| 2015-06-23 11:36:23 | 1ST REVIEW: FBC 2010 MECHANICAL |
| | |
| | 1) PROVIDE REVISED ENERGY CALCULATIONS SHOWING THE |
| | COMPLIANCE DATA FOR THE NEW AC UNITS. |
| | 2) SHEET M0.1: PROVIDE THE OUTDOOR AIR CALCULATIONS FOR |
| | THE GUEST ROOMS PER TABLE 403.3 FBC-10 MECHANICAL. |
| | 3) SHEETS M0.1 & M1.1: THE REQUIRED 108 CFM'S OF |
| | OUTDOOR AIR FOR THE GUEST ROOM CORRIDORS SHOWN IN THE |
| | SCHEDULE IS NOT BEING SUPPLIED: PLEASE NOTE THE MINI |
| | SPLIT SYSTEMS AC-1A AND AC-1B ARE DUCTLESS. |
| | 4) M1.1: THE AC-1A &1B CASSETTES APPEAR TO BE MOUNTED |
| | IN THE FIRE-RATED CORRIDOR CEILING MEMBRANE. INDICATE |
| | HOW THESE OPENINGS ARE GOING TO PROTECTED FROM FIRE AND |
| | SMOKE INTRUSION- REFERENCE SECTION 607.6.2 FBC-10 |
| | MECHANICAL. |
| | 5) M1.1 THE RETURN AIR GRILLS AND SUPPLY DUCTS ABOVE |
| | THE EAST AND WEST CORRIDOR FIRE DOORS IN THE CORRIDOR |
| | CEILINGS MUST BE PROTECTED WITH FIRE/SMOKE DAMPERS. |
| | PROVIDE A SCHEDULE ON THE PLANS INDICATING THE MAKES, |
| | MODELS, TYPES, SIZES, AND FIRE-RESISTANCE RATINGS OF |
| | THESE DAMPERS, AND ALL REQUIRED DAMPERS TO BE INSTALLED |
| | IN THE CORRIDORS AND GUEST ROOMS. NOTE: ALL DAMPER |
| | ACCESS DOORS LOCATED IN THE CORRIDOR AND GUEST ROOM |
| | CEILINGS SHALL BE FIRE-RATED. PROVIDE DETAILS AND |
| | SUBMIT SPECS FOR ALL PRODUCTS REVIEWED AND STAMPED BY |
| | THE DESIGN PROFESSIONAL OF RECORD. |
| | 6) M1.1: SHOW THE LOCATIONS OF THE CONDENSER UNITS FOR |
| | AC-1A & 1B, AND PROVIDE INSTALLATION DETAILS. |
| | 7) M1.1: FIRE/SMOKE DAMPERS ARE REQUIRED FOR THE |
| | EXHAUST DUCTS PENENTRATING THE EAST AND WEST RATED |
| | CORRIDOR WALLS, UNLESS CLAIMING ONE OF THE EXCEPTIONS |
| | UNDER SECTION 607.5.3: PLEASE PROVIDE DETAUILS |
| | INDICATING COMPLIANCE. |
| | 8) M1.1: SHOW THE O/A SUPPLY DUCT FOR AC-2. |
| | 9) PROVIDE A NARRATIVE INDICATING HOW THE DUCT SMOKE |
| | DETECTORS WILL BE SUPERVISED RELATING TO THE FIRE ALARM |
| | SYSTEM AND THE FAN SHUT SEQUENCE OF OPERATION. CLARIFY |
| | IS AC-1A & 1B WILL BE LINKED TO THE SYSTEM. |
| | 10) PROVIDE PRIMARY AND SECONDARY CONDENSATE DISPOSAL |
| | DETAILS FOR ALL OF THE AIR HANDLERS- SECTION 307 FBC-10 |
| | MECH. |
| | 11) PROVIDE REFRIGERANT PIPING DETAILS INCLUDING PIPING |
| | MATERIAL, PIPING INSULATION, PIPING RUNS AND THROUGH |
| | PENETRATION FIRE-STOPPING DETAILS. INDICATE THE AMOUNT |
| | OF REFRIGERANT CHARGE IN LBS. FOR AC-1. |
| | 12) PROVIDE HANGING AND SUPPORT DETAILS FOR THE VAV |
| | BOXES AND DUCTS. |
| | 13) PROVIDE A SUBMITTAL PACKAGE FROM THE DESIGN |
| | PROFESSIONAL OF RECORD THAT INCLUDES THE AC UNITS, THE |
| | FIRE/SMOKE DAMPERS, THE DUCT SMOKE DETECTORS, THE |
| | MOTORIZED O/A DAMPERS, AND THE VAV BOXES. |
| | |
| | CHRISTOPHER L. COLE |
| | MECHANICAL PLANS EXAMINER |
| | 561-805-6719 |
| | [email protected] |
| | |
| | |