| Plan Review Stops For Permit 15090051 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2015-10-31 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-10-31 |
Time |
10:16 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-10-31 |
Time |
10:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-10-20 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-10-20 |
Time |
14:34 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-10-20 |
Time |
14:34 |
Sent To |
|
|
| Notes |
| 2015-10-20 14:41:59 | 1ST REVIEW: FBC 2014 5TH ED. | | | | | | UPDATE THE PLAN TO INDICATE COMPLIANCE WITH THE | | | FOLLOWING: | | | | | | FBC 107.3.4 - PROVIDE PRODUCT APPROVALS FOR THOSE | | | PRODUCTS WHICH ARE REGULATED BY FAC RULE 9N-3 REVIEWED | | | AND APPROVED IN WRITING BY THE DESIGNER OF RECORD. | | | SPECIFICALLY, PROVIDE IMPACT RESISTANT SKYLIGHT | | | SUBMITTAL. | | | | | | FBC-R310.1 EMERGENCY ESCAPE AND RESCUE REQUIRED IN | | | BEDROOM 2 AS FOLLOWS: WHERE EMERGENCY ESCAPE AND RESCUE | | | OPENINGS ARE PROVIDED THEY SHALL HAVE A SILL HEIGHT OF | | | NOT MORE THAN 44 INCHES (1118 MM) MEASURED FROM THE | | | FINISHED FLOOR TO THE BOTTOM OF THE CLEAR OPENING. | | | R310.1.1 MINIMUM OPENING AREA GRADE FLOOR OPENINGS | | | SHALL HAVE A MINIMUM NET CLEAR OPENING OF 5 SQUARE FEET | | | R310.1.2 MINIMUM OPENING HEIGHT. | | | THE MINIMUM NET CLEAR OPENING HEIGHT SHALL BE 24 INCHES | | | R310.1.3 MINIMUM OPENING WIDTH. | | | THE MINIMUM NET CLEAR OPENING WIDTH SHALL BE 20 INCHES | | | | | | FBC-R 315.1 ? PROVIDE CARBON MONOXIDE ALARMS WITHIN 10 | | | FEET OF EACH SLEEPING ROOM. | | | | | | STEVEN KENNEDY, CBO | | | CHIEF PLANS EXAMINER | | | (561) 805-6710 | | | [email protected] | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2015-10-31 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-10-31 |
Time |
10:16 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-10-31 |
Time |
10:16 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2015-10-20 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-10-20 |
Time |
14:31 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-10-20 |
Time |
14:31 |
Sent To |
|
|
| Notes |
| 2015-10-20 14:34:14 | 1ST REVIEW: FBC 2014 5TH ED. | | | | | | MODIFY THE ELECTRICAL PLAN TO DEMOSTRATE CARBON | | | MONOXIDE ALARMS TO BE PROVIDED WITHIN 10 FEET OF EACH | | | SLEEPING ROOM PER FBC-R 315.1. | | | | | | STEVEN KENNEDY, CBO | | | CHIEF PLANS EXAMINER | | | (561) 805-6710 | | | [email protected] | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-10-31 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-10-31 |
Time |
10:17 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-10-27 |
Time |
09:45 |
Sent To |
|
|
| Notes |
| 2015-10-28 09:45:59 | GJOHNSON'S DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-10-20 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-10-20 |
Time |
14:42 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-09-02 |
Time |
16:32 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2015-10-31 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-10-31 |
Time |
10:16 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-10-31 |
Time |
10:16 |
Sent To |
|
|
| Notes |
| 2015-10-31 10:16:38 | PROVIDE REVISION |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2015-10-20 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-10-20 |
Time |
14:20 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-10-20 |
Time |
14:20 |
Sent To |
|
|
| Notes |
| 2015-10-20 14:31:17 | 1ST REVIEW: FBC 2014 5TH ED. | | | | | | PROVIDE A DUCT PLAN FOR THE RELOCATION OF THE AHU OR | | | ELECT TO SUBMIT ONE AS A REVISION. | | | | | | FBC- 107.3.5.3 ? PROVIDE A MECHANICAL PLAN TO SHOW | | | SUPPLY DUCTS & BALANCED AIR METHODS PER FBC-R M16. SHOW | | | OR NOTE THE CONDENSATION DISPOSAL METHOD AND AUXILIARY | | | DRAIN PER FBC-RM1411.3. | | | | | | STEVEN KENNEDY, CBO | | | CHIEF PLANS EXAMINER | | | (561) 805-6710 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
P |
Date |
2015-10-28 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2015-10-28 |
Time |
14:45 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2015-10-28 |
Time |
14:45 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2015-09-09 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2015-09-09 |
Time |
16:26 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2015-09-09 |
Time |
16:26 |
Sent To |
|
|
| Notes |
| 2015-09-09 17:08:43 | 1ST REVIEW: FBC 2014 | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | 561-805-6711 | | | [email protected] | | | | | | | | | PLUMBING COMMENTS: | | | | | | 1.LAUNDRY SHALL TIE INTO BUILDING DRAIN DOWN STREAM OF | | | BATHROOM GROUP. | | | PER FBC RES. PLUMB. SEC. P3108.1 | | | | | | | | | 2. IN PLUMBING NOTES P3 INDICATES EXISTING WASHING | | | MACHINE BEING RELOCATED TO NEW LOCATION NEED TO SHOW | | | NEW LOCATION OR INDICATE NO EXISTING . | | | PER WPB AMEND. 107.2.1 | | | | | | 3. PROVIDE SPECS FOR TANKLESS WATER HEATER | | | GAS PLAN REVIEW | | | A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL | | | PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT | | | THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE | | | REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK. | | | PROVIDE COMPLETE PLANS, APPLIANCE/ EQUIPMENT | | | SPECIFICATIONS AND GAS RISER THAT REFLECTS THE ENTIRE | | | SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE | | | FBC-R, SEC. G2404.3. | | | GAS APPLIANCES SHALL BE LISTED AND LABELED PER THE FBC, | | | FUEL GAS, SEC.301.3. | | | |
|
|