| 2015-08-12 10:58:05 | 1ST REVIEW: FBC 2014 MECHANICAL |
| | PERMIT #15080353 |
| | 8/12/15 |
| | |
| | 1) REFERENCE SECTION C403.2.1 FBC-14 ENERGY |
| | CONSERVATION: PROVIDE COOLING AND HEATING LOAD |
| | CALCULATIONS FOR THE NEW AC SYSTEMS IN ACCORDANCE WITH |
| | ACCA MANUAL N OR THE ACCA/ASHRAE STANDARD 183. THE |
| | SUBMITTED RHEEM DESIGN STAR LOAD CALCULATION IS NOT AN |
| | ACCA APPROVED CALCULATION METHOD. |
| | 2) REFERENCE SECTION C101.4.5 FBC-14 ENERGY |
| | CONSERVATION: "ANY NONCONDITIONED SPACE THAT IS ALTERED |
| | TO BECOME CONDITIONED SPACE SHALL BE REQUIRED TO BE |
| | BROUGHT INTO FULL COMPLIANCE WITH THIS CODE". THE PLAN |
| | INDICATES NEW AC IN THE STORAGE ROOM WHICH PREVIOUSLY |
| | HAD NO AC SYSTEM. PLEASE REVIEW CHAPTER 4 FOR |
| | COMPLIANCE REQUIREMENTS, AND SUBMIT ENERGY CALCULATIONS |
| | USING FLORIDA BUILDING COMMISION SOFTWARE AS NOTED IN |
| | SECTION C101.5.1. PLEASE NOTE THAT MODIFICATIONS TO THE |
| | BUILDING FOR IMPROVED ENERGY PERFORMANCE MAY BE |
| | REQUIRED. |
| | 3) THE AIR CONDITIONING SYSTEM GENERAL NOTES, AND THE |
| | AHU INSTALLATION DETAIL NOTES HAVE PRINT THAT IS TOO |
| | FAINT TO READ. PLEASE ENLARGE AND DARKEN THE PRINT TO |
| | EXPEDITIE THE REVIEW- WPB AMENDMENTS TO SECTION 107.2 |
| | FBC-14 BUILDING CODE. |
| | 4) INDICATE CLEARLY HOW AIR IS BEING RETURNED TO THE |
| | AHU. THE AHU DETAIL HAS A NOTE INDICATING A RETURN DUCT |
| | ATTACHED TO A RETURN PLENUM BOX UNDER THE UNIT, BUT THE |
| | PLAN IS NOT INDICATING RETURN DUCTWORK. IS THERE A |
| | RETURN GRILL IN THE PLENUM BOX? IF SO, PLEASE INDICATE |
| | THE DIMENSIONS. |
| | 5) THE PLAN INDICATES A "SMOKE DETECTOR" AT THE AIR |
| | HANDLER: PLEASE CLARIFY THE CONTROL OPERATION OF THE |
| | DEVICE PERTAINING TO THE NEW AND EXISITNG AC SYSTEMS- |
| | REFER TO SECTION 606.4 AND 606.4.1 FBC-14 MECHANICAL. |
| | 6) PROVIDE VENTILATION CALCULATIONS FOR THE NEW |
| | CONDITIONED SPACE IN COMPLIANCE WITH TABLE 403.3. |
| | INDICATE ON THE PLAN THE REQUIRED AND PROVIDED CFM'S OF |
| | O/A AIR. |
| | 7) REFER TO SECTION C403.2.4.4 FBC-14 ENERGY |
| | CONSERVATION AND INDICATE COMPLIANCE WITH SHUTOFF |
| | DAMPER CONTROLS FOR THE O/A INTAKE. |
| | 8) CORRECT THE NOTE INDICATING 26 GAUGE HANGING STRAPS |
| | FOR THE FIBERGLASS DUCT WORK- 22 GAUGE IS REQUIRED PER |
| | FIGUTRE 6-1 SMACNA- FIBROUS GLASS DUCT CONSTRUCTION |
| | STANDARDS- 2010. |
| | 9) SUBMIT AN ELECTRICAL PLAN AND AN ELECTRICAL |
| | SUB-PERMIT FOR REVIEW; OR INDICATE ON THE PLAN THAT THE |
| | ELECTRICAL WILL BE DONE UNDER A SEPARATE PRIMARY |
| | PERMIT. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |
| | |