| Plan Review Stops For Permit 15061430 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2015-10-15 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-10-15 |
Time |
10:49 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2015-10-15 |
Time |
10:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-07-24 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-07-24 |
Time |
15:57 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2015-07-24 |
Time |
15:30 |
Sent To |
|
|
| Notes |
| 2015-07-24 15:57:18 | BUILDING PLAN REVIEW | | | W. P. B. PERMIT: 15061430 | | | ADD: 2301 CENTREPARK WEST DRIVE SUITE # 150 | | | CONT: WOOLEMS INC. | | | TEL: (561)835-0401 | | | E-MAIL: ????????? | | | | | | 2014 FLORIDA BUILDING CODE W | | | * 2014 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE, CHAPTER 1, ADMINISTRATION | | | | | | 2014 EXISTING BUILDING CODE LEVEL II 701.3 | | | COMPLIANCE. ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, | | | SYSTEMS, AND SPACES SHALL COMPLY WITH THE REQUIREMENTS | | | OF THE FLORIDA BUILDING CODE, BUILDING. | | | | | | 1ST REVIEW | | | DATE: FRI. JULY 24/ 2015 | | | ACTION: DENIED | | | | | | 1) THE PLANS SUBMITTED ON JUNE 30/ 2015 IS THE 1ST DAY | | | OF THE 2014 FBC ADOPTED STATEWIDE. PLEASE UPDATE PLANS. | | | | | | 2) SHEET A-1 INDICATES A EXECUTIVE BATHROOM ROOM # 108. | | | PLEASE NOTE BOTH SECTION IN THE 2014 FBC-ACCESSIBILITY | | | CODE 603.2.3 & 608.3 FOR THIS BATHROOM TO BE CONSIDERED | | | A PRIVATE OFFICE THE OCCUPANT HAS TO GO THROUGH THE | | | PRIVATE OFFICE AND NOT FOR COMMON USE. | | | | | | 3) WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION | | | & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS | | | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | | REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | | COOPERATION. | | | | | | JAMES A. WITMER CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | TEL: 561-805-6715 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
N |
Date |
2015-10-13 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-10-13 |
Time |
14:17 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2015-10-13 14:19:35 | THIS WAS WAS ALREADY APPROVED BY PHIL ON 9/1/15. NO | | | ADDITIONAL ELECTRICAL REVIEW REQUIRED UNLESS CHANGES TO | | | THE ORIGINAL HAVE BEEN MADE, AND THEN A FULL REVISION | | | REVIEW WILL BE REQUIRED. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2015-09-01 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2015-09-01 |
Time |
11:19 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2015-09-01 |
Time |
10:28 |
Sent To |
|
|
| Notes |
| 2015-09-01 11:24:24 | PASSED | | | IN LARGE DENIED BIN W |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
3 |
Status |
P |
Date |
2015-10-20 |
|
|
Cont ID |
|
| Sent By |
fstallwo |
Date |
2015-10-20 |
Time |
|
Rev Time |
0.00 |
| Received By |
fstal |
Date |
2015-10-20 |
Time |
13:23 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2015-09-15 |
|
|
Cont ID |
|
| Sent By |
fstal |
Date |
2015-09-15 |
Time |
|
Rev Time |
0.00 |
| Received By |
fstal |
Date |
|
Time |
|
Sent To |
B |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2015-07-07 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-07-07 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-07-07 |
Time |
16:21 |
Sent To |
|
|
| Notes |
| 2015-07-07 16:31:48 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | THE SUBMITTED PLAN SHEETS ARE NOT BOUND, ORGANIZED OR | | | ORDERLY. A PROPER REVIEW CAN NOT BE CONDUCTED. PLEASE | | | ORGANIZED AND BIND EACH SET TOGETHER AND RESUBMIT. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2015-10-21 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-10-21 |
Time |
03:39 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-10-13 |
Time |
11:10 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-10-14 |
|
|
Cont ID |
|
| Sent By |
lmarchan |
Date |
2015-10-13 |
Time |
11:10 |
Rev Time |
0.00 |
| Received By |
lmarchan |
Date |
2015-09-10 |
Time |
08:49 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-09-01 |
|
|
Cont ID |
|
| Sent By |
ppetty |
Date |
2015-09-01 |
Time |
11:24 |
Rev Time |
0.00 |
| Received By |
ppetty |
Date |
2015-06-30 |
Time |
14:38 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2015-09-21 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-09-21 |
Time |
13:36 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-09-21 |
Time |
13:36 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2015-07-16 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-07-16 |
Time |
12:02 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-07-16 |
Time |
12:02 |
Sent To |
|
|
| Notes |
| 2015-07-16 12:33:09 | 1ST REVIEW: FBC 2014 MECHANICAL | | | 7/16/15 | | | | | | 1) THE PLANS ARE UNACCEPTABLE BECAUSE THE SHEETS WERE | | | SUBMITTED LOOSELY AND UNBOUND- REFER TO SECTION | | | 107.2.1.4 WPB AMENDEMENTS TO THE FLORIDA BUILDING CODE. | | | 2) DESIGN CRITERIA: THE FLORIDA BUILDING CODES-2014 | | | FIFTH EDITION WENT INTO EFFECT JUNE 30, 2015. PLEASE | | | PROVIDE ON THE PLANS A LIST OF CURRENT CODES AND | | | STANDARDS USED IN THE DESIGN OF THE PROJECT, AND UPDATE | | | THE 2010 REFERENCE UNDER THE O/A CALCULATION TABLE ON | | | SHEET M0.1. | | | 3) M1.1: THE RETURN AIR TRANFER FROM JIM'S OFFICE TO | | | THE CORRIDOR IS NOT PERMITTED- REFER TO SECTION 601.2 | | | FBC-14 MECHANICAL. | | | 4) M1.1: SHOW THE DUCT CONNECTIONS TO THE RELOCATED | | | ERV. | | | 5) AC LOAD CALCULATIONS HAVE BEEN SUBMITTED FOR AHU'S | | | 1-6, HOWEVER THERE ARE NO AC EQUIPMENT SCHEDULES ON THE | | | PLANS TO COMPARE THE CALCS TO. PLEASE PROVIDE THE | | | SCHEDULES ON THE PLAN. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2015-10-21 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-10-21 |
Time |
03:39 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-10-21 |
Time |
03:01 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2015-09-28 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-09-28 |
Time |
11:27 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-09-28 |
Time |
11:17 |
Sent To |
|
|
| Notes |
| 2015-09-28 11:26:27 | 1) THE ARCHITECTURAL FLOOR PLAN ON SHEET A-1 DOES NOT | | | CORRELATE WITH THE FLOOR PLAN ON SHT. P1.1. ROOM NAMES | | | ARE DIFFERENT,THE FLOOR PLAN IS DIFFERENT.THE EXECUTIVE | | | BATHROOM IS SHOWN ON A-1 BUT IT IS SHOWN AS A STORAGE | | | ROOM WITH THE PLUMBING FIXTURES DELETED ON P1.1. SUBMIT | | | PLANS THAT MATCH. WPB AMEND. TO FBC SEC. 107.2.1. | | | 2) WATER HEATER DETAIL #2. A PAN DRAIN IS REQD. FOR THE | | | EWH. | | | 3) THE BREAK ROOM SINK SHALL COMPLY WITH THE | | | FBC-ACCESSIBILITY SEC.212.3. SHOW COMPLIANCE ON THE | | | PLANS. 2ND. REQUEST. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2015-07-25 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-07-25 |
Time |
10:28 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-07-25 |
Time |
09:45 |
Sent To |
|
|
| Notes |
| 2015-08-31 14:53:26 | PPETTY'S DESK | | 2015-07-25 10:07:03 | 1) THE BREAK ROOM SINK SHALL COMPLY W/2014 FAC | | | SEC.212.1, 606.2, 606.3. | | | 2) THE URINAL IS SHOWN IN TOILET ROOM #106 ON SHT.A-1 | | | AND IT IS SHOWN IN TOILET ROOM # 105 ON SHT.P1.1. | | | CLARIFY. | | | 3) EXECUTIVE BATHROOM #108 SHALL FULLY COMPLY WITH THE | | | 2010 FAC SEC.213.2.IN ORDER TO NOT HAVE TO FULLY COMPLY | | | WITH THE FAC, THE BATH ROOM MUST BE ACCESSIBLR THROUGH | | | A PRIVATE OFFICE. AS DESIGNED, IT DOES NOT COMPLY WITH | | | THE EXCEPTION IN THE CODE. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | |
|
|