Plan Review Details - Permit 15050527
| Plan Review Stops For Permit 15050527 |
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-07-24 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-07-24 |
Time |
12:35 |
Rev Time |
|
| Received By |
ndaniels |
Date |
|
Time |
07:54 |
Sent To |
|
|
| Notes |
| 2015-05-27 07:56:34 | 1ST MECHANICAL REVIEW. | | | | | | 1) THE PLANS SHALL BE SIGNED AND SEALED BY THE ENGINEER | | | OF RECORD- SECTION 105.3.1.2(5) WPB AMENDMENTS TO THE | | | FBC-10 BUILDING. | | | 2) SHEETS R-1& R-3: INDICATE THE DISCHARGE OR | | | TERMINATION LOCATIONS OF THE CONDENSATE PIPING FROM ALL | | | COMPONENTS OF THE REFRIGERATION SYSTEMS INCLUDING THE | | | WALK-IN BOXES, CASES, CONDENSERS, CHILLERS, ETC. PLEASE | | | NOTE THAT CONDENSATE FROM COOLING COILS IS PROHIBITED | | | TO DISCHARGE INTO THE SANITARY SYSTEM PER SEC. 90-126 | | | WPB CODE OR ORDINANCES. | | | 3) SHEET R-2: INDICATE THE AMOUNT OF REFRIGERANT IN | | | EACH CIRCUIT SHOWN IN THE SCHEDULES- TABLE 1103.1 AND | | | SECTION 1104.2 FMC-10. | | | 4) SHEET R-8: THE REFRIGERATION ROOF PLAN DETAIL, AND | | | THE MECHANICAL CENTER DIAGRAM ON THE SHEET NEED TO BE | | | ENLARGED FOR CLARITY: PLEASE COMPLY. | | | 5) SHEET R-8: PLEASE REVIEW AND UPDATE THE WIND LOAD | | | DESIGN CRITERIA FOR THE MECHANICAL CENTER TO 170 MPH | | | PER SECTION 1609 FBC-10 BUILDING. | | | 6) PROVIDE WIND LOAD ENGINEERING FOR ATTACHMENT OF THE | | | CONDENSERS AND MECHANICAL CENTER TO THE MAIN STRUCTURE- | | | SECTION 301.12 FMC-10. SUBMIT NOA?S OR FL. PRODUCT | | | APPROVALS FOR THE ROOF STANDS. | | | 7) R-8: PROVIDE A SEQUENCE OF OPERATION FOR THE | | | REFRIGERANT LEAK DETECTOR, AND SUBMIT MANUFACTURER?S | | | SPECIFICATIONS FOR THE DEVICE. | | | 8) PROVIDE THE EFFICIENCY RATINGS FOR CHILLERS 1 & 2- | | | TABLE 503.2.3(7) FBC-10 ENERGY CONSERVATION. | | | | | | CHRISTOPHER COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | | | | | | 2015-05-14 13:42:32 | ROUTED TO MECHANICAL OVER $5000 |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
2 |
Status |
P |
Date |
2015-07-13 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-07-13 |
Time |
08:38 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-07-10 |
Time |
08:38 |
Sent To |
|
|
| Notes |
| 2015-07-13 10:15:34 | PUBLIX REFRIGERATION | | | PERMIT #15050527 | | | 831 VILLAGE BLVD | | | 7/13/15 | | | | | | PROVISOS: THE RE-SUBMITTED PLANS WERE RETURNED WITHOUT | | | ADDRESSING ALL 1ST REVIEW COMMENTS. I AM APPROVING THE | | | PLANS WITH EXCEPTION, HOWEVER REVISIONS TO THE | | | PERMITTED PLANS ARE REQUIRED. PLEASE PROVIDE: | | | | | | 1) SHEET R8: ENLARGED MECHANICAL CENTER LAYOUT PLANS | | | IDENTIFYING ALL COMPONENTS OF THE STRUCTURE, AND | | | EQUIPMENT CONTAINED WITHIN. | | | 2) UPDATED SHOP DRAWINGS FOR THE MECHANICAL CENTER TO | | | MEET THE CURRENT WIND LOAD DESIGN CRITERIA IN | | | ACCORDANCE WITH SECTION1609 FLORIDA BUILDING CODE 2010. | | | THE DRAWINGS SHALL BE REVIEWED AND APPROVED BY THE | | | ARCHITECT OF RECORD. | | | 3) CERTIFICATION OR OTHER DOCUMENTATION TO VERIFY | | | INSPECTION APPROVAL OF THE PRE-MANUFACTURED CENTER. | | | 4) SEQUENCE OF OPERATION FOR THE REFRIGERANT LEAK | | | DETECTOR IN THE MECHANICAL CENTER, AND A SUBMITTAL FOR | | | THE DEVICE REVIEWED AND APPROVED BY THE DESIGN | | | PROFESSIONAL OF RECORD. | | | | | | CHRISTOPHER L. COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | | | | |
|
|
| Review Stop |
M |
MECHANICAL (A/C) |
| Rev No |
1 |
Status |
F |
Date |
2015-05-27 |
|
|
Cont ID |
|
| Sent By |
ccole |
Date |
2015-05-27 |
Time |
08:05 |
Rev Time |
0.00 |
| Received By |
ccole |
Date |
2015-05-27 |
Time |
08:08 |
Sent To |
|
|
| Notes |
| 2015-05-27 08:07:38 | 1ST MECHANICAL REVIEW | | | | | | 1) THE PLANS SHALL BE SIGNED AND SEALED BY THE ENGINEER | | | OF RECORD- SECTION 105.3.1.2(5) WPB AMENDMENTS TO THE | | | FBC-10 BUILDING. | | | 2) SHEETS R-1& R-3: INDICATE THE DISCHARGE OR | | | TERMINATION LOCATIONS OF THE CONDENSATE PIPING FROM ALL | | | COMPONENTS OF THE REFRIGERATION SYSTEMS INCLUDING THE | | | WALK-IN BOXES, CASES, CONDENSERS, CHILLERS, ETC. PLEASE | | | NOTE THAT CONDENSATE FROM COOLING COILS IS PROHIBITED | | | TO DISCHARGE INTO THE SANITARY SYSTEM PER SEC. 90-126 | | | WPB CODE OR ORDINANCES. | | | 3) SHEET R-2: INDICATE THE AMOUNT OF REFRIGERANT IN | | | EACH CIRCUIT SHOWN IN THE SCHEDULES- TABLE 1103.1 AND | | | SECTION 1104.2 FMC-10. | | | 4) SHEET R-8: THE REFRIGERATION ROOF PLAN DETAIL, AND | | | THE MECHANICAL CENTER DIAGRAM ON THE SHEET NEED TO BE | | | ENLARGED FOR CLARITY: PLEASE COMPLY. | | | 5) SHEET R-8: PLEASE REVIEW AND UPDATE THE WIND LOAD | | | DESIGN CRITERIA FOR THE MECHANICAL CENTER TO 170 MPH | | | PER SECTION 1609 FBC-10 BUILDING. | | | 6) PROVIDE WIND LOAD ENGINEERING FOR ATTACHMENT OF THE | | | CONDENSERS AND MECHANICAL CENTER TO THE MAIN STRUCTURE- | | | SECTION 301.12 FMC-10. SUBMIT NOA?S OR FL. PRODUCT | | | APPROVALS FOR THE ROOF STANDS. | | | 7) R-8: PROVIDE A SEQUENCE OF OPERATION FOR THE | | | REFRIGERANT LEAK DETECTOR, AND SUBMIT MANUFACTURER?S | | | SPECIFICATIONS FOR THE DEVICE. | | | 8) PROVIDE THE EFFICIENCY RATINGS FOR CHILLERS 1 & 2- | | | TABLE 503.2.3(7) FBC-10 ENERGY CONSERVATION. | | | | | | CHRISTOPHER COLE | | | MECHANICAL PLANS EXAMINER | | | 561-805-6719 | | | [email protected] | | | | | | |
|
|
|