| Plan Review Stops For Permit 15090929 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2016-05-11 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2016-05-11 |
Time |
10:27 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2016-05-11 |
Time |
10:27 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2016-03-28 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2016-03-28 |
Time |
08:53 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2016-03-28 |
Time |
08:00 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2015-12-16 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-12-16 |
Time |
07:30 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2015-12-16 |
Time |
07:02 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-10-05 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-10-05 |
Time |
06:45 |
Rev Time |
|
| Received By |
jwitmer |
Date |
2015-10-05 |
Time |
06:01 |
Sent To |
|
|
| Notes |
| 2015-10-05 06:33:41 | BUILDING PLAN REVIEW | | | W. P. B. PERMIT: 15090929 | | | ADD: 1044 26TH ST. | | | CONT: JOSEPH W. SCHUESSLER, INC. | | | TEL: (561)635-6712 | | | E-MAIL: [email protected] | | | | | | 2014 FLORIDA BUILDING CODE W 2014 WEST PALM BEACH | | | AMENDMENTS TO THE FLORIDA BUILDING CODE, CHAPTER 1, | | | ADMINISTRATION | | | | | | 2014 EXISTING BUILDING CODE LEVEL II 701.3 COMPLIANCE. | | | ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, SYSTEMS, AND | | | SPACES SHALL COMPLY WITH THE REQUIREMENTS OF THE | | | FLORIDA BUILDING CODE, BUILDING. | | | | | | 1ST REVIEW | | | DATE: MON. OCT. 5/2015 | | | ACTION: DENIED | | | | | | 1) SHEET 1SHOWS A BOILER WITHIN NEW 1 HOUR FIRE RATED | | | WALLS. THE PLANS DO NOT PROVIDE AT WHAT PRESSURE AND | | | THE HORSEPOWER OF THE MOTOR. IF THE BOILER IS OVER 15 | | | PSI AND 10 HORSEPOWER THEN IT WOULD REQUIRE EITHER A 1 | | | HOUR FIRE RATED ROOM OR AN AUTOMATIC FIRE SPRINKLER | | | SYSTEM. 2014 FBC-B TABLE 509. THE PLANS DO INDICATE A 1 | | | HOUR FIRE RATED ROOM, IF THE BOILERS OPERATING PRESSURE | | | IS OVER 15 PSI AND MOTOR IS OVER 10 HORSEPOWER THEN THE | | | DOOR WILL NEED TO BE 3/4 HR RATING IN COMPLIANCE WITH | | | TABLE 716.5. | | | | | | 2) WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION | | | & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS | | | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | | REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | | COOPERATION. | | | | | | JAMES A. WITMER CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | TEL: 561-805-6715 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2016-05-09 |
|
|
Cont ID |
|
| Sent By |
vperez |
Date |
2016-05-09 |
Time |
16:02 |
Rev Time |
0.00 |
| Received By |
vperez |
Date |
2016-05-09 |
Time |
16:01 |
Sent To |
|
|
| Notes |
| 2016-05-09 16:06:36 | TO BIN C21- ITS ON JIMS LIST |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
F |
Date |
2016-04-05 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2016-04-05 |
Time |
10:24 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2016-04-05 |
Time |
09:21 |
Sent To |
I |
|
| Notes |
| 2016-04-05 10:25:05 | NO ELECTRICAL DATA PROVIDED. I SPOKE WITH THE | | | CONTRACTOR AND HE WILL SUBMIT AN ELECTRICAL SHEET AS | | | REQUIRED. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2016-01-14 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2016-01-14 |
Time |
10:19 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2016-01-14 |
Time |
10:06 |
Sent To |
I |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2015-10-02 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-10-02 |
Time |
10:06 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-10-02 |
Time |
09:55 |
Sent To |
M |
|
| Notes |
| 2015-10-02 10:14:06 | PLEASE NOTE THAT I, MIKE ALBARRAN, ELECTRICAL PLANS | | | EXAMINER HAVE COMPLETED THE SECOND ELECTRICAL REVIEW OF | | | THE ABOVE MENTIONED JOB. BELOW ARE THE COMMENTS WITH | | | REGARDS TO THE REQUIRED CORRECTIONS. THE PLANS SHALL BE | | | REVISED TO ADDRESS FOLLOWING ITEMS; ONCE CORRECTED | | | SHALL BE RESUBMITTED FOR ANOTHER REVIEW. | | | 1. YOU SHALL SUBMIT ELECTRICAL DRAWINGS INDICATING THE | | | SCOPE OF WORK. | | | 2. THE SPECS ON THE BOILER DO NOT INDICATE WHICH OF THE | | | CHOICES FOR THE PUMPS ETC. | | | 3. YOU SHALL PROVIDE THE REQUIRED LIGHTING AND SERVICE | | | OUTLET FOR THE NEW BOILER ROOM. | | | 4. YOU WILL SUBMIT A SIMPLE FEEDER SCHEDULE (RISER | | | DIAGRAM) INDICATING THE WIRE SIZE, INSULATION AND ALL | | | APPLICABLE COMPONENTS OF THE INSTALLATION. | | | 5. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE | | | PREVIOUSLY REVIEWED SHEETS. | | | | | | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO | | | CONTACT ME DIRECTLY. | | | | | | THANK YOU | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
4 |
Status |
P |
Date |
2016-05-03 |
|
|
Cont ID |
|
| Sent By |
J.Walker |
Date |
2016-05-03 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
2016-05-02 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2016-03-16 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2016-03-16 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2016-03-16 |
Time |
15:54 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2015-12-17 |
|
|
Cont ID |
|
| Sent By |
J.Walker |
Date |
2015-12-17 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
2015-12-16 |
Time |
|
Sent To |
|
|
| Notes |
| 2015-12-17 10:49:41 | WILL REQUIRE BALLARDS INSTALLED IF OCCUPANT PLANS ON | | | PARKING VEHICLES WITHIN THE STRUCTURE |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
P |
Date |
2015-09-24 |
|
|
Cont ID |
|
| Sent By |
Walker |
Date |
2015-09-24 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
2015-09-23 |
Time |
|
Sent To |
E |
|
| Notes |
| 2015-09-24 07:39:30 | WILL REQUIRE BALLARDS AROUND EQUIPMENT IF VEHICLES WILL | | | BE PARKED IN THE STRUCTURE |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
4 |
Status |
P |
Date |
2016-05-02 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-05-02 |
Time |
07:33 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-05-02 |
Time |
04:56 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
3 |
Status |
F |
Date |
2016-03-18 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-03-18 |
Time |
12:46 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-03-18 |
Time |
12:35 |
Sent To |
|
|
| Notes |
| 2016-03-18 13:02:24 | 1) SHT. M-100 INDICATES A TYPE "B" VENT FOR THE | | | BOILER.THE GAS CODE REFERS TO CATEGORY I APPLIANCES | | | BEING USED WITH A TYPE B VENT AND THESE TYPE OF | | | APPLIANCES OPERATE UNDER A NONPOSITIVE VENT STATIC | | | PRESURE. THE REPORT FROM VAN-PACKER INDICATES THAT THE | | | BOILER IS A FORCED DRAFT SYSTEM AND THEREFORE CANNOT BE | | | USED WITH A TYPE B VENT. | | | 2) PLEASE COMPILE THE PLANS INTO TWO COMPLETE SETS OF | | | PLANS FOR REVIEW. | | | 3) THE 12" VENT IS UNDERSIZED FOR THE BOILER IN | | | ACCORDANCE WITH TABLE 504.2 (1) OF 2014 FUEL GAS CODE. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2016-02-05 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-02-05 |
Time |
12:33 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-02-05 |
Time |
10:45 |
Sent To |
|
|
| Notes |
| 2016-02-05 10:46:45 | 1) SHT. P100 - PROPANE TANK HOLDOWN AREA - THE 2014 FBC | | | HAS ADOPTED ASCE-10, NOT ASCE-98. REVISE. | | | 2) THE WIND LOAD IS 170 MPH, ULT DESIGN PER 2014 FBC | | | SEC. 1609. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2015-12-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-12-20 |
Time |
10:07 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-12-20 |
Time |
08:33 |
Sent To |
|
|
| Notes |
| 2015-12-20 09:01:42 | 1) INDICATE ON THE PLAN THE VENTING CATEGORY OF THE | | | BOILER IN ACCORDANCE WITH THE 2014 FBC-FUEL GAS SEC. | | | 202 (DEFINITIONS - VENTED APPLIANCE CATEGORIES). | | | 2) SHOW THE SIZE OF THE GAS VENT FOR THE BOILER. THE | | | VENT SIZE SHALL COMPLY WITH SEC. 503.6.9 & TABLE | | | 504.2(2) IF THIS IS A CATEGORY I VENTED APPLIANCE. IF | | | NOT A CATEGORY I APPLIANCE, SUBMIT MANUF. SPECS FOR THE | | | REQUIRED VENT SIZING. | | | 3) SHT.P-200 - INDICATE THE TYPE OF MATERIAL, LOCATION | | | AND DISTANCE ABOVE THE ROOF OF THE VENTS FOR THE | | | BLOWDOWN TANKS FOR THE BOILER, FEEDWATER TANK AND THE | | | AUTOCLAVE.SUBMIT MANUFACTURER'S SPECS FOR THE VENT | | | INSTALLATION FOR THIS EQUIPMENT. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | 4) A TYPE B GAS VENT SHALL TERMINATE AT LEAST 5 FEET IN | | | VERTICAL HEIGHT ABOVE THE APPLIANCE DRAFT HOOD OR FLUE | | | COLLAR PER 2014 FGC SEC.503.6.5. SHOW ON THE THE PLANS. | | | SHOW THE TOTAL HEIGHT OF THE GAS VENT. | | | 5) INDICATE ON THE PLAN IF THE BOILER IS A NATURAL | | | DRAFT OR FAN ASSISTED VENT APPLIANCE. THIS WILL | | | DETERMINE VENT SIZE IF A CATEGORY I VENTED APPLIANCE | | | PER TABLE 504.2 (2). | | | 6) SUBMIT DETAILS FOR SUPPORT OF THE GAS VENT. 2014 FGC | | | SEC.503.6.1. | | | 7) SHOW THE SIZE OF THE LP TANKS ON THE PLAN.WPB AMEND. | | | TO FBC SEC. 107.2.1. | | | 8) SUBMIT ANCHORING DETAILS FOR THE LP TANKS.ANCHORING | | | SHALL BE DDESIGNED AND INSTALLED TO RESIST THE WIND | | | PRESSURES IN ACCORDANCE WITH THE FLORIDA BUILDING CODE, | | | BUILDING SEC.1609. | | | 9) SHT. P-100 - THE SIZE OF THE PIPING FROM THE LP | | | TANKS IS SHOWN AS 3/4 INCH BUT THE BOILER SYSTEM DETAIL | | | SHOWS 1 1/4 INCHES. CLARIFY. | | | 10) SUBMIT DETAILS FOR THE SEALING OF THE GAS PIPE | | | PENETRATION THROUGH THE EXTERIOR WALL. WPB AMEND. TO | | | FBC SEC. 107.2.1. | | | 11) SHOW THE LOCATION OF THE STEP DOWN GAS REGULATOR ON | | | THE GAS DRAWING.WPB AMEND. TO FBC SEC. 107.2.1. | | | 12) SHOW THE DISTANCE FROM THE STEP DOWN REGULATOR TO | | | THE MOST REMOTE OUTLET ON THE SYSTEM.WPB AMEND. TO FBC | | | SEC. 107.2.1. | | | 13) SHOW THE PIPE SIZE FROM THE STEP DOWN REGULATOR TO | | | THE EQUIPMENT.WPB AMEND. TO FBC SEC. 107.2.1. | | | 14) SHOW THE SIZE OF THE GAS PIPING FROM THE LP | | | TANKS.WPB AMEND. TO FBC SEC. 107.2.1. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2016-05-11 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2016-05-11 |
Time |
10:27 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2016-04-25 |
Time |
13:13 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2016-04-05 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2016-04-05 |
Time |
10:25 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2016-03-11 |
Time |
15:42 |
Sent To |
|
|
| Notes |
| 2016-04-05 10:27:14 | 4/5/16 FAILED ELECTRICAL REVIEW AS NOTED. CONTRACTOR | | | NOTIFIED VIA PHONE AND EMAIL. SENT FILE TO LARGE DENIED | | | "J" DRAWER. MA | | 2016-03-11 15:42:36 | C03 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2016-03-11 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2016-03-11 |
Time |
15:40 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2016-02-01 |
Time |
12:42 |
Sent To |
|
|
| Notes |
| 2016-02-02 12:42:53 | RESUB ROUTED TO CCOLE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2016-01-14 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2016-01-14 |
Time |
10:21 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-12-11 |
Time |
14:15 |
Sent To |
|
|
| Notes |
| 2016-01-14 10:40:08 | 1/14/16 PASSED ELECTRICAL BUT FAILED OTHER TRADE | | | REVIEWS. CONTRACTOR NOTIFIED VIA EMAIL. SENT TO SMALL | | | DENIED BIN "J". MA | | | | | 2015-12-11 14:15:31 | B34 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-10-07 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-10-07 |
Time |
08:27 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-09-22 |
Time |
12:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
5 |
Status |
P |
Date |
2016-04-27 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2016-04-27 |
Time |
12:24 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2016-04-27 |
Time |
07:28 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
F |
Date |
2016-03-17 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2016-03-17 |
Time |
13:47 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2016-03-17 |
Time |
13:47 |
Sent To |
|
|
| Notes |
| 2016-03-17 14:13:17 | 4TH REVIEW: FBC 2014 MECHANICAL | | | PERMIT #15090929 | | | 3/17/16 | | | | | | 1) THE RE-SUBMITTED M100 PLAN FROM GM CONSULTING | | | ENGINEERS IS INDICATING THE BOILER FLUE IS A B-VENT | | | TYPE FOR A CATEGORY 1 APPLIANCE, HOWEVER THE NEWLY | | | SUBMITTED MANUFACTURER'S SPECIFCATIONS FROM VAN PACKER | | | FOR THE BOILER SPECIFI A FORCED DRAFT VENTING SYSTEM . | | | PLEASE SEE THE DEFINITIONS OF CATEGORY-1, TYPE B VENT, | | | AND FORCED DRAFT IN SECTION 202 FBC-14 FUEL GAS: | | | | | | A) CATEGORY I. AN APPLIANCE THAT OPERATES WITH A | | | NONPOSITIVE VENT STATIC PRESSURE AND WITH A VENT GAS | | | TEMPERATURE THAT AVOIDS EXCESSIVE CONDENSATE PRODUCTION | | | IN THE VENT. | | | B) TYPE B VENT. A VENT LISTED AND LABELED FOR USE WITH | | | APPLIANCES WITH DRAFT HOODS AND OTHER CATEGORY I | | | APPLIANCES THAT ARE LISTED FOR USE WITH TYPE B VENTS. | | | C) FORCED-DRAFT VENTING SYSTEM. A PORTION OF A VENTING | | | SYSTEM USING A FAN OR OTHER MECHANICAL MEANS TO CAUSE | | | THE REMOVAL OF FLUE OR VENT GASES UNDER POSITIVE STATIC | | | VENT PRESSURE. | | | IT WOULD APPEAR THAT THE M100 PLAN INDICATING A | | | CATEGORY 1 APPLIANCE WITH A TYPE B VENT IS NOT | | | CONSISTENT WITH THE MANUFACTURER'S SPECIFICATIONS FROM | | | VAN-PACKER. | | | 2) PLEASE PROVIDE AN UPDATED WIND LOAD ENGINEERING | | | SUBMITTAL FOR INSTALLATION OF THE FLUE ABOVE THE ROOF. | | | THE PLAN IN THE FILE HAS BEEN MARKED VOID BY EITHER THE | | | CONTRACTOR OR DESIGN PROFESSIONAL. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
F |
Date |
2016-02-03 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2016-02-03 |
Time |
07:23 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2016-02-03 |
Time |
07:23 |
Sent To |
|
|
| Notes |
| 2016-02-03 07:30:53 | 3RD REVIEW: FBC 2014 MECHANICAL | | | PERMIT #15090929 | | | 2/3/15 | | | | | | 1) AFTER TWO PREVIOUS REVIEW REQUESTS, THE REVISED M100 | | | BOILER FLUE INSTALLATION DETAIL IS STILL NOT SHOWING A | | | TOTAL RUN LENGTH OF THE VENT WHICH IS REQUIRED TO | | | VERIFY CORRECT SIZING DAIMETER OF THE VENT. THE DRAWING | | | IS "NTS" BUT BY APPEARANCES THE 12" DIAMETER VENT MAY | | | BE UNDERSIZED FOR THE TOTAL LENGTH OF THE RUN. REFER TO | | | TABLE 504.2(1) FBC-14 FUEL GAS AND REVISE THE PLAN TO | | | SHOW THE TOTAL RUN LENGTH AND CORRECT VENT SIZING PER | | | THE TABLE. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2015-12-18 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-12-18 |
Time |
16:00 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-12-18 |
Time |
16:00 |
Sent To |
|
|
| Notes |
| 2015-12-18 16:03:02 | 1ST REVIEW 2014 MECHANICAL | | | PERMIT #15090929 | | | 12/18/15 | | | | | | THE1ST REVIEW COMMENTS # 1 & 2 WERE NOT ADDRESSED. I AM | | | NOT SEEING ANY DIMENSIONS INDICATING THE DIAMETER OF | | | THE DUCT AND THE LENGTH OF THE DUCT RUN- SEE TABLE | | | 504.2(1) FBC-14 FUEL GAS. I HAVE COPIED COMMENTS #1 & 2 | | | BELOW: PLEASE REVISE THE PLANS TO INDICATE COMPLIANCE. | | | 1) WORKING CLEARANCE- REFER TO SECTION 1004.3 FBC-014 | | | MECHANICAL: "PASSAGEWAYS AROUND ALL SIDES OF BOILERS | | | SHALL HAVE AN UNOBSTRUCTED WIDTH OF NOT LESS THAN 18" | | | UNLESS OTHERWISE APPROVED". THE SUBMITTED FLOOR PLAN | | | DRAWING INDICATES NON-COMPLIANCE- PLEASE REVISE. | | | 2) PROVIDE DETAILS FOR EXHAUST VENTING OF THE BOILER: | | | SHOW THE TYPE AND SIZE OF EXHAUST VENT, EXHAUST VENT | | | RUN AND TERMINATION LOCATION, AND SUBMIT MANUFACTURER'S | | | SPECIFICATIONS. | | | 3) PLEASE PROVIDE A TIE-DOWN DETAIL FOR ANCHORING THE | | | EXHAUST VENT ASSEMBLY ABOVE THE ROOF TO THE ROOF | | | STRUCTURE. | | | 4) SUBMIT TWO COPIES OF THE MIAMI-DADE NOA FOR THE | | | COMBUSTION AIR LOUVERS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2015-10-07 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-10-07 |
Time |
07:32 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-10-07 |
Time |
06:52 |
Sent To |
|
|
| Notes |
| 2015-10-07 08:26:59 | 1ST REVIEW: FBC 2014 MECHANICAL | | | PERMIT #15090929 | | | 10/7/15 | | | | | | 1) WORKING CLEARANCE- REFER TO SECTION 1004.3 FBC-014 | | | MECHANICAL: "PASSAGEWAYS AROUND ALL SIDES OF BOILERS | | | SHALL HAVE AN UNOBSTRUCTED WIDTH OF NOT LESS THAN 18" | | | UNLESS OTHERWISE APPROVED". THE SUBMITTED FLOOR PLAN | | | DRAWING INDICATES NON-COMPLIANCE- PLEASE REVISE. | | | 2) PROVIDE DETAILS FOR EXHAUST VENTING OF THE BOILER: | | | SHOW THE TYPE AND SIZE OF EXHAUST VENT, EXHAUST VENT | | | RUN AND TERMINATION LOCATION, AND SUBMIT MANUFACTURER'S | | | SPECIFICATIONS. | | | 3) REFER TO SECTION 1006.6- SAFETY AND RELIEF VALVE | | | DISCHARGE: "HIGH PRESSURE-STEAM SAFETY VALVES SHALL BE | | | VENTED TO THE OUTSIDE OF THE STRUCTURE" PLEASE PROVIDE | | | DETAILS. | | | 4) REFER TO SECTION 1008.1 AND INDICATE COMPLIANCE FOR | | | THE REQUIRED BLOWOFF VALVE AND BLOWOFF VALVE DISCHARGE | | | LOCATION. | | | 5) PROVIDE PIPING DIAGRAMS OR SCHEMATICS FOR THE BOILER | | | AND OTHER EQUIPMENT ASSOCIATED WITH THE SYSTEM. | | | INDICATE THE TYPES AND SIZES OF ALL PIPING, VALVE TYPES | | | AND LOCATIONS ETC. | | | 6) PROVIDE UL TESTED AND APPROVED FIRESTOPPING DETAILS | | | FOR ALL PIPES AND DUCTS PENETRATING THE FIRE-RATED | | | BOILER ENCLOSURE AND THE ROOF STRUCTURE. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2016-03-18 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-03-18 |
Time |
13:22 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-03-18 |
Time |
12:47 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2016-02-05 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2016-02-05 |
Time |
10:45 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2016-02-05 |
Time |
10:45 |
Sent To |
|
|
| Notes |
| 2016-02-05 10:45:13 | 1) ALL THE PLANS AND SUPPORTING DOCUMENTS SHALL BE | | | COMPILED INTO TWO COMPLETE SETS OF PLANS FOR | | | SUBMITTAL.2014 FBC SEC. 107.2.1. | | | 2) THE PLANS FROM GM CONSULTING ENGINEERS SHOWS THE | | | BOILER EXHAUST BEING VENTED WITH 2- 45 DEGREE OFFSETS | | | BUT THE PLANS FROM RIZA ALTAN SHOWS THE SAME VENT WITH | | | 2- 90 DEGREE FITTINGS. CLARIFY. | | | 3) THE PLUMBING RISER FROM TURQUOISE ENGINEERING SHOWS | | | 3-FLOOR SINKS, A VENT AND A FLOOR DRAIN FOR THIS | | | INSTALLATION. ONLY 2 FLOOR SINKS ARE SHOWN ON THE PLAN | | | BY GM CONSULTING ENGINEERS. A TRAP PRIMER IS REQUIRED | | | ON THE FLOOR DRAIN.CLARIFY.2014 FPC SEC.1002.4 | | | 4) THE 8 1/2" X 11 SHEET FROM BONDTECH IS ILLEGIBLE. | | | SUBMIT A CLEAR AND LEGIBLE SHEET FOR REVIEW.FBC SEC. | | | 107.2.1. | | | 5) A BACKFLOW PREVENTER (RPZ) IS REQUIRED ON THE WATER | | | FEED TO THE BOILER. 2014 FPC SEC. 608.3. | | | 6) |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2015-12-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-12-20 |
Time |
08:33 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-12-20 |
Time |
06:35 |
Sent To |
|
|
| Notes |
| 2015-12-20 07:41:21 | 1) WATER ABOVE 140 DEGRESS SHALL NOT BE DISCHARGED INTO | | | ANY PART OF A DRAINAGE SYSTEM PER 2014 FBC-PLUMBING | | | SEC. 803.1. | | | 2) SHT. P100 - IDENTIFY AND SIZE THE DRAIN FROM THE | | | FEEDWATER TANK TO THE FLOOR SINK. WPB AMEND. TO FBC | | | SEC. 107.2.1. | | | 3) SHT. P-200 - THE MINIMUM AIR GAP REQD. FOR THE | | | INDIRECT WASTE PIPES SHALL BE NOT LESS THE TWICE THE | | | EFFECTIVE OPENING OF THE INDIRECT WASTE PIPE. 2014 FBC | | | PLUMBING SEC.802.2.1. | | | 4) SHT. P-200 - SHOW THE WATER SUPPLY TO THE AUTOCLAVE | | | BLOWDOWN TANK ON THE AUTOCLAVE INSTALLATION DETAIL | | | DRAWING.WPB AMEND. TO FBC SEC. 107.2.1. | | | 5) SHT. P-200 - THE PTR VALVE FOR THE AUTOCLAVE SHALL | | | DISCHARGE BY GRAVITY PER 2014 FMC SEC.1006.5. | | | 6) SUBMIT AN INSTALLATION DETAIL FOR THE AUTOCLAVE | | | BLOWDOWN TANK TO THE AUTOCLAVE. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | 7) SHT. P-200 SHOWS THE FLOOR SINKS AS EXISTING BUT | | | SHT. 1 DOES NOT. ARE THEY NEW OR EXISTING? CLARIFY. | | | 8) THE FLOOR DRAINS ARE NOT VENTED. SHOW THE PROPER | | | VENTING FOR THE FLOOR FRAINS. FBC-PLUMBING SEC.901.2, | | | 901.2.1. THE DISTANCE OF THE TRAP TO A VENT SHALL | | | COMPLY WITH TABLE 909.1. | | | 9) TRAP PRIMERS ARE REQD. ON THE FLOOR DRAINS PER | | | FBC-PLUMBING SEC.1002.4. | | | 10) THE 8 1/2 X 11 SHEET FROM BONDTECH IS ILLEGIBLE. | | | SUBMIT A CLEAR AND LEGIBLE SHEET FOR REVIEW. WPB AMEND. | | | TO FBC SEC.107.2.1. | | | 11) THE BOILER SHALL BE LISTED IN ACCORDANCE WITH THE | | | 2014 FL. MECHANICAL CODE SEC.1004.1. | | | 12) SUBMIT COMPLETE SPCIFICATIONS FOR THE FEEDWATER | | | TANK AND THE BOILER. WPB AMEND. TO FBC SEC.107.2.1. | | | 130 INDICATE ON THE PLAN THE TYPE OF PIPING TO BE USED | | | FOR THE STEAM SYSTEM. WPB AMEND. TO FBC SEC.107.2.1. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2015-10-04 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-10-04 |
Time |
07:38 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-10-04 |
Time |
07:07 |
Sent To |
|
|
| Notes |
| 2015-10-04 07:05:00 | 1) THE FLOOR DRAINS ARE NOT VENTED. SHOW THE PROPER | | | VENTING FOR THE FLOOR FRAINS. FBC-PLUMBING SEC.901.2, | | | 901.2.1. THE DISTANCE OF THE TRAP TO A VENT SHALL | | | COMPLY WITH TABLE 909.1. | | | 2) TRAP PRIMERS ARE REQD. ON THE FLOOR DRAINS PER | | | FBC-PLUMBING SEC.1002.4. | | | 3) THE 8 1/2 X 11 SHEET FROM BONDTECH IS ILLEGIBLE. | | | SUBMIT A CLEAR AND LEGIBLE SHEET FOR REVIEW. WPB AMEND. | | | TO FBC SEC.107.2.1. | | | 4) THE BOILER SHALL BE LISTED IN ACCORDANCE WITH THE | | | 2014 FL. MECHANICAL CODE SEC.1004.1. | | | 5) SPECIFICATIONS HAVE BEEN SUBMITTED FOR THE BOILER | | | BUT NO PIPING DIAGRAM HAS BEEN SUBMITTED. INDICATE ON | | | THE PLAN THAT THE BOILER INSTALLATION WILL BE DONE | | | UNDER A SEPARATE PERMIT IF NOT BEING DONE AT THIS | | | TIME.IF IT IS, SUBMIT COMPLETE PIPING DIAGRAM FOR | | | REVIEW. WPB AMEND. TO FBC SEC.107.2.1. | | | 6) SUBMIT COMPLETE SPCIFICATIONS FOR THE FEEDWATER TANK | | | AND SUBMIT THE COVER SHEET FOR THE BOILER. WPB AMEND. | | | TO FBC SEC.107.2.1. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|