Review Stop E ELECTRICAL
Rev No 3 Status N Date 2015-11-18 Cont ID  
Sent By albarran Date 2015-11-18 Time 08:06 Rev Time 0.00
Received By albarran Date   Time   Sent To  
Notes
2015-11-18 08:07:59PER DOUG HARVEY THIS REVIEW SHOULD NOT BE REPEATED AS
 IT WAS DONE WITH THE MASTER PERMIT. PLANS ARE ON THE
 JOB.

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2015-11-02 Cont ID  
Sent By albarran Date 2015-11-02 Time 17:27 Rev Time 0.00
Received By albarran Date 2015-11-02 Time 17:10 Sent To I
Notes
2015-11-02 17:39:33THE PLANS FOR THE ABOVE MENTIONED PERMIT APPLICATION
 HAVE BEEN REVIEWED FOR COMPLIANCE WITH THE 2011 EDITION
 OF THE NEC, (NATIONAL ELECTRICAL CODE); THE 5TH EDITION
 OF THE FBC, (FLORIDA BUILDING CODE) AS APPLICABLE AND
 BELOW ARE THE DEFICIENCIES NOTED.
  
 THERE WERE THE SAME PLANS PREVIOUSLY REVIEWED AND
 SUBSEQUENTLY DENIED FOR LACK OF ELECTRICAL DATA. YOU
 WERE PREVIOUSLY INSTRUCTED TO PROVIDE AN ELECTRICAL
 SHEET WITH THE REQUIRED ELECTRICAL INFORMATION.
  
 1. AN ELECTRICAL SUB PERMIT SHALL BE SECURED FOR THE
 ELECTRICAL PORTION OF THIS JOB.
 2. PER FBC AND THE CITY OF WEST PALM BEACH AMENDMENTS
 TO SAME, THE PLANS SHALL BE DRAWN TO A SCALE OF NOT
 SMALLER THAN 1/8?.
 3. THE PERSON RESPONSIBLE FOR THE DRAWINGS SHALL PLACE
 HIS CLEARLY PRINTED NAME AND SIGNATURE ON THE DRAWINGS.
 4. THE ADDRESS OF THE JOB AND THE SCOPE OF WORK SHALL
 BE INCLUDED ON THE PLANS.
 5. THE PLANS SHALL REFLECT A SITE SPECIFIC FLOOR PLAN
 OF THE BUSINESS AND THE LOCATION OF EACH PROPOSED
 APPARATUS/EQUIPMENT SHALL BE INDICATED.
 6. THE LOCATION OF THE MAIN SERVICE DISCONNECT AND
 ELECTRICAL PANEL FROM THE EQUIPMENT IS SERVED SHALL
 ALSO BE ON THE PLANS.
 7. THERE SHALL BE A LOAD CALCULATION INDICATING BOTH,
 THE EXISTING LOAD AND THE PROPOSED ADDITION.
 8. YOU SHALL PROVIDE A SITE SPECIFIC FEEDER DIAGRAM
 INDICATING THE EXISTING SERVICE TO CONFIRM THAT IT IS
 CAPABLE OF ACCEPTING ANY ADDED LOADS.
 9. ALL ELECTRICAL WORK SHALL COMPLY WITH ALL THE
 REQUIREMENTS OF THE 2011 NEC.
  
 WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR
 RE-SUBMITTAL, YOU ARE REQUIRED TO PROVIDE A RESPONSE
 LETTER (NARRATIVE) ADDRESSING EACH ITEM ALONG WITH THE
 STANDARD CITY RE-SUBMITTAL FORM. ADDITIONALLY, PLEASE
 INSERT CORRECTED PAGES INTO THE SUBMITTAL AND LEAVE THE
 PREVIOUSLY REVIEWED SHEETS FOR COMPARISON.
 CLOUDING THE CHANGES WILL BE GREATLY APPRECIATED.
  
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
  
 THANK YOU,
 MIKE ALBARRAN
 ELECTRICAL PLANS EXAMINER
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-10-26 Cont ID  
Sent By albarran Date 2015-10-26 Time 13:25 Rev Time 0.00
Received By albarran Date 2015-10-26 Time 13:05 Sent To I
Notes
2015-10-26 13:28:19THE SUBMITTED DRAWINGS HAVE A LOT OF ELECTRICAL
 INFORMATION, BUT I NEED FOR THE ELECTRICAL CONTRACTOR
 TO PROVIDE A WIRING SCHEMATIC AND FEEDER SCHEDULE
 INDICATING LOCATION OF SOURCE PANEL AND WIRING METHODS
 TO EACH UNIT. THIS SCHEMATIC SHALL INCLUDE CONDUCTOR
 SIZING AND OCP.

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2015-11-17 Cont ID  
Sent By fstal Date 2015-11-17 Time 14:54 Rev Time 0.00
Received By fstal Date 2015-11-17 Time 14:56 Sent To B
Notes
2015-11-17 14:57:57SUMITTED TO B08

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2015-10-22 Cont ID  
Sent By albarran Date 2015-10-26 Time 13:33 Rev Time  
Received By fstal Date   Time   Sent To M
Notes
2015-10-22 08:39:55INSTALLATION SHALL COMPLY WITH NFPA 17,17A, 72 AND 96

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-11-18 Cont ID  
Sent By ccole Date 2015-11-18 Time 08:35 Rev Time 0.00
Received By ccole Date 2015-11-06 Time 11:58 Sent To  
Notes
2015-11-06 11:58:37B08

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By lmarchan Date 2015-10-27 Time 09:28 Sent To  
Notes
2015-11-02 17:42:3811/2/15 FAILED ELECTRICAL REVIEW FOR LAST OF SUPPORTING
 INFORMATION. CONTRACTOR NOTIFIED VIA EMAIL. SEND TO
 SMALL LARGE DENIED BIN "A". MA
2015-10-28 09:29:10RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-10-26 Cont ID  
Sent By albarran Date 2015-10-26 Time 13:33 Rev Time 0.00
Received By albarran Date 2015-10-19 Time 18:05 Sent To  
Notes
2015-10-26 13:33:0510/16/15 FAILED ELECTRICAL REVIEW. CONTRACTOR NOTIFIED
 VIA EMAIL. SENT TO LARGE DENIED BIN "A". MA

Review Stop M MECHANICAL (A/C)
Rev No 3 Status P Date 2015-11-18 Cont ID  
Sent By ccole Date 2015-11-18 Time 07:48 Rev Time 0.00
Received By ccole Date 2015-11-18 Time 07:48 Sent To  
Notes
2015-11-18 08:00:30MECHANICAL PROVISO
 PERMIT #15100624
 11/18/15
  
 1) PERMIT VALUE SHALL BE ADJUSTED TO $25,000.00 FOR
 LABOR, MATERIALS AND EQUIPMENT. WORK DESCRIPTION ON
 APPLICATION SHALL BE REVISED TO INCLUDE INSTALLATION OF
 THE KITCHEN HOODS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2015-10-28 Cont ID  
Sent By ccole Date 2015-10-28 Time 15:15 Rev Time 0.00
Received By ccole Date 2015-10-28 Time 15:15 Sent To  
Notes
2015-10-28 15:26:162ND REVIEW: FBC 2014 MECHANICAL
 PERMIT #15100624
 10/28/15
  
 1) THE COMMENTS FROM THE 1ST REVIEW STILL EXIST. PLEASE
 PROVIDE A NARRATIVE RESPONSE TO THOSE COMMENTS FROM THE
 DESIGN PROFESSIONALS. THE PLANS WERE RE-SUBMITTED WITH
 NO CORRECTIONS MADE, HOWEVER MANUFACTURER'S SPECS FOR
 THE PIZZA OVEN WERE SUBMITTED, AND REVISED ENERGY
 CALCULATIONS. PLEASE CLARIFY WHY THE CALCULATIONS WERE
 SUBMITTED, THEY WERE NOT REQUESTED. IF THEY HAVE BEEN
 SUBMITTED IN RESPONSE TO COMMENTS REGARDING MAKE-UP
 AIR, PLEASE INDICATE AND CLARIFY IN THE NARRATIVE
 RESPONSE.
 3) SHEET 4 SHOWS A 6' LONG GREASE HOOD THAT IS LABELED
 HOOD #5. IS THIS THE SAME HOOD FOR THE PIZZA OVEN THAT
 IS LABELED HOOD #4 IN THE SCHEDULE ON SHEET 1?
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2015-10-23 Cont ID  
Sent By ccole Date 2015-10-23 Time 16:15 Rev Time 0.00
Received By ccole Date 2015-10-23 Time 16:15 Sent To  
Notes
2015-10-23 16:23:591ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #15100624
 1023/15
  
 1) THE PROPOSED PROJECT IS FOR INSTALLATION OF 5
 KITCHEN HOODS, AND ONE PIZZA OVEN WITH GREASE DUCT IN
 THE RESTAURANT. PLEASE REVISE THE JOB DESCRIPTION ON
 THE PERMIT APPLICATION TO MATCH THE DRAWINGS, AND
 ADJUST THE PER IT VALUE TO INCLUDE LABOR, MATERIALS AND
 EQUIPMENT- SECTION 109.3 WPB AMENDMENTS TO THE FBC-14
 BUILDING. THE SUBMITTED APPLICATION IS INDICATING
 INSTALLATION OF THE DUCTWORK AND FANS ONLY FOR THE
 HOODS.
 2) THE PLANS INDICATE A MAKE-UP AIR FAN FOR HOODS 1-4.
 INDICATE HOW MAKE-UP AIR IS BEING SUPPLIED TO THE PIZZA
 OVEN- REFER TO SECTION508.1 FBC-14 MECHANICAL.
 3) REFER TO SECTION 508.1.1 AND REVISE THE PLANS TO
 INDICATE COMPLIANCE: MAKEUP AIR TEMPERATURE.
 THE TEMPERATURE DIFFERENTIAL BETWEEN MAKEUP AIR AND THE
 AIR IN THE CONDITIONED SPACE SHALL NOT EXCEED 10
 DEGREES F (6 DEGREES C) EXCEPT WHERE THE ADDED HEATING
 AND COOLING LOADS OF THE MAKEUP AIR DO NOT EXCEED THE
 CAPACITY OF THE HVAC SYSTEM.
 4) A GENERAL STATEMENT REGARDING VELOCITY CALCULATIONS
 FOR THE GREASE DUCT IS GIVEN ON SHEET NO.1. PROVIDE
 SPECIFIC VELOCITY CALCULATIONS FOR EACH INDIVIDUAL
 GREASE DUCT SYSTEM SERVING THE GREASE HOODS- SEE
 SECTION 506.3.4 FBC-14 MECHANICAL.
 5) PROVIDE A TYPICAL DETAIL ON THE PLANS INDICATING HOW
 THE GREASE DUCTS WILL BE FIRE-WRAPPED, AND HOW ANY DUCT
 PENETRATIONS WILL BE FIRE-STOPPED. PROVIDE A UL TESTED
 AND APPROVED FIRE-STOPPING DETAIL ON THE PLANS, AND
 SUBMIT MANUFACTURER'S SPECS FOR THE MORGAN THERMAL
 CERAMICS PYROSCAT DUCT WRAP.
 6) REFER TO SECTION 507.9 AND REVISE THE DRAWINGS TO
 INDICATE COMPLIANCE: CLEARANCES FOR TYPE I HOOD.
 A TYPE I HOOD SHALL BE INSTALLED WITH A CLEARANCE TO
 COMBUSTIBLES OF NOT LESS THAN 18 INCHES (457 MM).
 EXCEPTION: CLEARANCE SHALL NOT BE REQUIRED FROM GYPSUM
 WALLBOARD OR 1/2-INCH (12.7 MM) OR THICKER CEMENTITIOUS
 WALLBOARD ATTACHED TO NONCOMBUSTIBLE STRUCTURES
 PROVIDED THAT A SMOOTH, CLEANABLE, NONABSORBENT AND
 NONCOMBUSTIBLE MATERIAL IS INSTALLED BETWEEN THE HOOD
 AND THE GYPSUM OR CEMENTITIOUS WALLBOARD OVER AN AREA
 EXTENDING NOT LESS THAN 18 INCHES (457 MM) IN ALL
 DIRECTIONS FROM THE HOOD.
 7) PROVIDE A ROOF PLAN SHOWING THE TERMINATION
 LOCATIONS OF THE EXHAUST DUCTS AND CLEARANCE DISTANCE
 MEASUREMENTS TO THE SUPPLY FANS, OTHER AIR INTAKES,
 BUILDING PROPERTY LINES ETC.- REFER TO SECTION
 506.3.13.3, AND TO SECTION 304.11 GUARDS.
 8) PROVIDE SITE SPECIFIC WIND LOAD TIE-DOWN ENGINEERING
 FOR INSTALLATION OF THE ROOF TOP FANS- SECTION 301.15.
 SUBMIT MIAMI-DADE NOA'S FOR THE FANS AND CURBS REVIEWED
 AND APPROVED BY THE DESIGN PROFESSIONAL OF RECORD.
 9) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE PIZZA
 OVEN AND EXHAUST DUCT AND FAN.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  