| Plan Review Stops For Permit 15100495 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-10-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-10-22 |
Time |
08:05 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-10-22 |
Time |
08:05 |
Sent To |
|
|
| Notes |
| 2015-10-22 08:24:50 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. INSTALLATION SCHEDULE FOR PANELS, SPECIFY THE | | | SHUTTER CONNECTION MOUNTING TYPE (NAMING CONVENTION C1, | | | C2, C3, ETC. - SHOULD CORRELATE WITH ANCHOR CHARTS ON | | | PP 7-8). | | | | | | 2. INSTALLATION SCHEDULE FOR PANELS, SPECIFY THE | | | FASTENER. "TAPCON" IS NOT SPECIFIC ENOUGH, SEE PAGES | | | 7-8. REVISE TO STATE WHICH TYPE OF TAPCON. | | | | | | 3. INSTALLATION SCHEDULE FOR ACCORDIONS, SPECIFY THE | | | SHUTTER CONNECTION MOUNTING TYPE (NAMING CONVENTION IS | | | 1, 2, 3, ETC. - SHOULD CORRELATE WITH ANCHOR CHARTS). | | | SEVERAL DIFFERENT OPTIONS WERE CIRCLED; NOT CLEAR WHICH | | | IS PROPOSED. | | | | | | 4. INSTALLATION SCHEDULE FOR ACCORDIONS, PROPOSED | | | ANCHOR SPACING COLUMN IS BLANK, PLEASE COMPLETE. | | | | | | 5. INSTALLATION SCHEDULE FOR ACCORDIONS, SPECIFY THE | | | FASTENER. THIS SHOULD BE CONSISTENT WITH THE FASTENER | | | TYPE IN THE ANCHOR CHART. | | | | | | 6. SHOW THE EMERGENCY MEANS OF ESCAPE, FBC R310.4. | | | INCLUDE THE ROOM DESIGNATION. | | | | | | 7. PROVIDE A FLOOR PLAN SHOWING WHERE THE SHUTTERS WILL | | | BE INSTALLED AND PANEL SIZES WHICH CORRELATES WITH THE | | | INSTALLATION SCHEDULE. FBC R301, FBC1609, FBC*106. | | | | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-10-22 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-10-22 |
Time |
08:24 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-10-15 |
Time |
10:46 |
Sent To |
|
|
| Notes |
| 2015-10-15 10:47:06 | BLDG <5K |
|
|
|