Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-07-06 Cont ID  
Sent By jwitmer Date 2015-07-06 Time 12:28 Rev Time  
Received By jwitmer Date 2015-07-06 Time 12:01 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status N Date 2015-07-22 Cont ID  
Sent By albarran Date 2015-07-22 Time 11:47 Rev Time 0.00
Received By albarran Date 2015-07-22 Time 11:47 Sent To I
Notes
2015-07-22 11:53:36THIS WAS PREVIOUSLY APPROVED BY DAVID HAYES. ALL I DID
 WAS TO STAMP THE SUPPLEMENTAL SHEETS FOR SECURITY AND
 PROCESS THE INCOMING.

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-06-17 Cont ID  
Sent By dhayes Date 2015-06-17 Time 14:57 Rev Time 0.00
Received By dhayes Date 2015-06-17 Time 14:57 Sent To  
Notes
***NONE***

Review Stop FIRE FIRE DEPARTMENT
Rev No 1 Status P Date 2015-07-07 Cont ID  
Sent By pleduc Date 2015-07-07 Time   Rev Time 0.00
Received By pleduc Date 2015-07-07 Time 16:15 Sent To PC
Notes
2015-07-07 16:16:30THIS PLAN WAS REVIEWED AND APPROVED BY PETER LEDUC,
 FIRE MARSHAL, WITH THE FOLLOWING COMMENTS:
  
 PLEASE CONSIDER THE FOLLOWING AS PROVISO:
  
 THE NATURE OF THE REMODEL REQUIRES AN EVALUATION OF THE
 FIRE ALARM AND SPRINKLER SYSTEM FOR CODE COVERAGE AND
 COMPLIANCE. ANY REMOVAL AND/OR CONSTRUCTION OF WALLS
 REQUIRES AN EVALUATION.
 THE LIFE SAFETY SYSTEMS, FIRE ALARM AND/OR FIRE
 SPRINKLER SHALL REMAIN ACTIVE THROUGHOUT THE
 CONSTRUCTION PERIOD.
 ANY AND ALL WORK ON THE FIRE ALARM AND FIRE SPRINKLER
 SYSTEMS SHALL BE DONE UNDER SEPARATE SHOP DRAWINGS AND
 BY CERTIFIED LIFE SAFETY CONTRACTORS.
 ANY TIME THAT WORK ON THE LIFE SAFETY SYSTEMS,
 SPRINKLER AND/OR FIRE ALARM, EXCEEDS 4 HOURS, A FIRE
 WATCH SHALL BE IMPLEMENTED AND MAINTAINED UNTIL FULL
 AND COMPLETE PROTECTION IS RETURNED.
  
  

Review Stop I INCOMING/PROCESSING
Rev No 2 Status N Date 2015-07-22 Cont ID  
Sent By albarran Date 2015-07-22 Time 11:54 Rev Time 0.00
Received By albarran Date 2015-07-21 Time 09:06 Sent To  
Notes
2015-07-22 11:56:357/22/15 - PASSED ELECTRICAL REVIEW. CONTRACTOR NOTIFIED
 VIA EMAIL. SENT TO LARGE READY BIN "C". MA
  
2015-07-22 09:06:21TO CCOLE DESK.

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-07-08 Cont ID  
Sent By cpuell Date 2015-07-08 Time 12:44 Rev Time  
Received By cpuell Date 2015-06-15 Time   Sent To  
Notes
2015-06-17 15:26:32B45

Review Stop M MECHANICAL (A/C)
Rev No 2 Status P Date 2015-07-22 Cont ID  
Sent By ccole Date 2015-07-22 Time 09:46 Rev Time 0.00
Received By ccole Date 2015-07-22 Time 09:45 Sent To  
Notes
***NONE***

Review Stop M MECHANICAL (A/C)
Rev No 1 Status F Date 2015-06-17 Cont ID  
Sent By ccole Date 2015-06-17 Time 16:41 Rev Time 0.00
Received By ccole Date 2015-06-17 Time 16:41 Sent To  
Notes
2015-06-17 17:00:341ST REVIEW: FBC 2010 MECHANICAL
  
 1) SHEET M02.01: PLEASE DARKEN THE FAINTLY PRINTED
 OUTLINES OF THE RELOCATED VAV BOXES ON THE PLANS SO
 THEY CAN RE READILY IDENTIFIED, ALONG WITH ALL THE
 RECONNECTED DUCTS TO THEM- SECTION 107.2.1 FBC-10
 BUILDING.
  
 CHRISTOPHER COLE
 MECHANICAL PLANS EXAMINER
 561-805-6719
 [email protected]
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved