Review Stop B BUILDING (STRUCTURAL)
Rev No 1 Status P Date 2015-04-22 Cont ID  
Sent By shill Date 2015-04-22 Time 18:30 Rev Time 0.00
Received By shill Date 2015-04-22 Time 18:30 Sent To E
Notes
***NONE***

Review Stop E ELECTRICAL
Rev No 1 Status P Date 2015-05-02 Cont ID  
Sent By dhayes Date 2015-05-02 Time 14:49 Rev Time 0.00
Received By dhayes Date 2015-05-02 Time 14:49 Sent To  
Notes
2015-05-02 14:57:11APPROVED WITH EXCEPTION.
 THE PLANS HAVE BEEN APPROVED PROVISIONALLY. FAILURE TO
 CORRECT THE LISTED DEFICIENCIES PRIOR TO INSPECTION
 WILL RESULT IN FAILED INSPECTION(S) AND THE ASSESSMENT
 OF RE-INSPECTION FEE(S).
  
 1) THE VALUE OF THE PROJECT PROPOSED ON THE PERMIT
 APPLICATION APPEARS TO BE LOW. PLEASE PROVIDE
 ADDITIONAL DOCUMENTATION TO SUPPORT THE VALUE GIVEN.
 ALL ELEMENTS LISTED IN THE CODE ARTICLE BELOW SHALL BE
 INCLUDED IN THE VALUATION OF THE PROJECT.
  
 FBC WPB AMENDMENTS. SECTION 109.3
 IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE
 CLAIMED VALUATION OF BUILDING, ALTERATION, STRUCTURE,
 ELECTRICAL, GAS, MECHANICAL OR PLUMBING SYSTEMS APPEARS
 TO BE UNDERESTIMATED ON THE APPLICATION, THE PERMIT
 SHALL BE DENIED, UNLESS THE APPLICANT CAN SHOW
 DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED
 CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE APPROVAL
 OF THE BUILDING OFFICIAL. FOR PERMITTING PURPOSES,
 VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL
 REPLACEMENT VALUE TO INCLUDE STRUCTURAL, ELECTRIC,
 PLUMBING, MECHANICAL, INTERIOR FINISH, RELATIVE SITE
 WORK, ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. FBC
 WPB AMENDMENTS. SECTION 109.3
  
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR [email protected]

Review Stop I INCOMING/PROCESSING
Rev No 1 Status N Date 2015-05-02 Cont ID  
Sent By dhayes Date 2015-05-02 Time 14:50 Rev Time 0.00
Received By dhayes Date 2015-04-01 Time 14:13 Sent To  
Notes
2015-04-22 18:31:184/22 TO ELEC BOX
  
2015-04-01 14:13:56ROUTED TO ZONING

Review Stop Z ZONING
Rev No 1 Status F Date 2015-04-07 Cont ID  
Sent By jroach Date 2015-04-07 Time 15:05 Rev Time 0.00
Received By jroach Date 2015-04-07 Time 15:05 Sent To B
Notes
2015-05-02 14:58:47COPY OF VALUATION COMMENTS FROM THE ELECTRICAL REVIEW:
  
 1) THE VALUE OF THE PROJECT PROPOSED ON THE PERMIT
 APPLICATION APPEARS TO BE LOW. PLEASE PROVIDE
 ADDITIONAL DOCUMENTATION TO SUPPORT THE VALUE GIVEN.
 ALL ELEMENTS LISTED IN THE CODE ARTICLE BELOW SHALL BE
 INCLUDED IN THE VALUATION OF THE PROJECT.
  
 FBC WPB AMENDMENTS. SECTION 109.3
 IF, IN THE OPINION OF THE BUILDING OFFICIAL, THE
 CLAIMED VALUATION OF BUILDING, ALTERATION, STRUCTURE,
 ELECTRICAL, GAS, MECHANICAL OR PLUMBING SYSTEMS APPEARS
 TO BE UNDERESTIMATED ON THE APPLICATION, THE PERMIT
 SHALL BE DENIED, UNLESS THE APPLICANT CAN SHOW
 DETAILED, QUANTITY ESTIMATES, AND/OR BONA FIDE SIGNED
 CONTRACTS (EXCLUDING LAND VALUE) TO MEET THE APPROVAL
 OF THE BUILDING OFFICIAL. FOR PERMITTING PURPOSES,
 VALUATION OF BUILDINGS AND SYSTEMS SHALL BE TOTAL
 REPLACEMENT VALUE TO INCLUDE STRUCTURAL, ELECTRIC,
 PLUMBING, MECHANICAL, INTERIOR FINISH, RELATIVE SITE
 WORK, ARCHITECTURAL AND DESIGN FEES, MARKETING COSTS,
 OVERHEAD AND PROFIT; EXCLUDING ONLY LAND VALUE.
 VALUATION REFERENCES MAY INCLUDE THE LATEST PUBLISHED
 DATA OF NATIONAL CONSTRUCTION COST ANALYSIS SERVICES
 (MARSHALL-SWIFT, MEANS, ETC.), AS PUBLISHED BY
 INTERNATIONAL CODE CONGRESS. FINAL BUILDING PERMIT
 VALUATION SHALL BE SET BY THE BUILDING OFFICIAL. FBC
 WPB AMENDMENTS. SECTION 109.3
  
 DAVID HAYES, ELECTRICAL PLANS EXAMINER, PX3421,
 561-805-6717 OR [email protected]
2015-04-07 15:05:31ZONING PLAN REVIEW
 ___________________________________________
  
 DATE OF REVIEW: 04.07.2015
 PERMIT NO.: 15040027
 ADDRESS: 951 HANK AARON DRIVE
 CONTRACTOR/CONTACT: ROBERT NUNNO
 TELEPHONE NO.: 954.961.0777
 SCOPE OF REVIEW: CANOPY/AWNING
 ___________________________________________
  
 REVIEW STATUS: FAILED
 ___________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING PLAN
 REVIEW COMMENTS:
  
 1. A SITE PLAN SHALL BE PROVIDED IDENTIFYING THE
 LOCATION OF THE PROPOSED AWNING, DIMENSIONS, ETC.
 ___________________________________________
  
 PLEASE NOTE THAT SUBMITTAL OF ADDITIONAL AND/OR REVISED
 MATERIALS MAY RESULT IN NEW PLAN REVIEW COMMENTS.
 ___________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN ROACH, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 PHONE: 561.822.1448
 FAX: 561.822.1460
  
 EMAIL: [email protected]
  
 WWW.WPB.ORG
  


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved