Plan Review Details - Permit 15090992
Plan Review Stops For Permit 15090992
Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-11-03 Cont ID  
Sent By albarran Date 2015-11-03 Time 13:18 Rev Time 0.00
Received By albarran Date 2015-11-03 Time 12:52 Sent To I
Notes
2015-11-03 13:19:58THE ELECTRICAL SCOPE OF THIS PERMIT IS LIMITED TO
 TAKING THE DESCRIBED ELECTRICAL FEED TO AN EXISTING
 POINT OF CONNECTION OUTSIDE THE CLASSIFIED LOCATION AND
 TO REWIRE THE EMERGENCY STOP BUTTON.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-10-22 Cont ID  
Sent By albarran Date 2015-10-22 Time 15:35 Rev Time 0.00
Received By albarran Date 2015-10-22 Time 15:30 Sent To I
Notes
2015-10-22 15:40:51THE PLANS FOR THE ABOVE MENTIONED PERMIT APPLICATION
 HAVE BEEN REVIEWED FOR COMPLIANCE WITH THE 2011 EDITION
 OF THE NEC, (NATIONAL ELECTRICAL CODE); THE 5TH EDITION
 OF THE FBC, (FLORIDA BUILDING CODE) 2014, AS APPLICABLE
 AND BELOW ARE THE DEFICIENCIES NOTED.
 1. THERE IS NO ELECTRICAL INFORMATION ACCOMPANYING THIS
 SUBMITTAL FOR A REVIEW.
 2. PLEASE PROVIDE DETAILED INFORMATION ON THE PROPOSED
 WORK.
 3. I WILL NEED A COMPLETE SITE SPECIFIC RISER DIAGRAM
 INCLUDING ALL GROUNDING AND CONDUCTOR SIZING.
 4. YOU SHALL SUBMIT A PANEL SCHEDULE WITH RESPECTIVE
 LOAD CALCS.
 5. INDICATE THE LOCATION OF ALL MAIN DISCONNECTS.
 6. AL EQUIPMENT SHALL HAVE THE ARC-FLASH WARNING
 LABELS.
 THE PLANS SHALL BE REVISED TO ADDRESS THE HEREIN
 MENTIONED ITEMS; ONCE CORRECTED SHALL BE RESUBMITTED
 FOR ANOTHER REVIEW. WHEN RESUBMITTING, YOU ARE REQUIRED
 TO PROVIDE A RESPONSE LETTER ADDRESSING EACH ITEM ALONG
 WITH THE STANDARD CITY RE-SUBMITTAL FORM. PLEASE,
 ADDITIONALLY, INSERT CORRECTED PAGES INTO THE SUBMITTAL
 AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR
 COMPARISON. CLOUDING THE CHANGES WILL BE GREATLY
 APPRECIATED.
  
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
  
 THANK YOU,
 MIKE ALBARRAN
 ELECTRICAL PLANS EXAMINER
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2015-10-09 Cont ID  
Sent By Walker Date 2015-10-09 Time   Rev Time 0.00
Received By pleduc Date 2015-10-06 Time   Sent To  
Notes
2015-10-09 08:39:38PLANS AS SUBMITTED PASSED.
 WILL REQUIRE SLAB DETAIL AT TIME OF INSPECTION

Review Stop G GAS REVIEW
Rev No 2 Status P Date 2015-11-03 Cont ID  
Sent By tklarge Date 2015-11-03 Time 11:52 Rev Time 0.00
Received By tklarge Date 2015-11-03 Time 11:23 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status F Date 2015-09-26 Cont ID  
Sent By tklarge Date 2015-09-26 Time 05:54 Rev Time 0.00
Received By tklarge Date 2015-09-26 Time 05:23 Sent To  
Notes
2015-09-26 04:21:281) SUBMIT TWO COPIES OF THE FUEL DISPENSER
 MANUFACTURER'S INSTALLATION INSTRUCTIONS PER NFPA 58,
 2011 EDITION, SEC. 6.24.3.1.
 2) NFPA 58 SEC. 6.24.3.6 - PIPING AND THE DISPENSING
 HOSE SHALL BE PROVIDED WITH HYDROSTATIC RELIEF VALVES
 IN ACCORDANCE WITH SECTION 6.13 OF NFPA 58.
 3) NFPA 58-2011 - SEC. 6.24.3.7 - PROTECTION AGAINST
 TRESPASSING AND TAMPERING SHALL BE IN ACCORDANCE WITH
 6.18.4. SHOW ON THE PLAN HOW THE TANKS WILL BE
 PROTECTED AGAINST UNAUTHORIZED ACCESS.
 4) NFPA 58-2011 - SEC. 6.24.3.12 - ALL DISPENSERS
 EITHER SHALL BE INSTALLED ON A CONCRETE FOUNDATION OR
 SHALL BE PART OF A COMPLETE STORAGE AND DISPENSING UNIT
 MOUNTED ON A COMMON BASE AND INSTALLED IN ACCORDANCE
 WITH 6.6.3.1 (G). SHOW COMPLIANCE WITH TABLE 6.6.3 (A).
 5) PLANS SHALL BE DRAWN TO A MINIMUM 1/8 INCH SCALE PER
 THE WPB AMEND. TO FBC SEC. 107.2.1.4.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  
  
  
  
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-11-03 Cont ID  
Sent By albarran Date 2015-11-03 Time 13:20 Rev Time 0.00
Received By albarran Date 2015-11-03 Time 11:22 Sent To  
Notes
2015-11-03 13:22:2311/3/15 SUCCESSFULLY BEEN THROUGH ALL REVIEWS.
 CONTRACTOR NOTIFIED VIA EMAIL. SENT TO SMALL READY BIN
 "A". MA

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-10-22 Cont ID  
Sent By albarran Date 2015-10-22 Time 15:42 Rev Time 0.00
Received By albarran Date 2015-09-23 Time 12:57 Sent To  
Notes
2015-10-22 15:44:1110/22/15 FAILED ELECTRICAL REVIEW FOR LACK OF
 SUPPORTING DOCUMENTATION. CONTRACTOR NOTIFIED VIA
 EMAIL. SENT TO SMALL DENIED BIN "A".MA
2015-09-23 12:57:54B03

Review Stop P PLUMBING
Rev No 1 Status N Date 2015-11-03 Cont ID  
Sent By tklarge Date 2015-11-03 Time 11:23 Rev Time 0.00
Received By tklarge Date 2015-11-03 Time 11:22 Sent To  
Notes
2015-11-03 11:23:11REVIEW STOP ENTERED BY MISTAKE.TKL.

Review Stop Z ZONING
Rev No 1 Status P Date 2015-10-02 Cont ID  
Sent By sgraham Date 2015-10-02 Time   Rev Time 0.00
Received By   Date 2015-10-02 Time   Sent To  
Notes
2015-10-01 15:35:4810/1/15


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved