| Plan Review Stops For Permit 15050186 |
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
2 |
Status |
P |
Date |
2015-05-27 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-05-27 |
Time |
11:37 |
Rev Time |
0.00 |
| Received By |
skennedy |
Date |
2015-05-27 |
Time |
11:37 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
B |
BUILDING (STRUCTURAL) |
| Rev No |
1 |
Status |
F |
Date |
2015-05-21 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-05-21 |
Time |
14:31 |
Rev Time |
|
| Received By |
skennedy |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2015-05-21 14:31:16 | 1ST REVIEW: FBC 2010 | | | | | | IT IS ANTICIPATED THAT ADDITIONAL INFORMATION OR A | | | REDESIGN WILL BE PROVIDEDD AS TO THE SIGN BASE AS A | | | FUNCTION OF THE ZONING COMMENTS. I EXPECT THE SIGN BASE | | | DRAWING TO CHANGE. THE CRITERIA IS ACCEPTABLE, BUT | | | AGAIN, THE DRAWINGS ARE EXPECTED TO CHANGE. ALSO, UPON | | | SUBMITTAL OF ADDITIONAL INFORMATION, MORE EXTENSIVE | | | REVIEW CAN BE ACCOMPLISHED AS TO APPLICABLE SITE | | | CONSTRAINTS. | | | | | | STEVEN KENNEDY, CBO | | | CHIEF PLANS EXAMINER | | | (561) 805-6710 | | | [email protected] | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
P |
Date |
2015-05-28 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2015-05-28 |
Time |
16:10 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-05-28 |
Time |
16:10 |
Sent To |
|
|
| Notes |
| 2015-05-28 16:22:53 | 5/29/2015 | | | PROJECT: BICYCLE SHARING PROGRAM SOLAR PHOTO VOLTAIC | | | BIKE RACK AND SIGN | | | PERMIT#:15050186 | | | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC | | | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | 2ND ELECTRICAL PLAN REVIEW | | | ACTION: APPROVED WITH EXCEPTION. THE PLANS HAVE BEEN | | | APPROVED PROVISIONALLY. FAILURE TO CORRECT THE LISTED | | | DEFICIENCIES PRIOR TO INSPECTION WILL RESULT IN FAILED | | | INSPECTION(S) AND THE ASSESSMENT OF RE-INSPECTION | | | FEE(S). | | | | | | 1) PROVIDE MANUFACTURERS PRODUCT APPROVAL DATA FOR | | | NEXTBIKE INDICATING INSTALLATION INSTRUCTIONS AND | | | DESIGN DOCUMENTS IN COMPLIANCE WITH ALL APPLICABLE | | | SECTIONS OF THE NATIONAL ELECTRICAL CODE ARTICLE 690, | | | | | | 3) PROVIDE MANUFACTURER PRODUCT LISTING FOR THE | | | NEXTBIKE COMPLETE ASSEMBLY OF ALL ELECTRICALLY | | | CONNECTED COMPONENTS FROM AN APPROVED US NATIONALLY | | | RECOGNIZED TESTING LABORATORY IN COMPLIANCE WITH THE | | | NATIONAL ELECTRICAL CODE ARTICLE 110.3 | | | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2015-05-19 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2015-05-19 |
Time |
17:09 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-05-19 |
Time |
17:09 |
Sent To |
|
|
| Notes |
| 2015-05-19 17:09:52 | 5/19/2015 | | | PROJECT: BICYCLE SHARING PROGRAM SOLAR PHOTO VOLTAIC | | | BIKE RACK AND SIGN | | | PERMIT#:15050186 | | | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC | | | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | 1ST ELECTRICAL PLAN REVIEW | | | ACTION: DENIED | | | | | | REVISE YOUR PLANS IN RESPONSE TO THE FOLLOWING REVIEW | | | COMMENTS: | | | | | | 1) PROVIDE MANUFACTURERS PRODUCT APPROVAL DATA | | | INDICATING INSTALLATION INSTRUCTIONS AND COMPLETE | | | COMPLIANCE WITH ALL APPLICABLE SECTIONS OF THE NATIONAL | | | ELECTRICAL CODE ARTICLE 690, | | | | | | 2) PROVIDE MANUFACTURER PRODUCT APPROVAL DATA ON THE | | | SIGN IN COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE | | | ARTICLE 600 | | | | | | 3) PROVIDE MANUFACTURER PRODUCT LISTING FROM AN | | | APPROVED US NATIONALLY RECOGNIZED TESTING LABRATORY IN | | | COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE ARTICLE | | | 110.(3) | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. SEE LINK: | | | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ | | | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF | | | | | | ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED | | | PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE | | | PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE | | | REVIEW. | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-05-28 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2015-05-28 |
Time |
16:23 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-05-22 |
Time |
|
Sent To |
|
|
| Notes |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-05-21 |
|
|
Cont ID |
|
| Sent By |
skennedy |
Date |
2015-05-21 |
Time |
14:31 |
Rev Time |
|
| Received By |
skennedy |
Date |
|
Time |
|
Sent To |
|
|
| Notes |
| 2015-05-15 15:28:39 | TO STEVE K. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
3 |
Status |
P |
Date |
2016-04-05 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2016-04-05 |
Time |
08:26 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2016-04-05 |
Time |
08:26 |
Sent To |
|
|
| Notes |
| 2016-09-15 09:45:37 | AD PANEL AUTHORIZED WITH MAXIMUM HEIGHT OF 7'-4" | | 2016-04-05 08:33:01 | THE MAYOR AUTHORIZED THE INSTALLATION OF A TEST PANEL | | | AT THE 300 BLOCK OF CLEMATIS LOCATION. STAFF (UYEN KAHN | | | AND ANA APONTE) MET ON SITE WITH THE CONTRACTOR AL | | | RATHBUN TO DETERMINE THE LOCATION OF THE PANEL. THE | | | TEST PANEL WILL BE INSTALLED ACCORDING TO THE DETAIL | | | INCLUDED IN THE PERMIT. THE PANEL MAY REMAIN IN PLACE | | | UNTIL THE AGREEMENT WITH THE CITY IS MODIFIED. IF THE | | | CITY DECIDES THE PANEL SIZE IS NOT ACCEPTABLE, THE | | | PANEL SHALL BE REMOVED WITHIN 36 HOURS OF OFFICIAL | | | NOTIFICATION. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
2 |
Status |
P |
Date |
2015-05-26 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2015-05-26 |
Time |
14:19 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2015-05-26 |
Time |
14:19 |
Sent To |
|
|
| Notes |
| 2015-05-26 14:20:47 | PROVISO: AD PANEL NOT INCLUDED IN THIS APPROVAL. CITY | | | COMMISSION APPROVAL REQUIRED FOR THE PROPOSED AD PANEL. |
|
|
| Review Stop |
Z |
ZONING |
| Rev No |
1 |
Status |
F |
Date |
2015-05-15 |
|
|
Cont ID |
|
| Sent By |
aaponte |
Date |
2015-05-15 |
Time |
15:27 |
Rev Time |
0.00 |
| Received By |
aaponte |
Date |
2015-05-15 |
Time |
15:27 |
Sent To |
|
|
| Notes |
| 2015-05-15 15:28:24 | 1. ADVERTISEMENT PANEL EXCEEDS THE DIMENSIONS APPROVED | | | BY THE AGREEMENT SIGNED WITH THE CITY. SIZE APPROVED IS | | | 5' BY 3.5'; PROPOSED IS 8' BY 4.5'. | | | 2. PLEASE INDICATE THE EXACT DIMENSION OF THE PROPOSED | | | STATION, FIX PORTIONS AND WITH BIKES DOCKED. | | | 3. WHAT IS THE CLEARANCE PROVIDED BETWEEN THE PARKED | | | BIKES AND THE EXISTING STREETSCAPE ELEMENTS? | | | FOR ADDITIONAL INFORMATION PLEASE CONTACT ANA MARIA | | | APONTE AT 561-822-1439. |
|
|