Plan Review Stops For Permit 15050407
Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-05-23 Cont ID  
Sent By rmcdouga Date 2015-05-23 Time 08:25 Rev Time 0.00
Received By rmcdouga Date 2015-05-23 Time 08:25 Sent To  
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-05-23 Cont ID  
Sent By rmcdouga Date 2015-05-23 Time 08:25 Rev Time 0.00
Received By rmcdouga Date 2015-05-23 Time 08:25 Sent To  
Notes
***NONE***

Review Stop G GAS REVIEW
Rev No 1 Status N Date 2015-05-20 Cont ID  
Sent By tklarge Date 2015-05-20 Time 04:31 Rev Time 0.00
Received By tklarge Date 2015-05-20 Time 04:31 Sent To  
Notes
2015-05-20 04:33:34A GAS PLAN HAS NOT BEEN INCLUDED IN THIS SUBMITTAL
 PACKAGE. A GAS PLAN REVIEW HAS NOT BEEN PERFORMED AT
 THIS TIME. A GAS PERMIT IS REQUIRED FOR A CONTRACTOR TO
 PERFORM THE RELATED WORK. PROVIDE COMPLETE PLANS AND
 GAS RISER THAT REFLECTS THE ENTIRE SCOPE OF GAS WORK TO
 BE DONE AT THIS TIME OR PLACE A NOTE ON THE PLAN THAT
 THE GAS INSTALLATION WILL BE DONE UNDER A SEPARATE
 PERMIT. WPB AMEND. TO FBC SEC. 107.2.1

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-05-23 Cont ID  
Sent By rmcdouga Date 2015-05-23 Time 08:25 Rev Time 0.00
Received By rmcdouga Date 2015-05-12 Time 10:58 Sent To  
Notes
2015-05-13 10:58:59SENT TO ZONING SHELF FOR REVIEW. JG.

Review Stop P PLUMBING
Rev No 2 Status P Date 2015-06-05 Cont ID  
Sent By tklarge Date 2015-06-05 Time 06:36 Rev Time 0.00
Received By tklarge Date 2015-06-05 Time 06:24 Sent To Z
Notes
***NONE***

Review Stop P PLUMBING
Rev No 1 Status F Date 2015-05-20 Cont ID  
Sent By tklarge Date 2015-05-20 Time 04:30 Rev Time 0.00
Received By tklarge Date 2015-05-20 Time 03:22 Sent To  
Notes
2015-05-20 04:30:361) SUBMIT A COPY OF THE PUMP PERFORMANCE CURVE FROM THE
 MANUFACTURE.WPB AMEND. TO 2010 FBC SEC. 107.2.1.
 2) INDICATE THE TOTAL DYNAMIC HEAD OF THE SYSTEM PER
 2010 FBC SEC.424.1.6.5.4. SUBMIT CALCULATIONS AS TO HOW
 THE T.D.H. WAS DETERMINED. WPB AMEND. TO 2010 FBC SEC.
 107.2.1.
 30 SHT. 3 OF 3 REFERS TO FBC SEC. 403.9. THERE IS NO
 SUCH CODE SECTION IN THE FBC. CLARIFY.
  
 PLUMBING PLAN REVIEW
 TIM LARGE
 CHIEF PLUMBING INSPECTOR
 561-805-6692
 [email protected]
  
  

Review Stop Z ZONING
Rev No 2 Status P Date 2015-06-08 Cont ID  
Sent By sgraham Date 2015-06-08 Time 15:58 Rev Time 0.00
Received By sgraham Date 2015-06-08 Time 15:58 Sent To B
Notes
***NONE***

Review Stop Z ZONING
Rev No 1 Status F Date 2015-05-13 Cont ID  
Sent By sgraham Date 2015-05-13 Time 14:55 Rev Time 0.00
Received By sgraham Date 2015-05-13 Time 14:55 Sent To B
Notes
2015-05-13 14:57:265/13/15 ZONING FAILED
 1. SUBMIT A SIGNED AND SEALED SITE PLAN SHOWING THE
 LOCATION OF THE HOUSE & POOL