE VARIANCE
 ORDERS ISSUED BY THE DEPARTMENT OF HEALTH PURSUANT TO
 SECTION 514.0115(5), FLORIDA STATUTES INCLUDING ANY
 CONDITIONS ATTACHED TO THE GRANTING OF THE VARIANCE.
  
  
 14. ONE URINAL IS REQUIRED IN MEN?S POOL BATHROOM. PER
 FBC PL TABLE 403.6 AND SEC 403.6 SHT. A2.52B DOES NOT
 SHOW URINAL IN MENS BATHROOM.
  
 18. SHOW COMPLIANCE FOR OZONE EQUIPMENT ROOM
 VENTILATION MUST COMPLY WITH FBC SEC. 545.1.6.5.16.4.5
 PLEASE PROVIDE SHT. NUMBERS
  
 24. PROVIDE MSDS SHEETS FOR ALL CHEMICALS USED. PER WPB
 AMEND. TO FBC 107.2.
  
 28. OZONE GENERATING EQUIPMENT ELECTRICAL COMPONENTS
 AND WIRING SHALL COMPLY WITH THE REQUIREMENTS OF
 CHAPTER 27 OF THIS CODE AND THE MANUFACTURER SHALL
 PROVIDE A CERTIFICATE OF CONFORMANCE. THE PROCESS
 EQUIPMENT SHALL BE PROVIDED WITH AN EFFECTIVE MEANS TO
 ALERT THE USER WHEN A COMPONENT OF THIS EQUIPMENT IS
 NOT OPERATING PER FBC 454.1.6.5.16.4.1 SHOW NOTE ON
 PLAN
  
 29. PROVIDE SPECS FOR CHANNEL DRAINS FOR SPAL. PER WPB
 AMEND. TO FBC SEC. 107.2.1
  
 NEW COMMENTS
  
 1. FOR THE TRANSFER WALL AT HOT SPA SHOW COMPLIANCE
 WITH FBC ACC (A) 1009.4.1 CLEAR DECK SPACE.
 A CLEAR DECK SPACE OF 60 INCHES (1525 MM) MINIMUM BY 60
 INCHES (1525 MM) MINIMUM WITH A SLOPE NOT STEEPER THAN
 1:48 SHALL BE PROVIDED AT THE BASE OF THE TRANSFER
 WALL. WHERE ONE GRAB BAR IS PROVIDED, THE CLEAR DECK
 SPACE SHALL BE CENTERED ON THE GRAB BAR. WHERE TWO GRAB
 BARS ARE PROVIDED, THE CLEAR DECK SPACE SHALL BE
 CENTERED ON THE CLEARANCE BETWEEN THE GRAB BARS.
 (B)1009.4.2 HEIGHT.
 THE HEIGHT OF THE TRANSFER WALL SHALL BE 16 INCHES (405
 MM) MINIMUM AND 19 INCHES (485 MM) MAXIMUM MEASURED
 FROM THE DECK.
 (C)1009.4.5 GRAB BARS.
 AT LEAST ONE GRAB BAR COMPLYING WITH 609 SHALL BE
 PROVIDED ON THE TRANSFER WALL. GRAB BARS SHALL BE
 PERPENDICULAR TO THE POOL WALL AND SHALL EXTEND THE
 FULL DEPTH OF THE TRANSFER WALL. THE TOP OF THE
 GRIPPING SURFACE SHALL BE 4 INCHES (100 MM) MINIMUM AND
 6 INCHES (150 MM) MAXIMUM ABOVE TRANSFER WALLS. WHERE
 ONE GRAB BAR IS PROVIDED, CLEARANCE SHALL BE 24 INCHES
 (610 MM) MINIMUM ON BOTH SIDES OF THE GRAB BAR. WHERE
 TWO GRAB BARS ARE PROVIDED, CLEARANCE BETWEEN GRAB BARS
 SHALL BE 24 INCHES (610 MM) MINIMUM.
  
 2. DETAILS NOT SHOWN FOR BACKFLOW /AIR GAP ON FILL
 LINES AND OVER FLOW FILL LINE BOX FOR WATER FEATURE.
 PER WPB AMEND TO FBC 107.2.1
  
 3. THE CRYSTAL FOUNTAIN SHOWS AN OVERFLOW CONNECTING TO
 A SEWER YOU SHALL RECEIVE APPROVAL FROM ENGINEERING
 DEPARTMENT TO CONNECT ANY OVERFLOW FROM WATER FEATURES
 OR POOL EQUIPMENT CONTACT MANUEL GONZALEZ 561-494-1085
  
  
  
  
  
  
  
 DO TO THE DEFICIENCY'S AND SOME SHEETS BEING UNCLEAR A
 COMPLETE AND COMPREHENSIVE REVIEW OF THE PLUMBING
 SYSTEMS CAN NOT BE COMPLETED AT THIS TIME. THIS MAY
 GENERATE MORE COMMENTS UPON SECOND REVIEW.
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2016-02-02 Cont ID  
Sent By gjohnson Date 2016-01-28 Time   Rev Time 0.00
Received By gjohnson Date 2016-01-28 Time 15:50 Sent To  
Notes
2016-02-01 14:58:47GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
 PLUMBING COMMENTS:
  
 1. SHT. A6-70F DETAIL 3 IS CALLING OUT BATH 2 FOR SPEC
 B FHA, DETAIL 2 IS CALLING OUT BATH 2 AS STANDARD ,IT
 APPEARS TO BE A TYPO PLEASE CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 2. SHOLL WHICH BATHROOM IS DESIGNATED FOR FHA UNIT
 21A-21B.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 3.SHT. A2-75A REFERS TO A2-60A THEY DO NOT MATCH PLEASE
 CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 4.SHOW HEIGHT OF SINK IN ADMINISTRATION OFFICE TO
 COMPLY WITH FBC ACC. SEC. 606.3
 5. SHOW ACCESSIBILITY LEVEL FOR AMENITY BATH ROOMS ON
 LEVEL 1-3.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 6. SHT. P5-01 AND P5-01 THE LINES FOR FLOOR LEVELS AND
 WATER PIPES LOOK THE SAME. PROVIDE CLEAR ISOMETRIC
 WATER RISER DIAGRAM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 7. PROVIDE AN EXPANDED ISOMETRIC HOT AND COLD WATER
 RISER DIAGRAM FOR UNITS AND AMENITYS AND GUEST SUITES.
 PER WPB AMEND. TO FBC SEC. 107.2.
 8.LABEL WATER RISERS TO COINCIDE WITH UNIT DESIGNATION.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 9. WATER HAMMER ARRESTOR REQUIRED FOR TRASH SHUTE FLUSH
 RING TO COMPLY WITH FBC PL.SEC. 604.9
 10. PROVIDE ISOMETRIC FOR COOLING TOWER FILL PIPING.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 11. SHT. P5-01 SHOWS 6IN. CW RISER RUNNING UP FROM
 PUMPS TO BLADDER TANKS WHERE DOES IT CONNETC WITH THE
 REST OF THE WATER RISER PLEASE CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 12. PROVIDE HOT WATER ISOMETRIC.RISER DIAGRAM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 13. SIZE ALL SECTIONS OF PIPE ON HOT AND COLD ISOMETRIC
 RISER DIAGRAM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 14.INDICATE DIRECTION OF FLOW MORE CLEARLY ON HOT WATER
 RECIRCULATION SYSTEM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 15. PLEASE PROVIDE ISOMETRIC RISER DIAGRAM FOR SANITARY
 SHT.P5-03
 PER WPB AMEND. TO FBC SEC. 107.2.1
 16.SHT. P5-13 SHOWS S-13A NOT SHOWN ON P5-05 PLEASE
 CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 17.AAV. ARE NOT ALLOWED BELOW FOURTH BRANCH INTERVAL
 DOWN FROM THE TOP OF THE STACK. SHALL COMPLY WITH. FBC
 PL. SEC.918.3.1
  
 18. PLEASE LABEL ALL STACKS TO MATCH
 .PER WPB AMEND. TO FBC SEC. 107.2.
 19. PROVIDE EXPANDED ISOMETRIC DRAWINGS FOR ALL
 DWELLING UNITS AND AMENITY'S ONES PROVIDED ARE TO
 COMPACK.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 20. INDICATE BATHROOM # ON SANITARY ISOMETRIC DETAILS.
 PER WPB AMEND. TO FBC SEC. 107.2.
 21.SHT P5.06 DOES NOT MATCH PLEASE CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 22.SHT P5-03 SHOW ALL STACKS MISSING
 S3/S6-8/S11/S14-16/S18-19/S21-15/S28-30.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 23. FIXTURE DRAINS FOR WASHING MACHINE SHALL BE 3IN.
 PER FBC PL.SEC.406.2
 24.SHT. P5-20 SHOW TRAP PRIMERS ON ALL FLOOR DRAINS AND
 HUB DRAINS.
 SHALL COMPLY WITH FBC PL.SEC. 1002.4
 25.PROVIDE FLOOR PLAN WITH PLUMBING FOR MECHANICAL ROOM
 AND ISOMETRIC.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 26.ALL VENTS THROUGH ROOF SHALL BE A MINIMUM OF 10FT
 AWAY FROM ANY AIR INTAKE.
 SHALL COMPLY WITH FBC PL. SEC.903.5
 27. P5-04 PROVIDE ISOMETRIC RISER DIAGRAM SHALL ALL
 RWL.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 28. MISSING RD1-2 ON RISER DIAGRAM SHT. P5-21 ,BETWEEN
 LINES Q+S/11+12 ON SHT.P2-26.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 29. SHT. P5-04 SHOW ALL RWL WITH SIZE AND SQ FT
 DRAINED.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 30.SHT. P5-23 DETAIL #2 LOCATION CLARIFY
 LOCATION,CLARIFY NOTE *IN RWL FOR OVERFLOW.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 31. SHT.P2-01 DD-2 BETWEEN LINES 1-2 AND A-D IS MISSING
 ON RISER DIAGRAM ON SHT. P5-24 ALSO MISSING PD BETWEEN
 LINES 1-2 A-D.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 32.SHT. P5-24 DETAIL #1 LABEL LOCATION.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 33. LABEL WITH LOCATION ALL DD+PD+AD ON RISER DIAGRAM
 AND PLUMBING FLOOR PLAN.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 34.SHT. C3-01 SHOWS EXISTING SEWER TO BE USED AS DRAIN
 FOR FOUNTAIN. WATER FROM FOUNTAIN POOLS AND WATER
 FEATURES SHALL NOT DRAIN INTO SANITARY PER. WPB ORD.
 SEC. 90-126.(5)
 35. PROVIDE CALCULATIONS FOR STORM SUMP PUMP AND OIL
 SAND SEPARATORS.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 36. SHT. P5-24 SHORT TRENCH DRAINS MISSING SQ FT CALC .
 PLEASE PROVIDE.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 37. ALL OVER FLOW DRAINS MUST BE SIZED SAME AS MAIN
 DRAINS SHALL COMPLY WITH FBC PL. SEC. 1108.3
 38. PLEASE REMOVE ALL UNUSED DETAIL FROM PLUMBING
 DETAIL SHEETS.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 39. PROVIDE MANUFACTURE SECS FOR OIL SAND SEPARATOR.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 40. SHT. P4-06 DETAIL #3 IS THIS THE OIL SAND SEPARATOR
 YOU ARE USING PLEASE CLARIFY.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 41.PROVIDE MANUFACTURE SPEC SHEETS FOR ALL PUMPS
 ,THERMOSTATIC MIXING VALVES, TANKS, WATER HEATERS ECT.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 42. CLEAN OUTS REQUIRED AT THE BASE OF ALL STACKS SHOW
 COMPLIANCE WITH. FBC PL SEC. 708.3.4
 43. SHT.P5-20 + P2-26 IT APPEARS THAT YOU ARE DRAINING
 THE CONDENSATE OR COOLING WATER INTO THE SANITARY
 SYSTEM . CONDENSATE AND COOLING TOWER WATER MUST DRAIN
 INTO STORM AND BE INCLUDED IN SIZING CALCULATIONS.
 PER. WPB ORD. SEC. 90-126(5)
 44. PROVIDE COMPLETE CONDENSATE RISER DIAGRAM WITH
 SIZING CALCULATIONS.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 45.SHOW CONNECTION OF IRRIGATION SYSTEM ON WATER RISER
 DIAGRAM.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 46. SEPARATE PERMITS REQUIRED FOR BACKFLOW PREVENTER'S
 AT METERS. FOR IRRIGATION, DOMESTIC, AND COOLING TOWERS
 POOL FILL,FIRE
 47.SHT.M4-02 NOTE ON GENERATOR DETAIL STATES THAT FUEL
 PIPPING IS TO BE DONE BY ELECTRICAL CONTRACTOR. THAT IS
 NOT IN THERE SCOPE OF REG ALLOWED BY THE STATE PLEASE
 CLARIFY.
 48. SHT. M4-04 DETAIL FOR AIR SEPARATOR, EXPANSION TANK
 SHOWS CONNECTION TO WATER SUPPLY PLEASE CLARIFY WHAT
 THIS SYSTEM IS FOR.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 49. PROVIDE MANUFACTURE SPEC SHEETS FOR GENERATOR.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 50. PLEASE PROVIDE MSDS SHEETS FOR DIESEL FUEL.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 51.PROVIDE PROVIDE DETAILED PIPING RISER DIAGRAM FOR
 DIESEL FUEL PIPING.
 PER WPB AMEND. TO FBC SEC. 107.2.1
 52. WHERE DOES THE SUMP DRAINS ON FUEL PUMPS DISCHARGE
 TO.
 PER WPB AMEND. TO FBC SEC. 107.2.1
  
 DO TO THE DEFICIENCY'S AND SOME SHEETS BEING UNCLEAR A
 COMPLETE AND COMPREHENSIVE REVIEW OF THE PLUMBING
 SYSTEMS CAN NOT BE COMPLETED AT THIS TIME. THIS MAY
 GENERATE MORE COMMENTS UPON SECOND REVIEW.
  
 POOL COMMENTS:
  
 1. POOL ,HOT SPA POOL , HIS AND HER JACUZZIS AND ALL
 WATER FEATURES REQUIRE SEPARATE PERMIT FROM MAIN
 BUILDING.\
 2. SHALL OBTAIN OPERATING PERMIT FROM PALM BEACH COUNTY
 HEALTH DEPARTMENT.
 PER FBC SEC. 454
 NOTE: OTHER ADMINISTRATIVE AND PROGRAMMATIC PROVISIONS
 APPLY. SEE DEPARTMENT OF HEALTH (DOH) RULE 64E-9,
 FLORIDA ADMINISTRATIVE CODE AND CHAPTER 514, FLORIDA
 STATUTES. THE REGULATION AND ENFORCEMENT OF THE INITIAL
 AND ANNUAL OPERATION PERMIT FOR PUBLIC POOLS ARE
 PREEMPTED TO THE DOH. THE CONSTRUCTION PERMIT HOLDER IS
 RESPONSIBLE FOR OBTAINING AN OPERATION PERMIT ISSUED BY
 DOH, AS A PUBLIC SWIMMING POOL SHALL NOT BE PUT INTO
 OPERATION WITHOUT AN INSPECTION AND OPERATION PERMIT
 ISSUED FROM THE DOH. DOH MAY GRANT VARIANCES FROM THE
 PROVISIONS OF THE FLORIDA BUILDING CODE SPECIFICALLY
 PERTAINING TO PUBLIC SWIMMING POOLS AND BATHING PLACES
 AS AUTHORIZED BY SECTION 514.0115, FLORIDA STATUTES.
 BUILDING OFFICIALS SHALL RECOGNIZE AND ENFORCE VARIANCE
 ORDERS ISSUED BY THE DEPARTMENT OF HEALTH PURSUANT TO
 SECTION 514.0115(5), FLORIDA STATUTES INCLUDING ANY
 CONDITIONS ATTACHED TO THE GRANTING OF THE VARIANCE.
 3. SHT.W0-0.01 GENERAL NOTES SEC H ADA COMPLIANCE #1
 SWIMMING POOL SHALL COMPLY WITH FBC ACC. 2014.
 4. PROVIDE INSTALL GUIDE AND SPEC SHEETS FOR
 ACCESSIBILITY LIFT.
 NOTE: OTHER ADMINISTRATIVE AND PROGRAMMATIC PROVISIONS
 APPLY. SEE DEPARTMENT OF HEALTH (DOH) RULE 64E-9,
 FLORIDA ADMINISTRATIVE CODE AND CHAPTER 514, FLORIDA
 STATUTES. THE REGULATION AND ENFORCEMENT OF THE INITIAL
 AND ANNUAL OPERATION PERMIT FOR PUBLIC POOLS ARE
 PREEMPTED TO THE DOH. THE CONSTRUCTION PERMIT HOLDER IS
 RESPONSIBLE FOR OBTAINING AN OPERATION PERMIT ISSUED BY
 DOH, AS A PUBLIC SWIMMING POOL SHALL NOT BE PUT INTO
 OPERATION WITHOUT AN INSPECTION AND OPERATION PERMIT
 ISSUED FROM THE DOH. DOH MAY GRANT VARIANCES FROM THE
 PROVISIONS OF THE FLORIDA BUILDING CODE SPECIFICALLY
 PERTAINING TO PUBLIC SWIMMING POOLS AND BATHING PLACES
 AS AUTHORIZED BY SECTION 514.0115, FLORIDA STATUTES.
 BUILDING OFFICIALS SHALL RECOGNIZE AND ENFORCE VARIANCE
 ORDERS ISSUED BY THE DEPARTMENT OF HEALTH PURSUANT TO
 SECTION 514.0115(5), FLORIDA STATUTES INCLUDING ANY
 CONDITIONS ATTACHED TO THE GRANTING OF THE VARIANCE.
 5. SHOW ACCESSIBILITY TO HOT SPA. SHALL COMPLY WITH FBC
 ACC. SEC. 1009.4
 6. SHT.W0-1.12 MENS SPA JACUZZI SHOWS A TOILET IN THE
 JACUZZI THE TOILET IS MISSING IN THE BATHROOM NEXT TO
 IT PLEASE CORRECT.
 PERWPB AMEND. TO FBC SEC.107.2.1
 7. SHT. W1-1.02 SHOW DIMENSIONS ON ALL FLOOR INLETS MAX
 SPACING BETWEEN 20 FT MAX DISTANCE FROM ADJACENT WALL
 10FT TO COMPLY WITH FBC SEC.454.1.6.5.9.2
 8. PROVIDE DIMENSIONS AND VOLUME OF ALL COLLECTOR TANKS
 SHALL COMPLY WITH FBC SEC.454.1.6.5.10.5
 9. PROVIDE MATCH LINES ON ALL DRAWING TO SHOW
 CONTINUATION OF PIPING. PER WPBAMEND. TO FBC
 SEC.107.2.1
 10. PROVIDE MANUFACTURE SPECS FOR PUMPS AND OTHER
 EQUIPMENT .MAIN DRAIN AND SKIMMERS. PER WPBAMEND. TO
 FBC SEC.107.2.1
 11. DETAILS AND PLAN VIEWS FOR WATER FEATURES ARE
 UNCLEAR PLEASE PROVIDE COMPLETE PIPING DIAGRAMS AND
 DIMENSIONAL DEPTH OF ALL WATER FEATURES. PER WPBAMEND.
 TO FBC SEC.107.2.1
 12. SHT. W2-4.01 REFERS TO DETAIL 8 FOR BOTH DETAILS IN
 SEC B ONE SHOULD REFER TO DETAIL 7. PLEASE CLARIFY. PER
 WPBAMEND. TO FBC SEC.107.2.1
 13. SHOW ALL BACKFLOW DEVICES REQUIRED ON ALL FILL BOXS
 AND AUTO FILLS. TO COMPLY WITH FBC PL. SEC.608.1
 14. ONE URINAL IS REQUIRED IN MEN?S POOL BATHROOM. PER
 FBC PL TABLE 403.6 AND SEC 403.6
 15. EACH POOL BATHROOM SHALL BE EQUIPPED WITH BABY
 CHANGING TABLE .PER FBC PL. SEC. 403.6
 16. PROVIDE MANUFACTURE SPECS ON ALL POOL EQUIPMENT AND
 CHEMICAL TANKS. PER WPB AMEND. TO FBC 107.2.
 17. ON ALL POOL, HOT SPA, JACUZZI, SPLASH PAD AND WATER
 FEATURES. PLEASE SHOW CONTINUATION OF PIPING LABEL AND
 LIST PAGE FOR CONTINUATION. PER WPB AMEND. TO FBC SEC.
 107.2.1
 18. SHOW COMPLIANCE FOR OZONE EQUIPMENT ROOM
 VENTILATION MUST COMPLY WITH FBC SEC. 545.1.6.5.16.4.5
 19. SHOW COMPLIANCE WITH FBC SEC.545.1.6.5.16.4.6 FOR
 SELF-CONTAINED BREATHING APPARATUS.
 20. CONCENTRATION OR OZONE IN THE RETURN LINE TO THE
 SPLASH PAD SHALL NOT EXCEED 0.1MG/2 PER FBC SEC.
 454.1.6.5.16.4.3
 21. SHT. W4-1.03 EQUIPMENT TAG # DT-301 SHALL BE
 INSTALLED IN VERTICAL POSITION PER MANUFACTURE
 INSTALLATION GUIDE.
 22. ALL CARTRIDGE FILTERS SHALL COMPLY WITH FBC
 .1.6.5.5.1 FOR FILTRATION RATE CAPACITIES.
 23. ALL BACKFLOW PREVENTERS SHALL BE LEAD FREE AND
 LISTED ON THE UNIVERSITY OF SOUTHERN CALIFORNIA LIST OF
 APPROVED DEVICES. PER FBC PL SEC. 605.2 AND 605.2.1
 24. PROVIDE MSDS SHEETS FOR ALL CHEMICALS USED. PER WPB
 AMEND. TO FBC 107.2.
 25. SHT. W4-3.01 CHECK THE FLOW ARROWS @ EQUIPMENT TAG
 CL-401 THE SCHEMATIC SHOWS THE FLOW IN OPPOSITE
 DIRECTION@ CL-401 SHALL COMPLY WITH FBC 454.1.6.5.16
 26. SHT. W4-3.01 A FIXED THERMOSTAT SHALL BE MOUNTED ON
 IN POOL RECIRCULATION LINE DOWNSTREAM FROM THE POOL
 HEATER OUTLET. THERMOSTAT MOUNTED ON POOL HEATER
 OUTLETS DOES NOT MEET THIS REQUIREMENT. PER FBC SEC.
 454.1.6.5.14 CHECK ALL SYSTEMS FOR COMPLIANCE.
 27. SHT. W4-3.02 FLOW ARROWS FROM CL-501 ARE REVERSED
 SHALL COMPLY WITH FBC 454.1.6.5.16
 28. OZONE GENERATING EQUIPMENT ELECTRICAL COMPONENTS
 AND WIRING SHALL COMPLY WITH THE REQUIREMENTS OF
 CHAPTER 27 OF THIS CODE AND THE MANUFACTURER SHALL
 PROVIDE A CERTIFICATE OF CONFORMANCE. THE PROCESS
 EQUIPMENT SHALL BE PROVIDED WITH AN EFFECTIVE MEANS TO
 ALERT THE USER WHEN A COMPONENT OF THIS EQUIPMENT IS
 NOT OPERATING PER FBC 454.1.6.5.16.4.1
 29. PROVIDE SPECS FOR CHANNEL DRAINS FOR SPA AND MAIN
 DRAINS FOR POOL. PER WPB AMEND. TO FBC SEC. 107.2.1
 30. PROVIDE SPECS FOR STEAM GENERATOR AND SHOW WHAT IT
 IS GOING TO BE USED FOR. PER WPB AMEND. TO FBC SEC.
 107.2.1
 31. LABEL ALL EQUIPMENT AND CONTROLLERS ON ISOMETRIC
 VIEWS. PER WPB AMEND. TO FBC SEC. 107.2.1
 32. SHOW THE DEPTH OF ALL WATER FEATURES ON SECTION
 DRAWING PER WPB AMEND. TO FBC SEC. 107.2.1.
  
  
 DO TO THE DEFICIENCY'S AND SOME SHEETS BEING UNCLEAR A
 COMPLETE AND COMPREHENSIVE REVIEW OF THE PLUMBING
 SYSTEMS CAN NOT BE COMPLETED AT THIS TIME. THIS MAY
 GENERATE MORE COMMENTS UPON SECOND REVIEW.
  
  
  
  
  
  
  
  
  
  
  
  
  
  
  

Review Stop R ROOF PLAN REVIEW
Rev No 2 Status N Date 2016-08-29 Cont ID  
Sent By jwitmer Date 2016-08-29 Time 17:16 Rev Time 0.00
Received By jwitmer Date 2016-08-29 Time 17:16 Sent To  
Notes
2016-08-29 17:16:25ROOFING PLAN REVIEW
 W. P. B. PERMIT: 15111020
 ADD: 1100 S. FLAGLER DR.
 CONT: SUFFOLK CONSTRUCTION CO.
 TEL: 561-832-1616
 E-MAIL: [email protected]
  
 2010 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2ND REVIEW
 DATE: MON. AUGUST 29 27/2016
 ACTION: BUILDING PROVISO
  
 1) DEFERRED SUBMITTALS:107.3.4.2.
  
 , 1609.6.4.4.1 COMPONENTS & CLADDING. FLORIDA
 DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV. 01/ 2010
 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION SYSTEMS
 THAT WILL REQUIRE PRODUCT APPROVALS:
 (31)
 (D) ROOFING PRODUCTS AND ASSEMBLIES, ROOF TOP CURBS,
 (F) SKYLIGHTS
 (G) PRE-ENGINEERED A/C STANDS
  
 107.3.4.1 THOSE PRODUCTS WHICH ARE REGULATED BY DCA
 RULE 9N-3 SHALL BE REVIEWED AND APPROVED IN WRITING BY
 THE DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status F Date 2016-01-27 Cont ID  
Sent By jwitmer Date 2016-01-23 Time 09:34 Rev Time 0.00
Received By jwitmer Date 2016-01-23 Time 09:33 Sent To  
Notes
2016-01-23 10:07:46ROOFING PLAN REVIEW
 W. P. B. PERMIT: 15111020
 ADD: 1100 S. FLAGLER DR.
 CONT: SUFFOLK CONSTRUCTION CO.
 TEL: 561-832-1616
 E-MAIL: [email protected]
  
 2010 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH
 AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1,
 ADMINISTRATION
  
 2010EXISTING BUILDING CODE LEVEL II 701.3 COMPLIANCE.
 ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND
 SPACES SHALL COMPLY WITH THE REQUIREMENTS OF THE
 FLORIDA BUILDING CODE, BUILDING.
  
 1ST REVIEW
 DATE: WED. JAN. 27/2016
 ACTION: DENIED
  
 1) NO PRODUCT APPROVALS WERE SUBMITTED FOR THIS REVIEW.
  
 , 1609.6.4.4.1 COMPONENTS & CLADDING. FLORIDA
 DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV. 01/ 2010
 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION SYSTEMS
 THAT WILL REQUIRE PRODUCT APPROVALS:
 (31)
 (D) ROOFING PRODUCTS AND ASSEMBLIES, ROOF TOP CURBS,
 (F) SKYLIGHTS
 (G) PRE-ENGINEERED A/C STANDS
  
 107.3.4.1 THOSE PRODUCTS WHICH ARE REGULATED BY DCA
 RULE 9N-3 SHALL BE REVIEWED AND APPROVED IN WRITING BY
 THE DESIGNER OF RECORD PRIOR TO SUBMITTAL FOR
 JURISDICTIONAL APPROVAL.
  
 JAMES A. WITMER CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 4 Status P Date 2017-02-10 Cont ID  
Sent By lmarchan Date 2017-02-10 Time 10:47 Rev Time 0.00
Received By lmarchan Date 2017-02-10 Time 10:47 Sent To  
Notes
2017-02-07 12:12:00CCOLE, 2/7/17
 MECHANICAL PLAN SHEETS, ENERGYGAUGE COMPLIANCE
 SUBMITTAL, AND AC CALCULATIONS VERIFIED.
  
2017-02-06 17:06:542/6/17 PLUMBING,GAS AND POOL SHEETS OK/ GPJ
2017-02-06 13:50:06MON. FEB. 06/2017 ARCHITECTURAL & STRUCTURAL SHEETS
 REVIEWED FOR SIGNATURE, OK. JW

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 3 Status F Date 2017-02-10 Cont ID  
Sent By lmarchan Date 2017-02-10 Time 10:47 Rev Time 0.00
Received By lmarchan Date 2017-02-10 Time 10:47 Sent To  
Notes
2017-01-30 10:17:043RD BUILDING REVIEW, STILL THE ARCHITECTURAL SHEETS NOT
 SIGNED AND SEALED ELECTRONICALLY.
 STRUCTURAL ENGINEERED SHEETS ELECTRONICALLY SEALED.
  
 JAMES A. WITMER BN, PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 CONSTRUCTION SERVICES DIVISION/ DEVELOPMENT SERVICES
 DEPARTMENT
 401 CLEMATIS ST.
 WEST PALM BEACH. FL 33402
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 2 Status F Date 2017-02-10 Cont ID  
Sent By lmarchan Date 2017-02-10 Time 10:47 Rev Time 0.00
Received By lmarchan Date 2017-02-10 Time 10:47 Sent To  
Notes
2016-12-29 13:45:1412/29 /16
  
 NONE OF THE PLUMBING OR POOL SHEETS ARE DIGITALLY
 SIGNED ALL NEED TO BE .
 PER 61G15-23.005 PROCEDURES FOR SIGNING AND SEALING
 ELECTRONICALLY TRANSMITTED PLANS, SPECIFICATIONS,
 REPORTS OR OTHER DOCUMENTS
  
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER LL
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES
 BUILDING DIVISION
 561-805-6711
 [email protected]
  
  
  
  
  
2016-12-20 13:55:20DEC. 20/2016 THERE ARE NO DIGITAL SIGNATURES ON ANY OF
 THE ARCHITECTURAL NOR STRUCTURAL SHEETS. ANOTHER REVIEW
 WILL BE REQUIRED TO VERIFY NONE OF THE ARCHITECTIRAL OR
 STRUCTURAL SHEETS HAVE BEEN CHANGED ONCE THE PLANS ARE
 DIGITALLY SIGNED!!!!!!!!
 STRUCTURAL CALCULATIONS NOT ELECTRONICCALY SIGNED.
 COMPONENTS AND CLADDING REPORT COVERSHEET NOR THE TABLE
 OF CONTENTS IS DIGITALLY SIGNED.
 SMOKE CONTROL RATIONAL ANAYSIS REPORT COVERSHEET NOR
 THE TABLE OF CONTENTS IS DIGITALLY SIGNED.
  
  
 61G15-23.005 PROCEDURES FOR SIGNING AND SEALING
 ELECTRONICALLY TRANSMITTED PLANS, SPECIFICATIONS,
 REPORTS OR OTHER DOCUMENTS
  
  
  
 JAMES A. WITMER BN, PX, CBO
 SENIOR COMMERCIAL COMBINATION PLANS EXAMINER
 TEL: 561-805-6715
 FAX: 561-805-6676
 E-MAIL: [email protected]
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status F Date 2016-03-22 Cont ID  
Sent By skennedy Date 2016-03-22 Time 16:11 Rev Time 0.00
Received By skennedy Date 2016-03-22 Time 16:11 Sent To  
Notes
2016-03-22 17:02:111ST REVIEW: FBC 2014 5TH ED.
  
 PURSUANT TO FAC RULES 61G15 & 61G16, PLANS MUST CONTAIN
 APPROPRIATE TITLE BLOCK INFORMATION, AND IF DIGITALLY
 SIGNED AND SEAL, SUCH SHALL BE AS SET FORTH IN THE
 RULES. ADDITIONALL, DESIGN PROFESSIONALS AND FIRMS MUST
 BE APPROPRIATELY REGISTEREED WITH THE STATE OF FLORIDA.
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status P Date 2016-12-20 Cont ID  
Sent By jwitmer Date 2016-12-20 Time 13:31 Rev Time 0.00
Received By jwitmer Date 2016-12-20 Time 13:31 Sent To  
Notes
2016-12-20 13:32:32THRESHOLD AGREEMENT SIGNED UNDER THE FOUNDATION PERMIT
 :15050292 AS WELL AS THE BUILDING PERMIT 15111020.

Review Stop Z ZONING
Rev No 4 Status P Date 2017-02-07 Cont ID  
Sent By jroach Date 2017-02-07 Time 11:34 Rev Time 0.00
Received By jroach Date 2017-02-07 Time 11:34 Sent To  
Notes
2017-02-07 11:36:25ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 02.07.2017
 PERMIT NO.: 15111020
 ADDRESS: 1100 SOUTH FLAGLER DRIVE
 CONTRACTOR/CONTACT: DAN PETROVIC
 TELEPHONE NO.: 305.590.5000
 SCOPE OF REVIEW: NEW CONDOMINIUM BUILDING.
 ___________________________________________
  
 REVIEW STATUS: PASSED WITH PROVISOS
 ___________________________________________
  
 THIS REVIEW HAS BEEN PASSED SUBJECT TO THE FOLLOWING
 PROVISOS:
  
 1. ALL LANDSCAPE PLANS SHALL BE SUBMITTED AND REVIEWED
 UNDER A SEPARATE LANDSCAPE PERMIT APPLICATION.
  
 2. THE PROPOSED PLANTING WITHIN THE CITY'S RIGHT-OF-WAY
 SHALL BE SUBJECT TO THE REVIEW AND APPROVAL BY THE
 CITY'S ENGINEERING SERVICES DEPARTMENT.
  
 3. PRIOR TO THE ISSUANCE OF THE LANDSCAPE PERMIT, THE
 APPLICANT SHALL SUBMIT THE MOST RECENT APPROVED
 LANDSCAPE PLANS AND TREE MITIGATION CHART AS A REVISION
 TO THE TREE ALTERATION PERMIT.
  
 4. PRIOR TO APPROVAL OF THE FINAL LANDSCAPE INSPECTION,
 LANDSCAPE MATERIAL SHALL BE PROVIDED AROUND THE
 UTILITIES (BACKFLOW PREVENTERS, DOUBLE CHECK DETECTORS,
 ETC.) AT THE SOUTH END OF THE PROPERTY, ALONG SOUTH
 FLAGLER DRIVE, TO MINIMIZE THEIR VISUAL IMPACT. SUCH
 MATERIAL MAY CONSIST OF SHRUBS AND/OR GROUNDCOVER USED
 TO DISGUISE THE UTILITIES. ADDITIONALLY, THE UTILITIES
 SHALL BE PAINTED IN A COLOR THAT MINIMIZES THEIR
 VISIBILITY.
  
 5. A MINOR PD AMENDMENT SHALL BE SUBMITTED TO THE
 DEVELOPMENT SERVICES DEPARTMENT - PLANNING DIVISION TO
 UPDATE ALL PLANS PREVIOUSLY-APPROVED AS PART OF THE
 RESIDENTIAL PLANNED DEVELOPMENT (RPD), REFLECTING ALL
 REVISIONS THAT HAVE OCCURRED TO DATE.
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 F: 561.822.1460
  
 E: [email protected]
  
 W: WPB.ORG
  
  
  
  
  
  
  

Review Stop Z ZONING
Rev No 3 Status F Date 2017-01-11 Cont ID  
Sent By jroach Date 2017-01-11 Time 09:18 Rev Time 0.00
Received By jroach Date 2017-01-11 Time 09:18 Sent To  
Notes
2017-01-11 09:19:35ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 01.11.2017
 PERMIT NO.: 15111020
 ADDRESS: 1100 SOUTH FLAGLER DRIVE
 CONTRACTOR/CONTACT: DAN PETROVIC
 TELEPHONE NO.: 305.590.5000
 SCOPE OF REVIEW: NEW CONDOMINIUM BUILDING.
 ___________________________________________
  
 REVIEW STATUS: FAILED
 ___________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. THE FOLLOWING ITEMS ARE OF CONCERN AND DO NOT MATCH
 THAT WHICH WAS APPROVED THROUGH THE MINOR PD AMENDMENT
 ISSUED ON SEPTEMBER 9, 2015:
  
  A. REGARDING THE PARKING LAYOUT FOR P-2, AS SHOWN ON
 SHEET A0.31 AND A2.0P2:
  
  I. STRUCTURAL COLUMNS APPEAR TO ENCROACH INTO SEVERAL
 PARKING SPACES.
  
  II. PARKING SPACES ORIGINALLY IDENTIFIED ON THE
 PREVIOUSLY-APPROVED PLANS HAVE BEEN REPLACED WITH A DOG
 SPA AND CAR WASH; HAVE THESE SPACES BEEN RELOCATED? ARE
 THEY BEING ELIMINATED FROM THE PARKING COUNT?
  
  B. REGARDING THE PARKING LAYOUT FOR P-1, AS SHOWN ON
 SHEET A0.31 AND A2.0P1:
  
  I. STRUCTURAL COLUMNS APPEAR TO ENCROACH INTO SEVERAL
 PARKING SPACES.
  
  II. PARKING SPACES ORIGINALLY IDENTIFIED ON THE
 PREVIOUSLY-APPROVED PLANS HAVE BEEN ELIMINATED (1 WAS
 REPLACED BY THE NEWLY-IDENTIFIED TURNAROUND). ARE THESE
 SPACES BEING ELIMINATED FROM THE PARKING COUNT?
  
 THE FOLLOWING COMMENTS ARE NOT REQUIRED TO BE ADDRESSED
 PRIOR TO ISSUANCE OF THE BUILDING PERMIT, AND DO NOT
 REQUIRE MODIFICATIONS TO THE BUILDING PLANS AS PART OF
 THIS SUBMITTAL, BUT SHOULD BE CONSIDERED AS PROVISOS:
  
 1. ALL LANDSCAPE PLANS SHALL BE SUBMITTED AND REVIEWED
 UNDER A SEPARATE LANDSCAPE PERMIT APPLICATION.
  
 2. THE PROPOSED PLANTING WITHIN THE CITY'S RIGHT-OF-WAY
 SHALL BE SUBJECT TO THE REVIEW AND APPROVAL BY THE
 CITY'S ENGINEERING SERVICES DEPARTMENT.
  
 3. PRIOR TO THE ISSUANCE OF THE LANDSCAPE PERMIT, THE
 APPLICANT SHALL SUBMIT THE MOST RECENT APPROVED
 LANDSCAPE PLANS AND TREE MITIGATION CHART AS A REVISION
 TO THE TREE ALTERATION PERMIT.
  
 4. PRIOR TO APPROVAL OF THE FINAL LANDSCAPE INSPECTION,
 LANDSCAPE MATERIAL SHALL BE PROVIDED AROUND THE
 UTILITIES (BACKFLOW PREVENTERS, DOUBLE CHECK DETECTORS,
 ETC.) AT THE SOUTH END OF THE PROPERTY, ALONG SOUTH
 FLAGLER DRIVE, TO MINIMIZE THEIR VISUAL IMPACT. SUCH
 MATERIAL MAY CONSIST OF SHRUBS AND/OR GROUNDCOVER USED
 TO DISGUISE THE UTILITIES. ADDITIONALLY, THE UTILITIES
 SHALL BE PAINTED IN A COLOR THAT MINIMIZES THEIR
 VISIBILITY.
  
 5. A MINOR PD AMENDMENT SHALL BE SUBMITTED TO THE
 DEVELOPMENT SERVICES DEPARTMENT - PLANNING DIVISION TO
 UPDATE ALL PLANS PREVIOUSLY-APPROVED AS PART OF THE
 RESIDENTIAL PLANNED DEVELOPMENT (RPD), REFLECTING ALL
 REVISIONS THAT HAVE OCCURRED TO DATE.
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 F: 561.822.1460
  
 E: [email protected]
  
 W: WPB.ORG
  
  
  
  
  
  
  

Review Stop Z ZONING
Rev No 2 Status F Date 2016-08-23 Cont ID  
Sent By jroach Date 2016-08-23 Time 15:59 Rev Time 0.00
Received By jroach Date 2016-08-23 Time 15:59 Sent To  
Notes
2016-08-23 16:20:18ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 8.23.2016
 PERMIT NO.: 15111020
 ADDRESS: 1100 SOUTH FLAGLER DRIVE
 CONTRACTOR/CONTACT: DAN PETROVIC
 TELEPHONE NO.: 305.590.5000
 SCOPE OF REVIEW: NEW CONDOMINIUM BUILDING.
 ___________________________________________
  
 REVIEW STATUS: FAILED
 ___________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. THE FOLLOWING ITEMS ARE OF CONCERN AND DO NOT MATCH
 THAT WHICH WAS APPROVED THROUGH THE MINOR PD AMENDMENT
 ISSUED ON SEPTEMBER 9, 2015:
  
  A. REGARDING THE PARKING LAYOUT FOR P-2, AS SHOWN ON
 SHEET A0.31 AND A2.0P2:
  
  I. A PARKING TURN-AROUND NEEDS TO BE PROVIDED IN THE
 NORTHWEST CORNER OF THE GARAGE AS THIS IS A DEAD-END.
  
  II. STRUCTURAL COLUMNS APPEAR TO ENCROACH INTO
 SEVERAL PARKING SPACES.
  
  B. REGARDING THE PARKING LAYOUT FOR P-1, AS SHOWN ON
 SHEET A0.31 AND A2.0P1:
  
  I. A PARKING TURN-AROUND NEEDS TO BE PROVIDED IN THE
 NORTHEAST CORNER OF THE GARAGE AS THIS IS A DEAD-END.
  
  II. STRUCTURAL COLUMNS APPEAR TO ENCROACH INTO
 SEVERAL PARKING SPACES.
  
 2. PARKING STRIPING DETAIL SHALL BE PROVIDED.
  
 3. IT IS STAFF'S UNDERSTANDING THAT THE FIRE LANE ON
 THE SOUTH, EAST, AND NORTH SIDES OF THE BUILDING IS NO
 LONGER REQUIRED. IT IS STRONGLY ENCOURAGED THAT THIS
 AREA BE LOOKED AT FOR ADDITIONAL LANDSCAPING AND DESIGN
 ELEMENTS THAT MAY NOW BE INSTALLED.
  
 4. PLEASE PROVIDE THE OUTLINE OF THE TOWER ON THE SITE
 PLAN, ENSURING COMPLIANCE WITH THE APPROVED SETBACK.
  
 5. FURTHER EXPLANATION AND DISCUSSION NEEDS TO BE HAD
 REGARDING GUEST SUITES. ACCORDING TO THE PLANS IT
 APPEARS THAT 12 GUEST SUITES ARE PROPOSED.
  
 6. PHOTOMETRIC PLANS SHALL BE PROVIDED FOR ALL EXTERIOR
 LIGHTING, AND LEVELS SHALL NOT EXCEED 0.5 FOOTCANDLES
 WHEN MEASURED AT THE PROPERTY LINE.
  
 THE FOLLOWING COMMENTS ARE NOT REQUIRED TO BE ADDRESSED
 PRIOR TO ISSUANCE OF THE BUILDING PERMIT, AND DO NOT
 REQUIRE MODIFICATIONS TO THE BUILDING PLANS AS PART OF
 THIS SUBMITTAL, BUT SHOULD BE CONSIDERED AS PROVISOS:
  
 1. ALL LANDSCAPE PLANS SHALL BE SUBMITTED AND REVIEWED
 UNDER A SEPARATE LANDSCAPE PERMIT APPLICATION.
  
 2. THE PROPOSED PLANTING WITHIN THE CITY'S RIGHT-OF-WAY
 SHALL BE SUBJECT TO THE REVIEW AND APPROVAL BY THE
 CITY'S ENGINEERING SERVICES DEPARTMENT.
  
 3. PRIOR TO THE ISSUANCE OF THE LANDSCAPE PERMIT, THE
 APPLICANT SHALL SUBMIT THE MOST RECENT APPROVED
 LANDSCAPE PLANS AND TREE MITIGATION CHART AS A REVISION
 TO THE TREE ALTERATION PERMIT.
  
 4. PRIOR TO APPROVAL OF THE FINAL LANDSCAPE INSPECTION,
 LANDSCAPE MATERIAL SHALL BE PROVIDED AROUND THE
 UTILITIES (BACKFLOW PREVENTERS, DOUBLE CHECK DETECTORS,
 ETC.) AT THE SOUTH END OF THE PROPERTY, ALONG SOUTH
 FLAGLER DRIVE, TO MINIMIZE THEIR VISUAL IMPACT. SUCH
 MATERIAL MAY CONSIST OF SHRUBS AND/OR GROUNDCOVER USED
 TO DISGUISE THE UTILITIES. ADDITIONALLY, THE UTILITIES
 SHALL BE PAINTED IN A COLOR THAT MINIMIZES THEIR
 VISIBILITY.
  
 5. A MINOR PD AMENDMENT SHALL BE SUBMITTED TO THE
 DEVELOPMENT SERVICES DEPARTMENT - PLANNING DIVISION TO
 UPDATE ALL PLANS PREVIOUSLY-APPROVED AS PART OF THE
 RESIDENTIAL PLANNED DEVELOPMENT (RPD), REFLECTING ALL
 REVISIONS THAT HAVE OCCURRED TO DATE.
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 F: 561.822.1460
  
 E: [email protected]
  
 W: WPB.ORG
  
 1/8/15

Review Stop Z ZONING
Rev No 1 Status F Date 2016-04-13 Cont ID  
Sent By jroach Date 2016-04-13 Time 16:08 Rev Time 0.00
Received By jroach Date 2016-04-13 Time 16:07 Sent To  
Notes
2016-04-13 16:20:53ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 04.13.2016
 PERMIT NO.: 15111020
 ADDRESS: 1100 SOUTH FLAGLER DRIVE
 CONTRACTOR/CONTACT: DAN PETROVIC
 TELEPHONE NO.: 305.590.5000
 SCOPE OF REVIEW: NEW CONDOMINIUM BUILDING.
 ___________________________________________
  
 REVIEW STATUS: FAILED
 ___________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. ALL LANDSCAPE PLANS SHALL BE SUBMITTED AND REVIEWED
 UNDER A SEPARATE LANDSCAPE PERMIT APPLICATION.
  
 2. THE PROPOSED PLANTING WITHIN THE CITY?S RIGHT-OF-WAY
 SHALL BE SUBJECT TO THE REVIEW AND APPROVAL BY THE
 CITY?S ENGINEERING SERVICES DEPARTMENT.
  
 3. THE ROYAL PALMS PROPOSED TO BE LOCATED WITHIN THE
 CITY?S RIGHT-OF-WAY SHALL MATCH THE HEIGHT OF THOSE
 CURRENTLY LOCATED ALONG SOUTH FLAGLER DRIVE, SOUTH OF
 THE PROPOSED DEVELOPMENT; PLEASE INDICATE THIS ON THE
 PLANS.
  
 4. ALL GLASS MATERIALS SHALL BE REVIEWED AND APPROVED
 BY THE CITY?S DEVELOPMENT SERVICES DEPARTMENT ?
 PLANNING DIVISION, AND SHALL CONFORM TO THE FLORIDA
 BUILDING CODE. ALL GLASS SHALL BE HIGHLY TRANSPARENT
 AND SHALL NOT BE HEAVILY TINTED WITH A COLOR, INCLUDING
 BUT NOT LIMITED TO BLUE OR GREEN. PLEASE CLARIFY THAT
 GLAZING MATERIAL THAT HAS BEEN SPECIFIED AS ?SPANDREL
 GLASS? WITH ?CHARCOAL GREY? COVERAGE.
  
 5. ANY EXHAUST FANS REQUIRED FOR THE VENTILATION OF THE
 ENCLOSED PARKING GARAGE SHALL BE DIRECTED AWAY FROM
 ADJACENT RESIDENTIAL DEVELOPMENT SO AS NOT TO CREATE A
 NUISANCE FROM NOISE AND/OR FUMES.
  
 6. PRIOR TO THE ISSUANCE OF THE LANDSCAPE PERMIT, THE
 APPLICANT SHALL SUBMIT THE MOST RECENT APPROVED
 LANDSCAPE PLANS AND TREE MITIGATION CHART AS A REVISION
 TO THE TREE ALTERATION PERMIT.
  
 7. PRIOR TO APPROVAL OF THE FINAL LANDSCAPE INSPECTION,
 LANDSCAPE MATERIAL SHALL BE PROVIDED AROUND THE
 UTILITIES (BACKFLOW PREVENTERS, DOUBLE CHECK DETECTORS,
 ETC.) AT THE SOUTH END OF THE PROPERTY, ALONG SOUTH
 FLAGLER DRIVE, TO MINIMIZE THEIR VISUAL IMPACT. SUCH
 MATERIAL MAY CONSIST OF SHRUBS AND/OR GROUNDCOVER USED
 TO DISGUISE THE UTILITIES. ADDITIONALLY, THE UTILITIES
 SHALL BE PAINTED IN A COLOR THAT MINIMIZES THEIR
 VISIBILITY.
  
 8. ALL LANDSCAPE MATERIAL WITHIN THE VIEW CORRIDOR FROM
 SOUTH FLAGLER DRIVE TO THE INTRACOASTAL WATERWAY,
 LOCATED SOUTH OF THE PROPOSED BUILDING, SHALL BE
 MAINTAINED AT A HEIGHT SUCH THAT IT DOES NOT BLOCK THE
 VIEWS.
  
 9. SUBJECT TO THE REVIEW AND APPROVAL BY THE CITY?S
 DEVELOPMENT SERVICES ? PLANNING DIVISION STAFF, SMALL
 PEDESTRIAN-SCALE SIGNAGE SHALL BE PLACED AT THE NORTH
 AND SOUTH ENDS OF THE PUBLIC WALKWAY, IN CLOSE
 PROXIMITY TO SOUTH FLAGLER DRIVE, IDENTIFYING THE
 WALKWAY AS BEING OPEN FOR USE BY THE GENERAL PUBLIC AS
 WELL AS THE HOURS WITH WHICH IT IS OPEN. SUCH SIGNAGE
 SHALL BE INSTALLED PRIOR TO THE ISSUANCE OF THE FIRST
 CERTIFICATE OF OCCUPANCY.
  
 10. THE ZONING TABLE ON SHEET A0.25 IS NOT COMPLETE. A
 DATA TABLE SHALL BE PROVIDED INDICATING THE FOLLOWING:
  
  A. EXISTING/PROPOSED LAND USE AND ZONING.
  
  B. TOTAL ACRES OF THE PROJECT.
  
  C. TOTAL GROSS BUILDING SQUARE FOOTAGE.
  
  D. PERCENT OF OPEN SPACE, LANDSCAPING, BUILDING
 COVERAGE & IMPERMEABLE SURFACE.
  
  E. DENSITY AND NUMBER OF DWELLING UNITS (RESIDENTIAL).
  
  F. PARKING COMPUTATIONS (PARKING REQUIRED, PROVIDED,
 ETC.)
  
  G. FLOOR AREA RATIO (FAR).
  
 11. THE FOLLOWING ITEMS ARE OF CONCERN AND DO NOT MATCH
 THAT WHICH WAS APPROVED THROUGH THE MINOR PD AMENDMENT
 ISSUED ON SEPTEMBER 9, 2015:
  
  A. REGARDING THE PARKING LAYOUT FOR P-2, AS SHOWN ON
 SHEET A0.31 AND A2.0P2:
  
  I. A PARKING TURN-AROUND NEEDS TO BE PROVIDED IN THE
 NORTHWEST CORNER OF THE GARAGE AS THIS IS A DEAD-END.
  
  II. STRUCTURAL COLUMNS APPEAR TO ENCROACH INTO
 SEVERAL PARKING SPACES.
  
  III. PARKING SPACES ARE SHOWN IN THE CENTER OF THE
 BUILDING, BETWEEN THE TWO (2) CENTRAL CORES, WHICH ARE
 INACCESSIBLE.
  
  B. REGARDING THE PARKING LAYOUT FOR P-1, AS SHOWN ON
 SHEET A0.31 AND A2.0P1:
  
  I. A PARKING TURN-AROUND NEEDS TO BE PROVIDED IN THE
 NORTHEAST CORNER OF THE GARAGE AS THIS IS A DEAD-END.
  
  II. STRUCTURAL COLUMNS APPEAR TO ENCROACH INTO
 SEVERAL PARKING SPACES.
  
  III. PARKING SPACES ARE SHOWN IN THE CENTER OF THE
 BUILDING, BETWEEN THE TWO (2) CENTRAL CORES, WHICH ARE
 INACCESSIBLE.
  
  C. A WALKWAY AND CORRESPONDING MODIFICATIONS HAVE BEEN
 ADDED CONNECTING THE MAIN ENTRANCE TO THE PUBLIC
 WALKWAY ALONG THE SOUTH PROPERTY LINE.
  
 12. PARKING STRIPING DETAIL SHALL BE PROVIDED.
  
 13. PLEASE NOTE THAT THE TEMPORARY STRIPING OF FLAGLER
 DRIVE THAT WAS DONE AS PART OF THE FIRST BAPTIST CHURCH
 IMPROVEMENTS IS TO BE EVALUATED TO DETERMINE IF ANY
 ADJUSTMENTS ARE NEEDED PRIOR TO
 MILLING/RESURFACING/STRIPING. ADDITIONALLY, PURSUANT TO
 RESOLUTION NO. 140-14? ?TO THE MAXIMUM EXTENT POSSIBLE,
 THE DEVELOPER SHALL WORK WITH ALL APPLICABLE
 CONTROLLING GOVERNMENT AGENCIES FOR THE DESIGN AND
 INSTALLATION OF A MEDIAN IN SOUTH FLAGLER DRIVE ALONG
 THE DEVELOPMENT?S FRONTAGE. THE MEDIAN MAY CONTAIN THE
 APPROPRIATE TURN LANES DEEMED NECESSARY. THE DESIGN OF
 THE MEDIAN SHALL BE COMPLETE PRIOR TO THE ISSUANCE OF A
 BUILDING PERMIT FOR THE RESIDENTIAL CONDOMINIUM, AND
 CONSTRUCTION OF THE MEDIAN SHALL BE COMPLETE PRIOR TO
 THE ISSUANCE OF THE FIRST CERTIFICATE OF OCCUPANCY. THE
 DEVELOPER SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED
 WITH PERMITTING, CONSTRUCTION, ETC. AND SHALL BE
 RESPONSIBLE FOR MAINTENANCE IN PERPETUITY. IF IT IS
 DETERMINED BY THE APPLICABLE CONTROLLING GOVERNMENT
 AGENCIES THAT A MEDIAN WILL NOT BE VIABLE, THE
 DEVELOPER SHALL BE RELIEVED OF THIS OBLIGATION.?
  
 14. IT IS STAFF?S UNDERSTANDING THAT THE FIRE LANE ON
 THE SOUTH, EAST, AND NORTH SIDES OF THE BUILDING IS NO
 LONGER REQUIRED. IT IS STRONGLY ENCOURAGED THAT THIS
 AREA BE LOOKED AT FOR ADDITIONAL LANDSCAPING AND DESIGN
 ELEMENTS THAT MAY NOW BE INSTALLED.
  
 15. PLEASE PROVIDE THE OUTLINE OF THE TOWER ON THE SITE
 PLAN, ENSURING COMPLIANCE WITH THE APPROVED SETBACK.
  
 16. FURTHER EXPLANATION AND DISCUSSION NEEDS TO BE HAD
 REGARDING GUEST SUITES. ACCORDING TO THE PLANS IT
 APPEARS THAT 12 GUEST SUITES ARE PROPOSED.
  
 17. PLEASE PROVIDE ELEVATION POINTS AS SHOWN ON THE
 SITE PLAN APPROVED THROUGH THE MINOR PD AMENDMENT.
 SHEET A1.01 OF THE PERMIT PLANS HAS AN ELEVATION OF
 22?6? FOR THE PATIO/DECK AT THE NORTHEAST CORNER OF THE
 BUILDING; THIS IS 1?6? HIGHER THAN WHAT WAS INDICATED
 ON THE MINOR PD AMENDMENT. PLEASE CLARIFY ANY
 MODIFICATIONS THAT HAVE BEEN MADE SINCE THE SEPTEMBER
 9, 2015, APPROVAL.
  
 18. NOTE, THE SPA CANNOT BE OPEN TO THE PUBLIC AND
 SHALL ONLY BE MADE AVAILABLE TO RESIDENTS.
  
 19. PHOTOMETRIC PLANS SHALL BE PROVIDED FOR ALL
 EXTERIOR LIGHTING, AND LEVELS SHALL NOT EXCEED 0.5
 FOOTCANDLES WHEN MEASURED AT THE PROPERTY LINE.
  
 20. DETAILS SHALL BE PROVIDED REGARDING ALL SITE
 LIGHTING, INCLUDING POLE HEIGHT.
  
 21. THE WALLS/GATES IN THE SOUTHWEST CORNER OF THE
 PROPERTY HAVE BEEN MODIFIED SINCE THE SEPTEMBER 9, 2015
 APPROVAL OF THE MINOR PD AMENDMENT.
  
 22. PRODUCT SPECIFICATIONS SHALL BE PROVIDED FOR THE
 ARTIFICIAL TURF INDICATING COMPLIANCE WITH THE MINIMUM
 STANDARDS OF SECTION 94?451 OF THE CITY?S ZONING AND
 LAND DEVELOPMENT REGULATIONS.
  
 23. THE ENTRY GATE, WALL, AND SIGNAGE HAS ALL BEEN
 MODIFIED SINCE THE SEPTEMBER 9, 2015, APPROVAL OF THE
 MINOR PD AMENDMENT. THERE NEEDS TO BE DISCUSSION
 REGARDING THE IMPLICATIONS OF THIS CHANGE AND
 COMPLIANCE WITH THE SIGN REGULATIONS OF THE CITY?S
 ZONING AND LAND DEVELOPMENT REGULATIONS.
  
 24. ON SHEET L4.10, THE PAGE REFERENCES FOR SOME OF THE
 DETAILS ARE INCORRECT. FOR EXAMPLE, SHEET L4.10 REFERS
 TO DETAIL 3 ON SHEET L4.50 FOR AN ELEVATION OF THE
 PEDESTRIAN GATE CROSSING THE PUBLIC PROMENADE; DETAIL 3
 ON SHEET L4.50 IS THE EXIT GATE ELEVATION. ENSURE THAT
 ALL PAGE # AND DETAIL # REFERENCES ARE CORRECT.
 25. THE PROPOSED FENCE/GATE MATERIALS AND SOME SIZES
 HAVE BEEN MODIFIED FROM WHAT WAS PREVIOUSLY APPROVED,
 AND THERE IS CONCERN REGARDING WHAT IS PROPOSED.
  
 26. IT APPEARS THAT WITH MODIFICATIONS TO THE LANDSCAPE
 PLAN, FENCING, ETC., THE VIEW CORRIDOR AND OPEN LAWN
 AREA ON THE SOUTH SIDE OF THE BUILDING HAS ALMOST
 ENTIRELY BEEN ELIMINATED AND NO LONGER COMPLIES WITH
 THAT WHICH WAS PREVIOUSLY APPROVED. DISCUSSION NEEDS TO
 OCCUR REGARDING THIS MATTER.
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 F: 561.822.1460
  
 E: [email protected]
  
 W: WPB.ORG
  
2016-01-08 13:46:231/8/15


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved