| Plan Review Stops For Permit 15110575 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2016-02-04 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2016-02-04 |
Time |
13:16 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2016-02-04 |
Time |
13:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2015-12-15 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-12-15 |
Time |
13:51 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-12-15 |
Time |
13:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-11-21 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-11-21 |
Time |
18:39 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-11-21 |
Time |
18:39 |
Sent To |
|
|
| Notes |
| 2015-11-21 18:51:08 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. A1, BUILDING TYPE (PER PERMIT 99010529, SHEET B | | | LS1.01) IS TYPE II, 3 HOUR STRUCTURAL ELEMENTS. REVISE | | | "CODE INFORMATION". | | | | | | 2. REVISE DETAIL 4-A3 TO SHOW COMPLIANCE WITH FBC 2014 | | | ACCESSIBILITY 306. | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2016-01-07 |
|
|
Cont ID |
|
| Sent By |
mvaldes |
Date |
2016-01-07 |
Time |
10:43 |
Rev Time |
0.00 |
| Received By |
mvaldes |
Date |
2016-01-07 |
Time |
10:43 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2015-11-30 |
|
|
Cont ID |
|
| Sent By |
dharvey |
Date |
2015-11-30 |
Time |
13:26 |
Rev Time |
0.00 |
| Received By |
dharvey |
Date |
2015-11-30 |
Time |
12:59 |
Sent To |
Z |
|
| Notes |
| 2015-11-30 13:26:15 | CORRECT ELECTRICAL CODE REFERENCE IS 2011, NOT 2008. | | | ALL DEVICES NOTED IN NOTE 7 ARE TO BE LABELED FOR THE | | | LOCATION AS WELL. | | | 120V WATER HEATER FEED IN NOTE 8 DOES NOT APPEAR ON THE | | | PAQNEL SCHEDULE. | | | NOTE 16 DOES NOT INDICATETHE EQUIPMENT IT IS | | | REFERENCING TO BE CONNECTED. | | | NO ENERGY CODE COMPLIANCE FOR FBC-ENERGY APPEARS TO BE | | | CONNECTED. | | | NO REFERENCE IS MADE TO INDICATE COMPLIANCE WITH THE | | | ELECTRICAL REQUIREMENTS OF THE FBC-ENERGY. | | | CEILING FANS APPEAR TO BE EXISTING, HOWEVER, NO LOAD OR | | | CIRCUITIS INDICATED. | | | ARE GFCI RECEPTACLES PROPOSED AT THE BATHROOM BASINS? | | | NONE APPEAR TO BE INDICATED. | | | NOTES INDICATE AIR CONDITIONING/MECHANICAL WORK. NONE | | | IS SHOWN |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2016-01-29 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2016-02-01 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2016-01-29 |
Time |
16:00 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2015-12-11 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-12-11 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-12-11 |
Time |
14:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2015-11-25 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-11-25 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-11-25 |
Time |
11:39 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2016-02-04 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2016-02-04 |
Time |
13:16 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2016-01-25 |
Time |
11:25 |
Sent To |
|
|
| Notes |
| 2016-01-26 11:25:17 | RESUB ROUTED TO ESCHNEIDER VIA SGRAHAM'S DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-01-07 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2016-01-07 |
Time |
13:27 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2015-12-09 |
Time |
14:09 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-12-03 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-12-03 |
Time |
14:45 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-11-13 |
Time |
12:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
4 |
Status |
N |
Date |
2016-02-04 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2016-02-04 |
Time |
14:00 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2016-02-04 |
Time |
14:00 |
Sent To |
|
|
| Notes |
| 2016-02-04 14:01:08 | IMPACT FEES NOT REQUIRED PER MICHELLE, PBC. CST |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
3 |
Status |
F |
Date |
2016-02-04 |
|
|
Cont ID |
|
| Sent By |
cthroop |
Date |
2016-02-04 |
Time |
13:16 |
Rev Time |
0.00 |
| Received By |
cthroop |
Date |
2016-02-04 |
Time |
13:16 |
Sent To |
|
|
| Notes |
| 2016-02-04 13:18:09 | CHRISTOPHER S. THROOP, C.B.O. | | | BLDG. PLANS EXAMINER ? PX3169 | | | (561) 805-6718 | | | [email protected] | | | | | | PLANS REQUIRE REVIEW BY THE PBC IMPACT FEE OFFICE. CALL | | | 233-5025. UPON APPROVAL, YOU MAY CHECK OUT ONE PLAN AND | | | TAKE TO THAT OFFICE FOR REVIEW. PLEASE RETURN STAMPED | | | WITH A COPY OF RECEIPT AS APPLICABLE. |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
F |
Date |
2016-01-07 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2016-01-07 |
Time |
13:27 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2016-01-07 |
Time |
13:27 |
Sent To |
|
|
| Notes |
| 2016-01-07 13:27:26 | IMPACT FEES STILL REQUIRED. |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2015-12-03 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-12-03 |
Time |
14:48 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-12-03 |
Time |
14:48 |
Sent To |
|
|
| Notes |
| 2015-12-03 14:49:12 | 1ST REVIEW: FBC 2014 5TH ED. | | | | | | PLANS REQUIRE REVIEW BY THE PBC IMPACT FEE OFFICE. CALL | | | 233-5025. UPON APPROVAL, YOU MAY CHECK OUT ONE PLAN AND | | | TAKE TO THAT OFFICE FOR REVIEW. PLEASE RETURNED STAMPED | | | WITH A COPY OF RECEIPT AS APPLICABLE. | | | | | | | | | STEVEN KENNEDY, CBO | | | CHIEF PLANS EXAMINER | | | (561) 805-6710 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
N |
Date |
2015-12-17 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-12-17 |
Time |
09:03 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-12-17 |
Time |
09:03 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2015-11-23 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-11-23 |
Time |
09:27 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-11-23 |
Time |
09:27 |
Sent To |
|
|
| Notes |
| 2015-11-23 09:33:18 | 1ST REVIEW 2014 MECHANICAL | | | PERMIT #15110575 | | | 11/23/15 | | | | | | 1) PLEASE CLARIFY THE SCOPE OF MECHANICAL WORK FOR THE | | | PROPOSED PROJECT. WILL ANY OF THE BAR EQUIPMENT REQUIRE | | | REFRIGERATION SYSTEMS AND REMOTE CONDENSERS? WILL NEW | | | TOILET ROOM EXHAUST FANS AND EXHAUST DUCTS BE | | | INSTALLED? | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2015-12-14 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2015-12-14 |
Time |
15:06 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2015-12-14 |
Time |
15:06 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2015-11-20 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2015-11-20 |
Time |
16:12 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2015-11-20 |
Time |
16:12 |
Sent To |
|
|
| Notes |
| 2015-11-20 16:37:00 | 1ST REVIEW: FBC 2014 | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | | | | PLUMBING COMMENTS: | | | | | | 1. PLEASE SHOW DISTANCE FROM WATER HEATER .HOT WATER | | | SYSTEM SHALL CONFORM TO FBC P SEC 607.2 HOT OR TEMPERED | | | WATER SUPPLY TO FIXTURES. | | | THE DEVELOPED LENGTH OF HOT OR TEMPERED WATER PIPING, | | | FROM THE SOURCE OF HOT WATER TO THE FIXTURES THAT | | | REQUIRE HOT OR TEMPERED WATER, SHALL NOT EXCEED 50 FEET | | | (15 240 MM). RECIRCULATING SYSTEM PIPING AND | | | HEAT-TRACED PIPING SHALL BE CONSIDERED TO BE SOURCES OF | | | HOT OR TEMPERED WATER. | | | 2.VENT NEEDED ON TH SIDE WHERE THER ARE 2 FLOOR SINKS | | | AND1 FLOOR DRAIN.SHALL COMPLY WITH FBC P SEC 915.2.3 | | | CONNECTION. | | | THE COMBINATION WASTE AND VENT SYSTEM SHALL BE PROVIDED | | | WITH A DRY VENT CONNECTED AT ANY POINT WITHIN THE | | | SYSTEM OR THE SYSTEM SHALL CONNECT TO A HORIZONTAL | | | DRAIN THAT IS VENTED IN ACCORDANCE WITH ONE OF THE | | | VENTING METHODS SPECIFIED IN THIS CHAPTER. COMBINATION | | | WASTE AND VENT SYSTEMS CONNECTING TO BUILDING DRAINS | | | RECEIVING ONLY THE DISCHARGE FROM A STACK OR STACKS | | | SHALL BE PROVIDED WITH A DRY VENT. THE VENT CONNECTION | | | TO THE COMBINATION WASTE AND VENT PIPE SHALL EXTEND | | | VERTICALLY TO A POINT NOT LESS THAN 6 INCHES (152 MM) | | | ABOVE THE FLOOD LEVEL RIM OF THE HIGHEST FIXTURE BEING | | | VENTED BEFORE OFFSETTING HORIZONTALLY. | | | 3.GRAB BARS SHALL BE MEASURED FROM THE TOP OF THE | | | GRIPPING SURFACE. PER FBC ACC. SEC 609.4 | | | 4. TOILET PAPER DISPENSER SHALL COMPLY WITH FBC ACC. | | | SEC 604.7 DISPENSERS. | | | TOILET PAPER DISPENSERS SHALL COMPLY WITH 309.4 AND | | | SHALL BE 7 INCHES (180 MM) MINIMUM AND 9 INCHES (230 | | | MM) MAXIMUM IN FRONT OF THE WATER CLOSET MEASURED TO | | | THE CENTERLINE OF THE DISPENSER. THE OUTLET OF THE | | | DISPENSER SHALL BE 15 INCHES (380 MM) MINIMUM AND 48 | | | INCHES (1220 MM) MAXIMUM ABOVE THE FINISH FLOOR AND | | | SHALL NOT BE LOCATED BEHIND GRAB BARS. DISPENSERS SHALL | | | NOT BE OF A TYPE THAT CONTROLS DELIVERY OR THAT DOES | | | NOT ALLOW CONTINUOUS PAPER FLOW. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2016-01-28 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2016-01-28 |
Time |
15:45 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2016-01-28 |
Time |
15:04 |
Sent To |
FIRE |
|
| Notes |
| 2016-01-28 15:45:40 | PASSED | | | | | | THE TENSION FABRIC CANOPY MAY NOT BE MADE OUT OF VINYL. | | | | | | | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
F |
Date |
2015-12-16 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2015-12-16 |
Time |
17:17 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2015-12-16 |
Time |
16:44 |
Sent To |
|
|
| Notes |
| 2015-12-16 17:18:22 | FAILED | | | | | | 1) REPEAT COMMENT: PLEASE PROVIDE INFORMATION ON THE | | | NEW TENSION FABRIC. PLEASE NOTE THAT THIS MAY NOT BE | | | MADE OUT OF VINYL. | | | | | | 2) REPEAT COMMENT: STAFF IS CONCERNED WITH THE FOUR | | | "HIGH COMMUNAL TABLES" AND THE ADJOINING CHAIRS | | | IMPEDING THE TRAVEL WAYS. PLEASE PROVIDE THE DIMENSION | | | LINE FROM THE BACK OF A CHAIR IN ITS OCCUPIED STATE TO | | | THE WALL OF THE BAYS TO EITHER SIDE OF THE OUTDOOR BAR | | | (CITY CELLAR AND THE FUTURE TAP HOUSE) ON THE OVERALL | | | SITE PLAN. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | | | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2015-12-03 |
|
|
Cont ID |
|
| Sent By |
eshcneid |
Date |
2015-12-03 |
Time |
13:52 |
Rev Time |
0.50 |
| Received By |
eschneid |
Date |
2015-12-03 |
Time |
13:52 |
Sent To |
|
|
| Notes |
| 2015-12-03 14:17:38 | FAILED | | | | | | 1) PLEASE PROVIDE INFORMATION ON THE NEW TENSION | | | FABRIC. PLEASE NOTE THAT THIS MAY NOT BE MADE OUT OF | | | VINYL. | | | | | | 2) STAFF IS CONCERNED WITH THE FOUR "HIGH COMMUNAL | | | TABLES" AND THE ADJOINING CHAIRS IMPEDING THE TRAVEL | | | WAYS. PLEASE PROVIDE THE DIMENSION LINE FROM THE BACK | | | OF A CHAIR IN ITS OCCUPIED STATE TO THE WALL OF THE | | | BAYS TO EITHER SIDE OF THE OUTDOOR BAR (CITY CELLAR AND | | | THE FUTURE TAP HOUSE) ON THE OVERALL SITE PLAN. | | | | | | CONTACT ERIC SCHNEIDER @ (561) 822-1446. | | | | | | | | | | | | |
|
|