| Plan Review Stops For Permit 15040809 |
| Review Stop |
E |
ELECTRICAL |
| Rev No |
1 |
Status |
P |
Date |
2015-05-04 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2015-05-04 |
Time |
10:23 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-05-04 |
Time |
10:23 |
Sent To |
|
|
| Notes |
| 2015-05-04 10:33:11 | THE PLANS HAVE BEEN APPROVED PROVISIONALLY. FAILURE TO | | | CORRECT THE LISTED DEFICIENCIES PRIOR TO INSPECTION | | | WILL RESULT IN FAILED INSPECTION(S) AND THE ASSESSMENT | | | OF RE-INSPECTION FEE(S). | | | | | | 1) PROVIDE A MAIN SERVICE DISCONNECT AT A READILY | | | ACCESSIBLE LOCATION NEAREST THE POINT OF ENTRANCE OF | | | THE SERVICE CONDUCTORS. NEC 230.70 | | | | | | 2) AN INTERSYSTEM BONDING TERMINATION FOR CONNECTING | | | INTERSYSTEM BONDING AND GROUNDING CONDUCTORS REQUIRED | | | FOR OTHER SYSTEMS SHALL BE PROVIDED EXTERNAL TO | | | ENCLOSURES AT THE SERVICE EQUIPMENT AND AT THE | | | DISCONNECTING MEANS FOR ANY ADDITIONAL BUILDINGS OR | | | STRUCTURES. NEC 250.94. | | | | | | 3) THE NON?CURRENT-CARRYING METAL PARTS OF EQUIPMENT | | | INDICATED IN 250.92(A)(1) AND (A)(2) SHALL BE BONDED | | | TOGETHER. NEC 250.92 | | | | | | | | | DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421, | | | 561-805-6717 OR [email protected] |
|
|
| Review Stop |
I |
INCOMING/PROCESSING |
| Rev No |
1 |
Status |
N |
Date |
2015-05-04 |
|
|
Cont ID |
|
| Sent By |
dhayes |
Date |
2015-05-04 |
Time |
10:23 |
Rev Time |
0.00 |
| Received By |
dhayes |
Date |
2015-04-22 |
Time |
12:54 |
Sent To |
|
|
| Notes |
| 2015-04-22 12:54:21 | ROUTED TO ELEC $5000 & UNDER |
|
|
|