| 2016-01-05 18:31:36 | GREGG, PLEASE NOTE THAT I CORRECTED A COUPLE OF |
| | CLUSTERS WITH THE TWO PERMITS. PERMIT 15101055 IS |
| | STRICTLY FOR THE FIRE SUPPRESSION AND THEREFORE SHOULD |
| | NOT HAVE ANY ELECTRICAL PLAN REVIEW STOPS ATTACHED |
| | THERETO. THE ONLY ELECTRICAL REVIEW THAT SHOULD BE |
| | ASSOCIATED WITH THIS PERMIT WOULD BE IF THERE IS AN |
| | EXISTING FIRE ALARM SYSTEM TO WHICH THIS FIRE |
| | SUPPRESSION SYSTEM WITH TIE IN TO. THEN AND ONLY THEN A |
| | SEPARATE FIRE ALARM PERMIT WILL BE REQUIRED. I HAVE |
| | ENTERED A NOTE IN THE FRONT SCREEN AS WELL AS ON THE |
| | PLANS OF THE 15101055 PERMIT INDICATING THAT. THAT |
| | PERMIT IS READY FOR ISSUANCE PENDING PAYMENT OF THE |
| | BALANCE DUE OF $146.00. KEEP IN MIND THAT IT IS RUNNING |
| | TOGETHER WITH 15101045 AND THEY SHOULD BE PICKED UP |
| | TOGETHER. ALL OF THE ELECTRICAL REVIEW COMMENTS, BOTH |
| | OF MARIO VALDES AND MYSELF HAVE BEEN TRANSFERRED TO THE |
| | 15101045 PERMIT. |
| | WITH REGARDS TO THE 15101045, PLEASE READ BELOW. |
| | 1. IN MY REVIEW COMMENTS OF 15101055 I ASKED THAT THE |
| | SCOPE OF WORK BE DEFINED ON THE PLANS AND PERMIT. THE |
| | PERMIT CALLS FOR THE INSTALLATION OF A PAINT BOOTH. YOU |
| | SHALL INDICATE: A) IF THIS IS A LISTED UNIT, ALL THE |
| | ELECTRICAL CONTRACTOR WILL BE DOING IS TO PROVIDE |
| | ELECTRICAL POWER FROM THE ELECTRICAL PANEL TO A |
| | DISCONNECT AND NOTHING ELSE. IN SUCH A CASE THE DATA |
| | PROVIDED FOR THE EQUIPMENT SHALL INDICATE THAT B) IF |
| | THE ELECTRICAL CONTRACTOR WILL BE ASSISTING IN THE |
| | ASSEMBLY OF THE UNIT, INDICATE SUCH. THIS WOULD ENTAIL |
| | INSPECTIONS OF THE WORK PERFORMED IN THE FIELD. |
| | FURTHERMORE, THE PLAN NOTES ON SHEET E1 OF THE |
| | SUBMITTED PLANS CALL FOR UPGRADING OR WORKING ON THE |
| | ELECTRICAL SERVICE; THIS IS NOT STATED ON ANY OF THE |
| | PERMITS (AN ELECTRICAL SUB PERMIT HAS NOT YET BEEN |
| | SECURED). |
| | 2. ON TO MY SECOND COMMENT, WHICH WE HAVE DISCUSSED |
| | OVER AND OVER AND STILL I FAIL TO SEE ANYTHING |
| | INDICATING THAT A SINGLE PHASE MOTOR WILL DO THE TRICK. |
| | THE SINGLE SHEET WHICH YOU SENT ME DOES INCLUDE A |
| | SINGLE PHASE MOTOR. THE PROBLEM WITH THAT IS THAT I |
| | HAVE NO IDEA WHERE THAT CAME FROM AND IT IS AN OLD |
| | (2011) REVISION TO SOMETHING. THE CURRENT ONE WHICH |
| | ACCOMPANIES THE SUBMITTAL IS DATED DEC. 11, 2013. THE |
| | LATEST REVISION DOES NOT ADDRESS THE SINGLE PHASE MOTOR |
| | FOR A REASON. I WILL NEED SOMETHING FROM THE |
| | MANUFACTURER OR THE LISTING AGENT INDICATING THAT |
| | REPLACING THE MOTORS WILL NOT AFFECT THE LISTING. |
| | 3. TO SETTLE THE MATTER WITH REGARDS TO THE THIRD |
| | COMMENT, THE ONE INQUIRING ON THE AMPS AS MENTIONED ON |
| | THE LITERATURE, I WILL NEED SOMETHING REFLECTING THE |
| | ACTUAL MOTORS WHICH WILL BE USED AND THE RESPECTIVE |
| | LOAD CALCS. THOUGHT I RECEIVED A LETTER FROM GARMART |
| | USA IT DOES NOT SPECIFY WHAT I AM ASKING FOR. THE SPEC |
| | SHEETS PROVIDE SEVERAL OPTIONS ALL OF WHICH HAVE |
| | DIFFERENT ELECTRICAL REQUIREMENTS. YOU SHALL INDICATE |
| | WHICH OF THOSE OPTIONS YOU WILL BE APPLYING AND PROVIDE |
| | THE PROPER LOAD CALCS FOR THAT APPLICATION. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE DO NOT HESITATE TO |
| | CONTACT ME; I WILL GLADLY HELP YO UNDERSTAND WHAT I |
| | NEED. BY THE WAY, I SPOKE W/CHRIS OF XTREME ELECTRICAL |
| | SERVICES AND HE WAS ABLE TO UNDERSTAND EVERYTHING I WAS |
| | SAYING. |
| | |
| | THANK YOU, |
| 2016-01-05 17:31:29 | DUE TO THE CONFUSION BETWEEN THIS PERMIT AND PERMIT |
| | 15101055 THIS PERMIT GOT INADVERTENTLY PASSED. THIS |
| | REVIEW WILL ENCOMPASS ALL REQUIRED CORRECTIONS FOR THIS |
| | PERMIT. |