Plan Review Details - Permit 15070828
Plan Review Stops For Permit 15070828
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-07-28 Cont ID  
Sent By jwitmer Date 2015-07-28 Time 13:14 Rev Time 0.00
Received By jwitmer Date 2015-07-28 Time 11:15 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-09-01 Cont ID  
Sent By albarran Date 2015-09-01 Time 12:33 Rev Time 0.00
Received By albarran Date 2015-09-01 Time 10:44 Sent To I
Notes
2015-09-01 12:39:47THE APPROVED WAS ACTUALLY A REVISION TO THE FIRST. THE
 PREVIOUSLY ADDRESSED ISSUES WERE CORRECTED, THOUGH THE
 ACCOMPANYING NARRATIVE HAD NOTHING TO DO WITH THE
 PREVIOUS COMMENTS.

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-08-04 Cont ID  
Sent By albarran Date 2015-08-04 Time 10:35 Rev Time 0.00
Received By albarran Date 2015-08-04 Time 9:47 Sent To I
Notes
2015-08-04 10:48:55PLEASE NOTE THAT I, MIKE ALBARRAN, ELECTRICAL PLANS
 EXAMINER HAVE COMPLETED THE REVIEW OF THE ABOVE
 MENTIONED JOB. BELOW ARE THE COMMENTS WITH REGARDS TO
 THE REQUIRED CORRECTIONS. THE FOLLOWING ITEMS SHALL BE
 CORRECTED AND THE PLANS RESUBMITTED FOR ANOTHER REVIEW.
  
 1. YOUR NARRATIVE WHICH IS PART OF THE SUBMITTAL
 EXCLUDES THE ADDITION OF NOTES 59 & 60 ON PAGE E0.1
 2. THE LIGHTING FIXTURE SCHEDULE ON PAGE E1.1 DOES NOT
 INCLUDE A TYPE M FIXTURE DESCRIPTION MAKING IT
 IMPOSSIBLE TO VERIFY CONFORMANCE WITH FBC-E SECTION
 505.5.3.
 3. THE VARIOUS ROOM DESIGNATIONS ARE ILLEGIBLE MAKING
 IT DIFFICULT TO CONFIRM THE CHANGES MENTIONED.
 4. PAGE E1.1 HAS ADDITIONAL CHANGES NOT ADDRESSED ON
 THE NARRATIVE.
 5. PROVIDE A LIGHTING POWER DENSITY CHART FOR THE AREA
 COMPLIANT WITH FBC-ENERGY CONSERVATION TABLE 505.5.3.
  
 WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE
 LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY
 RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT
 CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE
 PREVIOUSLY REVIEWED SHEETS.
  
 IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO
 CONTACT ME DIRECTLY.
  
 THANK YOU
  

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2015-07-30 Cont ID  
Sent By pleduc Date 2015-07-30 Time   Rev Time 0.00
Received By pleduc Date 2015-07-30 Time 13:54 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-09-01 Cont ID  
Sent By albarran Date 2015-09-01 Time 12:40 Rev Time 0.00
Received By albarran Date 2015-08-18 Time 13:07 Sent To  
Notes
2015-09-01 12:42:379/1/15 - PASSED ELECTRICAL REVIEW. CONTRACTOR NOTIFIED
 VIA EMAIL. SENT TO LARGE READY BIN "C". MA
2015-08-18 13:07:07RESUB ROUTED TO MALBARRAN

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-08-04 Cont ID  
Sent By albarran Date 2015-08-04 Time 10:51 Rev Time 0.00
Received By albarran Date 2015-07-21 Time 10:19 Sent To  
Notes
2015-08-04 10:52:518/4/15 - FAILED ELECTRICAL REVIEW AS NOTED. CONTRACTOR
 NOTIFIED VIA EMAIL. SENT TO LARGE DENIED BIN "C". MA
2015-07-23 10:27:39C27

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2015-07-31 Cont ID  
Sent By ccole Date 2015-07-31 Time 12:51 Rev Time 0.00
Received By ccole Date 2015-07-31 Time 12:51 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2015-07-29 Cont ID  
Sent By gjohnson Date 2015-07-29 Time 14:21 Rev Time 0.00
Received By gjohnson Date 2015-07-29 Time 14:21 Sent To  
Notes
***NONE***


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved