Review Stop B BUILDING (STRUCTURAL)
Rev No 2 Status P Date 2015-08-03 Cont ID  
Sent By tklarge Date 2015-08-03 Time 13:32 Rev Time 0.00
Received By tklarge Date 2015-08-03 Time 13:32 Sent To  
Notes
2015-08-03 13:32:55SEE PLUMBING PROVISOS.

Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status F Date 2015-08-03 Cont ID  
Sent By skennedy Date 2015-08-03 Time 11:15 Rev Time 0.00
Received By skennedy Date 2015-08-03 Time 11:15 Sent To  
Notes
2015-08-03 11:17:271ST REVIEW: FBC 2010
  
 SEE COMMENTS UNDER PLUMBING RE: SLAB REPAIR DETAIL AND
 ACCESSIBILITY IN BATHS.
  
  
 STEVEN KENNEDY, CBO
 CHIEF PLANS EXAMINER
 (561) 805-6710
 [email protected]
  

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-07-29 Cont ID  
Sent By skennedy Date 2015-07-29 Time 13:59 Rev Time 0.00
Received By skennedy Date 2015-07-29 Time 13:59 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2015-07-30 Cont ID  
Sent By wjolin Date 2015-07-30 Time 10:37 Rev Time 0.00
Received By wjolin Date 2015-07-30 Time 10:24 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-08-03 Cont ID  
Sent By tklarge Date 2015-08-03 Time 13:33 Rev Time 0.00
Received By tklarge Date 2015-08-03 Time 13:33 Sent To  
Notes
***NONE***

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-08-03 Cont ID  
Sent By skennedy Date 2015-08-03 Time 11:17 Rev Time 0.00
Received By skennedy Date 2015-07-15 Time 12:07 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2015-07-28 Cont ID  
Sent By ccole Date 2015-07-28 Time 10:04 Rev Time 0.00
Received By ccole Date 2015-07-28 Time 10:04 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 2 Status P Date 2015-08-03 Cont ID  
Sent By tklarge Date 2015-08-03 Time 13:31 Rev Time 0.00
Received By tklarge Date 2015-08-03 Time 13:31 Sent To  
Notes
2015-08-03 13:31:41PLUMBING PASSED WITH PROVISOS. TKL.

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-07-31 Cont ID  
Sent By tklarge Date 2015-07-31 Time 07:02 Rev Time 0.00
Received By tklarge Date 2015-07-31 Time 05:54 Sent To  
Notes
2015-07-31 07:00:401)SUBMIT A SLAB REPAIR DETAIL FOR THE PORTION OF SLAB
 BEING REMOVED FOR THE INSTALLATION OF THE PLUMBING FOR
 THE BREAK ROOM SINK.WPB AMEND. TO FBC SEC. 107.2.1.
 2) SHOW THE DISTANCE BETWEEN THE SUPPORT LEGS FOR THE
 LAVATORIES IN THE TOILET ROOMS. A 30 INCH WIDE BY 48
 INCH LONG CLEAR FLOOR SPACE SHALL BE PROVIDED FOR A
 FORWARD APPROACH PER 5TH ED. FBC-ACCESSIBILITY
 SEC.305.3.
 3) SHOW THE DISTANCE FROM THE FINISH FLOOR TO THE
 UNDERSIDE OF THE LAVATORY VANITY. KNEE CLEARANCE SHALL
 BE PROVIDED PER 5TH ED. OF FBC-ACCESSIBILITY SEC.306.3.
 4) MIRRORS IN THE TOILET ROOMS SHALL COMPLY WITH 5TH
 ED. FBC-ACCESSIBILITY SEC.603.3.
 5) THE WALL FINISH IN THE TOILET ROOMS SHALL COMPLY
 WITH 5TH ED.FBC SEC.1210.2.2.
 6) A CLEANOUT IS REQD. IN THE BASE OF THE DRAINAGE
 STACK PER 5HT ED. OF FBC-PLUMBING SEC. 708.3.4.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  

Review Stop SIGNATURE ELECTRONIC SIGNATURE SHEET
Rev No 1 Status P Date 2015-08-03 Cont ID  
Sent By skennedy Date 2015-08-03 Time 14:48 Rev Time 0.00
Received By skennedy Date 2015-08-03 Time 14:42 Sent To  
Notes
2015-07-15 13:49:09PLANS SUBMITTED IN LEIU OF PEDDS