Plan Review Details - Permit 15060791
| Plan Review Stops For Permit 15060791 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
3 |
Status |
P |
Date |
2015-10-19 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-10-19 |
Time |
15:55 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2015-10-19 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
F |
Date |
2015-09-21 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-09-21 |
Time |
|
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2015-09-21 |
Time |
|
Sent To |
|
|
| Notes |
| 2015-09-21 14:38:47 | BUILDING PLAN REVIEW | | | W. P. B. PERMIT: 15060791 | | | ADD: 333 CLEMATIS ST. | | | CONTRACTOR: HORMAK CONSTRUCTION | | | TEL: (561)790-6863 | | | E-MAIL: [email protected] | | | | | | 2010 FLORIDA BUILDING CODE W | | | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION | | | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. | | | | | | 2010 EXISTING BUILDING CODE LEVEL II 701.3 | | | COMPLIANCE. ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, | | | SYSTEMS, AND SPACES SHALL COMPLY WITH THE REQUIREMENTS | | | OF THE FLORIDA BUILDING CODE, BUILDING. | | | | | | 2ND REVIEW | | | DATE: MON. SEPT. 21/2015 | | | ACTION: DENIED | | | | | | 1A) COMPLIED. WILL NEED TO GET A CBC OR CGC ONBOARD FOR | | | WORK BEYOND THE SCOPE OF YOUR LICENSE. FL S.S. 489.113. | | | | | | 1B)VALUE IS STILL LOW AT $20,000.00. THE SUMMITED | | | CONTRACT VALUE IS $23,500.00 AND THERE IS NO LINE ITEM | | | FOR THE NEW STOREFRONT DOOR AND WALL SYSTEM. | | | 1ST REVIEW COMMENT. FOR THE WHOLE PROJECT THE VALUE OF | | | $3,000.00 IS CONSIDERABLY LOW. 108.3* BUILDING PERMIT | | | VALUATION. | | | | | | 2) COMPLIED. SHEET A-1. THE RESTROOM DOORWAY NEXT TO | | | THE REAR EXIT BLOCKS THE REAR EXIT, WILL NEED TO SWING | | | INTO THE RESTROOM, SHOW COMPLIANCE WITH SECTION 2010 | | | FBC-B 1008.1.9.11 DURING ITS SWING, ANY DOOR IN A MEANS | | | OF EGRESS SHALL LEAVE UNOBSTRUCTED AT LEAST ONE HALF OF | | | THE REQUIRED WIDTH OF AN CORRIDOR, PASSAGEWAY OR | | | LANDING, NOR PROJECT MORE THAN 7 INCHES INTO THE | | | REQUIRED WIDTH OF CORRIDOR OR PASSAGEWAY. | | | | | | 3) SEMI- COMPLIED. SHEET A-2 INDICATES THE WIND DESIGN | | | CRITERIA. NOTE THE DESIGNER OF RECORD HAS INDICATED | | | THAT THE EXPOSURE FOR THIS LOCATION IS A EXPOSURE D. | | | THIS IS MORE RESTRICTIVE BUT IF THE DESIGNER OF ECORD | | | WISHES TO DESIGN TO THE MORE RESTRICTIVE D EXPOSURE | | | THEN THE PRESSURES ALSO WILL NEED TO MEET THE | | | PRESSURES. | | | | | | THE PRESSURES FOR ROOF ZONES 1, 2 & 3 ALL INDICATE A | | | PRESSURE OF 23.99 FOR 20 SQ. FT. THE FASTENING FOR | | | ROOFS IS TAKEN AT 10 SQ. FT. FOR FASTENERS. THE DESIGN | | | LIST THE VULT WIND SPEED OF 170 MPH. THE PRESSURES DO | | | NOT INDICATE IF THEY ARE VULT OR VASD? THE ROOF | | | PRESSURES IN VASD FOR A EXPOSURE D ARE FOR ZONE 1 ARE | | | -50.4, ZONE 2 -108.4 & FOR ZONE 3 -127.3 @ 25 FT. MEAN | | | ROOF HEIGHT. | | | | | | THE WINDOW PRESSURES WILL ALSO NEED TO INDICATE IF THEY | | | ARE VULT OR VASD. | | | | | | COMMENT FROM THE 1ST REVIEW | | | SHEET A-1 SHOWS A NEW GLASS STOREFRONT WINDOWS AND SET | | | OF DOUBLE DOORS. PLEASE PROVIDE THE WIND DESIGN | | | CRITERIA. | | | . WIND DESIGN CRITERIA | | | 2010 FBC-B 1609.1.1 DETERMINATION OF WIND DESIGN- | | | CHAPTER 6 OF ASCE 7-10. | | | 1609.3 BASIC WIND SPEED FIGURE 1609.A-C | | | 1609.3 WIND SPEED CONVERSION | | | | | | | | | 3.1) THE BASIC WIND SPEED, VU, SHALL BE DETERMINED IN | | | ACCORDANCE WITH 1609.3.1 & ASCE 7-10 | | | | | | 3.2) AN IMPORTANCE FACTOR, FIGURE 1609 A-C, ASCE 7-10. | | | | | | 3.3) AN EXPOSURE CATEGORY SHALL BE DETERMINED IN | | | ACCORDANCE WITH 1609.4 & ASCE 7-10 | | | | | | 3.4) A HEIGHT AND EXPOSURE ADJUSTMENT COEFFICIENT, * | | | SHALL BE DETERMINED FROM TABLE 1609.7.2. ASCE 7-10. | | | | | | 3.5) COMPONENTS & CLADDING PRESSURES POSITIVE & | | | NEGATIVE TABLE 1609.2(2). | | | | | | 4) 2ND REQUEST, UNTIL PRESSURES ARE INDICATED IN EITHER | | | VULT OR VASD THE PRODUCT APPROVALS CAN NOT BE REVIEWED. | | | COMPONENTS & CLADDING/ 2010 FBC-B 1609.1.2 PROTECTION | | | OF OPENINGS, 1609.6.4.4.1 COMPONENTS & CLADDING | | | FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV. | | | 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION | | | SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS: | | | (31)(A) EXTERIOR DOORS. | | | (B) WINDOWS | | | (C) STOREFRONTS, CURTAIN WALLS, WALL LOUVERS, EFIS | | | SYSTEMS | | | (D) ROOFING PRODUCTS AND ASSEMBLIES | | | (G) PRE-ENGINEERED A/C STANDS | | | | | | 5) FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS | | | WHICH ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE | | | REVIEWED AND APPROVED IN WRITING BY THE DESIGNER OF | | | RECORD PRIOR TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. | | | FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR | | | SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, | | | SHOP DRAWINGS ETC.. | | | | | | 6) 2ND REQUEST. PLEASE PROVIDE ENERGY CALCULATIONS FOR | | | THE NEW ADDITION. PROVIDE COMPLIANCE FOR THE SHGC OF | | | THE GLAZING COMPLY WITH FBC-ENERGY TABLE 502.1.1.1(1) | | | OR TABLE 502.1.1.1(2). | | | | | | 7) 2ND REQUEST. DEALS WITH THE ELEVATED PEDICURE | | | STATIONS AND THE RAISED PLATFORM BY TENANT. EITHER THE | | | RAISED PLATFORM IS PART OF THE PERMIT AND THE WORK | | | SHOWN OR IT IS NOT AND THE PEDICURE STATIONS ARE NOT | | | SHOWN SINCE THEY WOULD NO LONGER BE IN THE SCOPE OF | | | WORK. | | | | | | 107.2.1 INFORMATION ON CONSTRUCTION DOCUMENTS. | | | CONSTRUCTION DOCUMENTS SHALL BE OF SUFFICIENT CLARITY | | | TO INDICATE THE LOCATION, NATURE AND EXTENT OF THE WORK | | | PROPOSED AND SHOW IN DETAIL THAT IT WILL CONFORM TO THE | | | PROVISIONS OF THIS CODE AND RELEVANT LAWS, ORDINANCES, | | | RULES AND REGULATIONS, AS DETERMINED BY THE BUILDING | | | OFFICIAL. SUCH DRAWINGS AND SPECIFICATIONS SHALL | | | CONTAIN INFORMATION, IN THE FORM OF NOTES OR OTHERWISE, | | | AS TO THE QUALITY OF MATERIALS, WHERE QUALITY IS | | | ESSENTIAL TO CONFORMITY WITH THE TECHNICAL CODES. SUCH | | | INFORMATION SHALL BE SPECIFIC, AND THE TECHNICAL CODES | | | SHALL NOT BE CITED AS A WHOLE OR IN PART, NOR SHALL THE | | | TERM "LEGAL" OR ITS EQUIVALENT BE USED AS A SUBSTITUTE | | | FOR SPECIFIC INFORMATION. | | | | | | AS FAR AS THE ACCESSIBLE PEDICURE STATION WITH A | | | PORTABLE WASH TUB FOR SERVICE, IT WILL NEED TO SHOW A | | | EQUIVALENCY TOO, 2010 FBC-ACCESSIBILITY CODE 103 | | | EQUIVALENT FACILITATION. | | | | | | | | | COMMENT FROM THE 1ST REVIEW. SHEET A-1 SHOWS ELEVATED | | | PEDICURE STATIONS AND A DETAIL 1 OF SHEET A-2. PLEASE | | | SHOW COMPLIANCE WITH FBC-ACCESSIBILITY, VERTICAL | | | ACCESSIBILITY TO PEDICURE STATIONS. 201.1.1. | | | | | | 8) 2ND REQUEST, ADDITIONAL SQUARE FOOTAGE ADDED. BEFORE | | | A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT FEES MUST | | | BE PAID TO PALM BEACH COUNTY. THE ACTUAL PERMIT SET OF | | | PLANS MUST BE STAMPED BY THAT OFFICE, AND A COPY OF THE | | | PAID RECEIPT ATTACHED TO THE PERMIT APPLICATION. PLEASE | | | CALL (561)233-5025 FOR MORE INFORMATION. | | | | | | 9) WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION | | | & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS | | | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | | REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | | COOPERATION. | | | | | | JAMES A. WITMER CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | TEL: 561-805-6715 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-06-22 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-06-22 |
Time |
06:28 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2015-06-22 |
Time |
05:44 |
Sent To |
|
|
| Notes |
| 2015-06-22 06:12:25 | | | | BUILDING PLAN REVIEW | | | W. P. B. PERMIT: 15060791 | | | ADD: 333 CLEMATIS ST. | | | CONTRACTOR: RANDYS PLUMBING | | | TEL: (561)242-9627 | | | E-MAIL: | | | | | | 2010 FLORIDA BUILDING CODE W | | | * 2010 WEST PALM BEACH AMENDMENTS TO THE FLORIDA | | | BUILDING CODE, CHAPTER 1, ADMINISTRATION, 2010 EDITION | | | 2012 FBC SUPPLEMENTS ADOPTED APRIL 25/2013. | | | | | | 2010 EXISTING BUILDING CODE LEVEL II 701.3 | | | COMPLIANCE. ALL NEW CONSTRUCTION ELEMENTS, COMPONENTS, | | | SYSTEMS, AND SPACES SHALL COMPLY WITH THE REQUIREMENTS | | | OF THE FLORIDA BUILDING CODE, BUILDING. | | | | | | 1ST REVIEW | | | DATE: MON. JUNE 22/2015 | | | ACTION: DENIED | | | | | | 1A) WILL NEED TO GET A CBC OR CGC ONBOARD FOR WORK | | | BEYOND THE SCOPE OF YOUR LICENSE. FL S.S. 489.113. | | | | | | 1B) FOR THE WHOLE PROJECT THE VALUE OF $3,000.00 IS | | | CONSIDERABLY LOW. 108.3* BUILDING PERMIT VALUATION. | | | | | | 2) SHEET A-1. THE RESTROOM DOORWAY NEXT TO THE REAR | | | EXIT BLOCKS THE REAR EXIT, WILL NEED TO SWING INTO THE | | | RESTROOM, SHOW COMPLIANCE WITH SECTION 2010 FBC-B | | | 1008.1.9.11 DURING ITS SWING, ANY DOOR IN A MEANS OF | | | EGRESS SHALL LEAVE UNOBSTRUCTED AT LEAST ONE HALF OF | | | THE REQUIRED WIDTH OF AN CORRIDOR, PASSAGEWAY OR | | | LANDING, NOR PROJECT MORE THAN 7 INCHES INTO THE | | | REQUIRED WIDTH OF CORRIDOR OR PASSAGEWAY. | | | | | | 3) SHEET A-1 SHOWS A NEW GLASS STOREFRONT WINDOWS AND | | | SET OF DOUBLE DOORS. PLEASE PROVIDE THE WIND DESIGN | | | CRITERIA. | | | | | | WIND DESIGN CRITERIA | | | 2010 FBC-B 1609.1.1 DETERMINATION OF WIND DESIGN- | | | CHAPTER 6 OF ASCE 7-10. | | | 1609.3 BASIC WIND SPEED FIGURE 1609.A-C | | | 1609.3 WIND SPEED CONVERSION | | | | | | | | | 3.1) THE BASIC WIND SPEED, VU, SHALL BE DETERMINED IN | | | ACCORDANCE WITH 1609.3.1 & ASCE 7-10 | | | | | | 3.2) AN IMPORTANCE FACTOR, FIGURE 1609 A-C, ASCE 7-10. | | | | | | 3.3) AN EXPOSURE CATEGORY SHALL BE DETERMINED IN | | | ACCORDANCE WITH 1609.4 & ASCE 7-10 | | | | | | 3.4) A HEIGHT AND EXPOSURE ADJUSTMENT COEFFICIENT, * | | | SHALL BE DETERMINED FROM TABLE 1609.7.2. ASCE 7-10. | | | | | | 3.5) COMPONENTS & CLADDING PRESSURES POSITIVE & | | | NEGATIVE TABLE 1609.2(2). | | | | | | 4) COMPONENTS & CLADDING/ 2010 FBC-B 1609.1.2 | | | PROTECTION OF OPENINGS, 1609.6.4.4.1 COMPONENTS & | | | CLADDING | | | FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3 NOV. | | | 01/ 2010 (31) SUB-CATEGORY OF PRODUCTS OR CONSTRUCTION | | | SYSTEMS THAT WILL REQUIRE PRODUCT APPROVALS: | | | (31)(A) EXTERIOR DOORS. | | | (B) WINDOWS | | | (C) PANEL WALLS: STOREFRONTS, CURTAIN WALLS, WALL | | | LOUVERS, EFIS SYSTEMS, | | | (D) ROOFING PRODUCTS AND ASSEMBLIES | | | (E) SHUTTERS | | | (F) SKYLIGHTS | | | (G) EXTERIOR COOLER, FREEZERS & PRE-ENGINEERED A/C | | | STANDS | | | | | | 5) FBC 107.3.4.1 PRODUCT APPROVALS. THOSE PRODUCTS | | | WHICH ARE REGULATED BY THE DCA RULE 9N-03 SHALL BE | | | REVIEWED AND APPROVED IN WRITING BY THE DESIGNER OF | | | RECORD PRIOR TO SUBMITTAL FOR JURISDICTIONAL APPROVAL. | | | FL 61G1-23.015 (2) THE ARCHITECT IS RESPONSIBLE FOR | | | SUPERVISING AND REVIEWING ALL PROJECT DATA, REPORTS, | | | SHOP DRAWINGS ETC.. | | | | | | 6) PLEASE PROVIDE ENERGY CALCULATIONS FOR THE NEW | | | ADDITION. PROVIDE COMPLIANCE FOR THE SHGC OF THE | | | GLAZING COMPLY WITH FBC-ENERGY TABLE 502.1.1.1(1) OR | | | TABLE 502.1.1.1(2). | | | | | | 7) SHEET A-1 SHOWS ELEVATED PEDICURE STATIONS AND A | | | DETAIL 1 OF SHEET A-2. PLEASE SHOW COMPLIANCE WITH | | | FBC-ACCESSIBILITY, VERTICAL ACCESSIBILITY TO PEDICURE | | | STATIONS. 201.1.1. | | | | | | 8) BEFORE A PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT | | | FEES MUST BE PAID TO PALM BEACH COUNTY. THE ACTUAL | | | PERMIT SET OF PLANS MUST BE STAMPED BY THAT OFFICE, AND | | | A COPY OF THE PAID RECEIPT ATTACHED TO THE PERMIT | | | APPLICATION. PLEASE CALL (561)233-5025 FOR MORE | | | INFORMATION. | | | | | | 9) WHEN RESUBMITTING PLANS PLEASE INDICATE THE REVISION | | | & REMOVE ANY VOIDED SHEETS & REPLACE ANY PAGES AS | | | NECESSARY. A TRANSMITTAL LETTER LISTING THE ORIGINAL | | | REVIEW COMMENT NUMBER, WITH A DESCRIPTION OF THE | | | REVISION MADE, IDENTIFYING THE SHEET OR SPECIFICATION | | | PAGE WHERE THE CHANGES CAN BE FOUND WILL HELP TO | | | EXPEDITE YOUR PERMIT. THANK YOU FOR YOUR ANTICIPATED | | | COOPERATION. | | | | | | JAMES A. WITMER CBO | | | SENIOR COMMERCIAL COMBINATION PLANS EXAMINER | | | TEL: 561-805-6715 | | | FAX: 561-805-6676 | | | E-MAIL: [email protected] | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
4 |
Status |
P |
Date |
2015-11-30 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-11-30 |
Time |
15:37 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-11-30 |
Time |
14:00 |
Sent To |
I |
|
| Notes |
| 2015-11-30 15:45:30 | PER A TELEPHONE CONVERSATION WITH DEVEREN PETERKIN, WE | | | AGREED THAT THERE IS A MISSING EMERGENCY LIGHT IN THE | | | ELECTRICAL ROOM AND THE MISSING SIGN OUTLETS FOR THE | | | REAR DOORS. SINCE ALL OTHER TRADES WERE APPROVED, I | | | TOLD MR. PETERKIN THAT AS LONG AS WE AGREED TO GET | | | THESE ITEMS DONE, I WOULD APPROVE MY REVIEW WITH THE | | | EXCEPTION/PROVISO THAT THESE BE DONE FOR INSPECTION. |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
3 |
Status |
F |
Date |
2015-10-28 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-10-28 |
Time |
12:37 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-10-28 |
Time |
09:37 |
Sent To |
I |
|
| Notes |
| 2015-10-28 14:01:24 | THE FAILURE TO PROVIDE A NARRATIVE OF THE CORRECTIONS | | | AS REQUIRED PROMPTED FOR A COMPLETE REVIEW OF THE | | | PLANS. THIS REVIEW PROVED THAT THE PREVIOUS COMMENTS | | | WERE NOT FULLY ADDRESSED. BELOW ARE THE RESULTS OF THE | | | THIRD REVIEW | | | THE PLANS FOR THE ABOVE MENTIONED PERMIT APPLICATION | | | HAVE BEEN REVIEWED FOR COMPLIANCE WITH THE 2008 EDITION | | | OF THE NEC, (NATIONAL ELECTRICAL CODE); 2010 EDITION OF | | | THE FBC, (FLORIDA BUILDING CODE) AS APPLICABLE AND | | | BELOW ARE THE DEFICIENCIES NOTED. | | | 1. FOR SAFE EMERGENCY EGRESS, AN EMERGENCY LIGHT SHALL | | | BE INSTALLED IN THE ELECTRICAL ROOM. AN ADDITIONAL | | | EMERGENCY LIGHT SHALL BE INSTALLED IN THE HAIR WASH | | | AREA, AND ANY OTHER AREA AS REQUIRED BY CODE. | | | 2. PER NFPA 101 SECTION 7.10.1.5.1 ALL EXITS SHALL BE | | | MARKED WITH APPROVED READILY VISIBLE SIGNS. THE WAY | | | TOWARDS THE EXITS, IF NOT READILY APPARENT SHALL BE | | | MARKED AS WELL. | | | 3. NEC 1101.26(D) REQUIRES THAT PROPER ILLUMINATION BE | | | PROVIDED FOR ALL WORKING SPACES ABOUT ELECTRICAL | | | PANELS. THE AREA IN FRONT OF ELECTRICAL PANEL ?A? IS | | | LACKING SAFE WORKING ILLUMINATION. | | | 4. FBC-ENERGY CONSERVATION SECTION 502.3.8 REQUIRES | | | THAT ALL RECESSED LIGHTING INSTALLED IN THE BUILDING | | | ENVELOPE SHALL BE IC PROTECTED AND AIR-TIGHT RATED & | | | SEALED TO PREVENT AIR LEAKAGE BETWEEN THE CONDITIONED | | | AND UNCONDITIONED SPACE. | | | 5. NEC 422.52 REQUIRES THAT THE ELECTRIC WATER COOLER | | | BE CONNECTED TO A GFCI PROTECTED CIRCUIT. | | | 6. NEC 600.5 REQUIRES THAT EVERY COMMERCIAL OCCUPANCY | | | BE PROVIDED WITH A DEDICATED 20 AMP CIRCUIT FOR SIGN OR | | | OUTLINE LIGHTING AT EACH PEDESTRIAN ENTRANCE. | | | 7. NEC 422.30(B) REQUIRES THAT THERE BE A DISCONNECT | | | FOR THE 80 GAL STORAGE WATER HEATER. | | | 8. THE 5TH ED. 2014 FBC-ENERGY CONSERVATION SECTION 505 | | | HAS SPECIFIC REQUIREMENTS FOR COMMERCIAL LIGHTING WHICH | | | SHALL BE ADHERED TO. IN ADDITION TO THE LIGHT DENSITY | | | CHART, THERE ARE MANDATORY SWITCHING REQUIREMENTS WHICH | | | SHALL BE PROVIDED. | | | 9. YOU SHALL PROVIDE SITE SPECIFIC LOAD CALCS IN | | | ACCORDANCE TO NEC 220 PART III. YOUR LOAD CALCS AS | | | SUBMITTED DO NOT MATCH THE PANEL ESTIMATED LOADS. | | | 10. INDICATE THE LOCATION OF THE HVAC EQUIPMENT ON THE | | | ELECTRICAL FLOOR PLAN. YOU DO NOT HAVE ANY HVAC | | | DRAWINGS OR SPECIFICATIONS ON THE PLANS. | | | THE PLANS SHALL BE REVISED TO ADDRESS THE HEREIN | | | MENTIONED ITEMS; ONCE CORRECTED SHALL BE RESUBMITTED | | | FOR ANOTHER REVIEW. | | | WHEN RESUBMITTING, YOU ARE REQUIRED TO PROVIDE A | | | RESPONSE LETTER ADDRESSING EACH ITEM ACCOMPANIED WITH | | | THE STANDARD CITY RE-SUBMITTAL FORM. | | | PLEASE, ADDITIONALLY, INSERT CORRECTED PAGES INTO THE | | | SUBMITTAL AND LEAVE THE PREVIOUSLY REVIEWED SHEETS FOR | | | COMPARISON. CLOUDING THE CHANGES WILL BE GREATLY | | | APPRECIATED. | | | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO | | | CONTACT ME DIRECTLY. | | | | | | PURSUANT TO FS553.80, THE 4TH SUBMITTAL FOR A PERMIT | | | WHICH REFLECTS FAILURE TO CORRECT A DEFICIENCY | | | PREVIOUSLY SPECIFICALLY AND CONSISTENTLY IDENTIFIED ON | | | ALL PRIOR SUBMITTALS MUST RESULT IN THE ASSESSMENT OF A | | | PENALTY OF 3 TIMES THE PLAN REVIEW FEE IN ADDITION TO | | | THE NORMAL FEE. | | | | | | THANK YOU, | | | MIKE ALBARRAN | | | ELECTRICAL PLANS EXAMINER | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2015-09-16 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-09-16 |
Time |
19:02 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-09-16 |
Time |
17:32 |
Sent To |
|
|
| Notes |
| 2015-09-16 19:03:05 | PLEASE NOTE THAT I, MIKE ALBARRAN, ELECTRICAL PLANS | | | EXAMINER HAVE COMPLETED THE REVIEW OF THE ABOVE | | | MENTIONED JOB. BELOW ARE THE COMMENTS WITH REGARDS TO | | | THE REQUIRED CORRECTIONS. THE FOLLOWING ITEMS SHALL BE | | | CORRECTED AND THE PLANS RESUBMITTED FOR ANOTHER REVIEW. | | | 1. FOR SAFE EMERGENCY EGRESS, AN EMERGENCY LIGHT SHALL | | | BE INSTALLED IN THE ELECTRICAL ROOM. AN ADDITIONAL | | | EMERGENCY LIGHT SHALL BE INSTALLED IN THE HAIR WASH | | | AREA. | | | 2. NEC 422.52, REQUIRES THAT THE ELECTRIC WATER COOLER | | | BE CONNECTED TO A GFCI PROTECTED CIRCUIT. | | | 3. NEC 600.5, REQUIRES THAT EVERY COMMERCIAL OCCUPANCY | | | BE PROVIDED WITH AT LEAST ONE OUTLET IN AN ACCESSIBLE | | | LOCATION AT EACH ENTRANCE A DEDICATED 20 AMP CIRCUIT | | | FOR SIGN OR OUTLINE LIGHTING | | | 4. NEC 422.30(B), REQUIRES THAT THERE BE A DISCONNECT | | | FOR THE 80 GAL STORAGE WATER HEATER. | | | 5. NEC 210.70 (A)(2), REQUIRES THAT THE STAIRWAY BE | | | ILLUMINATED AND THE LIGHT BE CONTROLLED BY A WALL | | | SWITCH. | | | 6. THE 5TH ED. 2014 FBC-ENERGY CONSERVATION SECTION 505 | | | HAS SPECIFIC REQUIREMENTS FOR COMMERCIAL LIGHTING WHICH | | | SHALL BE ADHERED TO. | | | 7. IN VARIOUS PLACES THROUGHOUT THE NOTES DIFFERENT | | | NON-BINDING EDITIONS OF THE NEC ARE QUOTED. PLEASE | | | CORRECT THE NOTES TO ADDRESS THE 2011 EDITION OF THE | | | NEC. | | | 8. FIRE ALARM WORK, EVEN THOUGH SHALL BE UNDER A | | | SEPARATE PERMIT AND SHOP DRAWING, SHALL BE DESIGNED TO | | | COMPLY WITH NFPA 72, 2010 EDITION NOT THE NFPA 96. | | | 9. YOU SHALL INDICATE ON THE ELECTRICAL RISER DIAGRAM | | | WHAT PORTIONS OF IT PERTAIN TO THIS SPECIFIC PROJECT, | | | AND INDICATED THE CONDUCTOR SIZING FOR THE APPLICABLE | | | PANELS. | | | 10. THE PANEL SCHEDULES AS PRESENTED DO NOT MATCH THE | | | FLOOR PLAN MARKINGS AND CIRCUIT DESIGNATIONS. | | | 11. ACCORDING TO THE MARKINGS ON THE PANEL DESIGNATOR | | | THIS IS A 3 PHASE SERVICE CONTRARY TO THE LAYOUT OF THE | | | PANELS. CORRECT ACCORDINGLY. | | | 12. ACCORDING TO THE SAME PANEL DESIGNATOR, ALL PANELS | | | ARE BOTTOM FED. IF THE FEEDERS ARE COMING FROM | | | UNDERGROUND, CONDUCTOR INSULATION SHALL BE RATED FOR | | | WET LOCATIONS AS INDICATED IN NEC 300.5 (B) AND THE | | | ENDS OF THE RACEWAY SEALED ACCORDING TO NEC 300.5(G). | | | 13. YOU SHALL PROVIDE SITE SPECIFIC LOAD CALCS IN | | | ACCORDANCE TO NEC 220 PART III. | | | 14. INDICATE THE LOCATION OF THE HVAC EQUIPMENT. YOU DO | | | NOT HAVE ANY HVAC DRAWINGS OR SPECIFICATIONS ON THE | | | PLANS. | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. PLEASE, ADDITIONALLY, INSERT | | | CORRECTED PAGES INTO TO SUBMITTAL AND LEAVE THE | | | PREVIOUSLY REVIEWED SHEETS. | | | | | | IF YOU HAVE FURTHER QUESTIONS, PLEASE DON?T HESITATE TO | | | CONTACT ME DIRECTLY. | | | | | | THANK YOU | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2015-07-10 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2015-07-10 |
Time |
10:08 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-07-10 |
Time |
10:05 |
Sent To |
|
|
| Notes |
| 2015-07-10 10:36:05 | 7/10/2015 | | | PROJECT: NAIL SALON | | | PERMIT#: 15060791 | | | CODE: 2011EDITION OF THE NEC, FIFTH EDITION OF THE FBC | | | , WPB AMENDMENTS TO THE FBC, CHAPTER 1, ADMINISTRATION, | | | FBC SUPPLEMENTS. | | | 1ST ELECTRICAL PLAN REVIEW | | | ACTION: DENIED | | | | | | REVISE YOUR PLANS IN RESPONSE TO THE FOLLOWING REVIEW | | | COMMENTS: | | | | | | 1) ACCESS TO EXITS SHALL BE MARKED BY APPROVED, READILY | | | VISIBLE SIGNS IN ALL CASES WHERE THE EXIT OR WAY TO | | | REACH THE EXIT IS NOT READILY APPARENT TO THE | | | OCCUPANTS. NFPA 101 SECTION 7.10.1.5.1 | | | | | | 2) EMERGENCY ILLUMINATION SHALL INCLUDE ALL REQUIRED | | | MEANS OF EGRESS LIGHTING, ILLUMINATED EXIT SIGNS, AND | | | ALL OTHER LIGHTS SPECIFIED AS NECESSARY TO PROVIDE | | | REQUIRED ILLUMINATION. EMERGENCY LIGHTING SYSTEMS SHALL | | | BE DESIGNED AND INSTALLED SO THAT THE FAILURE OF ANY | | | INDIVIDUAL LIGHTING ELEMENT, SUCH AS THE BURNING OUT OF | | | A LAMP, CANNOT LEAVE IN TOTAL DARKNESS ANY SPACE THAT | | | REQUIRES EMERGENCY ILLUMINATION. NEC 700.16 | | | | | | 3) THE BRANCH CIRCUIT FEEDING THE UNIT EQUIPMENT SHALL | | | BE THE SAME BRANCH CIRCUIT AS THAT SERVING THE NORMAL | | | LIGHTING IN THE AREA AND CONNECTED AHEAD OF ANY LOCAL | | | SWITCHES. THE BRANCH CIRCUIT THAT FEEDS UNIT EQUIPMENT | | | SHALL BE CLEARLY IDENTIFIED AT THE DISTRIBUTION PANEL. | | | EMERGENCY LUMINAIRES THAT OBTAIN POWER FROM A UNIT | | | EQUIPMENT AND ARE NOT PART OF THE UNIT EQUIPMENT SHALL | | | BE WIRED TO THE UNIT EQUIPMENT AS REQUIRED BY 700.9 AND | | | BY ONE OF THE WIRING METHODS OF NEC CHAPTER 3. NEC | | | 700.12(F) | | | | | | 4) PLEASE INDICATE COMPLIANCE WITH FBC-ENERGY. | | | ELECTRICAL POWER AND LIGHTING SYSTEMS. (MANDATORY) | | | SECTION 505 | | | | | | 5) RECESSED LUMINAIRES INSTALLED IN THE BUILDING | | | THERMAL ENVELOPE SHALL BE IC AND AIR TIGHT RATED AND | | | SEALED TO LIMIT AIR LEAKAGE BETWEEN CONDITIONED AND | | | UNCONDITIONED SPACES. FBC-E 502.3.8 RECESSED LIGHTING. | | | | | | 6) AT LEAST ONE RECEPTACLE OUTLET SHALL BE INSTALLED | | | WITHIN 450 MM (18 IN.) OF THE TOP OF SHOW WINDOW FOR | | | EACH 3.7 LINEAR M (12 LINEAR FT) OR MAJOR FRACTION | | | THEREOF OF SHOW WINDOW AREA MEASURED HORIZONTALLY AT | | | ITS MAXIMUM WIDTH. NEC 210.62 | | | | | | 7) EACH COMMERCIAL OCCUPANCY ACCESSIBLE TO PEDESTRIANS | | | SHALL BE PROVIDED WITH AT LEAST ONE OUTLET SUPPLIED BY | | | A BRANCH CIRCUIT RATED AT LEAST 20 AMPERES THAT | | | SUPPLIES NO OTHER LOAD. NEC 600.5 | | | | | | 8) BOXES LISTED SPECIFICALLY FOR THIS APPLICATION SHALL | | | BE USED FOR RECEPTACLES LOCATED IN THE FLOOR. NEC | | | 314.27(C) | | | | | | 9) PROVIDE PRODUCT APPROVALS FOR THE WATER HEATER AND | | | INDICATE THE APPROPRIATE SIZE CIRCUIT AND DISCONNECT | | | REQUIRED. NEC 422.31 | | | | | | 10) SEPARATE PERMIT APPLICATIONS ACCOMPANIED BY | | | MANUFACTURERS EQUIPMENT SUBMITTALS, AND SHOP DRAWINGS | | | ARE REQUIRED FOR FIRE ALARM, ACCESS CONTROL SYSTEM, | | | SECURITY, CCTV, AUDIO/VIDEO, NETWORK, DATA, AND, | | | COMMUNICATION. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. SEE LINK: | | | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ | | | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF | | | | | | A THOROUGH REVIEW CANNOT BE MADE AT THIS TIME, AS A | | | RESULT OF THE ADDITIONAL INFORMATION REQUESTED | | | ADDITIONAL COMMENTS MAY APPEAR THAT WERE NOT PART OF | | | THIS REVIEW. | | | ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED | | | PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE | | | PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE | | | REVIEW. | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2015-09-03 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-09-03 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-09-03 |
Time |
11:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2015-06-22 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-06-22 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-06-22 |
Time |
13:41 |
Sent To |
|
|
| Notes |
| 2015-06-22 14:08:52 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | 1) THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF | | | THE 5TH EDITION OF FLORIDA FIRE PREVENTION CODE | | | INCLUDING THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND | | | ALL OTHER APPLICABLE CODES OR STANDARDS. | | | FIRE SPRINKLER WORK SHALL COMPLY WITH THE REQUIREMENTS | | | OF NFPA 13, 2010 EDITION. | | | FIRE ALARM WORK SHALL COMPLY WITH THE REQUIREMENTS OF | | | NFPA 72, 2010 EDITION. | | | CONSTRUCTION WORK SHALL COMPLY WITH THE REQUIREMENTS OF | | | NFPA 241, 2009 EDITION. | | | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS | | | OF NFPA 10, 2010 EDITION. | | | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. | | | | | | 2) A DOOR SCHEDULE, INCLUDING HARDWARE IS NOT PROVIDED. | | | | | | 3) THE BATHROOM DOOR OPENS AND RESTRICTS THE MEANS OF | | | EGRESS. IT SHALL SWING INTO THE BATHROOM. NFPA 101 | | | CHAPTER 7, MEANS OF EGRESS | | | 7.2.1.4.3 DOOR LEAF ENCROACHMENT | | | 7.2.1.4.3.1 DURING ITS SWING, ANY DOOR LEAF IN A MEANS | | | OF EGRESS SHALL LEAVE NOT LESS THAN ONE-HALF OF THE | | | REQUIRED WIDTH OF AN AISLE, A CORRIDOR, A PASSAGEWAY, | | | OR A LANDING UNOBSTRUCTED AND SHALL NOT PROJECT NOT | | | MORE THAN 7 IN. INTO THE REQUIRED WIDTH OF AN AISLE, A | | | CORRIDOR, A PASSAGE WAY, OR A LANDING, WHEN FULLY OPEN, | | | UNLESS BOTH OF THE FOLLOWING CONDITIONS ARE MET: | | | (1) THE DOOR OPENING PROVIDES ACCESS TO A STAIR IN AN | | | EXISTING BUILDING. | | | (2) THE DOOR OPENING MEETS THE REQUIREMENTS THAT LIMITS | | | PROJECTION TO NOT MORE THAN 7 IN. INTO THE REQUIRED | | | WIDTH OF THE STAIR LANDING WHEN THE DOOR LEAF IS FULLY | | | OPEN. | | | | | | 4) AN EXIT LIGHT SHALL BE INSTALLED AT THE REAR DOOR. | | | | | | 5) AN EXIT LIGHT SHALL BE INSTALLED LEADING INTO THE | | | REAR EXIT CORRIDOR. | | | | | | 6) THE NATURE OF THE REMODE, IF EXISTING,L REQUIRES AN | | | EVALUATION OF THE FIRE ALARM AND SPRINKLER SYSTEM FOR | | | CODE COVERAGE AND COMPLIANCE. ANY REMOVAL AND/OR | | | CONSTRUCTION OF WALLS REQUIRES AN EVALUATION. PLEASE | | | PROVIDE A NOTE INDICATING ANY EXISTING SYSTEM(S). | | | IF EXISTING, THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR | | | FIRE SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE | | | CONSTRUCTION PERIOD. | | | IF INDICATED, ANY AND ALL WORK ON THE FIRE ALARM AND | | | FIRE SPRINKLER SYSTEMS SHALL BE DONE UNDER SEPARATE | | | SHOP DRAWINGS AND BY CERTIFIED LIFE SAFETY CONTRACTORS. | | | ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS, | | | SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE | | | WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL | | | AND COMPLETE PROTECTION IS RETURNED. | | | | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2015-11-30 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-11-30 |
Time |
16:05 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-11-12 |
Time |
10:00 |
Sent To |
|
|
| Notes |
| 2015-11-30 16:08:18 | 11/30/15 ELECTRIC APPROVED WITH THE FOLLOWING PROVISO: | | | ELECTRICAL PROVISO TO PERMIT 15090791 1. INSTALL | | | EMERGENCY LIGHT IN ELECTRIC ROOM 2. INSTALL THE MISSING | | | SIGN OUTLETS FOR THE REAR ENTRIES AS REQUIRED IN NEC | | | 600.5 PER CONVERSATION W/MR. PETERKIN. CONTRACTOR | | | NOTIFIED VIA EMAIL. SENT TO LARGE READY BIN "H." MA | | | | | 2015-11-13 10:01:00 | RESUB ROUTED TO CCOLE |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2015-10-28 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-10-28 |
Time |
14:03 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-10-06 |
Time |
13:00 |
Sent To |
|
|
| Notes |
| 2015-10-28 14:04:09 | 10/28/15 FAILED ELECTRICAL PLAN REVIEW FOR A THIRD | | | TIME. NOTICE OF ADDITIONAL FEE FOR FAILING NEXT REVIEW | | | WAS MADE ON FRONT SCREEN AND TO CUSTOMER VIA EMAIL WHEN | | | NOTIFIED OF FAILED STATUS. SENT TO LARGE DENIED BIN | | | "H". MA | | 2015-10-07 13:00:39 | C33 |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-09-21 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-09-21 |
Time |
14:39 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2015-09-02 |
Time |
15:44 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-07-10 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2015-07-10 |
Time |
10:36 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-06-18 |
Time |
14:00 |
Sent To |
|
|
| Notes |
| 2015-06-18 14:01:26 | INCOMING SENT TO C-35 BOX. |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
3 |
Status |
N |
Date |
2015-10-19 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-10-19 |
Time |
14:59 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2015-10-19 |
Time |
14:59 |
Sent To |
|
|
| Notes |
| 2015-10-19 15:02:19 | IMPACT FEES | | | MU-2015-022185-0000 | | | REC:2015-0922-182 | | | FEES PAID: $142.67 | | | J. WITMER |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
2 |
Status |
F |
Date |
2015-09-21 |
|
|
Cont ID |
|
| Sent By |
|
Date |
2015-09-21 |
Time |
|
Rev Time |
0.00 |
| Received By |
|
Date |
2015-09-21 |
Time |
|
Sent To |
|
|
| Notes |
| 2015-09-21 14:39:27 | 2ND REQUEST, ADDITIONAL SQUARE FOOTAGE ADDED. BEFORE A | | | PERMIT TO CONSTRUCT, MAY BE ISSUED, IMPACT FEES MUST BE | | | PAID TO PALM BEACH COUNTY. THE ACTUAL PERMIT SET OF | | | PLANS MUST BE STAMPED BY THAT OFFICE, AND A COPY OF THE | | | PAID RECEIPT ATTACHED TO THE PERMIT APPLICATION. PLEASE | | | CALL (561)233-5025 FOR MORE INFORMATION. | | | |
|
|
| Review Stop |
IMPACT |
COUNTY IMPACT FEES |
| Rev No |
1 |
Status |
F |
Date |
2015-06-22 |
|
|
Cont ID |
|
| Sent By |
jwitmer |
Date |
2015-06-22 |
Time |
06:12 |
Rev Time |
0.00 |
| Received By |
jwitmer |
Date |
2015-06-22 |
Time |
06:12 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
4 |
Status |
P |
Date |
2015-11-19 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-11-19 |
Time |
11:51 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-11-19 |
Time |
11:51 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
3 |
Status |
F |
Date |
2015-10-27 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-10-27 |
Time |
16:09 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-10-27 |
Time |
16:09 |
Sent To |
|
|
| Notes |
| 2015-10-27 16:30:22 | 3RD REVIEW: FBC 2014 MECHANICAL | | | PERMIT #15060791 | | | 10/27/15 | | | | | | 1) PROVIDE EQUIPMENT SCHEDULES ON THE PLANS FOR THE | | | INTAKE AND EXHAUST FANS INCLUDING MAKES AND MODELS, CFM | | | CAPACITIES, ELECTRICAL DATA ETC. | | | 2) THE MECHANICAL DAMPERS SHOWN ON THE EXTRERIOR WALLS | | | COVERING THE FANS MUST BE WIND AND WATER RESISTANT- SEE | | | SECTIONS 401.5 AND 501.2.2 FBC-10 MECHANICAL AND SUBMIT | | | MANUFACTURER'S SPECIFICATIONS THAT INDICATE COMPLIANCE. | | | 3) PLEASE REFER TO SECTION 1609.1.2 (PROTECTION OF | | | OPENINGS) AND 1609.6.4.4.1 (COMPONENTS AND CLADDING) | | | FBC-10 BUILDING, AND PROVIDE TWO COPIES OF FLORIDA | | | PRODUCT APPROVALS OR MIAMI-DADE NOA'S FOR THE DAMPERS- | | | FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS RULE 9N-3. | | | 4) SUBMIT MANUFACTURER'S SPECIFICATIONS FOR THE | | | FLEXIBLE EXHAUST HOSES. REFER TO SECTION 501.4: EXHAUST | | | DUCTS SHALL BE OF METAL AND SUCH CONSTRUCTION SHALL | | | COMPLY WITH CHAPTER 6 FBC-10 MECHANICAL. PLEASE NOTE | | | THAT THIS SECTION DOES NOT RESTRICT THE USE OF | | | ALTERNATE MATERIALS IF LISTED AND LABELED FOR THE USE | | | SPECIFIED ON THE PLAN. | | | 5) IT APPEARS THAT THE EXHAUST DISCHARGE AT THE REAR OF | | | THE BUILDING IS WITHIN THE MINIMUM 10 FT. REQUIRED | | | CLEARANCE DISTANCE TO THE REAR DOOR OPENING- REFER TO | | | SECTION 501.2.1 FBC-10 MECHANICAL AND INDICATE | | | COMPLIANCE. | | | 6) INDICATE THE CLEARANCE DISTANCE MEASUIREMENT FROM | | | THE NEW AIR INTAKE AT THE REAR OF THE BUILDING TO THE | | | PARKING LOT AND DRIVE AREAS- REFER TO SECTION 401.4 AND | | | 401.4.1 FBC-10 MECHANICAL. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2015-09-09 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-09-09 |
Time |
08:19 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-09-09 |
Time |
08:19 |
Sent To |
|
|
| Notes |
| 2015-09-09 08:29:55 | 2ND REVIEW: FBC 2010 MECHANICAL | | | PERMIT #15060791 | | | 9/9/2015 | | | | | | 1) COMMENT #1 FROM THE 1ST REVIEW STILL EXISTS. | | | ALTHOUGH THE REVISED PLAN DOES SHOW A NEW EXHAUST FAN, | | | THE LOCATION OF THE FAN DOES NOT COMPLY WITH FOOTNOTE H | | | UNDER TABLE 403.3 FBC-10 MECHANICAL WHICH REQUIRES | | | CONTAMINANTS AND ODORS TO BE CAPTURED AT THEIR SOURCES. | | | I AM RE-PRINTING THE COMMENT HERE FOR REVIEW: | | | (AN EXHAUST VENTILATION SYSTEM DESIGNED IN ACCORDANCE | | | WITH TABLE 403.3 FBC-20 MECHANICAL IS REQUIRED FOR THE | | | NEW NAIL SALON. PLEASE REFER TO FOOTNOTES B AND H AT | | | THE BOTTOM OF THE TABLE FOR SPECIFIC REQUIREMENTS FOR | | | NAIL SALONS: B) MECHANICAL EXHAUST IS REQUIRED AND THE | | | RECIRCULATION OF AIR FROM SUCH SPACES IS PROHIBITED | | | (SEE SECTION 403.2.1, ITEM 3: WHERE MECHANICAL EXHAUST | | | IS REQUIRED BY NOTE B IN TABLE 403.3, RECIRCULATION OF | | | AIR FROM SUCH SPACES SHALL BE PROHIBITED. ALL AIR | | | SUPPLIED TO SUCH SPACES SHALL BE EXHAUSTED, INCLUDING | | | ANY AIR IN EXCESS OF THAT REQUIRED BY TABLE 403.3). H) | | | FOR NAIL SALONS, THE REQUIRED EXHAUST SHALL INCLUDE | | | VENTILATION TABLES OR OTHER SYSTEMS THAT CAPTURE THE | | | CONTAMINANTS AND ODORS AT THEIR SOURCE AND ARE CAPABLE | | | OF EXHAUSTING A MINIMUM OF 50 CFM PER STATION. THIS | | | REQUIREMENT APPLIES TO BOTH MANICURE AND PEDICURE | | | STATIONS. PLEASE REVISE THE PLANS ACCORDINGLY.) IN | | | ORDER FOR THE SALON TO BE IN COMPLIANCE, EXHAUST INLETS | | | MUST BE PLACED AT EVERY MANICURE TABLE AND PEDICURE | | | STATION IN THE FACILITY, AND MAKE-UP AIR MUST BE | | | PROVIDED AT THESE LOCATIONS FOR THE EXHAUST. THE SYSTEM | | | MUST BE INDEPENDENT OF THE MAIN HVAC SYSTEM, AND MUST | | | BE DESIGNED TO BE AIR IN/ AIR OUT WITH NO RECIRCULATION | | | OF EXHAUST. | | | 2) PLEASE REVISE THE OUTDOOR AIR CALCULATIONS ON SHEET | | | A-2 TO INCLUDE THE EXHAUST CFM'S PER SQ. FT., AND | | | PROVIDE AN AIR BALANCE CALCULATION. | | | | | | IF YOU HAVE ANY QUESTIONS PLEASE CONTACT ME. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2015-07-09 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-07-09 |
Time |
16:08 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-07-09 |
Time |
16:08 |
Sent To |
|
|
| Notes |
| 2015-07-09 16:35:16 | 1ST REVIEW: FBC 2010 MECHANICAL | | | PERMIT #15060791 7/9/15 | | | | | | 1) AN EXHAUST VENTILATION SYSTEM DESIGNED IN ACCORDANCE | | | WITH TABLE 403.3 FBC-20 MECHANICAL IS REQUIRED FOR THE | | | NEW NAIL SALON. PLEASE REFER TO FOOTNOTES B AND H AT | | | THE BOTTOM OF THE TABLE FOR SPECIFIC REQUIREMENTS FOR | | | NAIL SALONS: B) MECHANICAL EXHAUST IS REQUIRED AND THE | | | RECIRCULATION OF AIR FROM SUCH SPACES IS PROHIBITED | | | (SEE SECTION 403.2.1, ITEM 3: WHERE MECHANICAL EXHAUST | | | IS REQUIRED BY NOTE B IN TABLE 403.3, RECIRCULATION OF | | | AIR FROM SUCH SPACES SHALL BE PROHIBITED. ALL AIR | | | SUPPLIED TO SUCH SPACES SHALL BE EXHAUSTED, INCLUDING | | | ANY AIR IN EXCESS OF THAT REQUIRED BY TABLE 403.3). H) | | | FOR NAIL SALONS, THE REQUIRED EXHAUST SHALL INCLUDE | | | VENTILATION TABLES OR OTHER SYSTEMS THAT CAPTURE THE | | | CONTAMINANTS AND ODORS AT THEIR SOURCE AND ARE CAPABLE | | | OF EXHAUSTING A MINIMUM OF 50 CFM PER STATION. THIS | | | REQUIREMENT APPLIES TO BOTH MANICURE AND PEDICURE | | | STATIONS. PLEASE REVISE THE PLANS ACCORDINGLY. | | | 2) THE SUBMITTED PLAN SHOWS A NEW O/A INTAKE PROVIDING | | | 680 CFM TO THE AHU. PROVIDE A VENTILATION CALCULATION | | | IN ACCORDANCE WITH TABLE 403.3 TO VERIFY THE MINIMUM | | | RATE COMPLIANCE. | | | 3) INDICATE ON THE PLAN THE AIR INTAKE OPENING WILL BE | | | LOCATED TO MEET OR EXCEED THE REQUIRED CLEARANCE | | | DISTANCES OUTLINED IN SECTION 401.4.1, AND THE OPENING | | | WILL BE PROTECTED IN COMPLIANCE WITH 401.5. PROVIDE TWO | | | COPIES OF A FLORIDA PRODUCT APPROVAL OR MIAMI-DADE NOA | | | FOR THE INTAKE LOUVER. | | | 4) A COMPLETE REVIEW OF THE PROJECT CANNOT BE COMPLETED | | | AT THIS TIME DUE TO THE LACK OF DETAILS ON THE | | | SUBMITTED PLANS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
3 |
Status |
P |
Date |
2015-10-14 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2015-10-14 |
Time |
14:11 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2015-10-14 |
Time |
14:11 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
2 |
Status |
F |
Date |
2015-09-10 |
|
|
Cont ID |
|
| Sent By |
gjohnson |
Date |
2015-09-10 |
Time |
14:09 |
Rev Time |
0.00 |
| Received By |
gjohnson |
Date |
2015-09-10 |
Time |
14:09 |
Sent To |
|
|
| Notes |
| 2015-09-10 14:12:22 | 1ST REVIEW: FBC 2014 | | | | | | GEORGE JOHNSON | | | PLUMBING PLANS EXAMINER | | | 561-805-6711 | | | [email protected] | | | | | | | | | | | | PLUMBING COMMENTS: | | | . | | | 1.WATER FOUNTAIN S SHALL COMPLY WITH FBC ACC. SEC. | | | 211.2 MINIMUM NUMBER. | | | NO FEWER THAN TWO DRINKING FOUNTAINS SHALL BE PROVIDED. | | | ONE DRINKING FOUNTAIN SHALL COMPLY WITH 602.1 THROUGH | | | 602.6 AND ONE DRINKING FOUNTAIN SHALL COMPLY WITH 602.7 | | | 2. PROVIDE INFORMATION AND MANUFACTURE SPEC SHEETS ON | | | THE PEDICURE CHAIRS. DELETING THEM OFF PLUMBING PLAN | | | DOES NOT COMPLY WE NEED TO SEE HOW THEY WORK . | | | WPB AMEND. 107.2.1 |
|
|
| Review Stop |
P |
PLUMBING |
| Rev No |
1 |
Status |
F |
Date |
2015-06-20 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-06-20 |
Time |
06:46 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-06-20 |
Time |
05:10 |
Sent To |
|
|
| Notes |
| 2015-06-20 06:39:01 | 1) SHT. A-1 - IDENTIFY THE ROOM WITH THE SINK THAT IS | | | LOCATED NEAR THE HAIR WASH SINKS. WPB AMEND.TO 2010 FBC | | | SEC. 107.2.1. | | | 2) A DRINKING FOUNTAIN IS REQUIRED IN A BUSINESS | | | OCCUPANCY PER TABLE 403.1 OF THE 2010 FPC. NO FEWER | | | THAN TWO DRINKING FOUNTAINS SHALL BE PROVIDED IN | | | ACCORDANCE WITH THE 2010 FL. ACCESSIBILITY CODE SEC. | | | 211.2 & FOOTNOTE # E OF TABLE 403.1 OF FPC. | | | 3) ONE HAIR WASH SINK SHALL BE ACCESSIBLE PER SEC.212 | | | OF FL. ACCESSIBILITY CODE. | | | 4) SHT. A-3 - WATER HEATER DETAIL - THE RELIEF LINE | | | SHALL DISCHARGE THROUGH AN AIR GAP LOCATED IN THE SAME | | | ROOM AS THE WATER HEATER PERR 2010 FPC SEC. 504.6 | | | (2).THE PLAN SHOWS IT DISCHARGING TO THE EXTERIOR. | | | 5) IDENTIFY THE ACCESSIBLE RESTROOM ON THE FLOOR PLAN | | | AND CLEARLY SHOW THE DIMENSIONS. (L X W). *5 INCHES IS | | | THE MINIMUM WIDTH IF BUILT PERFECT, 86 INCHES ALLOWS | | | FOR TOLERANCES. | | | 6) GRAB BARS SHALL BE MEASURED FORM THE FINISH FLOOR TO | | | THE TOP OF THE GRIPPING SURFACE PER THE 2010 FAC SEC. | | | 609.4. | | | 7) SHT. P-2 - THE PEDICURE CHAIRS ARE NOT VENTED. 201 | | | FPC SEC.901.2.1. | | | 8) IF THE PEDICURE CHAIRS ARE GOING TO BE WET VENTED | | | THE MAXIMUM NUMBER OF FIXTURE UNITS ON A HORIZONTAL WET | | | VENT SHALL COMPLY WITH TABLE 909.3 OF 2010 FPC. | | | 9) SIZE THE LOOP VENT FOR THE HAIR SINKS. COMPLY WITH | | | 2010 FPC SEC. 916.1 & TABLE 916.1. | | | 10) CLEANOUTS ARE REQUIRED IN STACKS PER 2010 FPC | | | SEC.708.3.4. | | | 11) SIZE ALL SECTIONS OF THE BUILDING DRAIN PER TABLE | | | 710.1 (1). | | | 12) SHT. P-2 CALLS OUT THE ADA BATH AS NEW & SHT. P-1 | | | NOTES IT AS EXISTING. CLARIFY. | | | 13) SHOW THE REQUIRED SHUTOFF VALVES TO THE PLUMBING | | | FIXTURES PER 2010 FPC SEC.606.1, 606.2. | | | 14) SHT. P-2 - SHOW THE LOCATION WHERE THE WATER SUPPLY | | | ENTERS THE STRUCTURE. WPB AMEND. TO 2010 FPC | | | 107.3.5.1.3. | | | 15) SUBMIT TWO COPIES OF THE MANUFACTURER'S | | | SPECIFICATIONS SHEETS AND INSRTALLATION MANUAL FOR THE | | | PEDICURE CHAIRS. | | | WPB AMEND.TO 2010 FBC SEC. 107.2.1. | | | 16) THE PLANS NOTE THAT THE APPLICABLE CODES ARE THE | | | 2014 FBC. THE CODE IN EFFECT FOR THIS PERMIT IS THE | | | 2010 FBC. CLARIFY. | | | 17) SHT. A-1 - NOTES THAT THE OCCUPANCY IS BASED ON AN | | | AREA NOTED AS SALES AREA. THE TYPE OF OCCUPANCY FOR A | | | NAIL SALON WOULD BE A BUSINESS OCCUPANCY. THE OCCUPANT | | | LOAD WOULD BE 100 SQ. FT. PER PERSON BUT THE PLAN NOTES | | | 60 SQ. FT. PER PERSON. CLARIFY. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
|
Account Summary | Usage Policy | Privacy Policy