Review Stop AIPP ART IN PUBLIC PLACES
Rev No 1 Status P Date 2015-12-21 Cont ID  
Sent By rbrown Date 2015-12-21 Time 13:06 Rev Time 0.00
Received By rbrown Date 2015-12-21 Time 13:06 Sent To  
Notes
2015-12-21 13:06:57PER SYBILLE WELTER, ART IN PUBLIC PLACES (AIPP)
 COORDINATOR, THE DEVELOPER HAS SUBMITTED THE REQUIRED
 ART ASSESSMENT APPLICATION INCLUDING ESCROWED FUNDS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 3 Status P Date 2017-06-21 Cont ID  
Sent By shill Date 2017-06-21 Time 11:27 Rev Time 0.00
Received By shill Date 2017-06-21 Time 11:27 Sent To  
Notes
2017-06-21 11:27:53PROJECT INFORMATION:
 CONSTRUCTION TYPE: 14-II-A - 5TH ED TYPE II-A
 UNITS: 1
 FLOORS: 4
 BEDROOMS:
 ROOMS:
 SQ FT LIVABLE: 62661
 SQ FT FOOTPRINT: 19159
 SQ FT ROOF: 19159
  
 SETBACKS FRONT (USE THIS TO ENTER VERTICAL DATUM IF
 KNOWN): NGVD29
 SETBACKS BACK (USE THIS TO ENTER FIRST FLOOR IF KNOWN):
 XX.XX
 SETBACKS LEFT (USE THIS TO ENTER SECOND FLOOR IF KNOWN:
 XX.XX
 OCC LOAD: 1519
 PROP USE: RETAIL
 SPRINKLER SYS? Y
 SPRK REQ'D? Y
 BATHRMS: 4
  
 BLDG CODE: FL 2014
 OCC CLASS: 5TH ED M
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2016-01-06 Cont ID  
Sent By shill Date 2016-01-06 Time 17:52 Rev Time 0.00
Received By shill Date 2015-12-30 Time 14:25 Sent To  
Notes
2016-01-06 18:31:24****PROVISOS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 SEPARATE PERMITS REQUIRED FOR:
 UNDERGROUND FIRE LINE
 COURTYARD (WALLS/FOUNDATIONS, PAVILION STRUCTURES)
 LANDSCAPE
 IRRIGATION
 SITE LIGHTING
 HARDSCAPE
 BIKE RACKS
 DUMPSTER ENCLOSURE
 FOUNTAINS
 PAVING
 SIGNAGE
 FIRE PROTECTION
 FIRE ALARM
 FABRIC COVERED AWNINGS
  
 PRODUCT APPROVALS FOR ALL COMPONENTS AND CLADDING ARE
 TO BE SUBMITTED PRIOR TO INSTALLATION, REVIEWED BY DOR
 PRIOR TO SUBMITTAL. COMPONENTS AND CLADDING TO COMPLY
 WITH THE DESIGN PRESSURES ON PAGE S102.
  
  
  
  

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-11-18 Cont ID  
Sent By shill Date 2015-11-18 Time 17:33 Rev Time 0.00
Received By shill Date 2015-11-18 Time 16:04 Sent To  
Notes
2015-11-18 17:33:23****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. **PENDING RESPONSE FROM DBPR**
  
 2. ENERGY CALCS REQUIRED, FBC ENERGY CONSERVATION 103.
  
 3. FBC 501.2, REVISE PLAN TO INDICATE LOCATION OF
 ADDRESS IDENTIFICATION ON THE BUILDING.
  
 4. THIRD FLOOR SQUARE FOOT AREA ON SHEET A003 IS NOT
 CONSISTENT WITH THE SQUARE FOOT AREA ON A020, PLEASE
 RECONCILE FBC 107. VERIFY ALL FLOORS. THIS IS TO BE
 DONE PRIOR TO IMPACT FEE ASSESSMENT.
  
 6. FBC 1007.1, ACCESSIBILITY 207.1, REVISE PLAN TO
 STATE WHICH OPTION IS ELECTED FOR ACCESSIBLE MEANS OF
 EGRESS. MEANS OF EGRESS SHALL COMPLY WITH SECTION
 1003.2.13 OF THE IBC 2000 OR SECTION 1007 OF THE IBC
 2003 EDITION. REVISE PLAN TO CLARIFY COMPLIANCE WITH
 EACH REQUIREMENT OF THE OPTION ELECTED.
  
 7. ADVISORY ONLY, WHEN APPLICATION IS SUBMITTED FOR
 PARKING LOT PAVING AND STRIPING, A050 OR RELATED CIVIL
 SHEET, REVISE PLAN TO PROVIDE THE FOLLOWING
 INFORMATION:
 TOTAL NUMBER OF PARKING SPACES
 NUMBER OF ACCESSIBLE SPACES
  
 FBC 2014 ACCESSIBILITY 208.2 (PARKING SPACES), 502
 (PARKING SPACES).
  
 8. PROVIDE THE VALUE OF THE ITEMS WHICH ARE TO BE ON
 SEPARATE PERMIT AS PER CORRESPONDENCE BETWEEN STEVE
 KENNEDY AND WAYNE CHUBB, FBC 109, FBC 107.
  
 AT THIS TIME, IT APPEARS THAT SEPARATE PERMITS WILL BE
 REQUIRED FOR:
  
 RETRACTABLE AWNINGS (UNLESS ALL INFORMATION PROVIDED IN
 RESUBMITTAL, SEE OTHER COMMENT)
 FREESTANDING TRELLIS AND RETRACTABLE AWNING
 PAVING, HARDSCAPE AND STRIPING
 SITE LIGHTING
 FOUNTAINS
 LANDSCAPING
 DUMPSTER ENCLOSURES
 SIGNAGE (STRUCTURAL DETAIL OF SIGN CONSTRUCTION,
 STRUCTURAL DETAIL FOR ATTACHMENT, ELECTRICAL
 INFORMATION NOT INCLUDED IN THE PERMIT SUBMITTAL)
 BICYCLE RACKS
  
 9. ADVISORY ONLY, SITE LIGHTING IS TO BE ON SEPARATE
 PERMIT. WHEN SUBMITTING, PROVIDE ENGINEERING FOR THE
 SITE LIGHTING AND SITE LIGHTING FIXTURES, FBC 107. THIS
 INFORMATION WAS NOT INCLUDED IN THE SUBMITTAL PACKAGE.
  
 10. FBC 2014 ACCESSIBILITY 404.2.4.1, SHOW MANEUVERING
 CLEARANCE, PULL SIDE (18IN MIN) FOR THE FOLLOWING
 DOORS:
 LEVEL 1 WOMENS AND MENS WC, SHEET A120, A101
 LEVEL 3 DOORS 340.1, 340.2
  
 10. SHEET A120 SPECS AMERICAN STANDARD CADET 3. FBC
 2014 ACCESSIBILITY 604.4, SEAT HEIGHT TO BE 17 IN
 MINIMUM AND 19 IN MAXIMUM. IT IS NOT CLEAR WHICH CADET
 3 MODEL IS PROPOSED, BUT SEAT HEIGHTS ON THE
 MANUFACTURER WEBSITE WERE15IN AND 16.5 IN (TWO
 DIFFERENT MODELS CHECKED). REVISE PLAN TO SHOW SEAT
 HEIGHT OR SEAT HEIGHT RANGE AND CLARIFY CADET 3 MODEL
 PROPOSED (OR REMOVE MODEL SPEC).
  
 11. SHEET A120, SPECIFY DRINKING FOUNTAIN HEIGHTS OR
 HEIGHT RANGES, FBC 2014 ACCESSIBILITY 602.4, 602.7.
  
 12. PLANS SHOW THE RETRACTABLE AWNING AS "BY OWNER." IF
 AWNINGS ARE TO BE INCLUDED IN THIS PERMIT, PROVIDE
 STRUCTURAL DETAILS FOR THE RETRACTABLE AWNINGS, FBC
 107, INCLUDING WIND DESIGN CRITERIA FBC 1609, FASTENING
 INFORMATION, FABRIC INFORMATION TO SHOW COMPLIANCE WITH
 FBC 3105. IF ALL REQUIRED INFORMATION IS NOT PROVIDED,
 A SEPARATE PERMIT FOR THE AWNINGS WILL BE REQUIRED. IT
 IS NOT CLEAR WHETHER THIS IS TO MEET THE SAME WIND
 REQUIREMENTS OF THE BUILDING, OR IF IT IS A RISK
 CATEGORY 1, OR DESIGNED USING FBC3105.4.
  
 13. DUE TO PARKING CONFIGURATION, IT APPEARS THAT VALET
 PARKING WILL BE AVAILABLE. SEE FBC 503.3.2 AND .3;
 PLEASE REVISE PLAN TO INDICATE PULL UP SPACE AND ACCESS
 AISLE MARKING.
  
 14. PROVIDE STRUCTURAL DETAILS FOR THE STATIONARY
 AWNINGS, FBC 107, INCLUDING WIND DESIGN CRITERIA FBC
 1609, IF THEY ARE TO BE INCLUDED IN THIS PERMIT RATHER
 THAN BEING INCLUDED ON A SEPARATE PERMIT.
  
 15. A428 AND OTHER LOCATIONS, PLYWOOD SHEATHING SHOWN;
 REVISE TO SPECIFY FRT OR INCLUDE APPLICABLE EXCEPTION
 FBC TABLE 602.
  
 16. S421, REVISE PLAN TO INCLUDE PAGE NUMBER FOR THE
 "CMU REINF SCHED" REFERRED TO IN DETAIL 19, FBC 107.
  
 17. S421, VERTICAL STEEL REQUIRED IS NOT CLEAR, DETAIL
 20. TWO ARROWS ARE SHOWN BUT NOT SPECIFIED, TEXT STATES
 "#4 @ 16IN", DOES THIS MEAN TWO #4 AT 16IN OC? FBC 107.
  
 18. S002, RCSC REFERENCE NOT CONSISTENT WITH THE FBC
 2014. REVISE AND CHECK ALL STANDARDS; SEE FBC CHAPTER
 35. IF DESIGNER WOULD LIKE TO PROPOSE AN ALTERNATE,
 THIS MUST BE REQUESTED USING ALTERNATIVE MATERIALS AND
 METHODS FBC 104.11. CONTACT ME VIA EMAIL FOR FURTHER
 INFORMATION IF THIS IS DESIGNER'S INTENT.
  
 19. PROVISO: ADVISORY ONLY, PRODUCT APPROVALS FOR ALL
 COMPONENTS AND CLADDING ARE TO BE SUBMITTED PRIOR TO
 INSTALLATION, REVIEWED BY DOR PRIOR TO SUBMITTAL.
 COMPONENTS AND CLADDING TO COMPLY WITH THE PRESSURE ON
 PAGE S102.
  
  
  

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2016-01-20 Cont ID  
Sent By albarran Date 2016-01-20 Time 16:26 Rev Time 0.00
Received By albarran Date 2016-01-20 Time 12:30 Sent To  
Notes
2016-01-20 16:27:22ALL PREVIOUSLY MENTIONED DEFICIENCIES HAVE BEEN
 SATISFACTORILY ADDRESSED.
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-11-23 Cont ID  
Sent By albarran Date 2015-11-23 Time 18:41 Rev Time 0.00
Received By albarran Date 2015-11-19 Time 18:04 Sent To  
Notes
2015-11-23 18:42:58THE PLANS FOR THE ABOVE MENTIONED PERMIT APPLICATION
 HAVE BEEN REVIEWED FOR COMPLIANCE WITH THE EDITION OF
 THE NEC, (NATIONAL ELECTRICAL CODE) AND THE FBC,
 (FLORIDA BUILDING CODE) AS WELL AS THE CITY OF WEST
 PALM BEACH AMENDMENTS IN EFFECT AT THE TIME OF
 SUBMITTAL. BELOW IS A LIST OF THE DEFICIENCIES NOTED.
 PG. E050
 1. UNLESS PRIOR ARRANGEMENTS ARE MADE WITH ELECTRICAL
 INSPECTOR, ALL TRENCHING SHALL REMAIN OPEN FOR
 INSPECTIONS. NO SITE TUBES WILL BE ACCEPTED.
 2. ALL SITE LIGHTING SHALL BE UNDER SEPARATE PERMIT.
 PG. E201; E202; E203; E204
 1. NEC 314.27(B), BOXES SPECIFICALLY LISTED FOR THE
 APPLICATION SHALL BE USED FOR ALL FLOOR OUTLETS.
 2. NEC 406.9(B), ALL 15 & 20 AMP 125 AND 250 VOLT
 NONLOCKING RECEPTACLES INSTALLED IN WET LOCATIONS SHALL
 BE LISTED WEATHER RESISTANT.
 3. NEC 600.5, EVERY COMMERCIAL ESTABLISHMENT SHALL HAVE
 IN AN ACCESSIBLE LOCATION AT EACH ENTRY ACCESSIBLE TO
 PEDESTRIANS AT LEAST ONE OUTLET FOR SIGNAGE.
 4. NEC 210.62, THERE SHALL BE A SHOW WINDOW OUTLET FOR
 EVERY 12 FT. OF SHOW WINDOW OR MAJOR PORTION THEREOF OF
 SHOW WINDOW MEASURED HORIZONTALLY. THIS MAY NOT APPLY
 TO EVERY SPACE AS ALL MAY NOT HAVE SHOW WINDOWS.
 5. NEC 300.21, OPENINGS INTO OR THROUGH FIRE RATED
 WALLS, PARTITIONS, FLOORS OR CEILINGS SHALL BE
 FIRESTOPPED USING APPROVED METHODS TO MAINTAIN FIRE
 RESISTANCE RATING.
 6. ALL ENLARGED AREA WILL BE REVIEWED AND COMMENTED
 UPON AT THEIR RESPECTIVE PAGES/VIEWS.
 PG. E301; E302; E303; E304
 1. NEC 700.12, THE LIGHTING CIRCUIT FEEDING EMERGENCY
 AND EXIT LIGHTS SHALL BE THE CIRCUIT AS FOR THE AREA
 THEY OCCUPY UNLESS THERE ARE THREE OR MORE LIGHTING
 CIRCUITS FOR THAT AREA.
 2. SEE NOTES 3 & 4 ABOVE WITH REGARDS TO SIGN AND SHOW
 WINDOW OUTLETS.
 3. LAYERS DO NOT APPEAR TO BE PROPERLY ALIGNED NOR ARE
 WALLS CLEARLY IDENTIFIED TO ASCERTAIN EXIT LIGHT
 REQUIREMENTS.
 4. FBC-E C402.4.8, ALL RECESSED LUMINAIRES INSTALLED IN
 THE BUILDING THERMAL ENVELOPE SHALL BE IC RATED AND
 SEALED TO LIMIT AIR LEAKAGE BETWEEN CONDITIONED AND
 UNCONDITIONED AIR SPACES.
 PG. E402
 1. NEC 210.8(B)(2), THIRD LEVEL PREP KITCHEN AREA 340,
 ALL 15 VOLT, 15 ? 20 AMP SINGLE PHASE OUTLETS IN
 KITCHENS SHALL HAVE GFCI PROTECTION FOR PERSONNEL.
 2. NEC 210.8 (B)(5), SECOND LEVEL BREAKROOM 231,
 RECEPTACLES INSTALLED WITHIN 6 FT OF THE OUTSIDE EDGE
 OF A SINK SHALL HAVE GFCI PROTECTION FOR PERSONNEL.
 PG. E702
 1. FBC-E C402.4.8, ALL RECESSED LUMINAIRES INSTALLED IN
 THE BUILDING THERMAL ENVELOPE SHALL BE IC RATED AND
 SEALED TO LIMIT AIR LEAKAGE BETWEEN CONDITIONED AND
 UNCONDITIONED AIR SPACES.
 PG. E1101, E1102
 1. NEC 760.41(B) FIRE ALARM CIRCUITS DISCONNECTING
 MEANS SHALL HAVE A RED IDENTIFICATION, SHALL BE
 ACCESSIBLE ONLY TO QUALIFIED PERSONNEL AND SHALL BE
 IDENTIFIED AS ?FIRE ALARM CIRCUIT.?
  
 PLEASE REVISE YOUR DRAWINGS TO REFLECT THE ABOVE
 MENTIONED DEFICIENCIES.
 WHEN RESUBMITTING, FOR A QUICKER RETURN ON YOUR
 RE-SUBMITTAL, YOU ARE REQUIRED TO PROVIDE A RESPONSE
 LETTER (NARRATIVE) ADDRESSING EACH ITEM ALONG WITH THE
 STANDARD CITY RE-SUBMITTAL FORM. THE NARRATIVE SHOULD
 INCLUDE THE PLAN REVIEWER?S COMMENTS AND YOUR RESPONSE
 OR ACTION TO SAME. ADDITIONALLY, PLEASE INSERT
 CORRECTED PAGES INTO THE SUBMITTAL AND LEAVE THE
 PREVIOUSLY REVIEWED SHEETS FOR COMPARISON.
 CLOUDING THE CHANGES WILL BE GREATLY APPRECIATED.
  
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
  
 THANK YOU,
 MIKE ALBARRAN
 ELECTRICAL PLANS EXAMINER
 PH: 561-805-6746
 EMAIL: [email protected]
  

Review Stop ENG ENGINEERING CSD
Rev No 1 Status P Date 2015-12-08 Cont ID  
Sent By cranford Date 2015-12-08 Time 14:36 Rev Time 0.00
Received By cranford Date 2015-12-08 Time 14:36 Sent To  
Notes
2015-12-08 14:38:06ALSO REVIEWED UNDER E15080032

Review Stop FIRE FIRE DEPARTMENT
Rev No 2 Status P Date 2016-01-12 Cont ID  
Sent By pleduc Date 2016-01-12 Time   Rev Time 0.00
Received By pleduc Date 2016-01-12 Time 13:53 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status F Date 2015-10-27 Cont ID  
Sent By pleduc Date 2015-10-27 Time   Rev Time 0.00
Received By pleduc Date 2015-10-16 Time 15:12 Sent To  
Notes
2015-10-22 16:33:20THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE
 MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 1. SHEET 007 A.020, THE EXIT PATH FROM THE WEST DOORS
 LEADING THROUGH THE COURTYARD, APPEARS TOO NARROW
 INBETWEEN FOR THE OCCUPANCY LOAD. NO DIMENSIONS ARE
 INDICATED FOR THE WIDTH BETWEEN THE WATER FOUNTAINS AND
 LANDSCAPE.
  
 2. SHEET A.605, INDICATES A DOOR SCHEDULE; HOWEVER, A
 COLUMN IN THE TABLE REFERENCES A HARDWARE PACKAGE. I
 HAVE BEEN UNABLE TO IDENTIFY THE SHEETINDICATING THE
 HARDWARE PACKAGE INFORMATION.
  
 3. SHEET A-101, INDICATES DOORS 151.1, 152.1 & 132.1,
 132.2 THAT OPEN UP INTO THE EXIT ACCESS WAY. PER NFPA
 101 CHAPTER 7, MEANS OF EGRESS
 7.2.1.4.3 DOOR LEAF ENCROACHMENT
 7.2.1.4.3.1 DURING ITS SWING, ANY DOOR LEAF IN A MEANS
 OF EGRESS SHALL LEAVE NOT LESS THAN ONE-HALF OF THE
 REQUIRED WIDTH OF AN AISLE, A CORRIDOR, A PASSAGEWAY,
 OR A LANDING UNOBSTRUCTED AND SHALL NOT PROJECT NOT
 MORE THAN 7 IN. INTO THE REQUIRED WIDTH OF AN AISLE, A
 CORRIDOR, A PASSAGE WAY, OR A LANDING, WHEN FULLY OPEN,
 UNLESS BOTH OF THE FOLLOWING CONDITIONS ARE MET:
 (1) THE DOOR OPENING PROVIDES ACCESS TO A STAIR IN AN
 EXISTING BUILDING.
 (2) THE DOOR OPENING MEETS THE REQUIREMENTS THAT LIMITS
 PROJECTION TO NOT MORE THAN 7 IN. INTO THE REQUIRED
 WIDTH OF THE STAIR LANDING WHEN THE DOOR LEAF IS FULLY
 OPEN.
  
 PLEASE PROVIDE FOR COMPLIANCE WITH THE CODE.
  
 4. SHEET A-107, F3, INDICATES A 2 PEDESTRIAN SWING
 GATES. THERE IS NO INDICATION OF ANY LATCHING OR EXIT
 HARDWARE. PER NFPA 101 SECTION 7.2.1.5 THE LOCK/LATCH
 RELEASING MECHANISM ON ALL DOORS SHALL OPEN THE DOOR
 WITH NOT MORE THAN ONE RELEASING OPERATION. THE
 RELEASING MECHANISM SHALL HAVE AN OBVIOUS METHOD OF
 OPERATION THAT IS READILY OPERATED UNDER ALL LIGHTING
 CONDITIONS. THE RELEASING DEVICE SHOULD BE CAPABLE OF
 BEING OPERATED WITH ONE HAND AND SHOULD NOT REQUIRE
 TIGHT GRASPING, TIGHT PINCHING OR TWISTING OF THE WRIST
 TO OPERATE.
  
 PLEASE PROVIDE FOR COMPLAINCE WITH THE CODE AND FOR
 PANIC HARDWARE PER NFPA 101 7.2.1.7.
  
 5. FIRE FIGHTER?S EMERGENCY OPERATIONS.
 NFPA 101 9.4.3.1 ALL NEW ELEVATORS SHALL CONFORM TO THE
 FIRE FIGHTER?S EMERGENCY OPERATIONS REQUIREMENTS OF
 ASME A17.1/CSA B44, SAFETY CODE FOR ELEVATORS.
  
 PLEASE PROVIDE FOR COMPIANCE WITH THE CODE.
  
 6. PLEASE PROVIDE DOCUMENTATION THAT THIS BUILDING DOES
 NOT MEET THE REQUIRERMENTS OF A HIGH RISE AND THE
 REQUIREMENTS PROVISIONS OF NFPA 11.8.
  
 7. BASED ON REVIERW OF THE ABOVE ADDITIONAL
 REQUIREMENTS MAY BE PROVIDED
  
 PETER LEDUC
 FIRE MARSHAL
 561-804-4709
 [email protected]
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2016-02-18 Cont ID  
Sent By ccole Date 2016-02-18 Time 11:27 Rev Time 0.00
Received By ccole Date 2016-02-08 Time 09:06 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2016-02-03 Cont ID  
Sent By lmarchan Date 2016-02-03 Time 15:47 Rev Time 0.00
Received By lmarchan Date 2015-12-22 Time 14:55 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-12-08 Cont ID  
Sent By cpuell Date 2015-12-08 Time 15:08 Rev Time 0.00
Received By cpuell Date 2015-10-06 Time 13:57 Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 3 Status   Date   Cont ID  
Sent By   Date   Time   Rev Time 0.00
Received By   Date   Time   Sent To  
Notes
***NONE***

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 2 Status P Date 2016-01-11 Cont ID  
Sent By shill Date 2016-01-11 Time 12:10 Rev Time 0.00
Received By shill Date 2016-01-11 Time 12:10 Sent To  
Notes
2016-01-11 12:20:19MU-2015-019031-0000
  
  

Review Stop IMPACT COUNTY IMPACT FEES
Rev No 1 Status F Date 2015-11-18 Cont ID  
Sent By shill Date 2015-11-18 Time 15:55 Rev Time  
Received By shill Date 2015-11-09 Time 15:07 Sent To  
Notes
2015-11-09 15:07:34****CORRECTIONS****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY REQUIRED;
 561-233-5025 FOR MORE INFORMATION.
  
 THE SQUARE FOOT AREA ON THE PLAN SUBMITTED FOR IMPACT
 FEES FOR THE FOUNDATION PERMIT DIFFERS FROM THE ISSUED
 FOUNDATION PERMIT. IMPACT FEES ARE TO BE RE-ASSESSED ON
 THE NEW SQUARE FOOT AREA.
  

Review Stop M MECHANICAL (A/C)
Rev No 4 Status P Date 2016-02-18 Cont ID  
Sent By ccole Date 2016-02-18 Time 10:44 Rev Time 0.00
Received By ccole Date 2016-02-18 Time 10:44 Sent To  
Notes
2016-02-18 11:18:26MECHANICAL PROVISOS:
 PERMIT #15091225
 2/18/16
  
 1 ) C408.2 FBC-14 ENERGY CONSERVATION: MECHANICAL
 SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS.
 PRIOR TO PASSING THE FINAL MECHANICAL INSPECTION, THE
 REGISTERED DESIGN PROFESSIONAL SHALL PROVIDE EVIDENCE
 OF MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION IN
 ACCORDANCE THE PROVISIONS OF THIS SECTION.
 CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE
 PROVISIONS FOR COMMISSIONING AND COMPLETION
 REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE
 PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER
 REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE
 GIVEN TO THE OWNER AND MADE AVAILABLE TO THE CODE
 OFFICIAL UPON REQUEST IN ACCORDANCE WITH SECTIONS
 C408.2.4 AND C408.2.5.
 A) C408.2.1 COMMISSIONING PLAN.
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A REGISTERED
 DESIGN PROFESSIONAL OR APPROVED AGENCY AND SHALL
 INCLUDE THE FOLLOWING ITEMS:
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
 3. FUNCTIONS TO BE TESTED, INCLUDING, BUT NOT LIMITED
 TO CALIBRATIONS AND ECONOMIZER CONTROLS.
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 AT A MINIMUM, TESTING SHALL AFFIRM WINTER AND SUMMER
 DESIGN CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
 5. MEASURABLE CRITERIA FOR PERFORMANCE.
  
 B) C408.2.2 AIR DISTRIBUTION SYSTEM TESTING, ADJUSTING
 AND BALANCING.
 CONSTRUCTION DOCUMENTS SHALL REQUIRE THAT A WRITTEN
 BALANCE REPORT BE PROVIDED TO THE OWNER OR THE
 DESIGNATED REPRESENTATIVE OF THE BUILDING OWNER FOR
 HVAC SYSTEMS SERVING ZONES WITH A TOTAL CONDITIONED
 AREA EXCEEDING 5000 SQUARE FEET (465 M2). AIR
 DISTRIBUTION SYSTEMS SHALL BE TESTED, ADJUSTED, AND
 BALANCED BY A LICENSED ENGINEER OR A COMPANY OR
 INDIVIDUAL HOLDING A CURRENT CERTIFICATION FROM A
 RECOGNIZED TESTING AND BALANCING AGENCY ORGANIZATION IN
 ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING
 STANDARDS.
  
 C) C408.2.4 PRELIMINARY COMMISSIONING REPORT.
 A PRELIMINARY REPORT OF COMMISSIONING TEST PROCEDURES
 AND RESULTS SHALL BE COMPLETED AND CERTIFIED BY THE
 REGISTERED DESIGN PROFESSIONAL OR APPROVED AGENCY AND
 PROVIDED TO THE BUILDING OWNER. THE REPORT SHALL BE
 IDENTIFIED AS ?PRELIMINARY COMMISSIONING REPORT? AND
 SHALL IDENTIFY:
 1. ITEMIZATION OF DEFICIENCIES FOUND DURING TESTING
 REQUIRED BY THIS SECTION THAT HAVE NOT BEEN CORRECTED
 AT THE TIME OF REPORT PREPARATION.
 2. DEFERRED TESTS THAT CANNOT BE PERFORMED AT THE TIME
 OF REPORT PREPARATION BECAUSE OF CLIMATIC CONDITIONS.
 3. CLIMATIC CONDITIONS REQUIRED FOR PERFORMANCE OF THE
 DEFERRED TESTS.
  
 D) C408.2.4.1 ACCEPTANCE OF REPORT.
 BUILDINGS, OR PORTIONS THEREOF, SHALL NOT PASS THE
 FINAL MECHANICAL INSPECTION UNTIL SUCH TIME AS THE CODE
 OFFICIAL HAS RECEIVED A LETTER OF TRANSMITTAL FROM THE
 BUILDING OWNER ACKNOWLEDGING THAT THE BUILDING OWNER
 HAS RECEIVED THE PRELIMINARY COMMISSIONING REPORT.
  
 E) C408.2.4.2 COPY OF REPORT.
 THE CODE OFFICIAL SHALL BE PERMITTED TO REQUIRE THAT A
 COPY OF THE PRELIMINARY COMMISSIONING REPORT BE MADE
 AVAILABLE FOR REVIEW BY THE CODE OFFICIAL.
  
 F) C408.2.5.4 FINAL COMMISSIONING REPORT.
 A REPORT OF TEST PROCEDURES AND RESULTS IDENTIFIED AS
 "FINAL COMMISSIONING REPORT" SHALL BE DELIVERED TO THE
 BUILDING OWNER AND SHALL INCLUDE:
 1. RESULTS OF FUNCTIONAL PERFORMANCE TESTS.
 2. DISPOSITION OF DEFICIENCIES FOUND DURING TESTING,
 INCLUDING DETAILS OF CORRECTIVE MEASURES USED OR
 PROPOSED.
 3. FUNCTIONAL PERFORMANCE TEST PROCEDURES USED DURING
 THE COMMISSIONING PROCESS INCLUDING MEASURABLE CRITERIA
 FOR TEST ACCEPTANCE, PROVIDED HEREIN FOR REPEATABILITY.
 EXCEPTION: DEFERRED TESTS WHICH CANNOT BE PERFORMED AT
 THE TIME OF REPORT PREPARATION DUE TO CLIMATIC
 CONDITIONS.
  
 2) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 A) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT
 APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE
 DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
  
 3) FINAL APPROVAL OF THE ALTERNATE METHOD OF
 CONSTRUCTION OF THE ACCESS PANELS FOR ABOVE CEILING AC
 EQUIPMENT MECHANICAL IS CONTINGENT ON A LETTER OF
 ACKNOWLEDGEMENT FROM THE RESTORATION HARDWARE FACILITY
 MANAGER, AND YOU ALSO INCLUDE THE DISASSEMBLY PROCEDURE
 INSTRUCTIONS IN THE O & M MANUAL THAT THE
 CONTRACTOR/DESIGN TEAM WILL PROVIDED TO RESTORATION
 HARDWARE.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  
  
  
  
  

Review Stop M MECHANICAL (A/C)
Rev No 3 Status F Date 2016-02-03 Cont ID  
Sent By ccole Date 2016-02-03 Time 15:42 Rev Time 0.00
Received By ccole Date 2016-02-03 Time 15:42 Sent To  
Notes
2016-02-03 15:49:223RD REVIEW: FBC 2014 MECHANICAL
 PERMIT #15091225
 2/3/15
  
 1) THE ENGINEER AND ARCHITECT FAILED TO PROVIDE
 ACCURATELY CORRECTED PLANS FOR THE PROJECT UNDER THEIR
 REQUEST FOR A MID-CYCLE REVIEW. PLEASE NOTE THAT
 NUMEROUS PHONE CALLS AND EMAILS WERE SENT TO ME FROM
 THE DESIGN PROFESSIONALS AND EVERY ATTEMPT WAS MADE BY
 MYSELF TO BRING THE PROJECT INTO COMPLIANCE. AT THIS
 TIME THEY ARE REQUESTING THAT I CLOSE THE 3RD REVIEW
 STOP IN ORDER TO NOW UPLOAD THE CORRECTED AND REVISED
 PLAN SHEETS INTO PROJECT DOX.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 2 Status F Date 2015-12-31 Cont ID  
Sent By ccole Date 2015-12-31 Time 14:46 Rev Time 0.00
Received By ccole Date 2015-12-30 Time 14:46 Sent To  
Notes
2015-12-31 15:22:122ND REVIEW: FBC 2014 MECHANICAL
 PERMIT #15091225
 12/31/15
  
 1) ENERGY CALCULATION FORM 506-2014 HAS BEEN SUBMITTED,
 HOWEVER IT APPEARS THAT THE EFFICIENCY RATING CRITERA
 USED FOR THE HEAT PUMPS DOES NOT MATCH THE CRITERIA
 SPECIFIED IN TABLE C403.2.3(11) FBC-14 ENERGY
 CONSERVATION.PLEASE REVIEW AND CORRECT THE DOCUMENT.
 2) AC COOLING AND HEATING LOAD CALCULATIONS HAVE BEEN
 SUBMITTED, HOWEVER IT APPEARS THAT THE SYSTEM
 SELECTIONS ON THE PLANS ARE SOMEWHAT OVERSIZED IN
 CAPACITY WHEN COMPARED WITH THE CALCULATIONS. MOST
 NOTABLE ARE HP-2 AND HP-7 EACH HAVING A CALCULATED
 COOLING CAPACITY OF 18.7 TONS, BUT A SYSTEM SELECTION
 AT 24 TONS (SEE SCHEDULE ON M-401, MODULE 1 & 2 DAIKIN
 RXYQ144-12 TONS EACH). REFER TO SECTION C403.2.2 AND
 INDICATE COMPLIANCE. PLEASE NOTE THAT HP-8 MODULE 1
 DAIKIN RXYQ120 APPEARS TO BE MISLABELED AT 16 TONS IN
 THE SCHEDULE.
 3) IN REFERENCE TO THE ARCHITECT'S RESPONSES TO 1ST
 REVIEW COMMENTS #2, 3, 4, 5, & 6, PLEASE REVIEW THE
 FOLLOWING REQUIREMENTS FOR DEFERRED SUBMITTALS.
 DEFERRED SUBMITTALS:
 A) DEFERRED SUBMITTAL: 107.3.4.2 DEFERRED SUBMITTALS.
 FOR THE PURPOSES OF THIS SECTION, DEFERRED SUBMITTALS
 ARE DEFINED AS THOSE PORTIONS OF THE DESIGN THAT ARE
 NOT SUBMITTED AT THE TIME OF THE
 APPLICATION AND THAT ARE TO BE SUBMITTED TO THE
 BUILDING OFFICIAL WITHIN A SPECIFIED PERIOD. DEFERRAL
 OF ANY SUBMITTAL ITEMS SHALL HAVE THE PRIOR APPROVAL OF
 THE BUILDING OFFICIAL. THE REGISTERED DESIGN
 PROFESSIONAL IN RESPONSIBLE CHARGE SHALL LIST THE
 DEFERRED SUBMITTALS ON THE CONSTRUCTION DOCUMENTS FOR
 REVIEW BY THE BUILDING OFFICIAL.
 DOCUMENTS FOR DEFERRED SUBMITTAL ITEMS SHALL BE
 SUBMITTED TO THE REGISTERED DESIGN PROFESSIONAL IN
 RESPONSIBLE CHARGE WHO SHALL REVIEW THEM AND FORWARD
 THEM TO THE BUILDING OFFICIAL WITH A NOTATION
 INDICATING THAT THE DEFERRED SUBMITTAL DOCUMENTS HAVE
 BEEN REVIEWED AND FOUND TO BE IN GENERAL CONFORMANCE TO
 THE DESIGN OF THE BUILDING. THE DEFERRED SUBMITTAL
 ITEMS SHALL NOT BE INSTALLED UNTIL THE DEFERRED
 SUBMITTAL DOCUMENTS HAVE BEEN APPROVED BY THE BUILDING
 OFFICIAL.
 B) DEFERRED SUBMITTAL. 2010 FBC 107.3.4.1 PRODUCT
 APPROVALS. THOSE PRODUCTS WHICH ARE REGULATED BY THE
 DCA RULE 9N-03 SHALL BE REVIEWED AND APPROVED IN
 WRITING BY THE DESIGNER OF RECORD PRIOR TO SUBMITTAL
 FOR JURISDICTIONAL APPROVAL.
 4) THE ARCHITECT'S RESPONSE TO COMMENT #5 INDICATES THE
 CONDENSING UNITS WILL BE "POSTED UP ABOVE THE ROOF ON
 DUNNAGE GREATER THAN 8" WHICH IS ACCEPTABLE". PLEASE
 SEE TABLE 1522.3 FBC-14 BUILDING WHICH DETERMINES ROOF
 MOUNTED EQUIPMENT HEIGHTS REQUIREMENTS. THE WIDTH OF
 THE DAIKIN UNITS WILL DETERMINE THEIR INDIVIDUAL LEG
 MOUNTING HEIGHTS WHICH SHALL BE BETWEEN 14- 48 INCHES
 ABOVE THE FINISHED ROOF PER THE TABLE.
 5) IN LIEU OF A SEPARATE PERMIT FOR THE KITCHEN EXHAUST
 (AS INDICATED IN THE ARCHITECT'S RESPONSE TO 1ST REVIEW
 COMMENT #5), PLEASE SUBMIT MANUFACTURER'S
 SPECIFICATIONS FOR THE HOOD SYSTEM, INDICATE HOW
 MAKE-UP AIR WILL BE PROVIDED, AND PROVIDE A
 CALCULATION.
 6) COMMENT #3 FROM THE 1ST REVIEW WILL STAND PENDING
 ACCEPTANCE BY THE BUILDING OFFICIAL OF AN ALTERNATIVE
 METHOD FOR ACCESS AND SERVICE PANEL INSTALLATIONS FOR
 THE VRV UNITS ABOVE THE CEILINGS. UPON ACCEPTANCE THE
 PLANS SHALL BE REVISED TO SHOW THE LOCATIONS AND
 DIMENSIONS OF THE ALTERNATE ACCESS PANELS.
 7) PLEASE NOTE THAT THE REQUESTED AC LOAD CALCULATIONS
 AND PRELIMINARY COMMISSIONING REPORT WERE NOT UPLOADED
 INTO PROJECT DOCS AT THE TIME OF THIS REVIEW, HOWEVER
 THEY WERE EMAILED TO MY COMPUTER AFTER I CALLED THE
 ARCHITECT'S OFFICE. THE DOCUMENTS MUST BE UPLOADED FOR
 FINAL MECHANICAL APPROVAL OF THE PLANS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2015-11-03 Cont ID  
Sent By ccole Date 2015-11-03 Time 08:32 Rev Time 0.00
Received By ccole Date 2015-11-03 Time 08:32 Sent To  
Notes
2015-11-03 08:48:421ST REVIEW: FBC 2014 MECHANICAL, FBC 2014 ENERGY
 CONSERVATION
 PERMIT #15091225
 11/3/15
  
 1) SHEET A-003: PLEASE ADD THE 2014 (FIFTH EDITION)
 FLORIDA BUILDING CODE- ENERGY CONSERVATION TO THE LIST
 OF APPLICABLE CODES. REFER TO THE FOLLOWING SECTIONS OF
 THE CODE CALLED OUT BELOW AND SHOW COMPLIANCE:
 A ) PROVIDE AC COOLING AND HEATING CALCULATIONS IN
 ACCORDANCE WITH SECTION C403.2.1 FBC-14 ENERGY
 CONSERVATION- CALCULATION OF HEATING AND COOLING LOADS.
 DESIGN LOADS SHALL BE DETERMINED IN ACCORDANCE WITH THE
 PROCEDURES DESCRIBED IN THE ASHRAE/ACCA STANDARD 183 OR
 ACCA MANUAL N AND SHALL BE ATTACHED TO THE CODE
 COMPLIANCE FORM SUBMITTED TO THE BUILDING DEPARTMENT
 WHEN THE BUILDING IS PERMITTED OR, IN THE EVENT THE
 MECHANICAL PERMIT IS OBTAINED AT A LATER TIME, THE
 SIZING CALCULATION SHALL BE SUBMITTED WITH THE
 APPLICATION FOR THE MECHANICAL PERMIT. HEATING AND
 COOLING LOADS SHALL BE ADJUSTED TO ACCOUNT FOR LOAD
 REDUCTIONS THAT ARE ACHIEVED WHEN ENERGY RECOVERY
 SYSTEMS ARE UTILIZED IN THE HVAC SYSTEM IN ACCORDANCE
 WITH THE ASHRAE HVAC SYSTEMS AND EQUIPMENT HANDBOOK.
 ALTERNATIVELY, DESIGN LOADS SHALL BE DETERMINED BY AN
 APPROVED EQUIVALENT COMPUTATION PROCEDURE, USING THE
 DESIGN PARAMETERS SPECIFIED IN CHAPTER 3.
 B) PROVIDE ENERGY CALCULATIONS IN ACORDANCE WITH
 SECTION C101.2 AND C101.5.
 C) REFER TO SECTION C408 SYSTEM COMMISSIONING INCLUSIVE
 OF ALL SUB-SECTIONS AND SUBMIT A COMMISSIONING PLAN.
 PLEASE NOTE THAT PRELIMINARY AND FINAL REPORTS ON THE
 SYSTEMS SHALL BE PROVIDED PER SECTIONS C408.2.4 AND
 C408.2.5.4.
 2) SHEET M101: A) PROVIDE FSD SYMBOLS WHERE THE DUCTS
 ARE PENETRATING THE RATED SHAFT BY THE TOILET ROOMS. B)
 SHOW THE EXACT LOCATIONS OF THE FIRE-RATED ACCESS DOORS
 AT BOTH OF THE RATED SHAFTS, PROVIDE INSTALLATION
 DETAILS, AND A SUBMITTAL FOR THE DOOR REVIEWED AND
 APPROVED BY THE DESIGN PROFESSIONAL OF RECORD. C)
 PLEASE PLACE NOTE #7 AT ALL SHAFT DAMPER LOCATIONS: THE
 NOTE IS MSSING IN SEVERAL PLACES.
 3) M101, M102, M103, & M104: REFER TO SECTION 306.1
 ACCESS AND SERVICE SPACE: PROVIDE THE DIMENSIONS OF THE
 VRV ACCESS PANELS AND PROVIDE SECTION CUTS OF THE
 PANELS AND INSTALLATION DETAILS. PLEASE NOTE THAT THE
 CLEAR OPENING DIMENSIONS OF THE PANELS SHALL BE LARGE
 ENOUGH TO REPLACE THE UNITS WITHOUT REMOVING PERMANENT
 CONSTRUCTION.
 4) M300: PROVIDE INSTALLATION AND SUPPORT DETAILS FOR
 THE VRV'S AND EXHAUST FANS, AND DUCT HANGING AND
 CONNECTION DETAILS IN COMPLIANCE WITH THE CURRENT
 SMACNA STANDARDS.
 5) MP100, M300: SITE SPECIFIC WIND LOAD ENGINEERING IS
 REQUIRED FOR INSTALLATION OF THE ROOFTOP HP CONDENSERS,
 THE ERV, THE EXHAUST AND UPBLAST FANS, AND THE GRAVITY
 VENTILATIOR- REFER TO SECTION 301.15 FBC-14 MECHANICAL.
 PLEASE NOTE THAT IN ACCORDANCE WITH THIS SECTION, AND
 SECTIONS 237433 AND 238126 OF THE PROJECT MANUAL, THE
 ERV AND HP CONDENSERS MUST ALSO BE CERTIFIED FOR WIND
 RESISTANCE. PROVIDE THE WIND LOAD DESIGN CRITERIA AND
 DESIGN PRESSURES ON THE PLAN, AND COMPLETE DETAILS FOR
 ATTACHING THE VARIOUS CURBS, STANDS AND SUPPORTS TO THE
 STRUCTURE, AND MOUNTING THE APPLIANCES AND EQUIPMENT TO
 THE SUPPORTS. ALL SUBMITTALS PERTAINING TO THE
 INSTALLATIONS INCLUDING MIAMI-DADE NOA'S, FL, PRODUCT
 APPROVALS, MANUFACTURER'S SPECIFICATIONS ETC. SHALL BE
 REVIEWED AND APPROVED BY THE DESIGN PROFESSIONAL OF
 RECORD. PROVIDE SECTION CUTS ON THE PLAN THAT INDICATE
 THE HEIGHTS OF THE AC EQUIPMENT ABOVE THE FINISHED
 SURFACES OF THE ROOF- REFER TO TABLE 1522.3 FBC-14
 BUILDING. SEE ALSO SECTION 1522.3.4 FOR ELECTRICAL
 CONDUITS AND MECHANICAL PIPING MOUNTED ON ROOF DECKS
 AND PROVIDE DETAILS.
 6) PROVIDE A SUBMITTAL PACKAGE REVIEWED AND APPROVED BY
 THE DESIGN PROFESSIONAL OF RECORD THAT INCLUDES THE AC
 EQUIPMENT, THE FIRE/SMOKE DAMPERS, THE DUCT SMOKE
 DETECTORS, THE FANS, THE LOUVERS, THE ACCESS DOORS, THE
 MOD'S, REFRIGERANT AND CONDENSATE PIPING INSULATIONS
 (INSULATIONS SHALL BE PLENUM-RATED) ETC. PLEASE NOTE
 MIAMI-DADE NOA'S AND/OR FL. PRODUCT APPROVALS ARE
 REQUIRED FOR ALL EXTERIOR COMPONENTS SUCH AS THE
 EXHAUST FANS AND LOUVERS
 7) PROVIDE UL TESTED AND APPROVED FIRESTOPPING SYSTEMS
 COPIED ONTO THE PLANS FOR ALL PIPES, DUCTS, CONDUITS
 ETC. PENETRATING FIRE-RATED WALLS AND FLOOR/CEILING
 ASSEMBLIES.
 8) PLEASE NOTE THAT SEPARATE PERMITS ARE REQUIRED FOR
 KITCHEN HOOD AND EXHAUST SYSTEMS.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 4 Status P Date 2016-02-11 Cont ID  
Sent By tklarge Date 2016-02-11 Time 15:28 Rev Time 0.00
Received By tklarge Date 2016-02-10 Time 10:44 Sent To  
Notes
2016-02-11 15:28:53FOUNTAINS ARE NOT APPROVED UNDER THIS PERMIT.

Review Stop P PLUMBING
Rev No 3 Status F Date 2016-01-23 Cont ID  
Sent By tklarge Date 2016-01-23 Time 07:47 Rev Time 0.00
Received By tklarge Date 2016-01-23 Time 06:35 Sent To  
Notes
2016-01-23 07:39:421) SHT. A102 - SHOW THE REQUIRED CLEAR FLOOR SPACE FOR
 THE BREAK ROOM SINK ON THE 2ND LEVEL ON THE PLANS PER
 THE 2014 FBC-ACCESS. SEC. 606.2.IS THE SINK DESIGNED
 FOR A FORWARD OR PARALLEL APPROACH? IF FOR A PARALLEL
 APPROACH, IT APPEARS AS THOUGH THE REFRIGERATOR MAY
 INTERFERE WITH ACCESS TO THE FAUCET CONTROLS BY SOMEONE
 IN A WHEELCHAIR. CLARIFY.
 2) SHT. 120 DETAIL D/3 - THE SHOWER CONTROLS SHALL BE
 LOCATED A MAXIMUM OF 27 INCHES FROM THE SIDE WALL
 BEHIND THE SEAT PER THE 2014 FBC-ACCESS. SEC.608.5.3.
 SHOW THIS ON THE DETAIL.
 3) SHT. P300 - DETAIL #13 - DOWNSPOUTS FOR ROOF
 DRAINAGE SHALL DISCHARGE A MINIMUM OF ONE FOOT FROM THE
 BUILDING WALL PER THE 2014 FBC SEC. 1503.7.
 4) SHT. P201 - SUBMIT NOTES FOR NUMBERS 1-4 SURROUNDED
 BY A HEXAGON. WPB AMEND. TO FBC SEC. 107.2.1.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  

Review Stop P PLUMBING
Rev No 2 Status F Date 2016-01-05 Cont ID  
Sent By gjohnson Date 2016-01-05 Time 12:04 Rev Time 0.00
Received By gjohnson Date 2016-01-05 Time 12:04 Sent To  
Notes
2016-01-05 12:09:482ND REVIEW: FBC 2014
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
 PLUMBING COMMENTS:
  
 1.SHEET P201 + P100 HORIZONTAL DRY VENTS ARE NOT
 PERMITTED PER FBC PL SEC 905.3 + 905.4
 DRY VENTS SHALL CONNECT TO HORIZONTAL DRAIN ABOVE THE
 CENTER LINE AT A 45 DEGREE ANGLE OR GREATER AND MUST
 RUN VERTICALLY TO 6IN ABOVE FLOOD LEVEL RIM OF HIGHEST
 FIXTURE.
 (A) THE MOP SINK IN ROOM 132 SHOWS A HORIZONTAL DRY
 VENT.
 (B) THE STAND PIPE FOR THE ELEVATOR SUMP PIT DRAIN
 SHOWS A DRY VENT.
 (C)THE FLOOR DRAIN AND STAND PIPE FOR SPRINKLER DRAIN
 IN ROOM 151 SHOWS A DRY VENT.
  
 2. SHEET P201 + P100 HORIZONTAL DRY VENTS ARE NOT
 PERMITTED PER FBC PL SEC 905.3 + 905.4
 DRY VENTS SHALL CONNECT TO HORIZONTAL DRAIN ABOVE THE
 CENTER LINE AT A 45 DEGREE ANGLE OR GREATER AND MUST
 RUN VERTICALLY TO 6IN ABOVE FLOOD LEVEL RIM OF HIGHEST
 FIXTURE.
 (A)THE MOP SINK AND FLOOR SINK IN PREP KIT ROOM 340
 SHOWS A DRY VENT.
  
 3. SHEET P201 THE 3IN + 2IN VENTS FROM 3RD FL ABOVE
 PREP KIT AREA MUST TIE INTO VENT ABOVE FLOOD LEVEL RIM
 OF FIXTURES ON 4TH FLOOR IT IS SHOWING BEING TIED INTO
 HORIZONTAL DRAIN BELOW 3RD FLOOR. PER FBC PL SEC 905.4
  
 4. PLEASE PROVIDE SPECS FOR DOMESTIC PUMP THAT SHOWS
 THE SPECIFIC STANDARDS THAT THE PUMP MEETS THE SPECS
 THAT ARE PROVIDED DO NOT SHOW SPECIFIC STANDARDS ONLY
 GENERIC ONES. PER WPB AMEND TO FBC SEC107.2.1
  

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-10-19 Cont ID  
Sent By gjohnson Date 2015-10-19 Time 06:48 Rev Time 0.00
Received By gjohnson Date 2015-10-19 Time 06:48 Sent To  
Notes
2015-10-19 09:19:55 
  
 1ST REVIEW: FBC 2014
  
 GEORGE JOHNSON
 PLUMBING PLANS EXAMINER
 CITY OF WEST PALM BEACH
  561-805-6711
 [email protected]
  
 PLUMBING COMMENTS:
  
 1.WATER CLOSET SHALL COMPLY WITH FBC ACC. SEC 604.2
 LOCATION.
 THE WATER CLOSET SHALL BE POSITIONED WITH A WALL OR
 PARTITION TO THE REAR AND TO ONE SIDE. THE CENTERLINE
 OF THE WATER CLOSET SHALL BE 16 INCHES (405 MM) MINIMUM
 TO 18 INCHES (455 MM) MAXIMUM FROM THE SIDE WALL OR
 PARTITION, EXCEPT THAT THE WATER CLOSET SHALL BE 17
 INCHES (430 MM) MINIMUM AND 19 INCHES (485 MM) MAXIMUM
 FROM THE SIDE WALL OR PARTITION IN THE AMBULATORY
 ACCESSIBLE TOILET COMPARTMENT SPECIFIED IN 604.8.2.
 WATER CLOSETS SHALL BE ARRANGED FOR A LEFT-HAND OR
 RIGHT-HAND APPROACH.
 2.GRAB BARS SHALL COMPLY WITH FBC ACC SEC 609.4
 POSITION OF GRAB BARS.
 GRAB BARS SHALL BE INSTALLED IN A HORIZONTAL POSITION,
 33 INCHES (840 MM) MINIMUM AND 36 INCHES (915 MM)
 MAXIMUM ABOVE THE FINISH FLOOR MEASURED TO THE TOP OF
 THE GRIPPING SURFACE, EXCEPT THAT AT WATER CLOSETS FOR
 CHILDREN?S USE COMPLYING WITH 604.9, GRAB BARS SHALL BE
 INSTALLED IN A HORIZONTAL POSITION 18 INCHES (455 MM)
 MINIMUM AND 27 INCHES (685 MM) MAXIMUM ABOVE THE FINISH
 FLOOR MEASURED TO THE TOP OF THE GRIPPING SURFACE. THE
 HEIGHT OF THE LOWER GRAB BAR ON THE BACK WALL OF A
 BATHTUB SHALL COMPLY WITH 607.4.1.1 OR 607.4.2.1.
 3.SHOWER SEATS SHALL COMPLY WITH FBC SEC 610.3 SHOWER
 COMPARTMENT SEATS.
 WHERE A SEAT IS PROVIDED IN A STANDARD ROLL-IN SHOWER
 COMPARTMENT, IT SHALL BE A FOLDING TYPE, SHALL BE
 INSTALLED ON THE SIDE WALL ADJACENT TO THE CONTROLS,
 AND SHALL EXTEND FROM THE BACK WALL TO A POINT WITHIN 3
 INCHES (75 MM) OF THE COMPARTMENT ENTRY. WHERE A SEAT
 IS PROVIDED IN AN ALTERNATE ROLL-IN TYPE SHOWER
 COMPARTMENT, IT SHALL BE A FOLDING TYPE, SHALL BE
 INSTALLED ON THE FRONT WALL OPPOSITE THE BACK WALL, AND
 SHALL EXTEND FROM THE ADJACENT SIDE WALL TO A POINT
 WITHIN 3 INCHES (75 MM) OF THE COMPARTMENT ENTRY. IN
 TRANSFER-TYPE SHOWERS, THE SEAT SHALL EXTEND FROM THE
 BACK WALL TO A POINT WITHIN 3 INCHES (75 MM) OF THE
 COMPARTMENT ENTRY. THE TOP OF THE SEAT SHALL BE 17
 INCHES (430 MM) MINIMUM AND 19 INCHES (485 MM) MAXIMUM
 ABOVE THE BATHROOM FINISH FLOOR. SEATS SHALL COMPLY
 WITH 610.3.1 OR 610.3.2.
 3.SHOWER CONTROLS SHALL COMPLY WITH FBC ACC. 608.6
 SHOWER SPRAY UNIT AND WATER.
 A SHOWER SPRAY UNIT WITH A HOSE 59 INCHES (1500 MM)
 LONG MINIMUM THAT CAN BE USED BOTH AS A FIXED-POSITION
 SHOWER HEAD AND AS A HAND-HELD SHOWER SHALL BE
 PROVIDED. THE SHOWER SPRAY UNIT SHALL HAVE AN ON/OFF
 CONTROL WITH A NON-POSITIVE SHUT-OFF. IF AN
 ADJUSTABLE-HEIGHT SHOWER HEAD ON A VERTICAL BAR IS
 USED, THE BAR SHALL BE INSTALLED SO AS NOT TO OBSTRUCT
 THE USE OF GRAB BARS. SHOWER SPRAY UNITS SHALL DELIVER
 WATER THAT IS 120?F (49?C) MAXIMUM
 3.PROVIDE SPEC SHEETS ON ELEVATOR SUMP PUMP AND WATER
 HEATERS AND BOOSTERPUMP. PER WPB AMEND TO FBC
 SEC.107.2.1
 4. SHEET P201 PLEASE CLARIFY WHAT IS THE 6IN. STANDPIPE
 FOR SPRINKLER,WHAT IS THIS PIPE BEING USED FOR. WPB
 AMEND TO FBC SEC 107.2.1
 5. SHEET P201 THE 4IN. SOIL STACK THAT IS CONNECTING TO
 THE BUILDING DRAIN IN THE MIDDLE OF THE BATHROOM GROUP
 ON THE FIRST FLOOR IS REQUIRED TO CONNECT DOWN STEAM OF
 THE BATHROOM GROUP. PER FBC P SEC 912.2.1
 6. SHEET P201 THE BREAKROOM SINK P-5 IS NOT VENTED
 SHALL COMPLY WITH FBC P SEC 910.1
 7. PLEASE PROVIDE ISOMETRIC THREE DIMENSIONAL RISER
 DIAGRAMS THE DRAWINGS ON SHEET P201 ARE NOT SUITABLE
 FOR THE PURPOSE OF A COMPREHENSIVE PLAN REVIEW PER WPB
 AMEND.TO FBC SEC 107.2.1
 WHEN NEW DRAWING ARE PROVIDE A COMPLETE PLUMBING REVIEW
 WILL BE DONE THERE MAY BE ADDITIONAL COMMENTS.

Review Stop R ROOF PLAN REVIEW
Rev No 1 Status N Date 2015-12-07 Cont ID  
Sent By shill Date 2015-12-07 Time 16:28 Rev Time 0.00
Received By shill Date 2015-12-07 Time 16:28 Sent To  
Notes
2015-12-07 16:29:23****PROVISO****
  
 SAMANTHA HILL
 BUILDING PLANS EXAMINER
 [email protected]
 561-805-6724
  
 1. PROVISO: ADVISORY ONLY, PRODUCT APPROVALS FOR ALL
 COMPONENTS AND CLADDING ARE TO BE SUBMITTED PRIOR TO
 INSTALLATION, REVIEWED BY DOR PRIOR TO SUBMITTAL.
 COMPONENTS AND CLADDING TO COMPLY WITH THE PRESSURE ON
 PAGE S102.
  
 NO ROOFING PRODUCT APPROVALS SUBMITTED. A SEPARATE
 PERMIT, PRODUCT APPROVAL REVIEWED BY DOR, AND
 ENGINEERING (IF APPLICABLE) ARE REQUIRED.
  
  
  
  
  
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2016-02-19 Cont ID  
Sent By skennedy Date 2016-02-19 Time 15:31 Rev Time 0.00
Received By skennedy Date 2016-02-19 Time 15:31 Sent To  
Notes
***NONE***

Review Stop THRESHOLD THRESHOLD INSPECTOR DOCUMENTS
Rev No 1 Status P Date 2015-11-18 Cont ID  
Sent By shill Date 2015-11-18 Time 17:33 Rev Time 0.00
Received By shill Date 2015-11-18 Time 17:33 Sent To  
Notes
2015-11-18 17:34:11SEE THRESHOLD DOCUMENTS / AGREEMENT FOR 15080008
  
  

Review Stop Z ZONING
Rev No 2 Status P Date 2016-01-26 Cont ID  
Sent By eschneid Date 2016-01-26 Time 18:33 Rev Time 0.00
Received By eschneid Date 2016-01-25 Time 13:20 Sent To  
Notes
2016-01-26 18:35:03PASSED - BUILDING ONLY.
  
 1) SEE SEPARATE PERMITS FOR COMMENTS REGARDING OTHER
 ELEMENTS OF THE PLANS.
  
 2) SIGNS REQUIRE SEPARATE PERMITS, WITH PLANS.
  
 3) PLEASE REMEMBER THAT IN ACCORDANCE WITH RESOLUTION
 NO. 206-15, PRIOR TO THE ISSUANCE OF THE C.O., THE
 FOLLOWING SHALL OCCUR:
  
 A. RECORD A PUBLIC ACCESS EASEMENT FOR ANY PUBLIC
 SIDEWALKS OR UTILITIES ON THE SITE. THE EASEMENT
 LANGUAGE SHALL BE APPROVED BY THE CITY ATTORNEY'S
 OFFICE.
 B. ABANDON THE UNUSED FPL EASEMENT ON THE NORTH
 PROPERTY LINE.
 C. CONSTRUCT THE PEDESTRIAN CROSSING OF WESTBOUND
 OKEECHOBEE BOULEVARD FROM THE CITYPLACE OFFICE PARCEL
 TO THE RESTORATION HARDWARE PARCEL IN ACCORDANCE WITH A
 FLORIDA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY
 PERMIT APPROVAL AND TIE IT INTO THE SIDEWALK NETWORK ON
 THE EAST SIDE OF THE RESTORATION HARDWARE SITE. A COPY
 OF THE FLORIDA DEPARTMENT OF TRANSPORTATION
 RIGHT-OF-WAY PERMIT SHALL BE PROVIDED TO THE PLANNING
 DIVISION.
 D. CONSTRUCT THE MODIFICATIONS TO THE PEDESTRIAN
 CROSSING OF OKEECHOBEE BOULEVARD AT ROSEMARY AVENUE
 (EAST SIDE) TO BE IN COMPLIANCE WITH PLANS APPROVED BY
 THE FLORIDA DEPARTMENT OF TRANSPORTATION AND THE CITY.
 A COPY OF THE FLORIDA DEPARTMENT OF TRANSPORTATION
 RIGHT-OF-WAY PERMIT SHALL BE PROVIDED TO THE PLANNING
 DIVISION.
  
  
  

Review Stop Z ZONING
Rev No 1 Status F Date 2015-11-05 Cont ID  
Sent By eschneid Date 2015-11-05 Time 13:22 Rev Time 8.00
Received By eschneid Date 2015-11-05 Time 13:22 Sent To  
Notes
2015-11-05 13:24:54FAILED
  
 PROVIDE RESPONSES IN WRITING.
  
 1) THE FIRST FLOOR PLANS DO NOT MATCH THE PLANS
 APPROVED AS PART OF RESOLUTION NO. 206-15 OR THE MINOR
 PD AMENDMENT SUBMITTAL ? WEST SIDE DOOR OPENINGS.
  
 2) IF SHEET A-120 IS REVISED, PLEASE CLEARLY INDICATE
 THAT THE LEVEL 1 BATHROOM DOORS WILL LOCK FROM THE
 INSIDE.
  
 3) THE AMOUNT OF GLAZING VISIBLE AT THE DOORWAY/TRANSOM
 WINDOWS AND THE METAL AWNINGS COVERING THE
 DOORWAY/TRANSOM WINDOWS HAS CHANGED FROM WHAT WAS
 ORIGINALLY APPROVED BY RESOLUTION NO. 206-15. THE
 BUILDING PERMIT (ALSO THE MINOR AMENDMENT PLANS) SHOWS
 LESS GLAZING THAN WAS APPROVED (SEE CLOUDS ON PERMIT
 SET FOR EXAMPLES). SOME OF THE GLAZING IS COVERED BY
 LARGER OR RELOCATED METAL AWNINGS, WHILE OTHER GLAZING
 HAS BEEN REMOVED AND REPLACED BY SOLID WALL. STAFF WILL
 NOT APPROVE THE REDUCTION OR COVERING OF ADDITIONAL
 GLAZING SINCE PROVIDING MAXIMUM GLAZING WAS AN INTEGRAL
 PART OF THE CITY'S SUPPORT AND APPROVAL OF THE PROJECT.
 THIS COMMENT APPLIES TO THE WEST, EAST, NORTH AND SOUTH
 ELEVATIONS. SHEETS A201, 201A, 202, 202A
  
 4) THE LANDSCAPE PLAN SUBMITTED AS PART OF THE PERMIT
 DOES NOT MATCH THE LANDSCAPE PLAN APPROVED AS PART OF
 RESOLUTION NO. 206-15. NO REVISED LANDSCAPE PLAN WAS
 SUBMITTED AS PART OF THE CURRENT MINOR PD AMENDMENT
 UNDER REVIEW.
  
 5) THE REVISED LANDSCAPE LAYOUT OF THE ROOF PLAN
 REQUIRES REVISED PLANS AS PART OF THE SUBMITTED MINOR
 PD AMENDMENT.
  
 6) THE LANDSCAPE DETAILS SHEET DOES NOT PROVIDE
 INFORMATION ON THE ROOFTOP PLANTINGS.
  
 7) SEPARATE PERMITS WITH PLANS ARE REQUIRED FOR THE
 FOLLOWING ITEMS THAT ARE EXTERIOR TO THE BUILDING:
  
 A. AWNINGS
 B. PARKING LOT, INCLUDING STRIPING
 C. LANDSCAPE PLEASE NOTE THAT THE LANDSCAPE WITHIN THE
 RIGHT-OF-WAY REQUIRES FDOT PERMITS.
 D. FOUNTAINS
 E. SITE LIGHTING - PLEASE NOTE THAT THE LIGHTING WITHIN
 THE RIGHT-OF-WAY REQUIRES FDOT PERMITS.
 F. HARDSCAPE (ABOVE GROUND SITE WORK)
 G. BICYCLE RACKS
 H. WALLS, GATES AND THEIR COLUMNS
 I. SIGNS
 J. DUMPSTER ENCLOSURE - PLEASE NOTE THAT THE PERMIT SET
 OF PLANS NO LONGER SHOW A GATE FOR THE TRANSFORMER,
 THUS THE DUMPSTER IS NO LONGER FULLY SCREENED AS
 REQUIRED BY CODE.
 K. IRRIGATION - PLEASE NOTE THAT THE IRRIGATION WITHIN
 THE RIGHT-OF-WAY REQUIRES FDOT PERMITS.
  
 8) PLEASE REMEMBER THAT IN ACCORDANCE WITH RESOLUTION
 NO. 206-15, PRIOR TO THE ISSUANCE OF THE C.O., THE
 FOLLOWING SHALL OCCUR:
  
 A. RECORD A PUBLIC ACCESS EASEMENT FOR ANY PUBLIC
 SIDEWALKS OR UTILITIES ON THE SITE. THE EASEMENT
 LANGUAGE SHALL BE APPROVED BY THE CITY ATTORNEY'S
 OFFICE.
 B. ABANDON THE UNUSED FPL EASEMENT ON THE NORTH
 PROPERTY LINE.
 C. CONSTRUCT THE PEDESTRIAN CROSSING OF WESTBOUND
 OKEECHOBEE BOULEVARD FROM THE CITYPLACE OFFICE PARCEL
 TO THE RESTORATION HARDWARE PARCEL IN ACCORDANCE WITH A
 FLORIDA DEPARTMENT OF TRANSPORTATION RIGHT-OF-WAY
 PERMIT APPROVAL AND TIE IT INTO THE SIDEWALK NETWORK ON
 THE EAST SIDE OF THE RESTORATION HARDWARE SITE. A COPY
 OF THE FLORIDA DEPARTMENT OF TRANSPORTATION
 RIGHT-OF-WAY PERMIT SHALL BE PROVIDED TO THE PLANNING
 DIVISION.
 D. CONSTRUCT THE MODIFICATIONS TO THE PEDESTRIAN
 CROSSING OF OKEECHOBEE BOULEVARD AT ROSEMARY AVENUE
 (EAST SIDE) TO BE IN COMPLIANCE WITH PLANS APPROVED BY
 THE FLORIDA DEPARTMENT OF TRANSPORTATION AND THE CITY.
 A COPY OF THE FLORIDA DEPARTMENT OF TRANSPORTATION
 RIGHT-OF-WAY PERMIT SHALL BE PROVIDED TO THE PLANNING
 DIVISION.
  
  
 CONTACT ERIC SCHNEIDER @ (561) 822-1446.
  
2015-10-15 11:38:2910/15/15