|
 |
 |
 |
 |
 |
Plan Review Details - Permit 15100322
| Plan Review Stops For Permit 15100322 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2015-10-28 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-10-28 |
Time |
09:53 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2015-10-28 |
Time |
08:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2015-11-05 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-11-05 |
Time |
13:15 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2015-11-05 |
Time |
13:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2015-10-19 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-10-19 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-10-19 |
Time |
12:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-11-05 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2015-11-05 |
Time |
14:01 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2015-10-09 |
Time |
14:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
P |
Date |
2015-10-21 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-10-21 |
Time |
15:53 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-10-21 |
Time |
15:53 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
P |
Date |
2015-12-22 |
|
|
Cont ID |
|
| Sent By |
tlarge |
Date |
2015-10-22 |
Time |
15:13 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2015-12-22 |
Time |
14:15 |
Sent To |
|
|
| Notes |
| 2015-12-22 14:19:21 | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | 1. CONTRACTOR PROVIDED SIGNED AND SEALED LETTER STATING | | | NO PLUMBING ABOVE FIRST FLOOR . | | | APPROVED TO USE AAV. | | 2015-10-22 15:22:23 | | | | | | | 1ST REVIEW: FBC 2014 | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | CITY OF WEST PALM BEACH | | | 561-805-6711 | | | [email protected] | | | | | | PLUMBING COMMENTS: | | | | | | 1. WHEN YOU USE AN AAV ON A BRACH DRAIN THAT IS LOWER | | | THAN 4 FLOORS FROM THE TOP A RELIEF VENT IS REQUIRED. | | | PER FBCP SEC 917.3.2 RELIEF VENT. | | | | | | WHERE THE HORIZONTAL BRANCH IS LOCATED MORE THAN FOUR | | | BRANCH INTERVALS FROM THE TOP OF THE STACK, THE | | | HORIZONTAL BRANCH SHALL BE PROVIDED WITH A RELIEF VENT | | | THAT SHALL CONNECT TO A VENT STACK OR STACK VENT, OR | | | EXTEND OUTDOORS TO THE OPEN AIR. THE RELIEF VENT SHALL | | | CONNECT TO THE HORIZONTAL BRANCH DRAIN BETWEEN THE | | | STACK AND THE MOST DOWNSTREAM FIXTURE DRAIN CONNECTED | | | TO THE HORIZONTAL BRANCH DRAIN. THE RELIEF VENT SHALL | | | BE SIZED IN ACCORDANCE WITH SECTION 916.2 AND INSTALLED | | | IN ACCORDANCE WITH SECTION 905. THE RELIEF VENT SHALL | | | BE PERMITTED TO SERVE AS THE VENT FOR OTHER FIXTURES. | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved |
 |
 |