| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2015-07-01 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-07-07 |
Time |
11:45 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-07-01 |
Time |
14:08 |
Sent To |
I |
|
| Notes |
| 2015-07-01 14:41:59 | COMPLIANCE WITH ALL REQUIREMENTS OF THE FBC-R & NEC | | | 2008, SPECIALLY 210.63 |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2015-06-09 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-06-09 |
Time |
20:18 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-06-09 |
Time |
20:18 |
Sent To |
I |
|
| Notes |
| 2015-06-09 20:19:44 | CONDITIONING A PREVIOUSLY UNCONDITIONED SPACE CREATES A | | | HABITABLE ROOM AND THEREFORE HAS FURTHER REQUIREMENTS. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-07-01 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-07-01 |
Time |
14:42 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
2015-06-30 |
Time |
15:35 |
Sent To |
|
|
| Notes |
| 2015-07-01 14:44:46 | 7/1/15 - PASSED ELECTRICAL REVIEW BUT FAILED | | | MECHANICAL. CONTRACTOR NOTIFIED VIA EMAIL. SENT TO | | | SMALL DENIED BIN "S". MA |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-06-09 |
|
|
Cont ID |
|
| Sent By |
albarran |
Date |
2015-06-09 |
Time |
20:24 |
Rev Time |
0.00 |
| Received By |
albarran |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2015-06-09 20:25:37 | CONTRACTOR NOTIFIED VIA EMAIL. SENT TO SMALL DENIED BIN | | | "S" | | 2015-06-04 11:50:02 | ROUTED TO ELECTRICAL | | 2015-05-29 13:38:01 | ROUTED TO MECHANICAL LESS THAN $5000 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
F |
Date |
2015-07-01 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-07-01 |
Time |
08:49 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-07-01 |
Time |
08:49 |
Sent To |
|
|
| Notes |
| 2015-07-01 08:50:58 | 2ND MECHANICAL REVIEW FBC MECHANICAL 2010 | | | | | | 1) THE PREVIOUS REVIEW COMMENTS #1, 2, AND 4 HAVE NOT | | | BEEN ADDRESSED. PLEASE REVIEW AND SUBMIT THE REQUIRED | | | DOCUMENTS, PLANS AND DETAILS. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2015-07-07 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-06-05 |
Time |
11:44 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-06-04 |
Time |
11:04 |
Sent To |
E |
|
| Notes |
| 2015-06-04 11:46:24 | 1ST REVIEW: FBC 2010 MECHANICAL | | | | | | 1) THE INSTALLATION OF A NEW AC SYSTEM TO CONDITION THE | | | PREVIOUSLY UNCONDITIONED GARAGE, RESULTS WITH THE | | | GARAGE NOW BEING CLASSIFIED AS AN ADDITION- SEE TABLE | | | 101.4.1 AND SECTION 202 (DEFINITIONS) FBC-10 ENERGY | | | CONSERVATION. | | | FULL COMPLIANCE AS A HABITABLE SPACE IS REQUIRED IN | | | ACCORDANCE WITH BOTH THE FBC-10 RESIDENTIAL, AND | | | CHAPTER 4 OF THE FBC-10 ENERGY. PROVIDE PLANS AND | | | SPECIFICATIONS, AND SUBMIT EITHER ENERGY EFFICIENCY | | | FORM 402-2010 OR FORM 405-2010. THE NEW PLAN SHALL | | | INDICATE THE PROPOSED USE OF THE GARAGE- PLEASE NOTE | | | IMPACT FEES MAY APPLY. | | | 2) AS THE PERRMIT APPLICATION INDICATES THIS IS A NEW | | | SYSTEM, PLEASE DISCARD THE AC REPLACEMENT FORM: IT IS | | | NOT VALID FOR THIS PROJECT. | | | 3) PROVIDE AC LOAD CALCULATIONS FOR THE NEW SYSTEM IN | | | ACCORDANCE W ACCA MANUAL J- SECTION 403.6.1 FBC-10 | | | ENERGY. | | | 4) PROVIDE ON THE NEW AC PLAN THE FOLLOWING: A) THE | | | LOCATIONS OF THE AIR HANDLER AND CONDENSER. (SHOW THE | | | DISCONNECT LOCATIONS FOR EACH AND PROVIDE ELECTRICAL | | | PLANS.) B) CONDENSATE DISPOSAL DETAILS. C) CONDENSER | | | PAD AND ANCHORING DETAILS- SEE SECTION M1307.2.1 FBC-10 | | | RES. | | | | | | CHRISTOPHER COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | |
|
|
|