| Plan Review Stops For Permit 15070942 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
P |
Date |
2015-08-06 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-08-06 |
Time |
13:05 |
Rev Time |
|
| Received By |
jwitmer |
Date |
2015-08-06 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2015-10-16 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-10-16 |
Time |
13:04 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-10-16 |
Time |
12:58 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2015-08-21 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-08-21 |
Time |
13:38 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-08-21 |
Time |
13:38 |
Sent To |
|
|
| Notes |
| 2015-08-21 13:42:21 | 1ST REVIEW: FBC 2014 5TH ED. NEC 2011 | | | | | | SHEET E-4 PLEASE IDENTIFY THE CONDUIT & CONDUCTOR TYPE | | | AND SIZE FROM MDP TO PANEL DD, IDENTIFY GRND, VERIFY | | | ADEQUATE CAPACITY FOR ADDED LOAD OF PANE DD.. | | | | | | STEVEN KENNEDY, CBO | | | CHIEF PLANS EXAMINER | | | (561) 805-6710 | | | [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2015-09-23 |
|
|
Cont ID |
|
| Sent By |
scaldero |
Date |
2015-09-23 |
Time |
15:45 |
Rev Time |
0.00 |
| Received By |
scaldero |
Date |
2015-09-23 |
Time |
15:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2015-07-30 |
|
|
Cont ID |
|
| Sent By |
scaldero |
Date |
2015-07-30 |
Time |
17:06 |
Rev Time |
0.00 |
| Received By |
scaldero |
Date |
2015-07-30 |
Time |
16:58 |
Sent To |
|
|
| Notes |
| 2015-07-30 17:05:19 | PERMIT #15070942 | | | REVIEW COMMENTS - FIRE DEPARTMENT | | | | | | FAILED: | | | THE CURRENT LOCATION OF THE EGRESS PATH EXIT DOOR FOR | | | THE DUNKIN DONUTS WORK AREA AND THE DOOR FOR THE | | | RESTROOM OPEN INTO EACHOTHER, CREATING A POSSIBLE | | | OBSTRUCTION FOR PERSONS ON BOTH SIDES. THIS | | | CONFIGURATION NEEDS TO BE REVIEWED AND AN ALTERNATIVE | | | OR SOLUTION PROVIDED. | | | | | | SUE ELLEN CALDERON | | | ASST. FIRE MARSHAL | | | OFFICE OF THE FIRE MARSHAL | | | WEST PALM BEACH FIRE RESCUE | | | [email protected] | | | (561) 804-4751 | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2015-10-29 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-10-29 |
Time |
09:52 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-10-28 |
Time |
14:59 |
Sent To |
|
|
| Notes |
| 2015-10-28 14:59:35 | RESUB ROUTED TO TKLARGE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2015-10-21 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-10-21 |
Time |
12:38 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-10-19 |
Time |
13:27 |
Sent To |
|
|
| Notes |
| 2015-10-20 13:27:56 | RESUB ROUTED TO CCOLE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-10-16 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-10-16 |
Time |
13:04 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-09-18 |
Time |
11:15 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-08-21 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-08-21 |
Time |
13:42 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-07-23 |
Time |
07:59 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
P |
Date |
2015-10-29 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-10-29 |
Time |
09:53 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-10-29 |
Time |
09:52 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
F |
Date |
2015-10-21 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-10-21 |
Time |
06:58 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-10-21 |
Time |
06:58 |
Sent To |
|
|
| Notes |
| 2015-10-21 07:02:25 | 3RD REVIEW: FBC 2014 MECHANICAL | | | PERMIT #15070942 | | | 10/21/15 | | | | | | 1) M-1: THE REVISED AIR BALANCE SCHEDULE INDICATES A | | | DEFICIENT AMOUNT OF O/A CFM'S FOR OCCUPANTS BASED ON | | | THE REVISED O/A CALCULATIONS AND TABLE 403.3 FBC-14 | | | MECHANICAL- 675 CFM REQUIRED/550 PROVIDED. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2015-10-06 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-10-06 |
Time |
14:10 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-10-06 |
Time |
13:57 |
Sent To |
|
|
| Notes |
| 2015-10-06 14:27:44 | 1ST REVIEW: FBC 2014 MECHANICAL | | | PERMIT #15070942 | | | 10/6/15 | | | | | | 1) M-1: THE OUTSIDE AIR CALCULATIONS ARE NOT IN | | | COMPLIANCE WITH ASHRAE 62.1 OR TABLE 403.3 FBC-14 | | | MECHANICAL. EACH TABLE REQUIRES A RATE OF 7.5 CFM PER | | | OCCUPANT PLUS 0.18 CFM PER SQ. FT FOR CAFETERIA/FAST | | | FOOD. PLEASE REVISE THE CALCULATIONS. | | | 2) M-1: THE AIR BALANCE SCHEDULE MUST INDICATE HOW MUCH | | | OF THE O/A IS BEING PROVIDED FOR OCCUPANTS AND HOW MUCH | | | FOR MAKE-UP AIR FOR THE EXHAUST SYSTEMS. PLEASE NOTE | | | THAT MAKE UP AIR CFM'S SHALL BE APPROXIMATELLY EQUAL TO | | | REQUIRED EXHAUST CFM'S- SECTION 508.1. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2015-08-18 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-08-18 |
Time |
09:51 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-08-18 |
Time |
09:51 |
Sent To |
|
|
| Notes |
| 2015-08-20 09:39:01 | ON SKENNEDY'S DESK | | 2015-08-18 09:55:27 | 1ST REVIEW: FBC 2014 MECHANICAL | | | PERMIT #15070942 | | | 8/18/15 | | | | | | 1) REFER TO THE FBC-14 EXISITNG BUILDING CODE. PLEASE | | | ADD THE CODE TO THE DESIGN CODES LIST ON SHEET CS-1 AND | | | SEE SECTION 809.2- ALTERED EXISTING SYSTEMS. | | | IN MECHANICALLY VENTILATED SPACES, EXISTING MECHANICAL | | | VENTILATION SYSTEMS THAT ARE ALTERED, RECONFIGURED, OR | | | EXTENDED SHALL PROVIDE NOT LESS THAN 5 CUBIC FEET PER | | | MINUTE (CFM) (0.0024 M3/S) PER PERSON OF OUTDOOR AIR | | | AND NOT LESS THAN 15 CFM (0.0071 M3/S) OF VENTILATION | | | AIR PER PERSON; OR NOT LESS THAN THE AMOUNT OF | | | VENTILATION AIR DETERMINED BY THE INDOOR AIR QUALITY | | | PROCEDURE OF ASHRAE 62.1. PLEASE PROVIDE AN OUTSIDE AIR | | | CALCULATION AND SCHEDULE ON THE PLAN INDICATING THE | | | REQUIRED O/A AND THE O/A PROVIDED. | | | 2) THE CITY OF WEST PALM BEACH DEVELOPMENT SERVICES | | | DEPARTMENT REQUIRES A SEPARATE PERMIT FOR ALL KITCHEN | | | HOOD INSTALLATIONS. PLEASE PLACE A NOTE ON THE PLANS | | | ACCORDINGLY. | | | IN REFERENCE TO THIS PERMIT SET OF PLANS IT IS | | | NECESSARY TO INDICATE HOW MAKE-UP AIR IS BEING PROVIDED | | | FOR THE NEW EXHAUST HOOD TO VERIFY PROPER AIR BALANCING | | | WITHIN THE ALTERED SPACE- REFER TO SECTION 508 FBC-14 | | | MECHANICAL. | | | 508.1 MAKEUP AIR. | | | MAKEUP AIR SHALL BE SUPPLIED DURING THE OPERATION OF | | | COMMERCIAL KITCHEN EXHAUST SYSTEMS THAT ARE PROVIDED | | | FOR COMMERCIAL COOKING APPLIANCES. THE AMOUNT OF MAKEUP | | | AIR SUPPLIED TO THE BUILDING FROM ALL SOURCES SHALL BE | | | APPROXIMATELY EQUAL TO THE AMOUNT OF EXHAUST AIR FOR | | | ALL EXHAUST SYSTEMS FOR THE BUILDING. THE MAKEUP AIR | | | SHALL NOT REDUCE THE EFFECTIVENESS OF THE EXHAUST | | | SYSTEM. MAKEUP AIR SHALL BE PROVIDED BY GRAVITY OR | | | MECHANICAL MEANS OR BOTH. MECHANICAL MAKEUP AIR SYSTEMS | | | SHALL BE AUTOMATICALLY CONTROLLED TO START AND OPERATE | | | SIMULTANEOUSLY WITH THE EXHAUST SYSTEM. MAKEUP AIR | | | INTAKE OPENING LOCATIONS SHALL COMPLY WITH SECTION | | | 401.4. | | | 508.1.1 MAKEUP AIR TEMPERATURE. | | | THE TEMPERATURE DIFFERENTIAL BETWEEN MAKEUP AIR AND THE | | | AIR IN THE CONDITIONED SPACE SHALL NOT EXCEED 10 | | | DEGREES F (6 DEGREES C) EXCEPT WHERE THE ADDED HEATING | | | AND COOLING LOADS OF THE MAKEUP AIR DO NOT EXCEED THE | | | CAPACITY OF THE HVAC SYSTEM. | | | | | | PLEASE REVISE THE PLANS TO SHOW COMPLIANCE WITH THE | | | CODE SECTIONS ABOVE. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
4 |
Status |
P |
Date |
2015-10-29 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-10-29 |
Time |
06:48 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-10-29 |
Time |
06:34 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
F |
Date |
2015-10-21 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-10-21 |
Time |
12:37 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-10-21 |
Time |
11:41 |
Sent To |
|
|
| Notes |
| 2015-10-21 12:26:00 | 1) THE WATER RISER DIAGRAM ON SHT.P-2 SHALL SHOW ALL | | | THE WATER PIPING TO ALL THE FIXTURES SHOWN ON SHT.P-3 | | | AND INCLUDE ALL THE PIPE SIZES, BOTH FILTRATION | | | SYSTEMS, ETC. WPB AMEND. TO FBC SEC. 107.2.1. | | | CLARIFY WHY THERE ARE TWO WATER RISER DIAGRAMS, ONE ON | | | P-2 AND ONE ON P-3 AND NEITHER ONE MATCHES THE OTHER. | | | SUBMIT ONE WATER RISER DIAGRAM SHOWING ALL THE | | | FIXTURES/APPLIANCES CONNECTED THERETO OR SUPPLY BOTH | | | WATER RISERS THAT CORRELATE. | | | 2) YOU HAVE SUBMITTED GREASE TRAP SIZING CALCULATIONS | | | BASED ON 4 SEATS. WHERE ARE THE FOUR SEATS COMING FROM | | | WHEN THERE ARE NO SEATS SHOWN ON THE PLANS? CLARIFY. | | | | | | PLEASE CALL ME TO DISCUSS THESE COMMENTS. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2015-10-02 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-10-02 |
Time |
14:10 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-10-02 |
Time |
11:54 |
Sent To |
|
|
| Notes |
| 2015-10-02 14:08:45 | 1) THE WATER RISER DIAGRAM ON SHT.P-2 SHALL SHOW ALL | | | THE WATER PIPING TO ALL THE FIXTURES SHOWN ON SHT.P-3 | | | AND INCLUDE ALL THE PIPE SIZES, BOOSTER PUMP, BOTH | | | FILTRATION SYSTEMS, ETC. WPB AMEND. TO FBC SEC. | | | 107.2.1. | | | 2) SUBMIT SIZING CALCULATIONS TO ENSURE THAT THE | | | EXISTING TANK HAS THE CAPACITY TO HANDLE THE ADDITIONAL | | | GREASE WASTE. WPB AMEND. TO FBC SEC. 107.2.1., 2014 | | | FBC-PLUMBING SEC.1003.2. 2ND REQUEST. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2015-08-08 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-08-08 |
Time |
05:06 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-08-08 |
Time |
04:12 |
Sent To |
|
|
| Notes |
| 2015-08-08 04:58:45 | 1) INDICATE THE SIZE OF THE EXISTING GREASE TRAP AND | | | SUBMIT SIZING CALCULATIONS TO ENSURE THAT THE EXISTING | | | TANK HAS THE CAPACITY TO HANDLE THE ADDITIONAL GREASE | | | WASTE. WPB AMEND. TO FBC SEC. 107.2.1., 2014 | | | FBC-PLUMBING SEC.1003.2. | | | 2) SUBMIT MANUFACTURER'S SPECIFICATION SHEETS FOR ALL | | | NE W EQUIPMENT USED FOR FOOD PREP/BEVERAGES/ICE CREAM, | | | ETC. EQUIPMENT SHALL COMPLY WITH NSF. | | | 3) SHEETS K-1, K-2, K-3 APPEAR TO HAVE THE COLUMN | | | HEADING MISSING. CLARIFY. | | | 4) SUBMIT A DETAIL FOR THE NEW GREASE WASTE CONNECTION | | | TO THE EXISTIN GREASE INTERCEPTOR. COMPLY WITH FL. | | | ADMIN. CODE RULE 64E-6 FOR REQUIREMENTS. | | | 5) THE WATER PIPE SIZES ON THE PIPNG DIAGRAM ON P-3 DO | | | NOT CORRELATE WITH THE SIZES ON THE WATER RISER ON P-2. | | | CLARIFY. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|