| 2015-06-29 11:06:36 | 6/29/2015 | | | PROJECT: MOLLY'S TROLLYS | | | PERMIT#:15041009 | | | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC | | | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | 3RD ELECTRICAL PLAN REVIEW | | | ACTION: APPROVED WITH EXCEPTION. THE PLANS HAVE BEEN | | | APPROVED PROVISIONALLY. FAILURE TO CORRECT THE LISTED | | | DEFICIENCIES PRIOR TO INSPECTION WILL RESULT IN FAILED | | | INSPECTION(S) AND THE ASSESSMENT OF RE-INSPECTION | | | FEE(S). | | | | | | 1) MANUFACTURER'S PRODUCT APPROVALS INDICATING THE | | | POWER AND LISTING REQUIREMENTS FOR ALL OF THE | | | COMPONENETS INVOLVED. | | | | | | 2) NEC 514.11 CIRCUIT DISCONNECTS. | | | (A) GENERAL. EACH CIRCUIT LEADING TO OR THROUGH | | | DISPENSING EQUIPMENT, INCLUDING EQUIPMENT FOR REMOTE | | | PUMPING SYSTEMS, SHALL BE PROVIDED WITH A CLEARLY | | | IDENTIFIED AND READILY ACCESSIBLE SWITCH OR OTHER | | | ACCEPTABLE MEANS, LOCATED REMOTE FROM THE DISPENSING | | | DEVICES, TO DISCONNECT SIMULTANEOUSLY FROM THE SOURCE | | | OF SUPPLY, ALL CONDUCTORS OF THE CIRCUITS, INCLUDING | | | THE GROUNDED CONDUCTOR, IF ANY. SINGLE-POLE BREAKERS | | | UTILIZING HANDLE TIES SHALL NOT BE PERMITTED. | | | | | | (B) ATTENDED SELF-SERVICE MOTOR FUEL DISPENSING | | | FACILITIES. EMERGENCY CONTROLS AS SPECIFIED IN | | | 514.11(A) SHALL BE INSTALLED AT A LOCATION ACCEPTABLE | | | TO THE AUTHORITY HAVING JURISDICTION, BUT CONTROLS | | | SHALL NOT BE MORE THAN 30 M (100 FT) FROM DISPENSERS. | | | [30A:6.7.1] | | | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
2 |
Status |
F |
Date |
2015-06-09 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2015-06-09 |
Time |
16:57 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-06-09 |
Time |
16:57 |
Sent To |
|
|
| Notes |
| 2015-06-09 16:57:01 | 5/2/2015 | | | PROJECT: MOLLY'S TROLLYS | | | PERMIT#:15041009 | | | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC | | | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | 1ST ELECTRICAL PLAN REVIEW | | | ACTION: DENIED | | | | | | PLEASE PROVIDE ELECTRICAL PLANS AND SPECIFICATIONS THAT | | | CLEARLY INDICATE THE ENTIRE ESCOPE OF THE PROJECT | | | INCLUDING BUT NOT LIMITED TO THE FOLLOWING: | | | | | | 1) MANUFACTURER'S PRODUCT APPROVALS INDICATING THE | | | POWER AND LISTING REQUIREMENTS FOR ALL OF THE | | | COMPONENETS INVOLVED. | | | 2) A SITE PLAN INDICATING THE LOCATION OF THE SOURCE OF | | | POWER INCLUDING A PANEL SCHEDULE WITH THE ELECTRICAL | | | CIRCUITS OCPD AND WIRE SIZES PROPOSED. | | | 3) A SITE PLAN INDICATING THE LOCATIONS FOR THE PUMPS, | | | DISPENSER(S) CONTROLERS, DISCONNECTS AND EPO'S | | | (EMERGENCY POWER OFF), | | | 4) A SITE PLAN INDICATING THE LOCATIONS, PHOTOMETRIC | | | DETAIL AND CIRCUITING OF THE LUMINAIRS (EXISTING OR | | | NEW) FOR ILLUMINATION OF THE EQUIPMENT. | | | 5) A DETAILED PIPING AND CIRCUITING PLAN INDICATING THE | | | ELECTRICAL CONNECTION OF ALL THE AFOREMENTIONED | | | COMPONENETS BETWEEN THE SOURCE AND LOADS FOR THE ENTIRE | | | SCOPE OF WORK PROPOSED. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. SEE LINK: | | | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ | | | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF | | | | | | ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED | | | PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE | | | PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE | | | REVIEW. | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | | | | | | | | | | | | | |
|
|
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
F |
Date |
2015-05-02 |
|
|
Cont ID |
|
| Sent By |
|
Date |
2015-05-02 |
Time |
13:27 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-05-02 |
Time |
13:20 |
Sent To |
FIRE |
|
| Notes |
| 2015-05-02 13:50:31 | 5/2/2015 | | | PROJECT: | | | PERMIT#: | | | CODE: 2008 EDITION OF THE NEC, 2010 EDITION OF THE FBC | | | ,2010 WPB AMENDMENTS TO THE FBC, CHAPTER 1, | | | ADMINISTRATION, 2012 FBC SUPPLEMENTS. | | | ELECTRICAL PLAN REVIEW | | | ACTION: | | | | | | NO ELECTRICAL PLANS OR SPECIFICATIONS HAVE BEEN | | | PROVIDED. PLEASE PROVIDE ELECTRICAL PLANS AND | | | SPECIFICATIONS THAT CLEARLY INDICATE THE ENTIRE ESCOPE | | | OF THE PROJECT INCLUDING BUT NOT LIMITED TO THE | | | FOLLOWING: | | | | | | 1) MANUFACTURER'S PRODUCT APPROVALS INDICATING THE | | | POWER AND LISTING REQUIREMENTS FOR ALL OF THE | | | COMPONENETS INVOLVED. | | | 2) A SITE PLAN INDICATING THE LOCATION OF THE SOURCE OF | | | POWER INCLUDING A PANEL SCHEDULE WITH THE ELECTRICAL | | | CIRCUITS OCPD AND WIRE SIZES PROPOSED. | | | 3) A SITE PLAN INDICATING THE LOCATIONS FOR THE PUMPS, | | | DISPENSER(S) CONTROLERS, DISCONNECTS AND EPO'S | | | (EMERGENCY POWER OFF), | | | 4) A SITE PLAN INDICATING THE LOCATIONS, PHOTOMETRIC | | | DETAIL AND CIRCUITING OF THE LUMINAIRS (EXISTING OR | | | NEW) FOR ILLUMINATION OF THE EQUIPMENT. | | | 5) A DETAILED PIPING AND CIRCUITING PLAN INDICATING THE | | | ELECTRICAL CONNECTION OF ALL THE AFOREMENTIONED | | | COMPONENETS BETWEEN THE SOURCE AND LOADS FOR THE ENTIRE | | | SCOPE OF WORK PROPOSED. | | | | | | WHEN RESUBMITTING, IT IS HELPFUL TO PROVIDE A RESPONSE | | | LETTER ADDRESSING EACH ITEM ALONG WITH THE CITY | | | RE-SUBMITTAL FORM. SEE LINK: | | | HTTP://WPB.ORG/DEVELOPMENT/WP-CONTENT/UPLOADS/SITES/33/ | | | 2013/09/APPLICATION_RESUBMITTAL_FORM_04132010.PDF | | | | | | ADDITIONALLY, IT IS REQUIRED TO INSERT THE CORRECTED | | | PAGES INTO THE DENIED SUBMITTAL PACKAGE. VOID THE | | | PREVIOUSLY REVIEWED SHEETS AND LEAVE FOR COMPARATIVE | | | REVIEW. | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] | | | | | | | | | | | | | | | |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
2 |
Status |
P |
Date |
2015-06-04 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-06-04 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-06-04 |
Time |
15:44 |
Sent To |
E |
|
| Notes |
|
|
| Review Stop |
FIRE |
FIRE DEPARTMENT |
| Rev No |
1 |
Status |
F |
Date |
2015-05-04 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-05-04 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-05-04 |
Time |
10:53 |
Sent To |
|
|
| Notes |
| 2015-05-04 11:51:57 | THIS PLAN WAS REVIEWED AND FAILED BY PETER LEDUC, FIRE | | | MARSHAL, WITH THE FOLLOWING COMMENTS: | | | | | | PROVIDE DIMENSIONS FROM EACH PROPERTY LINE. | | | | | | PROVIDE INFORMATION INDICATING THAT THE TANK IS DOUBLED | | | WALLED. | | | | | | PROVIDE PIPING DETAIL FOR DISPENSER AND TANK. | | | | | | PROVIDE LOCATION OF EMERGENCY SHUT OFF. | | | | | | PROVIDE LOCATION OF FIRE EXTINGUISHERS. | | | | | | PROVIDE LOCATION OF NO SMOKING SIGNS. | | | | | | TANK SHALL BE ENCLOSED IN A FENCE IF THE ENTIRE | | | PROPEORTY IS NOT FENCED. PROVIDE NOTE INDICATING FENCE. | | | | | | ALL INSTALLATONS SHALL COMPLY WITH NFPA 1, 101, 30A AND | | | 58. | | | THE PROPOSED PROJECT SHALL MEET THE REQUIREMENTS OF THE | | | 5TH EDITION OF FLORIDA FIRE PREVENTION CODE INCLUDING | | | THE 2012 EDITION OF NFPA 1 AND NFPA 101 AND ALL OTHER | | | APPLICABLE CODES OR STANDARDS. | | | FIRE EXTINGUISHERS SHALL COMPLY WITH THE REQUIREMENTS | | | OF NFPA 10, 2010 EDITION. | | | ELECTRIC WORK SHALL COMPLY WITH NFPA 70, 2011 EDITION. | | | NFPA 58, LIQUEFIED PETROLEUM GAS CODE, 2011 EDITION. | | | NFPA 30A, CODE FOR MOTOR FUEL DISPENSING FACILITIES AND | | | REPAIR GARAGES, 2012 EDITION. |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
4 |
Status |
P |
Date |
2015-07-18 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-07-18 |
Time |
05:17 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-07-18 |
Time |
05:08 |
Sent To |
|
|
| Notes |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
3 |
Status |
F |
Date |
2015-06-23 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-06-23 |
Time |
04:31 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-06-23 |
Time |
04:06 |
Sent To |
|
|
| Notes |
| 2015-06-23 04:30:53 | THE ENGINEER'S SEAL AND SIGNATURE FOR THE TANK TIE-DOWN | | | ARE COPIES. COMPLY WITH FL. ADMIN. CODE RULE | | | 61G15-23.002 FOR THE REQUIREMENTS FOR THE ENGINEER'S | | | SEAL AND SIGNATURE. | | | | | | I SUGGEST SOMEONE CONTACT ME AT 561-805-6692 TO DISCUSS | | | THE ABOVE COMMENT AS IT SEEMS THERE IS SOME CONFUSION | | | AS TO WHAT IS REQUIRED REGARDING THE ENGINEER'S SEAL. | | | NOTE: I SPOKE TO KELLY AT AMERIGAS ON 6/23/15 @8:35 AM | | | AND EXPLAINED TO HIM WHAT WAS NEEDE TO COMPLY W/STATE | | | ADMINISTRATIVE CODE RULE. HE STATED HE WOULD GET IT | | | TAKEN CARE OF. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
2 |
Status |
F |
Date |
2015-06-04 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-06-04 |
Time |
08:31 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-06-04 |
Time |
06:18 |
Sent To |
FIRE |
|
| Notes |
| 2015-06-04 06:59:16 | 1) SUBMIT TIE-DOWN ENGINEERING FOR THE PROPANE TANK PER | | | 2010 FBC-FUEL GAS SEC. 301.10.THE RESPONSE FROM | | | AMERIGAS STATES THERE ARE SIGNED AND SEALED DRAWINGS | | | FROM AN ENGINEER BUT THERE ARE NO DRAWINGS FOR THE | | | ANCHORING OF THE TANK FROM AN ENGINEER. CLARIFY. 2ND | | | REQUEST. | | | 2) THE PLAN FROM SUPERIOR ENERGY SYSTEMS IS SIGNED AND | | | SEALED BY AN ENGINEER REGISTERED IN THE THE STAE OF | | | OHIO. THIS IS UNACCEPTABLE. IF THE DOCUMENTS ARE GOING | | | TO BE SIGNED AND SEALED BY AN ENGINEER, THE ENGINEER | | | SHALL BE REGISTERED IN THE STATE OF FLORIDA PER F.S> | | | 471 & FL. ADMIN. CODE RULE 61G15-23.002. | | | 3) THE SUBMITTED PLANS DO NOT SHOW COMPLIANCE WITH THE | | | FOLLOWING REQUIREMENTS OF NFPA 58. PLEASE SHOW | | | COMPLIANCE WITH THE FOLLOWING CODE SECTION REQUIREMENTS | | | ON THE PLANS. IDENTIFY ALL COMPONENTS OF THE PIPING | | | SYSTEM: | | | A) THE FUEL DISPENSER SHALL BE INSTALLED IN ACCORDANCE | | | WITH THE MANUFACTURER'S INSTALLATION INSTRUCTIONS PER | | | NFPA 58 SEC.6.22.3.1. SUBMIT TWO COPIES OF THE | | | INSTALLATION INSTRUCTIONS. | | | B) THE PIPING AND THE DISPENSING HOSE SHALL BE PROVIDED | | | WITH HYDROSTATIC RELIEF VALVES PER NFPA 58 SEC. | | | 6.22.3.6 & NFPA SEC. 6.11. | | | C) AN IDENTIFIED AND ACCESSIBLE SWITCH SHALL BE | | | INSTALLED AT A LOCATION NOT LESS THAN 20 FT. OR MORE | | | THAN 100 FT. FROM THE DISPENSING DEVICE TO SHUT OFF THE | | | POWER PER NFPA 58 SEC. 6.22.3.11. SHOW THE DISTANCE OF | | | THE EMERGENCY SHUTOFF SWITCH FROM THE DISPENSER. | | | D) THE HOSE LENGTH FROM THE DISPENSER SHALL NOT EXCEED | | | 18 FT. NFPA 58 SEC. 6.222.4.1 (1). ALL HOSES SHALL | | | LISTED FOR USE WITH LP GAS. | | | E) A LISTED EMERGENCY BREAKAWAY DEVICE COMPLYING WITH | | | UL 567 SHALL BE INSTALLED ON THE DISPENSER HOSE.NFPA 58 | | | SEC.6.22.4.2. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | | | | |
|
|
| Review Stop |
G |
GAS REVIEW |
| Rev No |
1 |
Status |
F |
Date |
2015-05-02 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2015-05-02 |
Time |
04:56 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-05-02 |
Time |
04:03 |
Sent To |
E |
|
| Notes |
| 2015-05-02 04:55:38 | 1) SUBMIT DOCUMENTATION THAT THE PLAN HAS BEEN SPPROVED | | | BY THE DEPT. OF AGRICULTURE, DIVISION OF LP GAS. WPB | | | AMENDMENTS TO 2010 FBC SEC.102.1.2, 107.2.1. | | | 2) THE VALUE OF THIS PROJECT SEEMS LOW. SUBMIT A COPY | | | OF THE SIGNED CONTRACT PER THE WPB AMENDMENTS TO 2010 | | | FBC SEC. 109.3. | | | 3) SUBMIT A SITE PLAN THAT IS LARGER AND LEGIBLE AND | | | SHOWS ALL DETAILS. WPB AMENDMENTS TO 2010 FBC SEC. | | | 107.2.1. | | | 4) SUBMIT CLEAR AND LEGIBLE SPECIFICATION SHEETS FOR | | | THE LP TANK.WPB AMENDMENTS TO 2010 FBC SEC. 107.2.1. | | | 5) DOCUMENTS THAT BEAR THE NAME AND TITLE BLOCK OF AN | | | ENGINEER SHALL BE SIGNED AND SEALED BY THAT DESIGN | | | PROFESSIONAL PER THE FL. ADMINISTRATIVE CODE. | | | SEC.61G15-23.002. SEE SHEET FROM RUSSEL PERLITA OF | | | BERLIN DRAFTING AND ALSO FROM R.F. TUCKER FROM TIE-DOWN | | | ENGINEERING | | | 6) SUBMIT DETAILS FOR THE BOLLARDS.SHOW HEIGHT ABOVE | | | GROUND, DEPTH IN GROUND, ARE DIRECT BURIAL OR IN | | | CONCRETE. IF IN CONCRETE SUPPLY DETAILS. SHOW DIAMETER | | | OF THE BOLLARDS AND THE CENTER TO CENTER SPACING OF THE | | | BOLLARDS AROUND THE TANK. WPB AMENDMENTS TO 2010 FBC | | | SEC. 107.2.1. | | | 7) SUBMIT PIPING DETAILS FOR THE PIPING FROM THE TANK | | | TO THE DISPENSER AND SUBMIT MANUF. SPECS THAT SHOW THE | | | CONNECTION DIAGRAM TO THE PUMP. WPB AMENDMENTS TO 2010 | | | FBC SEC. 107.2.1. | | | 8) CLEARLY SHOW THE LOCATION OF THE DISPENSER ON THE | | | SITE PLAN. | | | 9) INSTALLATION SHALL COMPLY WITH NFPA 58 FOR THE | | | INSTALLATION OF THE TANK & DISPENSER. | | | | | | PLUMBING PLAN REVIEW | | | TIM LARGE | | | CHIEF PLUMBING INSPECTOR | | | 561-805-6692 | | | [email protected] | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
4 |
Status |
N |
Date |
2015-07-18 |
|
|
Cont ID |
|
| Sent By |
tklarge |
Date |
2015-07-18 |
Time |
05:17 |
Rev Time |
0.00 |
| Received By |
tklarge |
Date |
2015-07-18 |
Time |
05:17 |
Sent To |
|
|
| Notes |
| 2015-07-17 12:43:19 | TLARGE DESK |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
3 |
Status |
N |
Date |
2015-06-29 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2015-06-29 |
Time |
10:56 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-06-22 |
Time |
19:23 |
Sent To |
|
|
| Notes |
| 2015-06-22 19:24:02 | RE-SUBMITTAL SENT TO TIM LARGE FOR REVIEW. JG. |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
2 |
Status |
N |
Date |
2015-06-09 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2015-06-09 |
Time |
16:57 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-06-02 |
Time |
16:05 |
Sent To |
|
|
| Notes |
| 2015-06-02 16:05:44 | TO PLUMBING | | | |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-05-04 |
|
|
Cont ID |
|
| Sent By |
pleduc |
Date |
2015-05-04 |
Time |
|
Rev Time |
0.00 |
| Received By |
pleduc |
Date |
2015-05-02 |
Time |
04:56 |
Sent To |
|
|
| Notes |
| 2015-04-27 15:38:35 | ROUTED TO PLUMBING LESS THAN $5000 |
|
|