Plan Review Details - Permit 15101016
| Plan Review Stops For Permit 15101016 |
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
N |
Date |
2015-12-22 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-12-21 |
Time |
07:06 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-12-21 |
Time |
06:29 |
Sent To |
|
|
| Notes |
| 2015-12-21 06:29:41 | 1) THE GAS SHALL BE DONE UNDER A SEPARATE PERMIT.A | | | SEPARATE PERMIT APPLICATION SHALL BE SUBMITTED FOR THE | | | GAS INSTALLATION. | | | 2) SUBMIT A GAS RISER DIAGRAM FOR REVIEW. SHOW THE | | | DISTANCE FROM THE METER TO THE MOST REMOTE OUTLET, THE | | | TYPE OF PIPE, THE PSI OF THE SYSTEM, AND INCLUDE ALL | | | EXISTING GAS APPLIANCES AND THE RESPECTIVE BTU LOADS OF | | | EACH APPLIANCE TO ENSURE PROPER SIZING.WPB AMEND. TO | | | FBC SEC.107.3.5.3. | | | 3) SUBMIT COMBUSTION AIR CALCULATIONS FOR THE DRYER. | | | FGC 304. | | | | | | GAS WILL BE UNDER A SEPARATE PERMIT. TKL.. | | | | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
N |
Date |
2015-12-22 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-11-02 |
Time |
10:10 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-12-22 |
Time |
08:26 |
Sent To |
|
|
| Notes |
| 2015-11-02 09:17:26 | 1) SUBMIT A GAS PIPING RISER FOR REVIEW. SHOW THE TYPE | | | OF PIPE MATERIAL, THE TOTAL BTU LOAD ON THE SYSTEM, THE | | | DISTANCE OF THE MOST REMOTE OUTLET FROM THE SOURCE TO | | | THE MOST REMOTE OUTLET AND THE PIPE SIZE. INDICATE THE | | | SPECIFIC SIZING TABLE FROM THE CODE THAT THE SYSTEM IS | | | BASED ON. WPB AMEND. TO FBC SEC. 107. | | | 2) INDICATE THE LOCATION OF THE GAS PIPING ON THE PLAN. | | | IS THIS NEW GAS PIPING OR IS THE DRYER CONNECTING TO AN | | | EXISTING OUTLET? IS THE DRYER BEING RELOCATED OR IS | | | THIS AN ADDITIONAL GAS LOAD ON AN EXISTING SYSTEM ? | | | SHOW WHAT IS NEW AND EXISTING. CLARIFY. | | | 3) SUBMIT MANUFACTURER SPECIFICATION SHEETS FOR THE GAS | | | APPLIANCES.APPLIANCES SHALL BE LISTED AND LABELED PER | | | THE 2014 FBC SER. G2404.3. | | | 4) SUBMIT DETAILS / CALCULATIONS FOR COMBUSTION AIR FOR | | | THE GAS DRYER PER THE 2014 FBC-RESIDENTIAL SEC. G2407. | | | 5) SUBMIT DETAILS FOR THE GAS DRYER EXHAUST.CLOTHES | | | DRYER EXHAUST SHALL CCOMPLY WITH THE 2014 FBC- | | | RESIDENTIAL SEC. G2439. UNITS EXHAUSTING MORE THAN 200 | | | CFM SHALL BE PROVIDED WITH MAKEUP AIR PER SEC. | | | G2439.4.SUBMIT THE INSTALLATION MANUAL FOR REVIEW. | | | 6) INDICATE THE TYPE OF GAS (NATURAL OR LP). | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-12-21 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-12-21 |
Time |
07:07 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-12-14 |
Time |
14:06 |
Sent To |
|
|
| Notes |
| 2015-12-14 14:06:16 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-11-02 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-11-02 |
Time |
10:10 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-10-29 |
Time |
08:45 |
Sent To |
|
|
| Notes |
| 2015-10-30 08:46:05 | PLUMB <5K |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2015-12-22 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-12-21 |
Time |
07:07 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-12-22 |
Time |
08:18 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2015-11-02 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-11-02 |
Time |
09:09 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-11-02 |
Time |
08:21 |
Sent To |
|
|
| Notes |
| 2015-11-02 08:22:21 | 1) THE PLANS SHOW A NEW LAUNDRY ROOM.INDICATE ON THE | | | PLAN IF THIS IS NEW ROOM TO BE BUILT OR IF IT IS AN | | | EXISTING ROOM BEING CONVERTED TO A LAUNDRY ROOM. SHOW | | | THE LOCATION OF THE EXISTING LAUNDRY ROOM. IF THIS IS A | | | NEW ROOM BEING CONSTRUCTED THEN A BUILDING AND | | | ELECTRICAL PERMIT WILL ALSO BE REQUIRED.WPB AMEND. TO | | | FBC SEC. 107.2.1. | | | 2) SUBMIT A SANITARY AND WATER RISER DIAGRAM FOR THE | | | CHANGES BEING MADE TO THE SANITARY AND WATER SYSTEMS. | | | SHOW ALL PIPE SIZES. WPB AMEND. TO FBC SEC.107.3.5.3. | | | 3) THE GAS SHALL BE DONE UNDER A SEPARATE PERMIT.A | | | SEPARATE PERMIT APPLICATION SHALL BE SUBMITTED FOR THE | | | GAS INSTALLATION. | | | 4) INDICATE ALL NEW EQUIPMENT/RELOCATED EQUIPMENT & | | | PLUMBING FIXTURES ON THE PLAN.WPB AMEND. TO FBC | | | SEC.107.3.5.3. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|
|
|