Plan Review Details - Permit 15110258
| Plan Review Stops For Permit 15110258 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2015-11-20 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2015-11-20 |
Time |
17:42 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2015-11-20 |
Time |
15:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2015-11-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2015-11-13 |
Time |
18:47 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2015-11-13 |
Time |
18:47 |
Sent To |
|
|
| Notes |
| 2015-11-13 18:47:10 | PLAN | | | REVIEW COMMENTS | | | | | | 3RD REVIEW: FBC FIFTH EDITION (2014) | | | ROBERT MCDOUGAL, CBO | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | (561) 805-6714 | | | [email protected] | | | | | | DENIED BY BUILDING | | | PLEASE ADDRESS THE ITEMS NOTED BELOW: | | | | | | 1) THE RAS 117 CALCULATIONS ARE INCORRECT. THE VULT | | | WINDSPEED FOR RISK CATEGORY IV FOR THIS BUILDING IS | | | GREATER THAN 170MPH. SEE WIND SPEED MAP FIGURE 1609B IN | | | THE FBC-BUILDING, 5TH EDITION (2014). THE FASTER WIND | | | SPEED WILL CREATE INCREASED DESIGN PRESSURES. THE THREE | | | ENHANCED FASTENING DOCUMENTS THAT WERE SUBMITTED ALL | | | HAVE THE SAME ROOF ZONE PRESSURES SPECIFIED, HOWEVER, | | | THE LAP SPACING WAS DECREASED. PLEASE REVISE THE | | | DOCUMENTS TO COMPLY WITH THE 2014 FBC. | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2015-11-12 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2015-11-12 |
Time |
13:17 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2015-11-12 |
Time |
13:17 |
Sent To |
|
|
| Notes |
| 2015-11-12 13:29:47 | RE-ROOF SECOND BUILDING REVIEW CHECKLIST.COMMENTS. | | | CODE: FBC 5TH EDITION (2014) | | | | | | 1- ENGINEER TO REVISE THE RAS 117 CALCULATIONS | | | SUBMITTED: | | | A) THE RISK CATEGORY IS INCORRECT. SEE TABLE 1604.5 OF | | | FBC-BUILDING, 5TH EDITION (2014) AND REVISE AS | | | REQUIRED. REVISE DESIGN PRESSURES ACCORDINGLY. | | | RESPONSE: THE SELECTED RISK CATEGORY IS INCORRECT | | | AGAIN. THIS IS A HOSPITAL. THIS IS NOT RISK CATEGORY | | | III. THE WIND VELOCITY AND DESIGN DESIGN PRESSURES NEED | | | TO BE REVISED ACCORDINGLY ALSO. ENGINEER TO REVIEW | | | FIGURE 1609B OF FBC-BUILDING, 5TH EDITION (2014) AND | | | REVISE ULTIMATE DESIGN WIND SPEED AND DESIGN PRESSURES | | | ACCORDINGLY. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | (561)805-6712 | | | [email protected] |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-11-09 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2015-11-09 |
Time |
18:40 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2015-11-09 |
Time |
17:59 |
Sent To |
|
|
| Notes |
| 2015-11-09 18:40:59 | RE-ROOF BUILDING REVIEW COMMENTS. | | | CODE: FBC 5TH EDITION (2014) | | | | | | 1- ENGINEER TO REVISE THE RAS 117 CALCULATIONS | | | SUBMITTED: | | | A) THE RISK CATEGORY IS INCORRECT. SEE TABLE 1604.5 OF | | | FBC-BUILDING, 5TH EDITION (2014) AND REVISE AS | | | REQUIRED. REVISE DESIGN PRESSURES ACCORDINGLY | | | | | | B) THE FASTENER SPACING SPECIFIED DOESN'T MATCH | | | SELECTED SYSTEM W-39. REVISE AS REQUIRED TO MATCH. | | | ALSO, REVISE FASTENER SPACING FOR ROOF ZONES 2 AND 3 | | | ACCORDINGLY. SEC. 1609 FBC BUILDING, 5TH EDITION | | | (2014). | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE CONTACT | | | JULIO GOMEZ | | | COMMERCIAL COMBINATION PLANS EXAMINER | | | DEVELOPMENT SERVICES DEPARTMENT | | | (561)805-6712 | | | [email protected] |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2015-11-20 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2015-11-20 |
Time |
15:51 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2015-11-20 |
Time |
15:50 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-11-13 |
|
|
Cont ID |
|
| Sent By |
rmcdouga |
Date |
2015-11-13 |
Time |
18:47 |
Rev Time |
0.00 |
| Received By |
rmcdouga |
Date |
2015-11-13 |
Time |
14:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-11-09 |
|
|
Cont ID |
|
| Sent By |
jgomez |
Date |
2015-11-09 |
Time |
18:08 |
Rev Time |
0.00 |
| Received By |
jgomez |
Date |
2015-11-09 |
Time |
15:23 |
Sent To |
|
|
| Notes |
| 2015-11-09 15:23:30 | JGOMEZ |
|
|
|