Plan Review Details - Permit 15060775
Plan Review Stops For Permit 15060775
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-06-25 Cont ID  
Sent By aclange Date 2015-06-25 Time 17:39 Rev Time 0.00
Received By aclange Date 2015-06-25 Time 17:39 Sent To E
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-07-06 Cont ID  
Sent By albarran Date 2015-07-06 Time 16:47 Rev Time 0.00
Received By albarran Date 2015-07-06 Time 16:11 Sent To P
Notes
2015-07-06 16:48:56ELECTRICAL PROVISO
 IF THIS FOUNTAIN IS TO SHARE WATER WITH THE SWIMMING
 POOL, THE REQUIREMENTS OF PART II OF ARTICLE 680 OF THE
 NEC SHALL APPLY.
  

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2015-07-10 Cont ID  
Sent By tklarge Date 2015-07-10 Time 04:00 Rev Time 0.00
Received By tklarge Date 2015-07-10 Time 04:00 Sent To  
Notes
2015-07-10 04:07:32GAS PLAN REVIEW
 A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A SEPARATE GAS PERMIT AND PLANS WILL BE
 REQUIRED FOR A CONTRACTOR TO PERFORM THE RELATED WORK.
 PROVIDE COMPLETE PLANS AND GAS RISER THAT REFLECTS THE
 ENTIRE SCOPE OF GAS WORK TO BE DONE. WPB AMEND. TO FBC
 SEC. 107.2.1
  

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-07-10 Cont ID  
Sent By tklarge Date 2015-07-10 Time 04:06 Rev Time 0.00
Received By tklarge Date 2015-06-17 Time   Sent To  
Notes
2015-06-18 07:49:41SENT TO ZONING

Review Stop P PLUMBING
Rev No 1 Status P Date 2015-07-10 Cont ID  
Sent By tklarge Date 2015-07-10 Time 03:59 Rev Time 0.00
Received By tklarge Date 2015-07-10 Time 03:43 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2015-06-18 Cont ID  
Sent By sgraham Date 2015-06-18 Time 11:42 Rev Time 0.00
Received By sgraham Date 2015-06-18 Time 11:42 Sent To B
Notes
***NONE***