| Plan Review Stops For Permit 15090231 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2015-09-09 |
|
|
Cont ID |
|
| Sent By |
tmoore |
Date |
2015-09-09 |
Time |
08:59 |
Rev Time |
0.00 |
| Received By |
tmoore |
Date |
2015-09-09 |
Time |
08:57 |
Sent To |
ENG |
|
| Notes |
| 2015-09-09 08:59:04 | HAVE ALL NEEDED UTILITY RELEASES AND SEWER LATERAL CAP. | | | MOVING ON TO ENGINEERING. |
|
|
| Review Stop |
ENG |
ENGINEERING CSD |
| Rev No |
1 |
Status |
P |
Date |
2015-09-16 |
|
|
Cont ID |
|
| Sent By |
cranford |
Date |
2015-09-16 |
Time |
08:55 |
Rev Time |
0.00 |
| Received By |
cranford |
Date |
2015-09-16 |
Time |
08:52 |
Sent To |
HIST |
|
| Notes |
| 2015-09-16 08:57:25 | 1. DISTURBED PORTIONS OF THE SITE SHALL BE PERMANENTLY | | | STABILIZED NO LATER THAN 7 DAYS AFTER THE LAST | | | CONSTRUCTION ACTIVITY HAS OCCURRED. | | | | | | 2. BROKEN PAVEMENT OR OTHER DEBRIS SHALL BE REMOVED | | | FROM THE SITE AS SOON AS PRACTICAL. EXCAVATED MATERIAL | | | OR DEMOLITION DEBRIS SHALL NOT BE STORED IN | | | RIGHT-OF-WAY OR EASEMENT DURING CONSTRUCTION. | | | | | | KELLY CRANFORD, P.E. | | | LAND DEVELOPMENT ENGINEER | | | PUBLIC WORKS DEPARTMENT | | | CITY OF WEST PALM BEACH | | | [email protected] | | | 561-494-1098 (OFFICE) | | | |
|
|
| Review Stop |
HIST |
HISTORICAL |
| Rev No |
1 |
Status |
P |
Date |
2015-09-17 |
|
|
Cont ID |
|
| Sent By |
fmittner |
Date |
2015-09-17 |
Time |
10:25 |
Rev Time |
0.00 |
| Received By |
fmittner |
Date |
2015-09-17 |
Time |
10:25 |
Sent To |
|
|
| Notes |
|
|
|