| Plan Review Stops For Permit 15101018 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2015-11-10 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-11-10 |
Time |
06:30 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2015-11-09 |
Time |
15:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2015-12-10 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-12-14 |
Time |
07:01 |
Rev Time |
0.00 |
| Received By |
mvaldes |
Date |
2015-12-10 |
Time |
11:09 |
Sent To |
P |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2015-11-25 |
|
|
Cont ID |
|
| Sent By |
mvaldes |
Date |
2015-11-25 |
Time |
13:28 |
Rev Time |
0.00 |
| Received By |
mvaldes |
Date |
2015-11-25 |
Time |
13:28 |
Sent To |
Z |
|
| Notes |
| 2015-11-25 13:40:50 | 1ST REVIEW: FBC 2014 5TH ED. NEC 2011 | | | MARIO VALDES | | | ELECTRICAL PLAN EXAMINER | | | 516-805-6700 | | | [email protected] | | | ALTERNATE CONTACT | | | PHIL PETTY | | | 561-805-6742 | | | [email protected] | | | | | | | | | NEC 210.11(B) OTHER THAN DWELLING UNITS. ALL 125-VOLT, | | | SINGLEPHASE, | | | 15- AND 20-AMPERE RECEPTACLES INSTALLED IN THE | | | LOCATIONS | | | SPECIFIED IN 210.8(B)(1) THROUGH (8) SHALL HAVE | | | GROUND-FAULT CIRCUIT-INTERRUPTER PROTECTION FOR | | | PERSONNEL. | | | (1) BATHROOMS | | | (2) KITCHENS X | | | (3) ROOFTOPS | | | (4) OUTDOORS | | | | | | | | | PLEASE PROVIDE LIGHTING PLAN WITH ENERGY CODE CONTROLS | | | FBC ENERGY C 405 | | | PLEASE MAKE SURE PANEL SCHEDULE REFLECTS POWER PLAN ( | | | CIRCUIT # A 21-23 FOR NEW W/H SHOWN AS SPARE ) | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2015-11-04 |
|
|
Cont ID |
|
| Sent By |
wjolin |
Date |
2015-11-04 |
Time |
09:56 |
Rev Time |
0.00 |
| Received By |
wjolin |
Date |
2015-11-04 |
Time |
09:49 |
Sent To |
|
|
| Notes |
| 2015-11-04 09:56:47 | SEPARATE PLANS AND PERMITS NEEDED FOR FIRE ALARM AND | | | FIRE SPRINKLER ALTERATIONS/MODIFICATIONS. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-12-14 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-12-14 |
Time |
07:01 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-12-07 |
Time |
16:31 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-12-01 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2015-12-01 |
Time |
12:13 |
Rev Time |
0.00 |
| Received By |
eschneid |
Date |
2015-11-02 |
Time |
13:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
N |
Date |
2015-12-14 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-12-14 |
Time |
07:00 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-12-14 |
Time |
07:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2015-11-09 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-11-09 |
Time |
07:33 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-11-06 |
Time |
17:17 |
Sent To |
|
|
| Notes |
| 2015-11-09 07:38:24 | 1ST REVIEW: FBC 2014 MECHANICAL | | | PERMIT #15101018 | | | 11/9/15 | | | | | | 1) PROVIDE A SCOPE OF WORK FOR MECHANICAL ALTERATIONS | | | ON THE PLAN INCLUDING A NEW DUCT LAYOUT PLAN AND AIR | | | DISTRIBUTION SCHEDULE. | | | 2) REFER TO SECTION 1009.1 FBC-14 EXISTING BUILDING AND | | | PROVIDE A VENTILATION CALULATION ON THE PLAN IN | | | COMPLIANCE WITH TABLE 403.3 FBC-14 MECHANICAL. SHOW THE | | | REQUIRED AMOUNT OF CFM'S OF OUTDOOR AIR, AND THE AMOUNT | | | OF CFM'S BEING PROVIDED BY THE EXISTING SYSTEMS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2015-12-11 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-12-11 |
Time |
04:56 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-12-11 |
Time |
04:21 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2015-11-12 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-11-12 |
Time |
08:28 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-11-12 |
Time |
04:22 |
Sent To |
|
|
| Notes |
| 2015-11-12 05:40:20 | 1) SUBMIT SIZING CALCULATIONS FOR THE HYDROMECHANICAL | | | GREASE INTERCEPTOR UNIT. THE INTERCEPTOR SHALL BE SIZED | | | IN ACCORDANCE WITH STANDARD PDI-G 101 (PLUMBING AND | | | DRAINAGE INSTITUTE) AS REFERENCED IN 2014 FBC | | | -PLUMBING, SEC.1003.3.4. | | | 2) SUBMIT MABNUFACTURER'S SPECIFICATIONS/INSTALLATION | | | MANUAL FOR THE GREASE INTERCEPTOR. WPB AMEND. TO FBC | | | SEC.107.3.5.1.3. | | | 3) THE WATER SUPPLY TO THE ICE MACHINE SHALL BE | | | PROTECTED AGAINST BACKFLOW IN ACCORDANCE WITH 2014 FBC | | | SEC.608.3. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
P |
Date |
2015-12-01 |
|
|
Cont ID |
|
| Sent By |
eschneid |
Date |
2015-12-01 |
Time |
12:13 |
Rev Time |
0.25 |
| Received By |
eschneid |
Date |
2015-12-01 |
Time |
12:13 |
Sent To |
|
|
| Notes |
|
|