Plan Review Details - Permit 15060013
Plan Review Stops For Permit 15060013
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-06-22 Cont ID  
Sent By RMCDOUGA Date 2015-06-22 Time 17:06 Rev Time 0.00
Received By rmcdouga Date 2015-06-22 Time 13:43 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 2 Status P Date 2015-10-15 Cont ID  
Sent By skennedy Date 2015-10-15 Time 13:01 Rev Time 0.00
Received By skennedy Date   Time   Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status F Date 2015-07-07 Cont ID  
Sent By DHAYES Date 2015-07-07 Time 15:44 Rev Time 0.00
Received By dhayes Date 2015-07-07 Time 14:51 Sent To  
Notes
2015-07-07 15:44:08ITEMS REQUESTED IN INITIAL ELECTRICAL PROVISO HAVE NOT
 BEEN COMPLIED WITH. COMPLY WITH COMMENTS LISTED BELOW:
  
 1) RECESSED LIGHTS. REQUIRES THAT RECESSED LUMINAIRES
 BE SEALED, AIR TIGHT, IC RATED. 2010 FBC 402.4.5
  
 2) PROVIDE THE ARC FAULT CALCULATION TO INDICATE THE
 AIC RATING ON SERVICE SWITCHGEAR. NEC 110.9 AND 110.10
  
 3) PROVIDE CUT SHEETS ON INFLOOR UP LIGHTS AND DROP
 DOWN SCREENS TO INDICATE COMPLIANCE WITH THE NEC 110.3
 INCLUDE MANUFACTURER PRODUCT INFORMATION ON LIGHTING
 CONTROL SYSTEM.
  
 4) NEW RECEPTACLES MUST BE TAMPER RESISTANT. THOSE
 OUTLETS IN WET LOCATIONS SHALL BE GFI & WEATHER
 RESISTANT NEC 406.8(B), 406.11
  
 5) INDICATE CIRCUITRY AND DISCONNECTS REQUIERD FOR
 TANKLESS WATER HEATERS.
  
 6) SEPARATE PERMIT APPLICATIONS ACCOMPANIED BY
 MANUFACTURERS EQUIPMENT SUBMITTALS, AND SHOP DRAWINGS
 ARE REQUIRED FOR GENERATOR. SWIMMING POOL, SECURITY AND
 AUDIO/VIDEO,
  
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421.
 561-805-6717 OR [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-07-07 Cont ID  
Sent By dhayes Date 2015-07-07 Time 15:44 Rev Time  
Received By dhayes Date 2015-06-01 Time   Sent To  
Notes
2015-06-02 11:28:28R01

Review Stop M MECHANICAL (A/C)
Rev No 1 Status P Date 2015-06-22 Cont ID  
Sent By RMCDOUGA Date 2015-06-22 Time 17:06 Rev Time 0.00
Received By rmcdouga Date 2015-06-22 Time 13:43 Sent To  
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status P Date 2015-06-22 Cont ID  
Sent By rmcdouga Date 2015-06-22 Time 16:40 Rev Time 0.00
Received By rmcdouga Date 2015-06-22 Time 16:40 Sent To  
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status P Date 2015-06-30 Cont ID  
Sent By llouie Date 2015-06-30 Time 14:53 Rev Time 0.00
Received By llouie Date 2015-06-30 Time 11:56 Sent To  
Notes
***NONE***