| Plan Review Stops For Permit 15071032 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
4 |
Status |
P |
Date |
2016-02-09 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-02-09 |
Time |
10:25 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-02-09 |
Time |
10:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
F |
Date |
2015-11-30 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-11-30 |
Time |
18:05 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-11-30 |
Time |
18:05 |
Sent To |
|
|
| Notes |
| 2015-11-30 18:15:10 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. FBC 5TH EDITION 301.1, DESIGNER IS TO ELECT | | | COMPLIANCE METHOD. EXISTING BUILDING IS BEING RENOVATED | | | (BY AFFECTING THE EXITING AT THE REAR) AND THE PROPOSED | | | CONSTRUCTION IS AN ADDITION. | | | | | | 3RD REVIEW, METHOD OF ALTERATION NOT STATED. | | | | | | 2. FBC 5TH EDITION CHAPTER 11, NO INFORMATION PROVIDED | | | FOR THIS ADDITION TO AN ASSEMBLY OCCUPANCY BUILDING | | | REGARDING ANY OF THE ITEMS IN THIS CHAPTER. PROVIDE | | | PLANS TO ADDRESS ALL. BASIC INFORMATION SUCH AS | | | OCCUPANCY CLASSIFICATION (FBC CHAPTER 3) NOT PROVIDED. | | | NO OCCUPANCY SEPARATION SHOWN, A 6" STEP IS SHOWN BUT | | | NO ACCESSIBILITY COMPLIANCE INFORMATION PROVIDED. THE | | | PLAN APPEARS TO ROUTE TWO ASSEMBLY OCCUPANCY EXITS | | | THROUGH A NEW STORAGE ROOM (OCCUPANCY CLASSIFICATION | | | NOT STATED, S1 OR S2?). THERE ARE MANY REFERENCES TO | | | THE "NEW BUILDING" BUT TO BE CONSIDERED A SEPARATE | | | BUILDING, A FIRE WALL IS REQUIRED, NONE SHOWN. | | | | | | 3RD REVIEW, ADDITIONAL INFORMATION WAS PROVIDED BUT | | | OCCUPANCY CLASSIFICATION NOT STATED, AND THE | | | ELIMINATION OF TWO EXITS NOT ADDRESSED, ACCESSIBILITY | | | NOT PROPERLY ADDRESSED. PROVIDE A LIFE SAFETY PLAN | | | WHICH SHOWS HOW THE PROPOSED RENOVATION AFFECTS | | | EXITING. INCLUDE OCCUPANT LOAD, EXIT LIGHTS, TRAVEL | | | DISTANCE, ALL OTHER APPLICABLE INFORMATION, FBC CHAPTER | | | 10. A STATEMENT IN THE RESPONSE LETTER THAT | | | ACCESSIBILITY AND EXITING IS MAINTAINED THROUGH THE | | | FRONT IS NOT ADEQUATE. | | | | | | 3. PROPOSED RENOVATION APPEARS TO ELIMINATE TWO EXITS, | | | BUT NO LIFE SAFETY PLAN PROVIDED. PROVIDE A LIFE SAFETY | | | PLAN TO SHOW HOW ELIMINATION OF TWO DOORS WILL AFFECT | | | THE EXITING FOR THIS BUILDING. | | | | | | 3RD REVIEW, NOT ADDRESSED. SEE COMMENT #2. EXITING AND | | | ACCESSIBLE EXITING NOT CLEAR. | | | | | | A SET HAS BEEN RETAINED. | | | | | | 4. CALCULATIONS FOR THE ROOF WERE PROVIDED. PROVIDE THE | | | PRODUCT APPROVAL, FAC9N-3. | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2015-09-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-09-01 |
Time |
15:45 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-09-01 |
Time |
15:45 |
Sent To |
|
|
| Notes |
| 2015-09-01 16:27:10 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. FBC 5TH EDITION 301.1, DESIGNER IS TO ELECT | | | COMPLIANCE METHOD. EXISTING BUILDING IS BEING RENOVATED | | | (BY AFFECTING THE EXITING AT THE REAR) AND THE PROPOSED | | | CONSTRUCTION IS AN ADDITION. | | | | | | 2. FBC 5TH EDITION CHAPTER 11, NO INFORMATION PROVIDED | | | FOR THIS ADDITION TO AN ASSEMBLY OCCUPANCY BUILDING | | | REGARDING ANY OF THE ITEMS IN THIS CHAPTER. PROVIDE | | | PLANS TO ADDRESS ALL. BASIC INFORMATION SUCH AS | | | OCCUPANCY CLASSIFICATION (FBC CHAPTER 3) NOT PROVIDED. | | | NO OCCUPANCY SEPARATION SHOWN, A 6" STEP IS SHOWN BUT | | | NO ACCESSIBILITY COMPLIANCE INFORMATION PROVIDED. THE | | | PLAN APPEARS TO ROUTE TWO ASSEMBLY OCCUPANCY EXITS | | | THROUGH A NEW STORAGE ROOM (OCCUPANCY CLASSIFICATION | | | NOT STATED, S1 OR S2?). THERE ARE MANY REFERENCES TO | | | THE "NEW BUILDING" BUT TO BE CONSIDERED A SEPARATE | | | BUILDING, A FIRE WALL IS REQUIRED, NONE SHOWN. | | | | | | 3. PROPOSED RENOVATION APPEARS TO ELIMINATE TWO EXITS, | | | BUT NO LIFE SAFETY PLAN PROVIDED. PROVIDE A LIFE SAFETY | | | PLAN TO SHOW HOW ELIMINATION OF TWO DOORS WILL AFFECT | | | THE EXITING FOR THIS BUILDING. | | | | | | 4. THERE IS A SIGNIFICANT AMOUNT OF TEXT ON THIS PLAN. | | | REMOVE ALL WHICH DOES NOT APPLY TO THIS SPECIFIC JOB. | | | FOR INSTANCE, LEVELS 1, 2, AND 3 ALTERATIONS ARE LSITED | | | UNDER "BUILDING CODES." IS ENGINEER STATING THAT THIS | | | IS A LEVEL 3 ALTERATION? SHEET S1.2 MAKES REFERENCE TO | | | THE RESIDENTIAL CODE; TO WHAT PART OF THE PROJECT IS | | | THIS APPLICABLE? | | | | | | NOT ENOUGH INFORMATION HAS BEEN PROVIDED FOR A COMPLETE | | | REVIEW. SEE FBC 107: | | | | | | 107.2 CONSTRUCTION DOCUMENTS. CONSTRUCTION DOCUMENTS | | | SHALL BE IN ACCORDANCE WITH SECTIONS | | | 107.2.1 THROUGH 107.2.5. | | | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | | CONSTRUCTION DOCUMENTS SHALL BE | | | DIMENSIONED AND DRAWN UPON SUITABLE MATERIAL. | | | ELECTRONIC MEDIA DOCUMENTS SHALL BE | | | SUBMITTED WHEN APPROVED BY THE BUILDING OFFICIAL. | | | CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT | | | CLARITY TO INDICATE THE LOCATION, NATURE AND EXTENT OF | | | THE WORK PROPOSED AND SHOW IN | | | DETAIL THAT IT WILL CONFORM TO THE PROVISIONS OF THIS | | | CODE AND RELEVANT LAWS, ORDINANCES, RULES | | | AND REGULATIONS, AS DETERMINED BY THE BUILDING | | | OFFICIAL. SUCH DRAWINGS AND SPECIFICATIONS SHALL | | | CONTAIN INFORMATION, IN THE FORM OF NOTES OR OTHERWISE, | | | AS TO THE QUALITY OF MATERIALS, WHERE | | | QUALITY IS ESSENTIAL TO CONFORMITY WITH THE TECHNICAL | | | CODES. SUCH INFORMATION SHALL BE SPECIFIC, | | | AND THE TECHNICAL CODES SHALL NOT BE CITED AS A WHOLE | | | OR IN PART, NOR SHALL THE TERM "LEGAL" OR | | | ITS EQUIVALENT BE USED AS A SUBSTITUTE FOR SPECIFIC | | | INFORMATION. ALL INFORMATION, DRAWINGS, | | | SPECIFICATIONS AND ACCOMPANYING DATA SHALL BEAR THE | | | NAME AND SIGNATURE OF THE PERSON | | | RESPONSIBLE FOR THE DESIGN. (SEE ALSO SECTION 107.3.5). | | | | | | A COMPLETE REVIEW WILL BE PERFORMED WHEN ALL TEXT NOT | | | APPLICABLE TO THIS JOB IS REMOVED AND INFORMATION | | | REQUIRED TO DETERMINE CODE COMPLIANCE IS PROVIDED. | | | | | | A SET HAS BEEN RETAINED. | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
N |
Date |
2015-08-04 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2015-08-04 |
Time |
08:41 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2015-08-04 |
Time |
08:41 |
Sent To |
|
|
| Notes |
| 2015-08-04 08:42:19 | NEW SURVEY CAME IN, IN THE MIDDLE OF REVIEW. OK PER | | | SHILL |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
P |
Date |
2016-02-08 |
|
|
Cont ID |
|
| Sent By |
mvaldes |
Date |
2016-02-08 |
Time |
10:39 |
Rev Time |
0.00 |
| Received By |
mvaldes |
Date |
2016-02-08 |
Time |
10:39 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2015-11-30 |
|
|
Cont ID |
|
| Sent By |
mvaldes |
Date |
2015-11-30 |
Time |
11:36 |
Rev Time |
0.00 |
| Received By |
mvaldes |
Date |
2015-11-30 |
Time |
11:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2015-09-10 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2015-09-10 |
Time |
09:09 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2015-09-10 |
Time |
08:56 |
Sent To |
|
|
| Notes |
| 2015-09-10 09:09:41 | NEED 2 SETS OF PLANS | | | LOCATION+SIZE OF SERVICE | | | IN SMALL BIN V | | | PHIL PETTY |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2016-01-26 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2016-01-26 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2016-01-26 |
Time |
13:41 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2015-11-25 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-11-25 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-11-25 |
Time |
13:45 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2015-09-02 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-09-02 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-09-02 |
Time |
16:34 |
Sent To |
E |
|
| Notes |
| 2015-09-02 16:55:18 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) ONLY ONE SET OF PLAN DRAWINGS WAS PROVIDED, TWO | | | SHALL BE PROVIDED FOR FINAL APPROVAL. | | | | | | 2) THERE APPEARS TO BE TWO DOORS LEADING FROM THE MAIN | | | BLDG THAT MAY BE REQUIRED EXIT DOORS. EXIT DOORS CAN | | | NOT PASS THRU A STORAGE AREA. | | | | | | 3) PROVIDE A LIFE SAFETY PLAN. | | | | | | 4) TWO CEILING FANS ARE BEING PROVIDED. IF THIS IS A | | | STORAGE AREA, WHAT TYPE OF MATERIAL WILL BE STORED | | | HERE. | | | | | | 5) NO EXIT SIGN IS PROVIDED AT THE EXTERIOR DOOR. | | | | | | 6) IS THE MAIN BUILDING SPRINKLERED OR CONTAIN A FIRE | | | ALARM. ANY LIFE SAFETY SYSTEM SHALL BE EXTENDED INTO | | | THE PROPOSED STORAGE AREA. | | | | | | 7) NO EMERGENCY LIGHTING IS INDICATED. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
5 |
Status |
N |
Date |
2016-02-17 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-02-17 |
Time |
09:30 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-02-17 |
Time |
09:30 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2016-02-09 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-02-09 |
Time |
12:44 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-01-25 |
Time |
11:30 |
Sent To |
|
|
| Notes |
| 2016-01-26 11:30:38 | RESUB ROUTED TO FIRE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2015-11-30 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-11-30 |
Time |
18:15 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-11-24 |
Time |
16:30 |
Sent To |
|
|
| Notes |
| 2015-11-24 16:31:08 | RESUB ROUTED TO FIRE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-10-19 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-09-10 |
Time |
08:40 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-08-03 |
Time |
08:42 |
Sent To |
Z |
|
| Notes |
| 2015-09-01 16:27:45 | 9/1 TO FIRE | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-08-04 |
|
|
Cont ID |
|
| Sent By |
cpuell |
Date |
2015-08-04 |
Time |
08:42 |
Rev Time |
0.00 |
| Received By |
cpuell |
Date |
2015-07-27 |
Time |
14:13 |
Sent To |
|
|
| Notes |
| 2015-07-28 14:14:01 | ZONING BOX |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
P |
Date |
2016-02-17 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-02-17 |
Time |
09:29 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-02-17 |
Time |
09:29 |
Sent To |
|
|
| Notes |
| 2016-02-17 09:30:05 | MU-2016-003588 | | | $1382.98 PAID | | | |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2016-02-09 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-02-09 |
Time |
12:39 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-02-09 |
Time |
12:39 |
Sent To |
|
|
| Notes |
| 2016-02-09 12:40:25 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. IMPACT FEE ASSESSMENT BY PALM BEACH COUNTY REQUIRED | | | PRIOR TO PERMIT ISSUANCE. THE PLANS ARE TO BE STAMPED | | | AND THE RECEIPT PROVIDED. | | | | | | |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
2 |
Status |
P |
Date |
2016-02-09 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2016-02-09 |
Time |
12:34 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2016-02-09 |
Time |
10:25 |
Sent To |
|
|
| Notes |
| 2016-02-09 12:34:56 | NOA 14-0611.01 AND CALCULATIONS SUBMITTED | | | |
|
|
| Review Stop |
R |
ROOF PLAN REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2015-09-01 |
|
|
Cont ID |
|
| Sent By |
shill |
Date |
2015-09-01 |
Time |
16:31 |
Rev Time |
0.00 |
| Received By |
shill |
Date |
2015-09-01 |
Time |
16:31 |
Sent To |
|
|
| Notes |
| 2015-09-01 16:32:01 | ****CORRECTIONS**** | | | | | | SAMANTHA HILL | | | BUILDING PLANS EXAMINER | | | [email protected] | | | 561-805-6724 | | | | | | 1. SYSTEM E1 HAS BEEN SELECTED, -45 PSF DP. ENGINEER | | | STATES THAT RING SHANK NAILS AND TIN CAPS ARE PROPOSED, | | | BUT THE CALCS WERE PERFORMED USING THE FASTENER PATTERN | | | FOR THE DRILL TEC FASTENERES. | | | | | | CLARIFY OR REVISE, FBC 1609. | | | | | | A SET HAS BEEN RETAINED. | | | | | | | | | | | | |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2015-08-04 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-10-19 |
Time |
08:41 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
2015-08-04 |
Time |
11:57 |
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2015-07-29 |
|
|
Cont ID |
|
| Sent By |
sgraham |
Date |
2015-07-29 |
Time |
12:31 |
Rev Time |
0.00 |
| Received By |
sgraham |
Date |
2015-07-29 |
Time |
12:31 |
Sent To |
B |
|
| Notes |
| 2015-07-29 12:32:37 | 7/29/15 ZONING FAILED | | | | | | 1. SUBMIT TWO UP TO DATE SURVEYS SHOW THE LOCATION OF | | | THE NEW STORAGE AREA |
|
|