Plan Review Details - Permit 15080247
Plan Review Stops For Permit 15080247
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status N Date 2015-08-07 Cont ID  
Sent By skennedy Date 2015-08-07 Time 14:55 Rev Time 0.00
Received By skennedy Date 2015-08-07 Time 14:55 Sent To  
Notes
2015-08-07 15:03:27APPROVED SUBJECT TO FBC 102.2(D)
  
 FBC 102.2 BUILDING. THE PROVISIONS OF THE FLORIDA
 BUILDING CODE SHALL APPLY TO THE CONSTRUCTION,
 ERECTION, ALTERATION, MODIFICATION, REPAIR, EQUIPMENT,
 USE AND OCCUPANCY, LOCATION, MAINTENANCE,
 REMOVAL AND DEMOLITION OF EVERY PUBLIC AND PRIVATE
 BUILDING, STRUCTURE OR FACILITY OR FLOATING RESIDENTIAL
 STRUCTURE, OR ANY APPURTENANCES CONNECTED OR ATTACHED
 TO SUCH BUILDINGS, STRUCTURES OR FACILITIES.
 ADDITIONS, ALTERATIONS, REPAIRS AND CHANGES OF USE OR
 OCCUPANCY GROUP IN ALL BUILDINGS AND
 STRUCTURES SHALL COMPLY WITH THE PROVISIONS PROVIDED IN
 CHAPTER 34 OF THIS CODE AND THE FLORIDA BUILDING
 CODE, EXISTING BUILDING. THE FOLLOWING BUILDINGS,
 STRUCTURES AND FACILITIES ARE EXEMPT FROM THE FLORIDA
 BUILDING CODE AS PROVIDED BY LAW, AND ANY FURTHER
 EXEMPTIONS SHALL BE AS DETERMINED BY THE
 LEGISLATURE AND PROVIDED BY LAW:
  
 (D) TEMPORARY BUILDINGS OR SHEDS USED EXCLUSIVELY FOR
 CONSTRUCTION PURPOSES.
  

Review Stop E ELECTRICAL
Rev No 1 Status N Date 2015-08-07 Cont ID  
Sent By skennedy Date 2015-08-07 Time 14:56 Rev Time 0.00
Received By skennedy Date 2015-08-07 Time 14:56 Sent To FIRE
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2015-08-18 Cont ID  
Sent By gtelfair Date 2015-08-18 Time   Rev Time 0.00
Received By gtelfair Date 2015-08-13 Time 09:42 Sent To PC
Notes
2015-08-18 09:04:22 
 THIS PLAN WAS REVIEWED AND APPROVED BY GARRETT TELFAIR,
 FIRE INSPECTOR, WITH THE FOLLOWING COMMENTS:
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 1. CONSTRUCTION, DEMOLITION, AND RENOVATION TO COMPLY
 WITH NFPA 241. EXTRA ATTENTION SHALL BE GIVEN TO THE
 PERMITTING AND LOCATION OF CONSTRUCTION TRAILERS. A
 PERMIT IS REQUIRED FOR ANY CONSTRUCTION TRAILER RELATED
 TO THIS PROJECT. SEPARATION DISTANCES FROM MAIN
 STRUCTURES AS WELL AS OTHER TRAILERS SHALL BE CLOSELY
 MONITORED FOR THE REQUIREMENTS OF FIRE SPRINKLER
 PROTECTION.
  
 2. TRAILER SHALL BE MOVED TO LOCATION INDICATED ON
 PLANS. MOVE TO OTHER SIDE OF ADJACENT MEDIAN. FIRE
 INSPECTOR WILL VERIFY ON FIRE INSPECTION. INSPECTOR
 WILL FAIL PLAN IF NOT MOVED.
  
 3. THE JOBSITE TRAILER SHALL NOT BLOCK OR CREATE
 IMPEDANCE TO ANY FIRE LANE, FIRE ACCESS ROAD, FIRE
 SUPPRESSION APPARATUS INCLUDING FIRE HYDRANTS.
2015-08-13 09:45:51FIRE MARSHAL ASSIGNED TO INSPECTOR TELFAIR.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-08-18 Cont ID  
Sent By gtelfair Date 2015-08-18 Time   Rev Time 0.00
Received By gtelfair Date 2015-08-07 Time 14:55 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved