| Plan Review Stops For Permit 15060997 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2015-08-05 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-08-05 |
Time |
08:24 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-08-05 |
Time |
08:25 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2015-07-17 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-07-17 |
Time |
09:20 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-07-17 |
Time |
09:20 |
Sent To |
|
|
| Notes |
| 2015-07-17 09:22:54 | 2ND REVIEW: FBC 2010 | | | | | | ALTHOUGH YOU HAVE SUBMITTED A LARGER GENERIC PLAN BY | | | ALLEN GEZELMAN, PE, WHICH IS APPRECIATED, THE SITE | | | SPECIFIC SKETCH YOU ORIGINALLY PROVIDED WAS ALSO TOO | | | SMALL AND WILL NOT COPY PROPERLY INTO OUR RECORDS | | | MANAGEMENT SYSTEM. IT IS A DARK PHOTO COPY FROM A | | | NOTEBOOK WHICH WAS SKETCHED UPON. FURTHER, THE SKETCH | | | IS VERY UNCLEAR IN TERMS OF DETAIL SUCH THAT I CANNOT | | | DETERMINE TO ANY EXTENT WHATSOEVER THE INTENT OF THE | | | SCOPE OF WORK. | | | | | | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | | CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN | | | UPON SUITABLE MATERIAL. CONSTRUCTION DOCUMENTS SHALL BE | | | OF SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE | | | AND EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT | | | IT WILL CONFORM TO THE PROVISIONS OF THIS CODE AND | | | RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS | | | DETERMINED BY THE BUILDING OFFICIAL. SUCH DRAWINGS AND | | | SPECIFICATIONS SHALL CONTAIN INFORMATION, IN THE FORM | | | OF NOTES OR OTHERWISE, AS TO THE QUALITY OF MATERIALS, | | | WHERE QUALITY IS ESSENTIAL TO CONFORMITY WITH THE | | | TECHNICAL CODES. | | | | | | THE PLANS ARE TOO SMALL TO READ AND WILL NOT TRANSLATE | | | WELL INTO THE CITY RECORDS MANAGEMENT SYSTEM. PLEASE | | | SUBMIT LARGER PLANS. | | | FBC 107.2.1.4 QUALITY OF BUILDING PLANS. BUILDING PLANS | | | SHALL BE DRAWN TO A MINIMUM 1/8 INCH SCALE UPON | | | SUBSTANTIAL PAPER, CLOTH OR OTHER ACCEPTABLE MEDIUM. | | | THIS POLICY MAY INCLUDE SUCH THINGS AS MINIMUM SIZE, | | | SHAPE, CONTRAST, CLARITY, OR OTHER ITEMS RELATED TO | | | RECORDS MANAGEMENT. | | | | | | STEVEN KENNEDY, CBO | | | CHIEF PLANS EXAMINER | | | (561) 805-6710 | | | [email protected] | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-07-17 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-07-10 |
Time |
17:23 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-07-10 |
Time |
17:23 |
Sent To |
|
|
| Notes |
| 2015-07-10 17:24:53 | 1ST REVIEW: FBC 2010 | | | | | | | | | THE PLANS ARE TOO SMALL TO READ AND WILL NOT TRANSLATE | | | WELL INTO THE CITY RECORDS MANAGEMENT SYSTEM. PLEASE | | | SUBMIT LARGER PLANS. | | | FBC 107.2.1.4 QUALITY OF BUILDING PLANS. BUILDING PLANS | | | SHALL BE DRAWN TO A MINIMUM 1/8 INCH SCALE UPON | | | SUBSTANTIAL PAPER, CLOTH OR OTHER ACCEPTABLE MEDIUM. | | | THIS POLICY MAY INCLUDE SUCH THINGS AS MINIMUM SIZE, | | | SHAPE, CONTRAST, CLARITY, OR OTHER ITEMS RELATED TO | | | RECORDS MANAGEMENT. | | | | | | STEVEN KENNEDY, CBO | | | CHIEF PLANS EXAMINER | | | (561) 805-6710 | | | [email protected] | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2015-08-27 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-08-27 |
Time |
13:10 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-08-27 |
Time |
12:56 |
Sent To |
I |
|
| Notes |
| 2015-08-27 13:26:37 | AFTER CAREFUL EVALUATION OF THIS SUBMITTAL, IT WAS | | | DECIDED TO APPROVE THE PERMIT AND LEAVE THE COMPLIANCE | | | ISSUES TO THE FIELD INSPECTOR. WE DISCUSSED THE GENERIC | | | NATURE OF THE DRAWINGS AND THE LACK OF CERTAINTY WITH | | | THE SIGNAGE REQUIREMENTS. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
F |
Date |
2015-08-04 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-08-04 |
Time |
13:06 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-08-04 |
Time |
17:35 |
Sent To |
|
|
| Notes |
| 2015-08-05 08:30:56 | PLEASE NOTE THAT I, MIKE ALBARRAN, ELECTRICAL PLANS | | | EXAMINER HAVE COMPLETED THE REVIEW OF THE ABOVE | | | MENTIONED JOB. BELOW ARE THE COMMENTS WITH REGARDS TO | | | THE REQUIRED CORRECTIONS. THE FOLLOWING ITEMS SHALL BE | | | CORRECTED AND THE PLANS RESUBMITTED FOR ANOTHER REVIEW. | | | 1. YOU CONTINUE TO SUBMIT GENERIC DRAWINGS. AS PER FAC | | | 61G15-23.002, A PROFESSIONAL ENGINEER SHALL SIGN AND | | | SEAL ALL PLANS. EACH SHEET SHALL HAVE A TITLE BLOCK | | | CONTAINING THE NAME ADDRESS AND LICENSE NUMBER OF THE | | | ENGINEER. EACH TITLE BLOCK, AT A MINIMUM SHALL CONTAIN | | | AMONG OTHER CRITERIA THE NAME AND IDENTIFICATION OF THE | | | PROJECT AND THE DATE PREPARED. | | | 2. WHAT YOU HAVE PROVIDED IS NOT A RISER DIAGRAM. THAT | | | MAY HELP THE BLDG. PLANS EXAMINER LOCATE THE VARIOUS | | | PANELS ON THE ROOF. | | | 3. THE FACT THAT I COMMITTED A TYPO DOES NOT ELIMINATE | | | THE REQUIREMENTS FOR THE BACKFED BREAKERS TO BE LISTED | | | FOR THE APPLICATION. THE PV SUB-PANEL HAS NOTHING TO DO | | | WITH THE BACKFED BREAKER. THAT IS FOR THE PROTECTION OF | | | ANY PERSON SERVICING THE UNIT ALONG WITH ITS RATING. | | | 4. REGARDLESS OF COMPLIANCE LISTED STATED I DO NOT SEE | | | A UL LISTING ON THE DEVICE NOR DOES IT SPECIFICALLY | | | STATE THAT IT IS IN FACT AN INTER-ACTIVE UNIT. HAD THIS | | | DEVICE BEEN TESTED FOR COMPLIANCE WITH THE UL | | | STANDARDS, IT WOULD PROUDLY DISPLAY THE UL STICKER. | | | 5. WHEN YOU SUBMIT THE PROPER AND CORRECTED DRAWINGS, | | | YOU MAY WANT TO REMOVE THE WORD ROMEX AND EDIT NOTE 10 | | | ALTOGETHER. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE | | | PREVIOUSLY REVIEWED SHEETS. | | | | | | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO | | | CONTACT ME DIRECTLY. | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2015-07-16 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-07-16 |
Time |
14:24 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-07-16 |
Time |
13:39 |
Sent To |
B |
|
| Notes |
| 2015-07-16 14:25:29 | PLEASE NOTE THAT I, MIKE ALBARRAN, ELECTRICAL PLANS | | | EXAMINER HAVE COMPLETED THE REVIEW OF THE ABOVE | | | MENTIONED JOB. BELOW ARE THE COMMENTS WITH REGARDS TO | | | THE REQUIRED CORRECTIONS. THE FOLLOWING ITEMS SHALL BE | | | CORRECTED AND THE PLANS RESUBMITTED FOR ANOTHER REVIEW. | | | 1. YOU HAVE SUBMITTED A GENERIC DRAWING WITH MULTIPLE | | | SYSTEMS. YOU SHALL INDICATE WHICH OF THESE SYSTEMS YOU | | | WILL BE INSTALLING. IF YOUR INSTALLATION DIFFERS FROM | | | THE SUBMITTED DRAWINGS, A SITE SPECIFIC DRAWING SHALL | | | BE PROVIDED. | | | 2. YOU SHALL PROVIDE A SITE SPECIFIC RISER DIAGRAM | | | SHOWING LOCATION OF INTERCONNECTION OF THE PV SYSTEM | | | AND VARIOUS COMPONENTS. THIS RISER SHALL INCLUDE ALL | | | REQUIRED SIGNAGE. | | | 3. THE SUBMITTED DRAWINGS APPEAR TO INCLUDE A BACK-FED | | | BREAKER WITHOUT ANY REFERENCES TO THE REQUIREMENTS OF | | | NEC 690.9(E). | | | 4. THE SUBMITTED SPECS FOR THE INVERTER FAIL TO | | | INDICATE A LISTING OR RATING FOR AN INTER-ACTIVE SYSTEM | | | AS REQUIRED IN NEC 690.60. | | | 5. FAILURE WITH NOTE 4 ABOVE VOIDS COMPLIANCE WITH NEC | | | 690.61. | | | 6. ROMEX, AS MENTIONED IN YOUR NOTES IS A BRAND NAME | | | AND NOT A TYPE OF LISTED CABLE; FURTHERMORE NEC | | | 334.12(B)(4) PROHIBITS THE USE OF NM, NMC ETC. IN WET | | | LOCATIONS. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE | | | PREVIOUSLY REVIEWED SHEETS. | | | | | | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO | | | CONTACT ME DIRECTLY. | | | | | | THANK YOU | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2015-07-17 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-06-29 |
Time |
09:57 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-06-29 |
Time |
13:11 |
Sent To |
|
|
| Notes |
| 2015-06-29 14:01:38 | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | | CONSTRUCTION DOCUMENTS SHALL BE DIMENSIONED AND DRAWN | | | UPON SUITABLE MATERIAL. CONSTRUCTION DOCUMENTS SHALL BE | | | OF SUFFICIENT CLARITY TO INDICATE THE LOCATION, NATURE | | | AND EXTENT OF THE WORK PROPOSED AND SHOW IN DETAIL THAT | | | IT WILL CONFORM TO THE PROVISIONS OF THIS CODE AND | | | RELEVANT LAWS, ORDINANCES, RULES AND REGULATIONS, AS | | | DETERMINED BY THE BUILDING OFFICIAL. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2015-08-27 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-08-27 |
Time |
13:26 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2015-08-27 13:27:50 | 8/27/15 - WITH HESITATION THIS PASSED ELECTRICAL | | | REVIEW. CONTRACTOR WAS NOTIFIED VIA EMAIL. SENT TO | | | SMALL READY BIN "L".MA |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2015-08-05 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-08-05 |
Time |
08:25 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-07-27 |
Time |
08:24 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-07-17 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-07-17 |
Time |
09:45 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-07-15 |
Time |
13:46 |
Sent To |
|
|
| Notes |
| 2015-07-15 13:46:52 | RESUB ROUTED TO MALBARRAN. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-07-10 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-07-10 |
Time |
17:24 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-06-23 |
Time |
17:04 |
Sent To |
|
|
| Notes |
| 2015-06-23 09:41:20 | ZONING |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
N |
Date |
|
|
|
Cont ID |
|
| Sent By |
|
Date |
|
Time |
|
Rev Time |
|
| Received By |
|
Date |
|
Time |
|
Sent To |
|
|
| Notes |
|
|