Plan Review Details - Permit 15071089
Plan Review Stops For Permit 15071089
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-08-18 Cont ID  
Sent By skennedy Date 2015-08-18 Time 11:03 Rev Time 0.00
Received By skennedy Date 2015-08-18 Time 11:03 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 3 Status P Date 2015-09-09 Cont ID  
Sent By albarran Date 2015-09-09 Time 10:34 Rev Time 0.00
Received By albarran Date 2015-09-08 Time 14:11 Sent To I
Notes
2015-09-09 10:35:28THE STAMPED DRAWINGS WERE SUBMITTED AS REQUESTED THIS
 MORNING. PASSED ELECTRICAL REVIEW. SENT TO LARGE READY
 BIN "P". MA
2015-09-08 15:25:36THE LOAD CALCS AND THE PANEL HAVE BEEN REVISED TO
 MATCH. I NOTIFIED NATE OF THIS BUT AM STILL MISSING THE
 INCLUSION OF THE SERVICE OUTLET REQUIRED BY NEC 210.63.
 ONCE I RECEIVE THOSE CORRECTED SHEETS I CAN APPROVED
 THE PERMIT.

Review Stop E ELECTRICAL
Rev No 2 Status F Date 2015-09-03 Cont ID  
Sent By albarran Date 2015-09-03 Time 14:41 Rev Time 0.00
Received By albarran Date 2015-09-03 Time 12:55 Sent To I
Notes
2015-09-03 14:41:58PLEASE NOTE THAT I, MIKE ALBARRAN, ELECTRICAL PLANS
 EXAMINER HAVE COMPLETED THE REVIEW OF THE ABOVE
 MENTIONED JOB. BELOW ARE THE COMMENTS WITH REGARDS TO
 THE REQUIRED CORRECTIONS. THE FOLLOWING ITEMS SHALL BE
 CORRECTED AND THE PLANS RESUBMITTED FOR ANOTHER REVIEW.
  
 YOUR FAILURE TO PROVIDE THE REQUIRED LOAD CALCS,
 PROMPTED ME TO SEEK THE INFORMATION ON MY OWN. IN GOING
 OVER YOUR SUBMITTAL AND THE NUMBERS THEREIN I NOTICED
 THE FOLLOWING:
  
 1. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR RTU
 AHU-1 OTHERWISE KNOWN ON THE PANEL SCHEDULE AS OA-1
 INDICATES 70AMP. PANEL GL2 CIRCUITS 38/40/42 SHOW TO
 HAVE A 90 AMP DEVICE.
 THE KVA/KW INDICATED ON THE FORM IS 27 YET THE LOAD ON
 THE PANEL PER THE SCHEDULE IS ONLY 11.92. CORRECT THE
 PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO MATCH AND
 ADJUST YOUR CONDUCTORS ACCORDINGLY.
 2. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR RTU
 AHU-2 OTHERWISE KNOWN ON THE PANEL SCHEDULE AS OA-2
 INDICATES 70AMP. PANEL LP2A CIRCUITS 20/22/24 SHOW TO
 HAVE A 90 AMP DEVICE.
 THE KVA/KW INDICATED ON THE FORM IS 27 YET THE LOAD ON
 THE PANEL PER THE SCHEDULE IS ONLY 11.92. CORRECT THE
 PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO MATCH AND
 ADJUST YOUR CONDUCTORS ACCORDINGLY.
 3. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR RTU
 AHU-3 OTHERWISE KNOWN ON THE PANEL SCHEDULE AS OA-3
 INDICATES 70AMP. PANEL SP CIRCUITS 1/3/5 SHOW TO HAVE A
 70 AMP DEVICE. (OK)
 THE KVA/KW INDICATED ON THE FORM IS 27 YET THE LOAD ON
 THE PANEL PER THE SCHEDULE IS ONLY 11.92. CORRECT THE
 PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO MATCH AND
 ADJUST YOUR CONDUCTORS ACCORDINGLY.
 4. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR RTU
 AHU-4 OTHERWISE KNOWN ON THE PANEL SCHEDULE AS OA-4
 INDICATES 70AMP. PANEL SP CIRCUITS 2/4/6 SHOW TO HAVE A
 70 AMP DEVICE. (OK)
 THE KVA/KW INDICATED ON THE FORM IS 27 YET THE LOAD ON
 THE PANEL PER THE SCHEDULE IS ONLY 11.92. CORRECT THE
 PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO MATCH AND
 ADJUST YOUR CONDUCTORS ACCORDINGLY.
 5. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR CW
 AHU-1, OTHERWISE KNOWN ON THE PANEL SCHEDULE AS AHU-1
 INDICATES 30AMP. PANEL GDA CIRCUITS 7/9/11 SHOW TO HAVE
 A 40 AMP DEVICE.
 THOUGH THERE IS NO KVA LOAD INDICATED ON THE FORM, FROM
 THE FLC (FULL LOAD CURRENT) IT IS EASILY VISIBLE THAT
 IT IS NOT THE 6.3 INDICATED ON THE PANEL SCHEDULE.
 CORRECT THE PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO
 MATCH AND ADJUST YOUR CONDUCTORS ACCORDINGLY.
 6. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR CW
 AHU-2, OTHERWISE KNOWN ON THE PANEL SCHEDULE AS AHU-2
 INDICATES 40AMP. PANEL GDA CIRCUITS 13/15/17 SHOW TO
 HAVE A 50 AMP DEVICE.
 THOUGH THERE IS NO KVA LOAD INDICATED ON THE FORM, FROM
 THE FLC (FULL LOAD CURRENT) IT IS EASILY VISIBLE THAT
 IT IS NOT THE 8.3 INDICATED ON THE PANEL SCHEDULE.
 CORRECT THE PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO
 MATCH AND ADJUST YOUR CONDUCTORS ACCORDINGLY.
 7. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR CW
 AHU-3, OTHERWISE KNOWN ON THE PANEL SCHEDULE AS AHU-3
 INDICATES 30AMP. PANEL GDA CIRCUITS 14/16/18 SHOW TO
 HAVE A 25 AMP DEVICE.
 THOUGH THERE IS NO KVA LOAD INDICATED ON THE FORM, FROM
 THE FLC (FULL LOAD CURRENT) IT IS EASILY VISIBLE THAT
 IT IS NOT THE 6.3 INDICATED ON THE PANEL SCHEDULE.
 CORRECT THE PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO
 MATCH AND ADJUST YOUR CONDUCTORS ACCORDINGLY.
 8. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR CW
 AHU-4, OTHERWISE KNOWN ON THE PANEL SCHEDULE AS AHU-4
 INDICATES 20AMP. PANEL GDA CIRCUITS 7/9/11 SHOW TO HAVE
 A 25 AMP DEVICE.
 THOUGH THERE IS NO KVA LOAD INDICATED ON THE FORM, FROM
 THE FLC (FULL LOAD CURRENT) IT IS EASILY VISIBLE THAT
 IT IS NOT THE 3.72 INDICATED ON THE PANEL SCHEDULE.
 CORRECT THE PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO
 MATCH AND ADJUST YOUR CONDUCTORS ACCORDINGLY.
 9. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR CW
 AHU-5, OTHERWISE KNOWN ON THE PANEL SCHEDULE AS AHU-5
 INDICATES 40AMP. PANEL CDP CIRCUITS 8/10/12 SHOW TO
 HAVE A 50 AMP DEVICE.
 THOUGH THERE IS NO KVA LOAD INDICATED ON THE FORM, FROM
 THE FLC (FULL LOAD CURRENT) IT IS EASILY VISIBLE THAT
 IT IS NOT THE 7.17INDICATED ON THE PANEL SCHEDULE.
 CORRECT THE PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO
 MATCH AND ADJUST YOUR CONDUCTORS ACCORDINGLY.
 10. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR CW
 AHU-6, OTHERWISE KNOWN ON THE PANEL SCHEDULE AS AHU-6
 INDICATES 40AMP. PANEL GDA CIRCUITS 19/21/23 SHOW TO
 HAVE A 50 AMP DEVICE.
 THOUGH THERE IS NO KVA LOAD INDICATED ON THE FORM, FROM
 THE FLC (FULL LOAD CURRENT) IT IS EASILY VISIBLE THAT
 IT IS NOT THE 8.4 INDICATED ON THE PANEL SCHEDULE.
 CORRECT THE PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO
 MATCH AND ADJUST YOUR CONDUCTORS ACCORDINGLY.
 11. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR CW
 AHU-7, OTHERWISE KNOWN ON THE PANEL SCHEDULE AS AHU-7
 INDICATES 30AMP. PANEL CDP CIRCUITS 1/3/5 SHOW TO HAVE
 A 40 AMP DEVICE.
 THOUGH THERE IS NO KVA LOAD INDICATED ON THE FORM, FROM
 THE FLC (FULL LOAD CURRENT) IT IS EASILY VISIBLE THAT
 IT IS NOT THE 5.57 INDICATED ON THE PANEL SCHEDULE.
 CORRECT THE PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO
 MATCH AND ADJUST YOUR CONDUCTORS ACCORDINGLY.
 12. THE MAXIMUM OVERCURRENT PROTECTION DEVICE (OCPD),
 INDICATED ON YOU A/C CHANGE-OUT COMPLIANCE FORM FOR CW
 AHU-8, OTHERWISE KNOWN ON THE PANEL SCHEDULE AS AHU-8
 INDICATES 20AMP. PANEL CDP CIRCUITS 2/4/6 SHOW TO HAVE
 A 40 AMP DEVICE.
 THOUGH THERE IS NO KVA LOAD INDICATED ON THE FORM, FROM
 THE FLC (FULL LOAD CURRENT) IT IS EASILY VISIBLE THAT
 IT IS NOT THE 3.72 INDICATED ON THE PANEL SCHEDULE.
 CORRECT THE PANEL SCHEDULE AND RESPECTIVE LOAD CALCS TO
 MATCH AND ADJUST YOUR CONDUCTORS ACCORDINGLY.
 EVERYTHING INDICATED ABOVE HAS A BEARING ON THE ACTUAL
 LOADS AND CONDUCTOR APPLICATION. REVISE THE PLANS AND
 THE LOAD CALCULATIONS TO MATCH. CORRECT THE CONDUCTORS
 ACCORDINGLY AND RESUBMIT.
  
  
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE
 PREVIOUSLY REVIEWED SHEETS.
  
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
  
 THANK YOU
  

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-08-03 Cont ID  
Sent By albarran Date 2015-08-03 Time 17:00 Rev Time 0.00
Received By albarran Date 2015-08-03 Time 16:50 Sent To B
Notes
2015-08-03 17:13:16PLEASE NOTE THAT I, MIKE ALBARRAN, ELECTRICAL PLANS
 EXAMINER HAVE COMPLETED THE REVIEW OF THE ABOVE
 MENTIONED JOB. BELOW ARE THE COMMENTS WITH REGARDS TO
 THE REQUIRED CORRECTIONS. THE FOLLOWING ITEMS SHALL BE
 CORRECTED AND THE PLANS RESUBMITTED FOR ANOTHER REVIEW.
  
 1. YOU SHALL PROVIDE A LOAD CALC FOR EACH UNIT AND
 INDICATE THE PROPOSED WIRING
 2. PROVIDE AN ELECTRICAL RISER DIAGRAM
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE
 PREVIOUSLY REVIEWED SHEETS.
  
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
  

Review Stop I INCOMING/PROCESSING
Rev No 3 Status N Date 2015-09-09 Cont ID  
Sent By albarran Date 2015-09-09 Time 10:35 Rev Time 0.00
Received By albarran Date   Time   Sent To  
Notes
2015-09-09 10:36:569/9/15 - PASSED ELECTRICAL REVIEW. CONTRACTOR WAITING
 OUT FRONT. SENT TO LARGE READY BIN "P". MA

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-09-03 Cont ID  
Sent By albarran Date 2015-09-03 Time 14:42 Rev Time 0.00
Received By albarran Date 2015-08-21 Time 10:27 Sent To  
Notes
2015-09-03 14:43:359/3/15 - FAILED ELECTRICAL REVIEW AS NOTED. CONTRACTOR
 NOTIFIED VIA EMAIL. SENT TO LARGE DENIED BIN "P". MA
2015-08-21 10:27:09RESUB ROUTED TO CCOLE

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-08-18 Cont ID  
Sent By skennedy Date 2015-08-18 Time 11:03 Rev Time 0.00
Received By skennedy Date 2015-07-28 Time 16:10 Sent To  
Notes
2015-07-28 16:11:12MECH BOX

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2015-08-25 Cont ID  
Sent By ccole Date 2015-08-25 Time 13:59 Rev Time 0.00
Received By ccole Date 2015-08-21 Time 13:59 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2015-07-29 Cont ID  
Sent By ccole Date 2015-07-29 Time 16:54 Rev Time 0.00
Received By ccole Date 2015-07-29 Time 16:54 Sent To E
Notes
2015-07-29 17:04:561ST REVIEW: FBC 2014 MECHANICAL
 PERMIT #15071089
 7/29/15
  
 1) SHEETS M1.0 , M1.1, M1.2, & M1.3: PROVIDE PRIMARY
 AND AUXILIARY CONDENSATE DISPOSAL PLANS FOR THE NEW AIR
 HANDLERS. REVISE THE DRAWINGS ACCORDINGLY.
 2) M1.0, M1.1, M1.2, & M1.3: DUCT SMOKE DETECTORS ARE
 REQUIRED IN THE AHU RETURN DUCTS- SECTION 606.2.1
 FBC-10 MECHANICAL. REVISE THE DRAWINGS ACCORDINGLY.
 3) M1.0, M1.1, M1.2, & M1.3: CORRECT THE AHU NUMBERS IN
 KEYNOTE #2 SO THEY MATCH WITH THE AHU NUMBERS SHOWN IN
 THE DIAGRAMS.
 4) M2.1: THE TOTAL O/A SHOWN IN THE SCHEDULES FOR EACH
 PAIRING OF AHU'S IS EXCEEDING THE AMOUNT OF O/A BEING
 SUPPLIED BY THE DEDICATED OAU FOR THOSE TWO SYSTEMS:
 PLEASE CLARIFY.
 5) PLEASE REVIEW AND SHOW COMPLIANCE WITH SECTION C408
 SYSTEM COMMISSIONING , FBC-14 ENERGY CONSERVATION:
  
 C408.1 GENERAL.
 THIS SECTION COVERS THE COMMISSIONING OF THE BUILDING
 MECHANICAL SYSTEMS IN SECTION C403 AND ELECTRICAL POWER
 AND LIGHTING SYSTEMS IN SECTION C405.
  
 C408.2 MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION
 REQUIREMENTS.
 PRIOR TO PASSING THE FINAL MECHANICAL INSPECTION, THE
 REGISTERED DESIGN PROFESSIONAL SHALL PROVIDE EVIDENCE
 OF MECHANICAL SYSTEMS COMMISSIONING AND COMPLETION IN
 ACCORDANCE THE PROVISIONS OF THIS SECTION.
  
 CONSTRUCTION DOCUMENT NOTES SHALL CLEARLY INDICATE
 PROVISIONS FOR COMMISSIONING AND COMPLETION
 REQUIREMENTS IN ACCORDANCE WITH THIS SECTION AND ARE
 PERMITTED TO REFER TO SPECIFICATIONS FOR FURTHER
 REQUIREMENTS. COPIES OF ALL DOCUMENTATION SHALL BE
 GIVEN TO THE OWNER AND MADE AVAILABLE TO THE CODE
 OFFICIAL UPON REQUEST IN ACCORDANCE WITH SECTIONS
 C408.2.4 AND C408.2.5.
  
 EXCEPTION: THE FOLLOWING SYSTEMS ARE EXEMPT FROM THE
 COMMISSIONING REQUIREMENTS:
  
 1. MECHANICAL SYSTEMS IN BUILDINGS WHERE THE TOTAL
 MECHANICAL EQUIPMENT CAPACITY IS LESS THAN 480,000
 BTU/H (140 690 W) COOLING CAPACITY AND 600,000 BTU/H
 (175 860 W) HEATING CAPACITY.
  
 2. SYSTEMS INCLUDED IN SECTION C403.3 THAT SERVE
 DWELLING UNITS AND SLEEPING UNITS IN HOTELS, MOTELS,
 BOARDING HOUSES OR SIMILAR UNITS.
  
 C408.2.1 COMMISSIONING PLAN.
 A COMMISSIONING PLAN SHALL BE DEVELOPED BY A REGISTERED
 DESIGN PROFESSIONAL OR APPROVED AGENCY AND SHALL
 INCLUDE THE FOLLOWING ITEMS:
  
 1. A NARRATIVE DESCRIPTION OF THE ACTIVITIES THAT WILL
 BE ACCOMPLISHED DURING EACH PHASE OF COMMISSIONING,
 INCLUDING THE PERSONNEL INTENDED TO ACCOMPLISH EACH OF
 THE ACTIVITIES.
  
 2. A LISTING OF THE SPECIFIC EQUIPMENT, APPLIANCES OR
 SYSTEMS TO BE TESTED AND A DESCRIPTION OF THE TESTS TO
 BE PERFORMED.
  
 3. FUNCTIONS TO BE TESTED, INCLUDING, BUT NOT LIMITED
 TO CALIBRATIONS AND ECONOMIZER CONTROLS.
  
 4. CONDITIONS UNDER WHICH THE TEST WILL BE PERFORMED.
 AT A MINIMUM, TESTING SHALL AFFIRM WINTER AND SUMMER
 DESIGN CONDITIONS AND FULL OUTSIDE AIR CONDITIONS.
  
 5. MEASURABLE CRITERIA FOR PERFORMANCE.
  
 C408.2.2 AIR DISTRIBUTION SYSTEM TESTING, ADJUSTING AND
 BALANCING.
 CONSTRUCTION DOCUMENTS SHALL REQUIRE THAT A WRITTEN
 BALANCE REPORT BE PROVIDED TO THE OWNER OR THE
 DESIGNATED REPRESENTATIVE OF THE BUILDING OWNER FOR
 HVAC SYSTEMS SERVING ZONES WITH A TOTAL CONDITIONED
 AREA EXCEEDING 5000 SQUARE FEET (465 M2). AIR
 DISTRIBUTION SYSTEMS SHALL BE TESTED, ADJUSTED, AND
 BALANCED BY A LICENSED ENGINEER OR A COMPANY OR
 INDIVIDUAL HOLDING A CURRENT CERTIFICATION FROM A
 RECOGNIZED TESTING AND BALANCING AGENCY ORGANIZATION IN
 ACCORDANCE WITH GENERALLY ACCEPTED ENGINEERING
 STANDARDS.
  
 EXCEPTIONS:
  
 1. BUILDINGS WITH COOLING OR HEATING SYSTEM CAPACITIES
 OF 15 TONS OR LESS PER SYSTEM MAY BE TESTED AND
 BALANCED BY A MECHANICAL CONTRACTOR LICENSED TO DESIGN
 AND INSTALL SUCH SYSTEM(S).
  
 2. BUILDINGS WITH COOLING OR HEATING SYSTEM CAPACITIES
 OF 65,000 BTU/H OR LESS PER SYSTEM ARE EXEMPT FROM THE
 REQUIREMENTS OF THIS SECTION.
  
 C408.2.2.1 AIR SYSTEM BALANCING.
 AIR SYSTEM BALANCING SHALL BE ACCOMPLISHED IN A MANNER
 TO FIRST MINIMIZE THROTTLING LOSSES, THEN FOR FANS WITH
 FAN SYSTEM POWER GREATER THAN 1 HP, FAN SPEEDS SHALL BE
 ADJUSTED TO MEET DESIGN FLOW CONDITIONS. BALANCING
 PROCEDURES SHALL BE IN ACCORDANCE WITH THE NATIONAL
 ENVIRONMENTAL BALANCING BUREAU (NEBB) PROCEDURAL
 STANDARDS, THE ASSOCIATED AIR BALANCE COUNCIL (AABC)
 NATIONAL STANDARDS, OR EQUIVALENT PROCEDURES.
  
 EXCEPTION: DAMPER THROTTLING MAY BE USED FOR AIR SYSTEM
 BALANCING WITH FAN MOTORS OF 1 HP OR LESS, OR IF
 THROTTLING RESULTS IN NO GREATER THAN 1/3 HP FAN
 HORSEPOWER DRAW ABOVE THAT REQUIRED IF THE FAN SPEED
 WERE ADJUSTED.
  
 NOTES:
  
 1. BUILDING ENVELOPE PRESSURIZATION SHOULD BE EITHER
 NEUTRAL OR POSITIVE TO PREVENT INFILTRATION OF EXCESS
 LATENT LOAD.
  
 2. COMMERCIAL KITCHEN HOOD EXHAUST CFM SHOULD BE SIZED
 TO PREVENT DEPRESSURIZATION. DISCHARGE DAMPERS ARE
 PROHIBITED ON CONSTANT VOLUME FANS AND VARIABLE VOLUME
 FANS WITH MOTORS 10 HORSEPOWER (HP) (7.5 KW) AND
 LARGER.
  
 CHRISTOPHER L. COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  