Plan Review Details - Permit 15100616
Plan Review Stops For Permit 15100616
Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-11-24 Cont ID  
Sent By cthroop Date 2015-11-24 Time 16:13 Rev Time 0.00
Received By cthroop Date 2015-11-24 Time 16:14 Sent To  
Notes
***NONE***

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-10-22 Cont ID  
Sent By shill Date 2015-10-22 Time 10:08 Rev Time 0.00
Received By shill Date 2015-10-22 Time 10:08 Sent To Z
Notes
2015-10-21 15:17:31****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. PER PLAN, THIS WALL IS TEMPORARY (30 DAY ESTIMATE),
 I WAS UNABLE TO LOCATE A PERMIT APPLICATION PENDING TO
 RESTORE THE WALL. AS A REMODEL PERMIT WITH STRUCTURAL
 WORK (EXTERIOR WALL) HAS A TARGET PLAN REVIEW TIME OF
 30 WORKING DAYS, IF A PLAN IS SUBMITTED TODAY THE
 TARGET TURNAROUND TIME COULD BE 6 WEEKS FOR FIRST
 REVIEW. A BUILDING PERMIT WITH ONE TRADE HAS A TARGET
 OF SEVEN WORKING DAYS. IF INTENT IS TO SUBMIT A
 SEPARATE APPLICATION TO RECONSTRUCT THE WALL, PLEASE
 INCLUDE THAT DETAIL AT THIS TIME AND INCLUDE IN THE
 SCOPE OF THIS PERMIT. IF INTENT IS TO INCLUDE THE WALL
 AS A PART OF A RENOVATION PERMIT, THE 30 DAY ESTIMATE
 DOES NOT APPEAR TO BE A REASONABLE AMOUNT OF TIME.
  
 PLEASE CLARIFY WHY PERMANENT CONSTRUCTION CANNOT BE
 INSTALLED AT THIS TIME AS A PART OF THIS PERMIT, OR
 REVISE THE PERMIT TO INCLUDE A CODE COMPLIANT DETAIL
 FOR INFILL (WATER INTRUSION, WIND RESISTANCE, ETC.).
  
 IF PERMANENT CONSTRUCTION IS NOT POSSIBLE, PROPOSE A
 MECHANISM FOR "TEMPORARY CONSTRUCTION" TO BE REMOVED.
 HOW WILL REMOVAL OF THE TEMPORARY CONSTRUCTION BE
 GUARANTEED? "TEMPORARY CONSTRUCTION" IS TYPICALLY FOR
 TEMPORARY STRUCTURES SUCH AS TENTS, WITH A PROPOSED
 TAKE DOWN DATE. IT IS NOT TYPICAL TO COMPROMISE THE
 BUILDING ENVELOPE WITH NO PLAN TO RESTORE THE BUILDING
 ENVELOPE.
  
  
  
  
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status N Date 2015-11-24 Cont ID  
Sent By J.Walker Date 2015-11-19 Time   Rev Time 0.10
Received By cthroop Date 2015-11-18 Time   Sent To B
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2015-11-02 Cont ID  
Sent By J.Walker Date 2015-11-02 Time   Rev Time 0.20
Received By   Date 2015-10-30 Time   Sent To I
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-11-24 Cont ID  
Sent By cthroop Date 2015-11-24 Time 16:13 Rev Time 0.00
Received By cthroop Date 2015-11-13 Time 15:29 Sent To  
Notes
2015-11-16 11:51:2111/16 TO FIRE BOX
  
2015-11-16 11:43:05TO SHILL
2015-11-13 15:29:40RESUB ROUTED TO AAPONTE VIA SGRAHAM'S DESK

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-11-03 Cont ID  
Sent By scaldero Date 2015-11-03 Time 14:31 Rev Time 0.00
Received By scaldero Date 2015-10-19 Time 13:19 Sent To  
Notes
2015-10-29 15:31:03TO FIRE BOX.
2015-10-22 10:09:2810/22 TO ZONING
  
2015-10-20 13:19:42BLDG <5K

Review Stop Z ZONING
Rev No 2 Status P Date 2015-11-16 Cont ID  
Sent By aaponte Date 2015-11-16 Time 11:42 Rev Time 0.00
Received By aaponte Date 2015-11-16 Time 11:42 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2015-10-29 Cont ID  
Sent By aaponte Date 2015-10-29 Time 15:30 Rev Time 0.00
Received By aaponte Date 2015-10-29 Time 15:30 Sent To  
Notes
2015-10-29 15:30:48TEMORARY WINDOW REMOVAL.